CN103195267A - Light-weight stainless steel pavilion and production method thereof - Google Patents

Light-weight stainless steel pavilion and production method thereof Download PDF

Info

Publication number
CN103195267A
CN103195267A CN2013101175460A CN201310117546A CN103195267A CN 103195267 A CN103195267 A CN 103195267A CN 2013101175460 A CN2013101175460 A CN 2013101175460A CN 201310117546 A CN201310117546 A CN 201310117546A CN 103195267 A CN103195267 A CN 103195267A
Authority
CN
China
Prior art keywords
stainless steel
centimeters
beams
booth
pavilion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101175460A
Other languages
Chinese (zh)
Inventor
张明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013101175460A priority Critical patent/CN103195267A/en
Publication of CN103195267A publication Critical patent/CN103195267A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The invention relates to a light-weight stainless steel pavilion and a production method thereof. The light-weight stainless steel pavilion is composed of four stainless steel pavilion columns, four beams, four cross frames, four inclined beams, four water-falling pavilion tops, a top cover and a stainless steel circular ball, wherein the four stainless steel pavilion columns, the four beams, the four cross frames and the four inclined beams are made of stainless steel, and the four water-falling pavilion tops and the top cover are made of stainless steel plates. The four stainless steel pavilion columns form a square and are vertical, the upper ends of the four stainless steel pavilion columns are connected through the four beams, and the lower portions of the four beams are connected and fixed through the four cross frames. The four inclined beams are connected with the middles of the beams or the upper faces of the pavilion columns, the four beams and the inclined beams are connected with the four water-falling pavilion tops matched with the beams and the inclined beams, and the stainless steel top cover and the circular ball are arranged on the top portion of the pavilion tops. The product is welded, has the advantage of being light in weight, high in strength, convenient to produce, transport and install, long in service life, rich and elegant in primary color, gorgeous and durable in colors, free of maintenance, low in cost, economical and practical and the like, can be widely applied to municipal construction small scenic spots and courtyard greening, and is especially suitable for installing and application on high mountains.

Description

Light-duty stainless steel wayside pavilion and production method thereof
Affiliated technical field
The present invention relates to a kind of metal landscape building, particularly a kind of light-duty stainless steel wayside pavilion and production method thereof.
Background technology
Landscape building wayside pavilion is the important component part of China's famous scenery and the scape that occupies a narrow space, and can view and admire, enjoy the cool, have a rest and take shelter from rain for visitor and passerby, welcome by everybody.At present, landscape building wayside pavilion is no matter be classic or modern, generally all adopt watt wooden construction or steel concrete watt wooden construction, though it is elegant in appearance, but watt wooden construction have perishable collapsing, existing of reinforced concrete structure is time-consuming expensive, and building difficulty is built the extremely difficult problem especially on the mountain in.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of can be in plant produced, in light weight, intensity big, easy to use, the long service life of processing, elegant in appearance, cheap, the wayside pavilion that can widely apply.
The present invention's technical scheme that adopts of dealing with problems is: 4 stainless steel booth posts that the present invention adopts the stainless-steel pipe of high-quality wall thickness more than 1 millimeter to make, 4 stainless steel crossbeams, 4 horizontal frames of stainless steel, 4 stainless steel cant beams and 1 the four booth top of falling into water made from the high-quality stainless-steel sheet of thickness more than 1 millimeter, 1 top cover and 1 stainless steel ball are formed, described 4 stainless steel booth post quadrates are upright, this booth post upper end connects with 4 stainless steel crossbeams, this crossbeam below nearby connects with 4 horizontal frames of stainless steel is fixed reinforcing, connect described 4 stainless steel cant beams in the middle part of described 4 crossbeams or above the booth post, this outside, 4 cant beam lower ends is mutually neat with the outer of crossbeam and booth post, and the upper end tilts to middle isogonism and also links together up; The four booths tops of falling into water that 4 crossbeams and being covered with above the cant beam are complementary with it, 1 top cover is arranged at top, described booth top, is welded with 1 ball on the top cover.Stainless steel flat plate can be adopted in described booth top, also can adopt corrosion resistant plate productions such as stainless steel warming plate, and the connection of above-mentioned all parts adopts stainless steel to be welded to connect.Its processing method is: at first choose stainless-steel pipe and thickness high-quality stainless-steel sheet and the stainless steel ball 1 millimeter or more of high-quality wall thickness more than 1 millimeter; Then, size as required, stainless-steel pipe is broken into 4 stainless steel booth posts, 4 stainless steel crossbeams, 4 horizontal frames of stainless steel, 4 stainless steel cant beams: simultaneously high-quality is marked the isosceles trapezoid top board that stainless-steel sheet is cut into 240 centimeters to 480 centimeters high 120 centimeters to 240 centimeters of 10 to 30 centimeters following hem widths of 4 top widths, then, described 4 isosceles trapezoid top board microcephalies are spliced up be welded into the 4 booths tops of falling into water, simultaneously offcut of steel plate is processed 1 15 centimeters * 15 centimeters, high 5 centimeters square stainless steel top cover; Then, described 4 stainless steel booth posts are erected into square, then, are welded together with 4 stainless steel crossbeams in this booth post upper end, then, 15 centimeters to 30 centimeters places below described crossbeam are welded to connect in order to fixing with 4 horizontal frames of stainless steel again; Then, in the middle of described 4 crossbeams or be welded to connect described 4 stainless steel cant beams above the booth post, these 4 cant beams upper ends are welded together to intermediate, inclined and with it, its angle, lower end is equal with outer on 4 crossbeams; Afterwards, described 4 drowning booth tops are placed on the crossbeam and cant beam that is complementary with it, by electric welding it tightly are welded on crossbeam and the cant beam; Then, again stainless steel top cover is welded on four fall into water the booths top go up auspicious, last, the stainless steel ball of on stainless steel top cover, burn-oning.
During use, it is good with concrete casting with the wayside pavilion basis in advance only to need, and wayside pavilion is transported to this place, squeezes in the basis with stainless steel expansion nut 4 booth post temporary lodgings, be welded on the booth post on the bolt or the stainless-steel sheet of burn-oning under the booth post, punching is screwed on this expansion nut with nut just can; Also wayside pavilion can be transported to the wayside pavilion scene of building, wayside pavilion booth post suspension column is poured in the concrete foundation, but, must add the road-side pavilion post when producing in advance.As the big transportation inconvenience of wayside pavilion size, also parts can be transported to on-the-spot welded and installed.
The invention has the beneficial effects as follows: 1. the present invention all adopts stainless steel pipe and the sheet material processing of high-quality wall thickness, adopts full weld to be welded, and production and processing is convenient, the intensity height: 2. adopt bar section of stainless steel, it is rotten can not get rusty, long service life; 3. supports such as booth post and crossbeam all adopt hollow tube, stainless-steel sheet is adopted on the booth top, save material, in light weight, price is low, is easy to transport and install and use, both can be used for the sight spot, also can be used for family's courtyard greening, be particularly suitable at the mountain height place that is difficult to walk, avoided traditional wayside pavilion to build the difficulty of scaffolding and the trouble of the repairerment that often needs painting; 4. adopting all steel structure, seem modern, rich and honour, generous with primary colors, as think gorgeously, also can fill in colors on a sketch and spray paint, is very much convenient; 5. after wayside pavilion installs and fixes, can be at other stifled about high 40 centimeters long 100 centimeters the parapet that be built into brick of every booth post, slabstone is sticked in the outside, both can reinforce the booth post, and can take a load off one's feet and enjoy the cool for the pedestrian again, be very much convenient; 6. as needing production specification big, can increase cant beam quantity, to guarantee effective support on booth top; 7. in sum, the present invention has application and popularization value widely.
Description of drawings
Fig. 1 is perspective exploded view of the present invention.
Among the figure: 1 represents 4 stainless steel booth posts, and 2 represent 4 horizontal frames of stainless steel, and 3 represent 4 stainless steel crossbeams, and 4 represent 4 stainless steel cant beams, and 5 represent four drowning booth tops, and 6 represent stainless steel top cover, and 7 represent the stainless steel ball.
The specific embodiment
, for 3 embodiment the present invention is further described below in conjunction with accompanying drawing 1.
Example 1. is described with summary of the invention as shown in Figure 1, and the present invention is made up of fall into water 5,1 stainless steel top cover 6 in booth top and stainless steel ball 7 of 1,4 stainless steel crossbeams 3 of 4 stainless steel booth posts, 4 horizontal frames 2 of stainless steel, 4 stainless steel cant beams 4 and 1 four.At first, two kinds of stainless steel square tubes with 8 centimeters of the required raw material high-quality of last art parts wall thickness 1 mm dias and 5 centimeters, long 600 centimeters wide 122 centimeters thick 1.2 millimeters stainless-steel sheets and stainless steel ball are purchased, the stainless steel square tube that diameter is 8 centimeters is broken into 4 stainless steel booth posts 1 of long 220 centimeters long, 4 stainless steel crossbeams 3 of 164 centimeters long and the 164 centimeters long horizontal frame 2 of 4 stainless steels, be broken into above 4 middle parts that are connected crossbeam 3 and the stainless steel cant beam 4 of 98 centimeters of the length at the band oblique angle that is complementary with it with the stainless steel square tube of 5 centimeters of diameters, to grow 600 centimeters * wide 122 centimeters stainless-steel sheet again, be cut into high 122 centimeters, 4 isosceles trapezoid top boards that 10 centimeters following face widths of last face width are 240 centimeters, simultaneously offcut of steel plate is processed 1 15 centimeters * 15 centimeters, high 5 centimeters square stainless steel top cover 6 is carried out welding assembly then.At first, described 4 stainless steel booth posts 1 are erected into the square of 180 centimeters of every limit length of sides, then, be welded together with 4 stainless steel crossbeams 3 in this booth post upper end, then, 15 centimeters places below this crossbeam are welded to connect in order to fixing with 4 horizontal frames 2 of stainless steel again; Then, be welded to connect described 4 stainless steel cant beams 5 on described 4 crossbeams 3 centres, these 4 cant beam 5 upper ends link together to intermediate, inclined and above 4 booth post centers, and Rui Jiao is equal with 4 crossbeam 2 outsides down for it; Afterwards, described 4 isosceles trapezoid top board microcephalies are spliced up be welded into the 4 booths tops 5 of falling into water, and it is placed on the crossbeam 3 and cant beam 4 that is complementary with it, then, by electric welding it tightly is welded on crossbeam 3 and the cant beam 4; Then, stainless steel top cover 6 is welded on four again and falls into water auspiciously on the booths top 5, last, the stainless steel ball 7 of burn-oning on stainless steel top cover 6 is just assembled and is finished.During use, in advance that the wayside pavilion basis is good with concrete casting, the present invention is transported to this place, squeeze in the basis with stainless steel expansion nut 4 stainless steel booth post 1 temporary lodgings, this booth post 1 is welded on the stainless steel expansion bolt just can again.
Example 2. adds 25 centimeters of road-side pavilion post 1 sizes as invention as described in the example 1, after soldering group installs, 1,4 stainless steel crossbeams 3 of 4 stainless steel booth posts and 4 horizontal frames 2 of stainless steel is sprayed paint into red, and black is sprayed paint on the 4 booths tops 5 of falling into water.During use, it is transported to newly-built wayside pavilion scene, the suspension column of 4 stainless steel booth posts 1 is directly poured in the concrete foundation for 25 centimeters.After treating concrete setting, at every stainless steel booth post 1 other wallette with about 100 centimeters high 40 centimeters of brick block one stifled length, slabstone is sticked in the outside, but both reinforced stainless steel booth posts 1 can take a load off one's feet and enjoys the cool again for the pedestrian, is very much convenient, and construction is simple, elegant in appearance.
Example 3. is as invention as described in the example 1, build big specification as need, transportation inconvenience is then purchased the material fracture according to big dimensional requirement, material is equipped with complete, transport to the wayside pavilion scene of building, having watered the local directly welded and installed on concrete wayside pavilion basis in advance, simultaneously, also can process supporting stainless steel chair in advance, being installed supportingly in that stainless steel booth post 1 is other, very is convenient.

Claims (1)

1. a light-duty stainless steel wayside pavilion and production method thereof, its architectural feature is: make by 1, the 4 stainless steel crossbeams 3 of 4 stainless steel booth posts that adopt the high-quality stainless-steel pipe to make, 4 horizontal frames 2 of stainless steel, 4 stainless steel cant beams 4 with high-quality mark stainless-steel sheet 1 four fall into water booth 5 and 1 top covers 6 in top and 1 stainless steel ball 7 are formed, described 4 stainless steel booth post 1 quadrates are upright, this booth post 1 upper end connects with 4 stainless steel crossbeams 3, and this crossbeam below connects booth post 1 with 4 horizontal frames 2 of stainless steel nearby; Described 4 crossbeam 3 middle parts or booth post 1 upper end are connecting described 4 stainless steel cant beam 4 lower ends, and its outer is mutually neat with it, and these 4 cant beam 4 upper ends tilt to middle isogonism and also link together in the above; These 4 crossbeams 2 be connected four booths top 5, described four booths that fall into water that fall into water that are complementary with it above 4 cant beams 4 and push up 5 tops 1 stainless steel top cover 6 is arranged, this is welding 1 stainless steel ball 7 above top cover 6.Its production method is: at first choose stainless-steel pipe and thickness high-quality stainless-steel sheet and the stainless steel ball 71 millimeter or more of high-quality wall thickness more than 1 millimeter; Then, size as required, stainless-steel pipe is broken into 1,4 stainless steel crossbeams 3 of 4 stainless steel booth posts, 4 horizontal frames 2 of stainless steel, 4 stainless steel cant beams 4: the isosceles trapezoid top board that simultaneously the high-quality stainless-steel sheet is cut into 240 centimeters to 480 centimeters high 120 centimeters to 240 centimeters of 10 to 30 centimeters following hem widths of 4 top widths, then, described 4 isosceles trapezoid top board microcephalies are spliced up be welded into the 4 booths tops 5 of falling into water, simultaneously offcut of steel plate is processed about 1 15 centimeters * 15 centimeters high 5 centimeters to 15 centimeters square stainless steel top cover 6; Then, described 4 stainless steel booth posts 1 are erected into square, are welded together with 4 stainless steel crossbeams 3 in this booth post 1 upper end, then, 15 centimeters to 30 centimeters places below described crossbeam 3 are welded to connect in order to fixing with 4 horizontal frames 2 of stainless steel again; Then, in the middle of described 4 crossbeams 3 or be welded to connect described 4 stainless steel cant beams 5 above the booth post 1, these 4 cant beam 5 upper ends are welded together to intermediate, inclined and with it, its angle, lower end is equal with outer on 4 crossbeams 2; Afterwards, described 4 drowning booth tops 5 are placed on the crossbeam 3 and cant beam 4 that is complementary with it, by electric welding it tightly are welded on crossbeam 3 and the cant beam 4; Then, again stainless steel top cover 6 is welded on four fall into water auspicious, last on the booths top 5, the stainless steel ball 7 of on stainless steel top cover 6, burn-oning.
CN2013101175460A 2013-04-08 2013-04-08 Light-weight stainless steel pavilion and production method thereof Pending CN103195267A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101175460A CN103195267A (en) 2013-04-08 2013-04-08 Light-weight stainless steel pavilion and production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101175460A CN103195267A (en) 2013-04-08 2013-04-08 Light-weight stainless steel pavilion and production method thereof

Publications (1)

Publication Number Publication Date
CN103195267A true CN103195267A (en) 2013-07-10

Family

ID=48718069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101175460A Pending CN103195267A (en) 2013-04-08 2013-04-08 Light-weight stainless steel pavilion and production method thereof

Country Status (1)

Country Link
CN (1) CN103195267A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025390A (en) * 2018-08-17 2018-12-18 苏州园林发展股份有限公司 A kind of roof truss primary structure member system
CN116727998A (en) * 2023-08-14 2023-09-12 河北宾宏石化设备有限公司 Oblique tee bend pipe fitting fixed-position welding equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM337607U (en) * 2007-12-20 2008-08-01 Cong-Neng Lin Structure of simple pavilion
CN201443210U (en) * 2009-03-17 2010-04-28 新疆科艺达铝塑制造有限公司 Four-corner pavilion assembled by wood-plastic composite material
KR101178895B1 (en) * 2012-04-20 2012-09-03 주식회사 위드조경 Pavilion with connection structure for rust proofing
CN202672790U (en) * 2012-08-10 2013-01-16 重庆博巨玻璃钢有限公司 Octagonal pavilion

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM337607U (en) * 2007-12-20 2008-08-01 Cong-Neng Lin Structure of simple pavilion
CN201443210U (en) * 2009-03-17 2010-04-28 新疆科艺达铝塑制造有限公司 Four-corner pavilion assembled by wood-plastic composite material
KR101178895B1 (en) * 2012-04-20 2012-09-03 주식회사 위드조경 Pavilion with connection structure for rust proofing
CN202672790U (en) * 2012-08-10 2013-01-16 重庆博巨玻璃钢有限公司 Octagonal pavilion

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025390A (en) * 2018-08-17 2018-12-18 苏州园林发展股份有限公司 A kind of roof truss primary structure member system
CN116727998A (en) * 2023-08-14 2023-09-12 河北宾宏石化设备有限公司 Oblique tee bend pipe fitting fixed-position welding equipment
CN116727998B (en) * 2023-08-14 2023-10-13 河北宾宏石化设备有限公司 Oblique tee bend pipe fitting fixed-position welding equipment

Similar Documents

Publication Publication Date Title
CN105569331B (en) A kind of simple support method of concrete cylindrical template
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN109138431B (en) Super high-rise pump pipe bridge crossing device and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN103195267A (en) Light-weight stainless steel pavilion and production method thereof
CN205153530U (en) Structure is assembled to integral template of reinforced concrete floor
CN217232907U (en) Folding fan-shaped classical landscape corridor frame
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN207609011U (en) Assembled architecture agent structure
CN216586226U (en) Large-scale concrete drainage box culvert roof suspension type template support
KR101875476B1 (en) Wooden Bridge Structure for Biosphere Preservation and a Construction Method Thereof
CN205400042U (en) Concrete cylinder template
CN209854531U (en) Street overpass capable of being assembled quickly
CN207934491U (en) A kind of assembled adjustable support frame
CN201274686Y (en) Reinforced concrete booth frame
CN209099893U (en) A kind of construction guard fender
CN209482822U (en) Assembling type fence in concrete
CN215717474U (en) Assembled escape way protection shed for construction
CN217679635U (en) Assembled reinforced concrete wayside pavilion skeleton structure
CN102454255A (en) Prefabricated porous column
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN216588043U (en) Assembled fence
CN113882721B (en) Mountain top view ring corridor
CN216809517U (en) Assembled steel-concrete trestle
CN113502956B (en) Construction method of high-altitude special-shaped inverted inclined plane curtain wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130710