CN104453285A - Assembled super-high-performance plain concrete recreation pavilion and construction method thereof - Google Patents
Assembled super-high-performance plain concrete recreation pavilion and construction method thereof Download PDFInfo
- Publication number
- CN104453285A CN104453285A CN201410610658.4A CN201410610658A CN104453285A CN 104453285 A CN104453285 A CN 104453285A CN 201410610658 A CN201410610658 A CN 201410610658A CN 104453285 A CN104453285 A CN 104453285A
- Authority
- CN
- China
- Prior art keywords
- junction plate
- backrest
- ceiling
- monomer
- plain concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
Provided are an assembled super-high-performance plain concrete recreation pavilion and a construction method thereof. The recreation pavilion comprises a single body, a ceiling connecting plate, a backrest connecting plate and a seat connecting plate, wherein the single body is made of super-high-performance plain concrete, comprises a ceiling tilted to a horizontal plane, a backrest connected to the lower end of the horizontal position of the ceiling and an inverted-C-shaped seat connected to the tail end of the backrest, is in a shape of a bent flat plate formed through integral casting and one-time processing, and the longitudinal section of the single body is in a shape of an Arabic numeral 5. The recreation pavilion is made of the super-high-performance plain concrete, steel bar configuration for the inside of the recreation pavilion is not needed, the service life is long, maintenance cost is low, and manpower and material resource consumption is reduced. The recreation pavilion uses the single body as boundary and can be flexibly designed and combined. In addition, the construction method of the recreation pavilion is simple and reliable, and the construction efficiency is ensured. The recreation pavilion can be widely applied indoors and outdoors and used for temporary rest of people.
Description
Technical field
The present invention relates to a kind of break pavilion structure and construction method.
Background technology
At present, general in scenic spot, the place such as park and outdoor bus shelter, the rest chair commonly built with stainless steel or wood materials or break pavilion, this type of seat can be convenient for people to rest and sit for a while, seek shelter from wind and rain temporarily, but due to the restriction of material itself, its application life is limited, usually need irregularly to safeguard, waste of manpower, material resources, and this type of seat needs to carry out lower margin installation cure process, destroy natural environment, in addition, traditional rest chair or break pavilion installation more complicated, inconvenient, and the size of rest chair or break pavilion is more single, make its can not flexible Application in different scene.
Summary of the invention
The object of this invention is to provide a kind of assembling very-high performance plain concrete rest pavilion and construction method thereof, solve and extend rest pavilion application life, complicated inflexible technical problem of constructing.
For achieving the above object, the present invention adopts following technical scheme:
A kind of assembling very-high performance plain concrete rest pavilion, comprise monomer, ceiling junction plate, backrest junction plate and seat junction plate, described monomer adopts very-high performance plain concrete to make; Described monomer comprises with the ceiling of horizontal plane, is connected to the backrest of one end that ceiling horizontal position sets low and is connected to the seat of the shape of falling C of backrest end, become bending flat by integrated poured time processing, its longitudinal section is the shape of Arabic numerals 5.
Described monomer has two at least, is bolted ceiling junction plate between the ceiling of adjacent monomer, has been bolted backrest junction plate between the backrest of adjacent monomer, has been bolted seat junction plate between the upper surface at the seat of adjacent monomer.
Described monomer is connected with ground by sill anchor.
There is the groove fitted with the edge of ceiling junction plate, backrest junction plate and seat junction plate at the position that described monomer is connected with ceiling junction plate, backrest junction plate and seat junction plate.
Described groove has bolt hole, and is embedded with the bolt connected.
Also comprise pigment in described very-high performance plain concrete, the quality of pigment accounts for 3 ‰ of total raw material quality.
A construction method for assembling very-high performance plain concrete rest pavilion, concrete steps are as follows:
Step one, installs the template of monomer template and ceiling junction plate, backrest junction plate and seat junction plate respectively.
Step 2, the bolt that is connected with ceiling junction plate, backrest junction plate and seat junction plate of pre-buried later stage in monomer template.
Step 3, builds very-high performance plain concrete in template.
Step 4, vibrates shaping on a vibration table.
Step 5, puts into fog room maintenance form removal after 24 hours.
Step 6, form removal can be come into operation two days later, and monomer, ceiling junction plate, backrest junction plate and seat junction plate are together transported to scene.
Step 7, is fixed monomer and ground by ground anchor bolt.
Step 8, connects ceiling junction plate, backrest junction plate and the seat junction plate between monomer, completes the rest pavilion installation of a unit.
Compared with prior art the present invention has following characteristics and beneficial effect:
Instant invention overcomes traditional rest chair or break pavilion and complicated dumb, shortcoming that application life is limited is installed, solve the technical problem that natural environment is safeguarded in break pavilion construction simultaneously.
Rest pavilion monomer of the present invention adopts very-high performance plain concrete to be that material is made, inner without the need to configuration reinforcement, long service life, good endurance, and economy, maintenance cost are low, reduce drain on manpower and material resources; This rest pavilion take monomer as boundary, all ceiling junction plate, backrest junction plate and seat junction plate one or more unit can be connected between some monomers, distance between monomer also can flexible design, the mode of this random combination can adapt to various different scene, and its scope of application is more extensive; Monomer is arbitrarily installed on the ground by ground anchor bolt, does not need to carry out specially treated to ground, is conducive to safeguarding natural environment, and connection disassembling is convenient; In addition, ceiling junction plate, backrest junction plate and seat junction plate carry out site assembly by bolt and monomer, and connected mode is simple and reliable, ensure that efficiency of construction; Connect simple between each component, can dismounting and change at any time, carry out reusing and facilitate carrying; Compared with existing rest chair or break pavilion, rest pavilion lithe of the present invention, attractive and durable, cheap, long service life, maintenance cost is low, and its construction method is simple and convenient, efficiency is high.
The present invention can be widely used in indoor and outdoor and have a rest for people temporarily.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is the structural representation of rest pavilion of the present invention.
Fig. 2 is the structural representation of monomer of the present invention.
Reference numeral 1-monomer, 1.1-ceiling, 1.2-backrest, 1.3-seat, 2-ceiling junction plate, 3-backrest junction plate, 4-seat junction plate, 5-sill anchor.
Detailed description of the invention
Embodiment is shown in Figure 2, this assembling very-high performance plain concrete rest pavilion, and comprise monomer 1, ceiling junction plate 2, backrest junction plate 3 and seat junction plate 4, described monomer 1 adopts very-high performance plain concrete to make, described monomer 1 comprises the ceiling 1.1 with horizontal plane, the seat 1.3 of the backrest 1.2 being connected to one end that ceiling horizontal position sets low and the shape of falling C being connected to backrest 1.2 end, bending flat is become by integrated poured time processing, plate thickness scope is about 45 ~ 60mm, its longitudinal section is the shape of Arabic numerals 5, concrete crushing strength is more than 100MPa, non-coarse aggregate in concrete, the gradient of described top margin is 2%, the length of encorbelmenting is no more than 1500mm, the altitude range of described backrest 1.2 is 2 ~ 2.5m, it can also have the circular hole of some decoration functions or design other decorating structures, the altitude range at the seat 1.3 of the described shape of falling C is 450 ~ 500mm.
Shown in Figure 1, described monomer 1 has two at least, spacing is no more than 1500mm, ceiling junction plate 2 is bolted between the top margin 1.1 of adjacent monomer, be bolted backrest junction plate 3 between the bottom of the straight flange 1.2 of adjacent monomer, between the upper surface of adjacent monomer flanging 1.3, be bolted seat junction plate 4; There is the groove fitted with the edge of ceiling junction plate 2, backrest junction plate 3 and seat junction plate 4 at the position that described monomer 1 is connected with ceiling junction plate 2, backrest junction plate 3 and seat junction plate 4; Described groove has bolt hole, and be embedded with the bolt connected, described monomer 1 is connected with ground by sill anchor 5, the soffit at seat 1.3 has the through hole that stone bolt passes, number of openings is determined according to actual conditions, can be two, four or eight etc.
Described ceiling junction plate 2, backrest junction plate 3 and seat junction plate 4 adopt lightweight, high-strength corrosion-resistant corrosion material is made, such as plastics or timber, the edge of ceiling junction plate 2, backrest junction plate 3 and seat junction plate 4 is reserved with bolt hole, wherein there is the nib agreed with top margin groove at the edge of ceiling junction plate 2, chimb thickness is no more than 45mm, and ceiling junction plate 2 is connected with the ceiling of monomer afterwards, both upper and lower surfaces are concordant; The threaded screw fasteners hole of seat junction plate 4 and backrest junction plate 3 penetrates thickness of slab, and seat junction plate 4 and the edge contract of backrest junction plate 3 to enter on monomer in corresponding groove and have bolt to be fixedly connected with.
Described very-high performance plain concrete, be called for short UHPC (Ultra-High Performance Concrete), also referred to as RPC (RPC, Reactive Powder Concrete), ultra-high performance concrete has the durability of superelevation and the mechanical property of superelevation, inner without the need to configuration reinforcement, according to concrete instructions for use, pigment can also be added in very-high performance plain concrete, rest pavilion is made into random color, and the quality of pigment accounts for 3 ‰ of total raw material quality.
The construction method of described assembling very-high performance plain concrete rest pavilion, concrete steps are as follows:
Step one, installs monomer template respectively.
Step 2, the bolt that is connected with ceiling junction plate, backrest junction plate and seat junction plate of pre-buried later stage in monomer template, spiro rod length is not more than 45mm.
Step 3, builds very-high performance plain concrete in template.
Step 4, vibrates shaping on a vibration table.
Step 5, puts into fog room maintenance form removal after 24 hours.
Step 6, form removal can be come into operation two days later, and monomer, ceiling junction plate, backrest junction plate and seat junction plate are together transported to scene.
Step 7, is fixed monomer and ground by ground anchor bolt, and ground anchor bolt diameter is not less than 16mm, and length is not less than 300mm.
Step 8, connects ceiling junction plate, backrest junction plate and the seat junction plate between monomer, completes the rest pavilion installation of a unit.
According to actual needs, can connect some monomers, form multiple unit.
Claims (6)
1. an assembling very-high performance plain concrete rest pavilion, comprises monomer (1), ceiling junction plate (2), backrest junction plate (3) and seat junction plate (4), it is characterized in that: described monomer (1) adopts very-high performance plain concrete to make; Described monomer (1) comprises with the ceiling of horizontal plane (1.1), is connected to the backrest (1.2) of one end that ceiling horizontal position sets low and is connected to the seat (1.3) of the shape of falling C of backrest (1.2) end, become bending flat by integrated poured time processing, its longitudinal section is the shape of Arabic numerals 5;
Described monomer (1) has two at least, ceiling junction plate (2) is bolted between the ceiling (1.1) of adjacent monomer, be bolted backrest junction plate (3) between the backrest (1.2) of adjacent monomer, between the upper surface at the seat (1.3) of adjacent monomer, be bolted seat junction plate (4).
2. assembling very-high performance plain concrete rest pavilion according to claim 1, is characterized in that: described monomer (1) is connected with ground by sill anchor (5).
3. assembling very-high performance plain concrete rest pavilion according to claim 1, is characterized in that: there is the groove fitted with the edge of ceiling junction plate (2), backrest junction plate (3) and seat junction plate (4) at the upper position be connected with ceiling junction plate (2), backrest junction plate (3) and seat junction plate (4) of described monomer (1).
4. assembling very-high performance plain concrete rest pavilion according to claim 3, is characterized in that: described groove has bolt hole, and is embedded with the bolt connected.
5. assembling very-high performance plain concrete rest pavilion according to claim 1, it is characterized in that: also comprise pigment in described very-high performance plain concrete, the quality of pigment accounts for 3 ‰ of total raw material quality.
6. a construction method for the assembling very-high performance plain concrete rest pavilion as described in claim 1 to 5 any one, it is characterized in that, concrete steps are as follows:
Step one, installs the template of monomer template and ceiling junction plate, backrest junction plate and seat junction plate respectively;
Step 2, the bolt that is connected with ceiling junction plate, backrest junction plate and seat junction plate of pre-buried later stage in monomer template;
Step 3, builds very-high performance plain concrete in template;
Step 4, vibrates shaping on a vibration table;
Step 5, puts into fog room maintenance form removal after 24 hours;
Step 6, form removal can be come into operation two days later, and monomer, ceiling junction plate, backrest junction plate and seat junction plate are together transported to scene;
Step 7, is fixed monomer and ground by ground anchor bolt;
Step 8, connects ceiling junction plate, backrest junction plate and the seat junction plate between monomer, completes the rest pavilion installation of a unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410610658.4A CN104453285B (en) | 2014-11-04 | 2014-11-04 | A kind of assembled very-high performance plain concrete rest pavilion and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410610658.4A CN104453285B (en) | 2014-11-04 | 2014-11-04 | A kind of assembled very-high performance plain concrete rest pavilion and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104453285A true CN104453285A (en) | 2015-03-25 |
CN104453285B CN104453285B (en) | 2016-09-07 |
Family
ID=52899973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410610658.4A Expired - Fee Related CN104453285B (en) | 2014-11-04 | 2014-11-04 | A kind of assembled very-high performance plain concrete rest pavilion and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104453285B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115263028A (en) * | 2022-08-11 | 2022-11-01 | 中国建筑第五工程局有限公司 | Assembled rib-free high-performance geopolymer concrete canopy |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29817428U1 (en) * | 1998-08-20 | 1999-05-12 | Lehrhuber Konrad | Carrier device for building constructions |
KR20090068608A (en) * | 2007-12-24 | 2009-06-29 | 서삼덕 | Movable simplified arbor |
CN201763013U (en) * | 2010-08-30 | 2011-03-16 | 吴碧峰 | Summerhouse with flat top |
CN202969999U (en) * | 2012-12-19 | 2013-06-05 | 中天建设集团有限公司 | Assembling type tea water kiosk |
CN204212456U (en) * | 2014-11-04 | 2015-03-18 | 中国建筑股份有限公司 | A kind of assembling very-high performance plain concrete rest pavilion |
-
2014
- 2014-11-04 CN CN201410610658.4A patent/CN104453285B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29817428U1 (en) * | 1998-08-20 | 1999-05-12 | Lehrhuber Konrad | Carrier device for building constructions |
KR20090068608A (en) * | 2007-12-24 | 2009-06-29 | 서삼덕 | Movable simplified arbor |
CN201763013U (en) * | 2010-08-30 | 2011-03-16 | 吴碧峰 | Summerhouse with flat top |
CN202969999U (en) * | 2012-12-19 | 2013-06-05 | 中天建设集团有限公司 | Assembling type tea water kiosk |
CN204212456U (en) * | 2014-11-04 | 2015-03-18 | 中国建筑股份有限公司 | A kind of assembling very-high performance plain concrete rest pavilion |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115263028A (en) * | 2022-08-11 | 2022-11-01 | 中国建筑第五工程局有限公司 | Assembled rib-free high-performance geopolymer concrete canopy |
CN115263028B (en) * | 2022-08-11 | 2024-01-26 | 中国建筑第五工程局有限公司 | Assembled no muscle high performance geopolymer concrete canopy |
Also Published As
Publication number | Publication date |
---|---|
CN104453285B (en) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
CN104153495B (en) | A kind of attachment structure of Multi-function light concrete curtain wall | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN204212456U (en) | A kind of assembling very-high performance plain concrete rest pavilion | |
CN104453285B (en) | A kind of assembled very-high performance plain concrete rest pavilion and construction method thereof | |
CN105780966B (en) | Rapid template system for on-site spraying and building wall | |
CN203716343U (en) | Plastic sheet internal mold cement mortar wall body | |
CN210316030U (en) | Indoor super large curved surface pond surface waterproof construction | |
CN204418559U (en) | A kind of bolt-type syndeton for connecting stair upper end | |
CN103541512B (en) | A kind of preparation method of FRP pipe concrete hetermorphiscal column of built-in high strength concrete filled steel tube stem stem | |
CN103498512B (en) | A kind of assembled architecture wall beam stablizes syndeton | |
CN207513006U (en) | A kind of compound Side fascia | |
CN203429878U (en) | Steel-structure floor board prefabricated in factory | |
CN204112670U (en) | The ventilating shaft that do not leak out in a kind of building | |
CN204959980U (en) | Simple to operate's floor connection structure | |
CN205189174U (en) | Light fitment wall | |
CN204238386U (en) | A kind of U-shaped keel | |
CN204960089U (en) | Novel precast floor slab | |
CN103195267A (en) | Light-weight stainless steel pavilion and production method thereof | |
CN203684411U (en) | U-shaped precast slab connecting member | |
CN219190611U (en) | Arched girder prefab pin-connected panel mould | |
CN203795929U (en) | Form support for haunched wall of basement | |
CN203050101U (en) | Two-surface plastic film clear water circular template | |
CN209277552U (en) | A kind of whole interlock type template steel joist of construction | |
CN201400960Y (en) | Archaizing lu roof connecting body tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160907 Termination date: 20191104 |