CN104266021A - Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method - Google Patents

Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method Download PDF

Info

Publication number
CN104266021A
CN104266021A CN201410523801.6A CN201410523801A CN104266021A CN 104266021 A CN104266021 A CN 104266021A CN 201410523801 A CN201410523801 A CN 201410523801A CN 104266021 A CN104266021 A CN 104266021A
Authority
CN
China
Prior art keywords
pipe
steel pipe
reducing working
thermal insulation
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410523801.6A
Other languages
Chinese (zh)
Inventor
赖贞澄
张居山
庄须文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Langge Site Energy Saving Technology Co Ltd
Original Assignee
Harbin Langge Site Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Langge Site Energy Saving Technology Co Ltd filed Critical Harbin Langge Site Energy Saving Technology Co Ltd
Priority to CN201410523801.6A priority Critical patent/CN104266021A/en
Publication of CN104266021A publication Critical patent/CN104266021A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/18Double-walled pipes; Multi-channel pipes or pipe assemblies
    • F16L9/19Multi-channel pipes or pipe assemblies
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • F16L59/028Composition or method of fixing a thermally insulating material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss
    • F17D5/06Preventing, monitoring, or locating loss using electric or acoustic means

Abstract

Disclosed are an intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and a manufacture method. The intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and the manufacture method solve the defects that domestic traditional prefabricated direct burial thermal insulation pipes are generally large in thermal loss amount, high in running cost, large in carbon emission, short in use life and the like at present. The intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline comprises a PE (poly ethylene) outer protection pipe (4), wherein two steel pipe tapered work pipes (1) are arranged in the middle of the PE outer protection pipe (4), a polyurethane thermal insulation layer (5) is arranged between the PE outer protection pipe (4) and each steel pipe tapered work pipe (1), alarm lines (2) are arranged in the polyurethane thermal insulation layers (5), the number of the alarm lines is 2, the large diameter pipe of the two steel pipe tapered work pipes (1) is connected with the small diameter pipe of the steel pipe tapered work pipes (1) through a tapered pipe, a support (3) is installed on the large diameter pipe, and another support is installed on the small diameter pipe. The intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and the manufacture method are used in an intelligent thermal insulation pipeline.

Description

Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline and making method
technical field:
the present invention relates to a kind of insulation pipe and making method, be specifically related to a kind of intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline and making method.
background technique:
at present, the defects such as domestic traditional prefabricated direct-buried thermal insulation pipe ubiquity that heat waste consumption is large, operating cost is high, carbon emission amount is large, pipeline working life is short.Its shortcoming has: (1) traditional type prefabricated direct-buried thermal insulation pipe is all that the form of the outer pillar of employing one steel pipe one carries out Cemented filling, and must set up another pipeline formation loop while work can use; (2) traditional operation cost is high, carbon emission amount is large, operation cost is high, and the life-span of prefabricated direct-buried thermal insulation pipe is low.These problems are not resolved always.
summary of the invention:
the object of this invention is to provide a kind of insulation pipe and making method, a kind of intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline and making method are specifically provided.
above-mentioned object is realized by following technological scheme:
a kind of intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, its composition comprises: the outer pillar of PE, in the middle of the outer pillar of described PE, 2 steel pipe reducing working pipe are set, described PE is outer has polyurethane insulation coating between pillar and described steel pipe reducing working pipe, alarming line is provided with in described polyurethane insulation coating, described alarming line is 2, in described steel pipe reducing working pipe, large diameter tube is connected by conical pipe with narrow tube, described large diameter tube is provided with support, described narrow tube is provided with support, the outer pillar of described PE is wrapped in outside polyurethane insulation coating.
described intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, 2 described steel pipe reducing working pipe are parallel, and described steel pipe reducing working pipe is rectilinear form.
described intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, the outer pillar of described PE has the outer pillar of large footpath PE, the outer pillar of described PE has the outer pillar of path PE, the outer pillar of described large footpath PE is connected with the outer pillar of path PE by PE reducer pipe, described reducer pipe one end is larger diameter end, the described reducer pipe the other end is miner diameter end, and the shape of described PE reducer pipe is cone type.
described intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, described steel pipe reducing working pipe has large footpath steel pipe reducing working pipe, described steel pipe reducing working pipe has path steel pipe reducing working pipe, and described large footpath steel pipe reducing working pipe is connected with path steel pipe reducing working pipe by cone type steel pipe reducing working pipe.
a making method for intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, the method comprises the steps:
(1) first make steel pipe reducing working pipe fixed mould, after steel pipe reducing working pipe is fixing, import poling machine, steel pipe reducing working pipe is penetrated in the outer pillar of PE;
(2) then by steel pipe reducing working pipe fixing foaming baffle plate, sealing dress is carried out at steel pipe reducing working pipe two ends and outer pillar and leaves exhaust port;
(3) finally adopt the mode of one end injection to foam, finishing operation can be proceeded to after slaking to be foamed and carry out end face processing, and be formed into QC.
beneficial effect of the present invention:
1, the present invention adopts cold and heat supply pipe technology, adopt two steel pipe to foam and same outer pillar protection simultaneously, closely greatly reduce heat loss, effectively reduce user cost and decrease carbon emission amount, traditional type prefabricated direct-buried thermal insulation pipe is all that the form of the outer pillar of employing one steel pipe one carries out Cemented filling, another pipeline formation loop must be set up can use while work, but the two-tube process engineering of prefabricated direct-buried thermal insulation pipe working steel tube just effectively avoids the foundation of this primary Ioops, because be equipped with two isometrical steel pipes in an outer pillar, effectively can form performance loop.
2, the present invention save heat loss aspect just not traditional prefabricated direct-buried thermal insulation pipe can compare, two-tubely to work simultaneously, form own circulation and more can effectively reduce cost reduction running cost, reduce carbon emission amount, fully demonstrate the two-tube process engineering of prefabricated direct-buried thermal insulation pipe working steel tube not only energy saving but also economic environmental protection, more fully can ensure that working life of prefabricated direct-buried thermal insulation pipe.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is main sectional views of the present invention.
accompanying drawing 3 is left views of the present invention.
accompanying drawing 4 is right elevations of the present invention.
embodiment:
embodiment 1:
a kind of intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, its composition comprises: the outer pillar 4 of PE, in the middle of the outer pillar of described PE, 2 steel pipe reducing working pipe 1 are set, described PE is outer has polyurethane insulation coating 5 between pillar and described steel pipe reducing working pipe, alarming line 2 is provided with in described polyurethane insulation coating, described alarming line is 2, in described steel pipe reducing working pipe, large diameter tube is connected by conical pipe with narrow tube, described large diameter tube is provided with support 3, described narrow tube is provided with support.
embodiment 2:
intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to embodiment 1,2 described steel pipe reducing working pipe are parallel, and described steel pipe reducing working pipe is rectilinear form.
embodiment 3:
intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to embodiment 1 or 2, the outer pillar of described PE has the outer pillar of large footpath PE, the outer pillar of described PE has the outer pillar of path PE, the outer pillar of described large footpath PE is connected with the outer pillar of path PE by PE reducer pipe, described reducer pipe one end is larger diameter end, the described reducer pipe the other end is miner diameter end, and the shape of described PE reducer pipe is cone type.
embodiment 4:
intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to embodiment 1 or 2 or 3, described steel pipe reducing working pipe has large footpath steel pipe reducing working pipe, described steel pipe reducing working pipe has path steel pipe reducing working pipe, and described large footpath steel pipe reducing working pipe is connected with path steel pipe reducing working pipe by cone type steel pipe reducing working pipe.
embodiment 5:
according to the making method of the intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline one of embodiment 1-4 Suo Shu, the method comprises the steps:
(1) first make steel pipe reducing working pipe fixed mould, after steel pipe reducing working pipe is fixing, import poling machine, steel pipe reducing working pipe is penetrated in the outer pillar (PE oversheath is polyethylene outer protective pipe) of PE;
(2) then by steel pipe reducing working pipe fixing foaming baffle plate, sealing dress is carried out at steel pipe reducing working pipe two ends and outer pillar and leaves exhaust port;
(3) finally adopt the mode of one end injection to foam, finishing operation can be proceeded to after slaking to be foamed and carry out end face processing, and be formed into QC.
described steel pipe reducing working pipe fixed mould is according to the large little makings of product.

Claims (5)

1. an intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline, its composition comprises: the outer pillar of PE, it is characterized in that: in the middle of the outer pillar of described PE, 2 steel pipe reducing working pipe are set, described PE is outer has polyurethane insulation coating between pillar and described steel pipe reducing working pipe, alarming line is provided with in described polyurethane insulation coating, described alarming line is 2, in described steel pipe reducing working pipe, large diameter tube is connected by conical pipe with narrow tube, described large diameter tube is provided with support, described narrow tube is provided with support, the outer pillar of described PE is wrapped in outside polyurethane insulation coating.
2. intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to claim 1, is characterized in that: 2 described steel pipe reducing working pipe are parallel, and described steel pipe reducing working pipe is rectilinear form.
3. intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to claim 1 and 2, it is characterized in that: the outer pillar of described PE has the outer pillar of large footpath PE, the outer pillar of described PE has the outer pillar of path PE, the outer pillar of described large footpath PE is connected with the outer pillar of path PE by PE reducer pipe, described reducer pipe one end is larger diameter end, the described reducer pipe the other end is miner diameter end, and the shape of described PE reducer pipe is cone type.
4. intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline according to claim 1 and 2, it is characterized in that: described steel pipe reducing working pipe has large footpath steel pipe reducing working pipe, described steel pipe reducing working pipe has path steel pipe reducing working pipe, and described large footpath steel pipe reducing working pipe is connected with path steel pipe reducing working pipe by cone type steel pipe reducing working pipe.
5. a making method for the intelligent prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline utilizing one of claim 1-4 described, is characterized in that: the method comprises the steps:
(1) first make steel pipe reducing working pipe fixed mould, after steel pipe reducing working pipe is fixing, import poling machine, steel pipe reducing working pipe is penetrated in the outer pillar of PE;
(2) then by steel pipe reducing working pipe fixing foaming baffle plate, sealing dress is carried out at steel pipe reducing working pipe two ends and outer pillar and leaves exhaust port;
(3) finally adopt the mode of one end injection to foam, finishing operation can be proceeded to after slaking to be foamed and carry out end face processing, and be formed into QC.
CN201410523801.6A 2014-10-08 2014-10-08 Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method Pending CN104266021A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410523801.6A CN104266021A (en) 2014-10-08 2014-10-08 Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410523801.6A CN104266021A (en) 2014-10-08 2014-10-08 Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method

Publications (1)

Publication Number Publication Date
CN104266021A true CN104266021A (en) 2015-01-07

Family

ID=52157575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410523801.6A Pending CN104266021A (en) 2014-10-08 2014-10-08 Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method

Country Status (1)

Country Link
CN (1) CN104266021A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105387305A (en) * 2015-12-08 2016-03-09 朗格斯特哈尔滨环保节能产品制造有限公司 Thermal insulation pipeline with leakage point monitoring function and alarming method
CN106015953A (en) * 2016-08-04 2016-10-12 深圳凌水环保科技股份有限公司 Water feed and drainage pipe as well as leakage detection system and detection method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5377374A (en) * 1976-12-09 1978-07-08 Moore & Co Samuel Composite tubes
CN2220574Y (en) * 1995-07-12 1996-02-21 姜振家 Double-pipe prefabricated insulating pipe
CN201980890U (en) * 2010-12-28 2011-09-21 上海市机械施工有限公司 Herringbone hoisting mast for hoisting under special situation of high altitude
CN202469378U (en) * 2012-03-09 2012-10-03 中投(天津)热能装备发展有限公司 Prefabricated directly buried steam diameter-varying flat bottom heat-insulating pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5377374A (en) * 1976-12-09 1978-07-08 Moore & Co Samuel Composite tubes
CN2220574Y (en) * 1995-07-12 1996-02-21 姜振家 Double-pipe prefabricated insulating pipe
CN201980890U (en) * 2010-12-28 2011-09-21 上海市机械施工有限公司 Herringbone hoisting mast for hoisting under special situation of high altitude
CN202469378U (en) * 2012-03-09 2012-10-03 中投(天津)热能装备发展有限公司 Prefabricated directly buried steam diameter-varying flat bottom heat-insulating pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邹宁宇,鹿成滨,张德信: "《绝热材料应用技术》", 1 September 2005 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105387305A (en) * 2015-12-08 2016-03-09 朗格斯特哈尔滨环保节能产品制造有限公司 Thermal insulation pipeline with leakage point monitoring function and alarming method
CN106015953A (en) * 2016-08-04 2016-10-12 深圳凌水环保科技股份有限公司 Water feed and drainage pipe as well as leakage detection system and detection method thereof
CN106015953B (en) * 2016-08-04 2019-05-10 深圳凌水环保科技股份有限公司 A kind of supplying drainage and its leak detection system and detection method

Similar Documents

Publication Publication Date Title
CN204239949U (en) Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting spanning tee
CN104266021A (en) Intelligent prefabricated direct burial thermal insulation pipe steel pipe double pipe fitting tapered pipeline and manufacture method
CN203404956U (en) Waste water heat energy recovery system for dyeing machine
CN204127495U (en) The prefabricated direct-buried crosslinked polyethylene of intelligence two-tube reducing work thermal insulation pipe
CN104455878A (en) Working steel tube double-tube tube fitting bend of intelligent prefabricated direct buried heating insulating tube and manufacturing method
CN204083530U (en) Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting tapered pipeline
CN104373699A (en) Intelligent prefabricated directly-buried thermal insulation pipe crosslinked polyethylene working pipe and manufacturing method
CN204176167U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene working pipe
CN204062286U (en) Intelligence prefabricated direct-buried thermal insulation pipe double steel tube pipe fitting reducing tee
CN104251359A (en) Intelligent prefabricated directly-buried heat-insulating pipe and steel pipe double pipe fitting parallel tee joint and manufacturing method
CN204176224U (en) The two-tube pipe elbow of intelligence prefabricated direct-buried thermal insulation pipe working steel tube
CN104373688A (en) Double working steel pipes of prefabricated directly-buried insulating pipe and manufacturing method
CN204176131U (en) There is the prefabricated direct-buried thermal insulation pipe of crosslinked polyethylene reducing work pipe fitting
CN104896262A (en) High-density polyethylene outer protection pipe double-pipe insulation pipe
CN104455940A (en) Crosslinked polyethylene double-tube parallel tee joint of intelligent prefabricated direct buried heating insulating tube and foaming method
CN203963395U (en) High temperature radiator aerogel blanket composite adiabatic structure
CN104295843A (en) Intelligent prefabricated direct burial thermal insulation pipe and steel pipe double-pipe pipe reducing tee and manufacturing method
CN203549159U (en) Antifreeze coal gas pipeline
CN204062284U (en) The two-tube pipe fitting parallel tee of intelligence prefabricated direct-buried thermal insulation pipe working steel tube
CN204372347U (en) Prefabricated direct-buried thermal insulation pipe working steel tube is two-tube
CN204083610U (en) Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene pipe fitting spanning tee
CN204112414U (en) A kind of energy-saving water supply system
CN204099798U (en) The two-tube parallel tee of intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene
CN204663064U (en) A kind of heat preserving antistaling storehouse
CN203726705U (en) Foaming drying room for phenolic foam production

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107