CN104455878A - Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method - Google Patents

Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method Download PDF

Info

Publication number
CN104455878A
CN104455878A CN201410523799.2A CN201410523799A CN104455878A CN 104455878 A CN104455878 A CN 104455878A CN 201410523799 A CN201410523799 A CN 201410523799A CN 104455878 A CN104455878 A CN 104455878A
Authority
CN
China
Prior art keywords
tube
pipe
working steel
prefabricated direct
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410523799.2A
Other languages
Chinese (zh)
Inventor
张居山
赖贞澄
庄须文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201410523799.2A priority Critical patent/CN104455878A/en
Publication of CN104455878A publication Critical patent/CN104455878A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L43/00Bends; Siphons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/14Arrangements for the insulation of pipes or pipe systems
    • F16L59/16Arrangements specially adapted to local requirements at flanges, junctions, valves or the like
    • F16L59/22Arrangements specially adapted to local requirements at flanges, junctions, valves or the like adapted for bends

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

The invention relates to a working steel tube double-tube tube fitting bend of an intelligent prefabricated direct buried heating insulating tube and a manufacturing method. At present, a traditional prefabricated direct buried heating insulating tube in China generally has the defects of being large in heat loss amount, high in operation cost, large in carbon discharge amount, short in tube service life and the like. The working steel tube double-tube tube fitting bend of the intelligent prefabricated direct buried heating insulating tube comprises a polyethylene outer protecting tube (1), a polyurethane protecting layer (3) is arranged in the polyethylene outer protecting tube (1), a double-tube working steel tube (4) is wrapped by the polyurethane protecting layer (3), an alarm line (2) is arranged in the polyurethane protecting layer (3), and a supporting support plate (5) is arranged between the polyethylene outer protecting tube (1) and the double-tube working steel tube (4). The manufacturing method is applied to manufacturing the working steel tube double-tube tube fitting bend of the intelligent prefabricated direct buried heating insulating tube.

Description

The intelligence two-tube pipe elbow of prefabricated direct-buried thermal insulation pipe working steel tube and making method
technical field:
the present invention relates to the two-tube pipe elbow of a kind of intelligent prefabricated direct-buried thermal insulation pipe working steel tube and making method.
background technique:
at present, the defects such as domestic traditional prefabricated direct-buried thermal insulation pipe ubiquity that heat waste consumption is large, operating cost is high, carbon emission amount is large, pipeline working life is short.Traditional type prefabricated direct-buried thermal insulation pipe is all that the form of the outer pillar of employing one steel pipe one carries out Cemented filling, another pipeline formation loop must be set up can use while work, but the two-tube process engineering of prefabricated direct-buried thermal insulation pipe working steel tube just effectively avoids the foundation of this primary Ioops, because be equipped with two isometrical steel pipes in an outer pillar, effectively performance loop can be formed.
summary of the invention:
the object of this invention is to provide the two-tube pipe elbow of a kind of intelligent prefabricated direct-buried thermal insulation pipe working steel tube and making method.
above-mentioned object is realized by following technological scheme:
the two-tube pipe elbow of a kind of intelligent prefabricated direct-buried thermal insulation pipe working steel tube; its composition comprises: polyethylene outer protective pipe; in described polyethylene outer protective pipe, there is protective polyurethane layer; described protective polyurethane layer wraps up one group of two-tube working steel tube; in described protective polyurethane layer, there is alarming line, there is between described polyethylene outer protective pipe and two-tube working steel tube supporting bracket plate.
the described two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube, described working steel tube internal diameter is 20-1200mm, and described protective polyurethane layer thickness is 30-200mm, and described outer pillar thickness is 1-30mm.
the making method of the described two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube, original seamless steel pipe has been replaced to be the working steel tube of prefabricated direct-buried thermal insulation pipe with two-tube the getting of existing crosslinked polyethylene, by the return of the original old-fashioned conventional tube of the two-tube replacement of crosslinked polyethylene, form loop own in a pipe, after crosslinked polyethylene pipe is installed support, the hdpe pipe of different amount is made to form the outer pillar of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work pipe elbow by highi degree of accuracy PE welding gun, then pipe ends installed foaming guard seal and leave exhaust sieve, eventually pass foaming machine spray foam to foam, end face finishing process is carried out after slaking, namely final finished is formed.
beneficial effect of the present invention:
1. the present invention save heat loss aspect just not traditional prefabricated direct-buried thermal insulation pipe can compare, two-tubely to work simultaneously, form own circulation and more can effectively reduce cost reduction running cost, reduce carbon emission amount, fully demonstrate the two-tube process engineering of prefabricated direct-buried thermal insulation pipe working steel tube not only energy saving but also economic environmental protection, more fully can ensure that working life of prefabricated direct-buried thermal insulation pipe.
between polyethylene outer protective pipe of the present invention and working steel tube, there is supporting bracket; to its intensity of working steel tube and the mutual support reinforcing of polyethylene outer protective pipe; the use more steadily simultaneously decreasing material is installed; in protective polyurethane layer, there is alarming line, when occurring alarm function to be played when leaking.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is plan views of the present invention.
embodiment:
embodiment 1:
the two-tube pipe elbow of a kind of intelligent prefabricated direct-buried thermal insulation pipe working steel tube, its composition comprises: polyethylene outer protective pipe 1, there is in described polyethylene outer protective pipe protective polyurethane layer 3, described protective polyurethane layer wraps up one group of working steel tube 4, there is in described protective polyurethane layer alarming line 2, described polyethylene outer tube has high temperature resin layer, described high temperature resin layer has anticorrosive coat, described anticorrosive coat has watertightness barrier, described polyethylene outer protective pipe and working steel tube have between the ends and are connected floor 5, described polyethylene outer protective pipe top and bottom are plane, upper plane width is less than lower plane width, described alarming line is positioned at plane side.
embodiment 2:
the two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube according to embodiment 1, described working steel tube internal diameter is 20-1200mm, and described protective polyurethane layer thickness is 30-200mm, and described outer pillar thickness is 1-30mm.
embodiment 3:
the making method of the two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube according to embodiment 1 or 2, original seamless steel pipe has been replaced to be the working steel tube of prefabricated direct-buried thermal insulation pipe with two-tube the getting of existing crosslinked polyethylene, by the return of the original old-fashioned conventional tube of the two-tube replacement of crosslinked polyethylene, form loop own in a pipe, after crosslinked polyethylene pipe is installed support, the hdpe pipe of different amount is made to form the outer pillar of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work pipe elbow by highi degree of accuracy PE welding gun, then pipe ends installed foaming guard seal and leave exhaust sieve, eventually pass foaming machine spray foam to foam, end face finishing process is carried out after slaking, namely final finished is formed.

Claims (3)

1. the two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube; its composition comprises: polyethylene outer protective pipe; it is characterized in that: in described polyethylene outer protective pipe, there is protective polyurethane layer; described protective polyurethane layer wraps up one group of two-tube working steel tube; in described protective polyurethane layer, there is alarming line, there is between described polyethylene outer protective pipe and two-tube working steel tube supporting bracket plate.
2. the two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube according to claim 1, it is characterized in that: described working steel tube internal diameter is 20-1200mm, described protective polyurethane layer thickness is 30-200mm, and described outer pillar thickness is 1-30mm.
3. the making method of the two-tube pipe elbow of intelligent prefabricated direct-buried thermal insulation pipe working steel tube that one of claim 1 or 2 is described, it is characterized in that: replaced original seamless steel pipe to be the working steel tube of prefabricated direct-buried thermal insulation pipe with two-tube the getting of existing crosslinked polyethylene, by the return of the original old-fashioned conventional tube of the two-tube replacement of crosslinked polyethylene, form loop own in a pipe, after crosslinked polyethylene pipe is installed support, the hdpe pipe of different amount is made to form the outer pillar of prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work pipe elbow by highi degree of accuracy PE welding gun, then pipe ends installed foaming guard seal and leave exhaust sieve, eventually pass foaming machine spray foam to foam, end face finishing process is carried out after slaking, namely final finished is formed.
CN201410523799.2A 2014-10-08 2014-10-08 Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method Pending CN104455878A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410523799.2A CN104455878A (en) 2014-10-08 2014-10-08 Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410523799.2A CN104455878A (en) 2014-10-08 2014-10-08 Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method

Publications (1)

Publication Number Publication Date
CN104455878A true CN104455878A (en) 2015-03-25

Family

ID=52902389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410523799.2A Pending CN104455878A (en) 2014-10-08 2014-10-08 Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method

Country Status (1)

Country Link
CN (1) CN104455878A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397641A (en) * 2018-04-08 2018-08-14 苏州南海道电子科技有限公司 A kind of heat distribution pipeline energy-saving insulating technique
CN109386692A (en) * 2018-12-24 2019-02-26 哈尔滨朗格斯特节能科技有限公司 The foaming of hard polyaminoester mold is combined insulating tube and manufacturing method with polyethylene winding
IT201800005259A1 (en) * 2018-05-11 2019-11-11 CONDUCT AND MANUFACTURING METHOD

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4288654A (en) * 1979-09-05 1981-09-08 Blom H District-heating line
CN2220574Y (en) * 1995-07-12 1996-02-21 姜振家 Double-pipe prefabricated insulating pipe
CN101089447A (en) * 2006-06-14 2007-12-19 布鲁格罗尔控股公司 Conduit pipe with thermal insulation
CN102777973A (en) * 2012-07-20 2012-11-14 天津天地龙管业有限公司 Directly buried pipeline alarm device
CN204176224U (en) * 2014-10-08 2015-02-25 哈尔滨朗格斯特节能科技有限公司 The two-tube pipe elbow of intelligence prefabricated direct-buried thermal insulation pipe working steel tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4288654A (en) * 1979-09-05 1981-09-08 Blom H District-heating line
CN2220574Y (en) * 1995-07-12 1996-02-21 姜振家 Double-pipe prefabricated insulating pipe
CN101089447A (en) * 2006-06-14 2007-12-19 布鲁格罗尔控股公司 Conduit pipe with thermal insulation
CN102777973A (en) * 2012-07-20 2012-11-14 天津天地龙管业有限公司 Directly buried pipeline alarm device
CN204176224U (en) * 2014-10-08 2015-02-25 哈尔滨朗格斯特节能科技有限公司 The two-tube pipe elbow of intelligence prefabricated direct-buried thermal insulation pipe working steel tube

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397641A (en) * 2018-04-08 2018-08-14 苏州南海道电子科技有限公司 A kind of heat distribution pipeline energy-saving insulating technique
IT201800005259A1 (en) * 2018-05-11 2019-11-11 CONDUCT AND MANUFACTURING METHOD
WO2019215698A1 (en) * 2018-05-11 2019-11-14 Ecoline S.r.l. Pipe and manufacturing method
CN109386692A (en) * 2018-12-24 2019-02-26 哈尔滨朗格斯特节能科技有限公司 The foaming of hard polyaminoester mold is combined insulating tube and manufacturing method with polyethylene winding

Similar Documents

Publication Publication Date Title
CN103075610B (en) Low-energy-consumption steam delivery pipe system
CN204239949U (en) Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting spanning tee
CN104455878A (en) Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method
CN204127495U (en) The prefabricated direct-buried crosslinked polyethylene of intelligence two-tube reducing work thermal insulation pipe
CN204176222U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work pipe elbow
CN104295844A (en) Crosslinked polyethylene pipe fitting parallel tee joint for intelligent prefabricated directly-buried insulating pipe and manufacturing method thereof
CN104295845A (en) Crosslinked polyethylene work pipe fitting elbow for directly-buried heat preservation pipe intelligently prefabricated and manufacturing method
CN204176224U (en) The two-tube pipe elbow of intelligence prefabricated direct-buried thermal insulation pipe working steel tube
CN104373699A (en) Intelligent prefabricated directly-buried thermal insulation pipe crosslinked polyethylene working pipe and manufacturing method
CN204176167U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene working pipe
CN104455877A (en) Crosslinked polyethylene double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method
CN104455940A (en) Crosslinked polyethylene double-tube parallel tee joint of intelligent prefabricated direct buried heating insulating tube and foaming method
CN204083610U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene pipe fitting spanning tee
CN204176131U (en) There is the prefabricated direct-buried thermal insulation pipe of crosslinked polyethylene reducing work pipe fitting
CN104266021A (en) Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method
CN104251359A (en) Intelligent prefabricated directly-buried heat-insulating pipe and steel pipe double pipe fitting parallel tee joint and manufacturing method
CN204062284U (en) The two-tube pipe fitting parallel tee of intelligence prefabricated direct-buried thermal insulation pipe working steel tube
CN204062283U (en) The two-tube reducing tee of intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene
CN204062285U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene work two-tube spanning tee
CN104373677A (en) Prefabricated directly-buried thermal insulation pipe with crosslinked polyethylene reducing working pipe fitting and manufacturing method thereof
CN204187193U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene pipe fitting reducing tee
CN204062286U (en) Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting reducing tee
CN204099798U (en) The two-tube parallel tee of intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene
CN204187207U (en) The work of intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene is two-tube
CN104295841A (en) Intelligent prefabricated direct burial thermal insulation pipe crosslinked polyethylene double pipe crossing tee and installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150325