CN104480863A - Method for mounting and positioning steel anchor beams for constructing cable-stayed bridge main tower - Google Patents
Method for mounting and positioning steel anchor beams for constructing cable-stayed bridge main tower Download PDFInfo
- Publication number
- CN104480863A CN104480863A CN201410759994.5A CN201410759994A CN104480863A CN 104480863 A CN104480863 A CN 104480863A CN 201410759994 A CN201410759994 A CN 201410759994A CN 104480863 A CN104480863 A CN 104480863A
- Authority
- CN
- China
- Prior art keywords
- steel anchor
- anchor beam
- stayed bridge
- bridge main
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a method for mounting and positioning steel anchor beams for constructing a cable-stayed bridge main tower. The steel anchor beams are mounted and positioned by using a detachable and reusable steel anchor beam support rack system. The detachable and reusable steel anchor beam support rack comprises a rigid support rack I and chain hoists II, wherein the rigid support rack I is arranged on a mounted No. n steel anchor beam and is used for jacking a No. n+1 steel anchor beam; after a No. n+2 steel anchor beam is mounted, four chain hoists II are mounted on the No. n+2 steel anchor beam; the No. n+1 steel anchor beam is hoisted; the rigid support rack I of the steel anchor beams is demounted; then the chain hoists II are used for putting the No. n+1 steel anchor beam in place. According to the detachable and reusable support rack system comprising the rigid support rack and the chain hoists, the steel anchor beams are mounted and positioned; the problem that the construction operation surface is insufficient is solved; the construction period is shortened; the cost is reduced; the device is simple and convenient to operate and convenient to control.
Description
Technical field
Invention relates to a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, is particularly useful for the king-tower steel anchor beam construction lifted after king-tower space can not meet steel anchor beam.
Background technology
On Cable stayed Bridge Main Tower tower, suspension cable anchoring adopts steel anchor beam to bear pulling force and concrete bearing compressive force structure mostly, i.e. the textural association of " steel anchor beam+concrete bracket ".Construction of Pylon adopts segmented construction, and general single segmental comprises two steel anchor beams.When king-tower space can not meet lift after steel anchor beam time, when constructing corresponding sections, before the concrete bracket reinforcing bar of a colligation topmost steel anchor beam, a bottom steel anchor beam must be hung in king-tower.But the concrete bracket that now this steel anchor beam is corresponding does not also build concrete, this steel anchor beam must be built on the steel anchor beam of sections in lower floor by dismountable rigidity bracket support.
Summary of the invention
The present invention will solve the technical problem that Cable stayed Bridge Main Tower steel anchor beam installs location, and the steel anchor beam installation and locating method providing a kind of Cable stayed Bridge Main Tower to construct.
Technical scheme of the present invention is: a kind of steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, adopt the steel anchor beam rack system of detachable recycling that location steel anchor beam is installed, comprise rigidity bracket I and Chain block II, rigidity bracket I is shelved on mounted n# steel anchor beam, in order to jacking n+1# steel anchor beam, treat that n+2# steel anchor beam installs, then at n+2# steel anchor beam, four Chain block II are installed, to sling n+1# steel anchor beam, remove steel anchor beam rigidity bracket I, then with Chain block II, n+1# steel anchor beam is in place.
Rigidity bracket I comprises longitudinal and transverse beam, longitudinal and transverse link rod, diagonal brace, angle brace, backing plate, longeron is fixed in backing plate upper end, fixed cross beam on longeron, middle part is fixedly connected with longitudinal and transverse link rod, be connected to diagonal brace between longitudinal and transverse beam, angle brace, connected by junction plate between crossbeam, junction plate is fixed by pull bar, and backing plate is fixed by limiting plate.
Useful achievement of the present invention is: a whole set of rack system consisted of rigidity bracket and Chain block, realize the installation location of steel anchor beam, the problem of operation side deficiency can be solved, the effective shortening Construction of Pylon duration under the prerequisite meeting safety and quality requirement.This device is easy and simple to handle, and it is convenient to control.
Accompanying drawing explanation
Fig. 1 is installation working condition chart of the present invention;
Fig. 2 is the front view of rigidity bracket;
Fig. 3 is one of sectional drawing of rigidity bracket;
Fig. 4 is the sectional drawing two of rigidity bracket.
Detailed description of the invention
Below in conjunction with instantiation, set forth the embodiment of patent of the present invention further.
As Fig. 1,2,3, shown in 4, the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction of the present invention, adopts the steel anchor beam rack system of detachable recycling to install location steel anchor beam, comprises rigidity bracket I11, Chain block II10.
Rigidity bracket I11 is shelved on mounted n# steel anchor beam 12, in order to jacking n+1# steel anchor beam 13, treat that n+2# steel anchor beam 14 installs, then at n+2# steel anchor beam 14, four Chain block II10 are installed, to sling n+1# steel anchor beam 13, remove steel anchor beam rigidity bracket I11, then with Chain block II10, n+1# steel anchor beam 13 is in place.
Rigidity bracket II10 comprises longitudinal and transverse beam 1,2, longitudinal and transverse link rod 3, diagonal brace 4, angle brace 5, backing plate 6, longeron 1 is fixed in backing plate 6 upper end, fixed cross beam 2 on longeron, and middle part is fixedly connected with longitudinal and transverse link rod 3, longitudinal and transverse beam 1, be connected to diagonal brace 4 between 2, angle brace 5, connected by junction plate 7 between longitudinal and transverse link rod 3, junction plate is fixed by pull bar 9, and backing plate 7 is fixed by limiting plate 8.
Concrete operation method of the present invention:
1) treat that last sections concreting is complete, after putting in place by specification maintenance, the n# steel anchor beam 12 installed places rigidity bracket I11, n+1# steel anchor beam 13 is installed, is shelved on rigidity bracket I11.
2) when n+1# steel anchor beam 13 is installed, absolute altitude exceeds design and installation position and is about 15cm.
3) assembling reinforcement is continued to completing second anchoring bracket.
4), after this section concreting completes, after reaching the intensity of design code, n+2# steel anchor beam 14 is installed.
5) on n+2# steel anchor beam 14, Chain block II10 is installed, utilizes Chain block II10 to be lifted by crane by n+1# steel anchor beam 13, hang rigidity bracket I11 certain distance.
6) screw rod of rigidity of dismantling bracket I11, disintegrates rigidity bracket I11 and hangs out king-tower.
7) utilize Chain block II10 to be transferred to by n+1# steel anchor beam 13 on corresponding steel anchor beam bracket, complete the construction of a sections.
Claims (2)
1. the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction, adopt the steel anchor beam rack system of detachable recycling that location steel anchor beam is installed, comprise rigidity bracket I (11) and Chain block II (10), it is characterized in that: rigidity bracket I (11) is shelved on mounted n# steel anchor beam (12), in order to jacking n+1# steel anchor beam (13), treat that n+2# steel anchor beam (14) installs, then at n+2# steel anchor beam (14), four Chain block II (10) are installed, to sling n+1# steel anchor beam (13), remove steel anchor beam rigidity bracket I (11), then Chain block II (10) is used to be in place by n+1# steel anchor beam (13).
2. the rigidity bracket for the steel anchor beam installation and locating method for Cable stayed Bridge Main Tower construction according to claim 1, it is characterized in that: described rigidity bracket I (11) comprises vertical, crossbeam (1, 2), vertical, horizontal-associate bar (3), diagonal brace (4), angle brace (5), backing plate (6), longeron (1) is fixed in backing plate (6) upper end, fixed cross beam (2) on longeron, middle part is fixedly connected with vertical, horizontal-associate bar (3), vertical, crossbeam (1, 2) diagonal brace (4) is connected between, angle brace (5), vertical, connected by junction plate (7) between horizontal-associate bar (3), junction plate is fixed by pull bar (9), backing plate (7) is fixed by limiting plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410759994.5A CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410759994.5A CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104480863A true CN104480863A (en) | 2015-04-01 |
CN104480863B CN104480863B (en) | 2016-08-24 |
Family
ID=52755461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410759994.5A Active CN104480863B (en) | 2014-12-12 | 2014-12-12 | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104480863B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105970819A (en) * | 2016-05-31 | 2016-09-28 | 中铁大桥局集团第五工程有限公司 | Installation construction method for steel anchor beams |
CN106284092A (en) * | 2016-08-31 | 2017-01-04 | 中铁四局集团第二工程有限公司 | Steel anchor beam suspender and using method thereof |
CN108103949A (en) * | 2017-12-29 | 2018-06-01 | 南通华凯重工有限公司 | A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process |
CN108316150A (en) * | 2018-01-25 | 2018-07-24 | 北京城建道桥建设集团有限公司 | The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam |
CN108374350A (en) * | 2018-05-14 | 2018-08-07 | 中交二公局第二工程有限公司 | A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit |
CN111005302A (en) * | 2019-12-30 | 2020-04-14 | 中交路桥华南工程有限公司 | Steel anchor beam mounting method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
CN101122114A (en) * | 2007-09-14 | 2008-02-13 | 中铁大桥局集团第五工程有限公司 | Back-cable-free cable-stayed bridge steel tower vertical turn construction method |
CN103243654A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method |
CN203440753U (en) * | 2013-07-08 | 2014-02-19 | 中交第二公路工程局有限公司 | Multifunctional steel bar locating framework |
-
2014
- 2014-12-12 CN CN201410759994.5A patent/CN104480863B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
CN101122114A (en) * | 2007-09-14 | 2008-02-13 | 中铁大桥局集团第五工程有限公司 | Back-cable-free cable-stayed bridge steel tower vertical turn construction method |
CN103243654A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method |
CN203440753U (en) * | 2013-07-08 | 2014-02-19 | 中交第二公路工程局有限公司 | Multifunctional steel bar locating framework |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105970819A (en) * | 2016-05-31 | 2016-09-28 | 中铁大桥局集团第五工程有限公司 | Installation construction method for steel anchor beams |
CN106284092A (en) * | 2016-08-31 | 2017-01-04 | 中铁四局集团第二工程有限公司 | Steel anchor beam suspender and using method thereof |
CN106284092B (en) * | 2016-08-31 | 2018-05-15 | 中铁四局集团第二工程有限公司 | Steel anchor beam suspender and its application method |
CN108103949A (en) * | 2017-12-29 | 2018-06-01 | 南通华凯重工有限公司 | A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process |
CN108316150A (en) * | 2018-01-25 | 2018-07-24 | 北京城建道桥建设集团有限公司 | The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam |
CN108316150B (en) * | 2018-01-25 | 2024-03-15 | 北京城建道桥建设集团有限公司 | Construction system and construction method for main tower and steel anchor beam of cable-stayed bridge |
CN108374350A (en) * | 2018-05-14 | 2018-08-07 | 中交二公局第二工程有限公司 | A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit |
CN108374350B (en) * | 2018-05-14 | 2024-05-31 | 中交二公局第二工程有限公司 | Assembly jig frame of steel anchor beam and steel corbel unit and installation method |
CN111005302A (en) * | 2019-12-30 | 2020-04-14 | 中交路桥华南工程有限公司 | Steel anchor beam mounting method |
CN111005302B (en) * | 2019-12-30 | 2021-07-30 | 中交路桥华南工程有限公司 | Steel anchor beam mounting method |
Also Published As
Publication number | Publication date |
---|---|
CN104480863B (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480863B (en) | The steel anchor beam installation and locating method of Cable stayed Bridge Main Tower construction | |
CN103635643B (en) | The construction method of nigh-level synthesis steel bar concrete cylindrical shell | |
CN102071798B (en) | Hydraulic climbing system for wall-attached support frame | |
CN102345381A (en) | Hydraulic creeping formwork system and creeping formwork construction method | |
CN102777030A (en) | Method for building up formwork construction platform of lift shaft | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
CN104060835A (en) | Lifting-sliding construction method for single plane truss | |
CN203530851U (en) | Basket device for combined basket working vehicle | |
CN108002244B (en) | Hoisting system and method for high pier column steel bar formwork | |
CN102733608B (en) | Construction method for spray head layer of granulation tower | |
CN107165056B (en) | Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof | |
CN209873584U (en) | Hang basket template and demolish device | |
CN109296192B (en) | Lifting frame for assembled building | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN208844424U (en) | Multifunctional assembled construction trolley | |
CN204455842U (en) | Bridge precast beam plate plays roof beam structure | |
CN102561689A (en) | Construction method for cantilever lifting scaffold | |
CN102677907A (en) | Method for manually installing steel beam at top of silo | |
CN203129025U (en) | Suspension fixing device for hanging basket | |
CN101768925B (en) | Mounting equipment of beam falling prevention stopping block and construction method thereof | |
CN202227365U (en) | Form traveler for guide wall of underground continuous wall | |
KR101232704B1 (en) | The installation and dismantlement method of main girder for bridge temporary |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |