CN104480863A - Method for mounting and positioning steel anchor beams for constructing cable-stayed bridge main tower - Google Patents

Method for mounting and positioning steel anchor beams for constructing cable-stayed bridge main tower Download PDF

Info

Publication number
CN104480863A
CN104480863A CN201410759994.5A CN201410759994A CN104480863A CN 104480863 A CN104480863 A CN 104480863A CN 201410759994 A CN201410759994 A CN 201410759994A CN 104480863 A CN104480863 A CN 104480863A
Authority
CN
China
Prior art keywords
steel anchor
anchor beam
stayed bridge
bridge main
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410759994.5A
Other languages
Chinese (zh)
Other versions
CN104480863B (en
Inventor
苗林
金仁兴
陈仕頲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201410759994.5A priority Critical patent/CN104480863B/en
Publication of CN104480863A publication Critical patent/CN104480863A/en
Application granted granted Critical
Publication of CN104480863B publication Critical patent/CN104480863B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a method for mounting and positioning steel anchor beams for constructing a cable-stayed bridge main tower. The steel anchor beams are mounted and positioned by using a detachable and reusable steel anchor beam support rack system. The detachable and reusable steel anchor beam support rack comprises a rigid support rack I and chain hoists II, wherein the rigid support rack I is arranged on a mounted No. n steel anchor beam and is used for jacking a No. n+1 steel anchor beam; after a No. n+2 steel anchor beam is mounted, four chain hoists II are mounted on the No. n+2 steel anchor beam; the No. n+1 steel anchor beam is hoisted; the rigid support rack I of the steel anchor beams is demounted; then the chain hoists II are used for putting the No. n+1 steel anchor beam in place. According to the detachable and reusable support rack system comprising the rigid support rack and the chain hoists, the steel anchor beams are mounted and positioned; the problem that the construction operation surface is insufficient is solved; the construction period is shortened; the cost is reduced; the device is simple and convenient to operate and convenient to control.

Description

The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction
Technical field
Invention relates to a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, is particularly useful for the king-tower steel anchor beam construction lifted after king-tower space can not meet steel anchor beam.
Background technology
On Cable stayed Bridge Main Tower tower, suspension cable anchoring adopts steel anchor beam to bear pulling force and concrete bearing compressive force structure mostly, i.e. the textural association of " steel anchor beam+concrete bracket ".Construction of Pylon adopts segmented construction, and general single segmental comprises two steel anchor beams.When king-tower space can not meet lift after steel anchor beam time, when constructing corresponding sections, before the concrete bracket reinforcing bar of a colligation topmost steel anchor beam, a bottom steel anchor beam must be hung in king-tower.But the concrete bracket that now this steel anchor beam is corresponding does not also build concrete, this steel anchor beam must be built on the steel anchor beam of sections in lower floor by dismountable rigidity bracket support.
Summary of the invention
The present invention will solve the technical problem that Cable stayed Bridge Main Tower steel anchor beam installs location, and the steel anchor beam installation and locating method providing a kind of Cable stayed Bridge Main Tower to construct.
Technical scheme of the present invention is: a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, adopt the steel anchor beam rack system of detachable recycling that location steel anchor beam is installed, comprise rigidity bracket I and Chain block II, rigidity bracket I is shelved on mounted n# steel anchor beam, in order to jacking n+1# steel anchor beam, treat that n+2# steel anchor beam installs, then at n+2# steel anchor beam, four Chain block II are installed, to sling n+1# steel anchor beam, remove steel anchor beam rigidity bracket I, then with Chain block II, n+1# steel anchor beam is in place.
Rigidity bracket I comprises longitudinal and transverse beam, longitudinal and transverse link rod, diagonal brace, angle brace, backing plate, longeron is fixed in backing plate upper end, fixed cross beam on longeron, middle part is fixedly connected with longitudinal and transverse link rod, be connected to diagonal brace between longitudinal and transverse beam, angle brace, connected by junction plate between crossbeam, junction plate is fixed by pull bar, and backing plate is fixed by limiting plate.
Useful achievement of the present invention is: a whole set of rack system consisted of rigidity bracket and Chain block, realize the installation location of steel anchor beam, the problem of operation side deficiency can be solved, the effective shortening Construction of Pylon duration under the prerequisite meeting safety and quality requirement.This device is easy and simple to handle, and it is convenient to control.
Accompanying drawing explanation
Fig. 1 is installation working condition chart of the present invention;
Fig. 2 is the front view of rigidity bracket;
Fig. 3 is one of sectional drawing of rigidity bracket;
Fig. 4 is the sectional drawing two of rigidity bracket.
Detailed description of the invention
Below in conjunction with instantiation, set forth the embodiment of patent of the present invention further.
As Fig. 1,2,3, shown in 4, the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction of the present invention, adopts the steel anchor beam rack system of detachable recycling to install location steel anchor beam, comprises rigidity bracket I11, Chain block II10.
Rigidity bracket I11 is shelved on mounted n# steel anchor beam 12, in order to jacking n+1# steel anchor beam 13, treat that n+2# steel anchor beam 14 installs, then at n+2# steel anchor beam 14, four Chain block II10 are installed, to sling n+1# steel anchor beam 13, remove steel anchor beam rigidity bracket I11, then with Chain block II10, n+1# steel anchor beam 13 is in place.
Rigidity bracket II10 comprises longitudinal and transverse beam 1,2, longitudinal and transverse link rod 3, diagonal brace 4, angle brace 5, backing plate 6, longeron 1 is fixed in backing plate 6 upper end, fixed cross beam 2 on longeron, and middle part is fixedly connected with longitudinal and transverse link rod 3, longitudinal and transverse beam 1, be connected to diagonal brace 4 between 2, angle brace 5, connected by junction plate 7 between longitudinal and transverse link rod 3, junction plate is fixed by pull bar 9, and backing plate 7 is fixed by limiting plate 8.
Concrete operation method of the present invention:
1) treat that last sections concreting is complete, after putting in place by specification maintenance, the n# steel anchor beam 12 installed places rigidity bracket I11, n+1# steel anchor beam 13 is installed, is shelved on rigidity bracket I11.
2) when n+1# steel anchor beam 13 is installed, absolute altitude exceeds design and installation position and is about 15cm.
3) assembling reinforcement is continued to completing second anchoring bracket.
4), after this section concreting completes, after reaching the intensity of design code, n+2# steel anchor beam 14 is installed.
5) on n+2# steel anchor beam 14, Chain block II10 is installed, utilizes Chain block II10 to be lifted by crane by n+1# steel anchor beam 13, hang rigidity bracket I11 certain distance.
6) screw rod of rigidity of dismantling bracket I11, disintegrates rigidity bracket I11 and hangs out king-tower.
7) utilize Chain block II10 to be transferred to by n+1# steel anchor beam 13 on corresponding steel anchor beam bracket, complete the construction of a sections.

Claims (2)

1. the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, adopt the steel anchor beam rack system of detachable recycling that location steel anchor beam is installed, comprise rigidity bracket I (11) and Chain block II (10), it is characterized in that: rigidity bracket I (11) is shelved on mounted n# steel anchor beam (12), in order to jacking n+1# steel anchor beam (13), treat that n+2# steel anchor beam (14) installs, then at n+2# steel anchor beam (14), four Chain block II (10) are installed, to sling n+1# steel anchor beam (13), remove steel anchor beam rigidity bracket I (11), then Chain block II (10) is used to be in place by n+1# steel anchor beam (13).
2. the rigidity bracket for the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction according to claim 1, it is characterized in that: described rigidity bracket I (11) comprises vertical, crossbeam (1, 2), vertical, horizontal-associate bar (3), diagonal brace (4), angle brace (5), backing plate (6), longeron (1) is fixed in backing plate (6) upper end, fixed cross beam (2) on longeron, middle part is fixedly connected with vertical, horizontal-associate bar (3), vertical, crossbeam (1, 2) diagonal brace (4) is connected between, angle brace (5), vertical, connected by junction plate (7) between horizontal-associate bar (3), junction plate is fixed by pull bar (9), backing plate (7) is fixed by limiting plate (8).
CN201410759994.5A 2014-12-12 2014-12-12 The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction Active CN104480863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410759994.5A CN104480863B (en) 2014-12-12 2014-12-12 The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410759994.5A CN104480863B (en) 2014-12-12 2014-12-12 The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction

Publications (2)

Publication Number Publication Date
CN104480863A true CN104480863A (en) 2015-04-01
CN104480863B CN104480863B (en) 2016-08-24

Family

ID=52755461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410759994.5A Active CN104480863B (en) 2014-12-12 2014-12-12 The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction

Country Status (1)

Country Link
CN (1) CN104480863B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970819A (en) * 2016-05-31 2016-09-28 中铁大桥局集团第五工程有限公司 Installation construction method for steel anchor beams
CN106284092A (en) * 2016-08-31 2017-01-04 中铁四局集团第二工程有限公司 Steel anchor beam suspender and using method thereof
CN108103949A (en) * 2017-12-29 2018-06-01 南通华凯重工有限公司 A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN108316150A (en) * 2018-01-25 2018-07-24 北京城建道桥建设集团有限公司 The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam
CN108374350A (en) * 2018-05-14 2018-08-07 中交二公局第二工程有限公司 A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit
CN111005302A (en) * 2019-12-30 2020-04-14 中交路桥华南工程有限公司 Steel anchor beam mounting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN101122114A (en) * 2007-09-14 2008-02-13 中铁大桥局集团第五工程有限公司 Back-cable-free cable-stayed bridge steel tower vertical turn construction method
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN203440753U (en) * 2013-07-08 2014-02-19 中交第二公路工程局有限公司 Multifunctional steel bar locating framework

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN101122114A (en) * 2007-09-14 2008-02-13 中铁大桥局集团第五工程有限公司 Back-cable-free cable-stayed bridge steel tower vertical turn construction method
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN203440753U (en) * 2013-07-08 2014-02-19 中交第二公路工程局有限公司 Multifunctional steel bar locating framework

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970819A (en) * 2016-05-31 2016-09-28 中铁大桥局集团第五工程有限公司 Installation construction method for steel anchor beams
CN106284092A (en) * 2016-08-31 2017-01-04 中铁四局集团第二工程有限公司 Steel anchor beam suspender and using method thereof
CN106284092B (en) * 2016-08-31 2018-05-15 中铁四局集团第二工程有限公司 Steel anchor beam suspender and its application method
CN108103949A (en) * 2017-12-29 2018-06-01 南通华凯重工有限公司 A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN108316150A (en) * 2018-01-25 2018-07-24 北京城建道桥建设集团有限公司 The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam
CN108316150B (en) * 2018-01-25 2024-03-15 北京城建道桥建设集团有限公司 Construction system and construction method for main tower and steel anchor beam of cable-stayed bridge
CN108374350A (en) * 2018-05-14 2018-08-07 中交二公局第二工程有限公司 A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit
CN108374350B (en) * 2018-05-14 2024-05-31 中交二公局第二工程有限公司 Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN111005302A (en) * 2019-12-30 2020-04-14 中交路桥华南工程有限公司 Steel anchor beam mounting method
CN111005302B (en) * 2019-12-30 2021-07-30 中交路桥华南工程有限公司 Steel anchor beam mounting method

Also Published As

Publication number Publication date
CN104480863B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104480863B (en) The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN102071798B (en) Hydraulic climbing system for wall-attached support frame
CN102345381A (en) Hydraulic creeping formwork system and creeping formwork construction method
CN102777030A (en) Method for building up formwork construction platform of lift shaft
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN203530851U (en) Basket device for combined basket working vehicle
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN102733608B (en) Construction method for spray head layer of granulation tower
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
CN209873584U (en) Hang basket template and demolish device
CN109296192B (en) Lifting frame for assembled building
CN203113793U (en) Large formwork installation system of oblique structure
CN208844424U (en) Multifunctional assembled construction trolley
CN204455842U (en) Bridge precast beam plate plays roof beam structure
CN102561689A (en) Construction method for cantilever lifting scaffold
CN102677907A (en) Method for manually installing steel beam at top of silo
CN203129025U (en) Suspension fixing device for hanging basket
CN101768925B (en) Mounting equipment of beam falling prevention stopping block and construction method thereof
CN202227365U (en) Form traveler for guide wall of underground continuous wall
KR101232704B1 (en) The installation and dismantlement method of main girder for bridge temporary

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant