CN104452533B - A kind of spike up apparatus that can simultaneously heat old asphalt concrete - Google Patents

A kind of spike up apparatus that can simultaneously heat old asphalt concrete Download PDF

Info

Publication number
CN104452533B
CN104452533B CN201410719665.8A CN201410719665A CN104452533B CN 104452533 B CN104452533 B CN 104452533B CN 201410719665 A CN201410719665 A CN 201410719665A CN 104452533 B CN104452533 B CN 104452533B
Authority
CN
China
Prior art keywords
heating
rake teeth
air
rake
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410719665.8A
Other languages
Chinese (zh)
Other versions
CN104452533A (en
Inventor
杨士敏
李旋
刘彦峰
马登成
薛金钢
王晓君
邱涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201410719665.8A priority Critical patent/CN104452533B/en
Publication of CN104452533A publication Critical patent/CN104452533A/en
Application granted granted Critical
Publication of CN104452533B publication Critical patent/CN104452533B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/14Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces for heating or drying foundation, paving, or materials thereon, e.g. paint
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/12Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor
    • E01C23/122Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor with power-driven tools, e.g. oscillated hammer apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of spike up apparatus that can simultaneously heat old asphalt concrete, including chassis, road surface pre-heating system, Hot-blast Heating induction system and rake pine heating system are installed on the vehicle frame of chassis: rake pine heating system includes being arranged on bottom of frame and heating rake teeth adjustable with ground distance, heating rake teeth inner hollow, heating rake teeth can move along the direction being parallel to ground;Hot-blast Heating induction system includes air stove, and the pressurization hot blast that air stove provides flows to heat rake teeth and from heating rake teeth internal action in ground;Road surface pre-heating system includes the heating pad wall being arranged on bottom of frame, and heating pad wall is heating between rake teeth and driver's cabin, the distance scalable between itself and ground.The present invention carries out post bake and heats bituminous paving from deep layer bituminous paving, and the good efficiency of heats is high, and during rake pine, rake teeth resistance is little, destroys little to asphalt aggregate grating, the beneficially recycling of old asphalt mixture.

Description

A kind of spike up apparatus that can simultaneously heat old asphalt concrete
Technical field
The present invention relates to the bituminous paving heating rake pine equipment in asphalt pavement maintenance machine tool technical field, specifically Bituminous paving deep layer can directly be heated by one, heats and harrow the rake pine heater of pine bituminous paving.
Background technology
Highway in China quickly grew in recent years, after bituminous paving comes into operation, in vehicle-mounted and external environment etc. Various damage phenomenon is there will be, in order to extend the service life of bituminous paving and ensure drip under the comprehensive function of factor The pavement performance on blue or green road surface, needs in time bituminous paving to be carried out maintenance.Revision at bituminous paving In can produce substantial amounts of waste asphalt mixture, waste asphalt material has certain use value, in order to the most not Destroy old asphalt mixture and ensure the performance of Bituminous concrete surface material, need first old asphalt pavement to be carried out pre-thermal softening and harrow again Pine.
Existing old asphalt pavement hot recycling equipment is all first to preheat asphalt road surface, and then road pavement is entered Row scarifying;But owing to asphalt is the non-conductor of heat, the heat that firing equipment produces is difficult to from asphalt road Surface is delivered to road surface deep layer, can be properly increased the temperature of bituminous paving deep layer by the temperature improving firing equipment Degree but can there is again coking phenomenon on fire because temperature is too high in asphalt road surface, and also may be used by extending heat time heating time Improve the temperature of bituminous paving deep layer but so can consume again more fuel and efficiency of construction can be reduced.
If asphalt pavement warm is spent low, during to bituminous paving rake pine, not only can be greatly increased rake pine equipment Resistance accelerate device damage, and be easily destroyed original grating of asphalt, reduce the performance of compound.
Summary of the invention
For overcoming the deficiencies in the prior art, the goal of the invention of the present invention is to provide one can heat old drip simultaneously The spike up apparatus of blue or green concrete, not only can guarantee that the efficiency of heating surface but also can improve the heats of bituminous paving deep layer.
For achieving the above object, the present invention is by the following technical solutions:
A kind of spike up apparatus that can simultaneously heat old asphalt concrete, including chassis, on the vehicle frame of chassis Road surface pre-heating system, Hot-blast Heating induction system and rake pine heating system are installed: rake pine heating system includes Being arranged on bottom of frame and heating rake teeth adjustable with ground distance, heat rake teeth inner hollow, heating rake teeth can Move along the direction being parallel to ground;Hot-blast Heating induction system includes air stove, the pressurized heat that air stove provides Wind flows to heat rake teeth and from heating rake teeth internal action in ground;Road surface pre-heating system includes being arranged on vehicle frame The heating pad wall of bottom, heating pad wall is heating between rake teeth and driver's cabin, the distance scalable between itself and ground.
Further, described rake pine heating system also includes being arranged on the of bottom of frame by the second hydraulic cylinder Two motion brackets, the second motion bracket is provided with the rake teeth installing plate of setting parallel to the ground, rake teeth installing plate Heating rake teeth described in upper installation;Being provided with motor on second motion bracket, motor drives rake by drive mechanism Tooth installing plate moves along chassis direct of travel on the second motion bracket.
Further, described drive mechanism includes the shaft coupling being connected with motor, and motor is exported by shaft coupling Moment of torsion passes to a reduction box, and the output shaft of reduction box is provided with the first belt wheel;The second described motion On frame, chassis direct of travel being provided with a pair turn-screw, the end of turn-screw is provided with the second belt wheel, Connected by belt between first belt wheel and the second belt wheel;It is symmetrically installed with feed screw nut on two turn-screws, Described rake teeth installing plate is fixedly mounted on feed screw nut.
Further, the vehicle frame of described chassis being provided with fuel tank, fuel tank passes through petroleum pipeline by fuel oil Flow to the burner being arranged in air stove, burner arranges the combustion air carrying air in oriented burner After machine, fuel oil and air mix in the burner, sprayed in air stove by fuel nozzle and burn;In air stove Being connected by the second air delivery pipe and have aerator, aerator blasts air in air stove, and air fires with fuel oil The flue gas that burning produces mixes in being incorporated in the burner hearth of air stove and carries out heat exchange formation high-pressure hot wind, and high-pressure hot wind is through hot blast Conveying pipe is supplied to heat rake teeth.
Further, described hot blast conveying pipe passes perpendicularly through vehicle frame and arranges, and hot blast conveying pipe is by different pipelines Slitless connection forms, and retractable but hot blast will not escape from pipeline junction;The lower end peace of hot blast conveying pipe Equipped with air bells cap, air bells cap is up-small and down-big umbrella-shaped structure, and air bells cap top and hot blast conveying pipe pass through even, under Rake teeth installing plate described in end installation.
Further, multiple rows of multiple row installing hole being distributed on described rake teeth installing plate, described heating rake teeth leads to Crossing installing hole to be fixedly mounted on rake teeth installing plate, the high-pressure hot wind in air stove is through hot blast conveying pipe, hot blast Installing hole on cover, rake teeth installing plate, from the internal action of heating rake teeth on ground.
Further, described heating pad wall is arranged on the first motion bracket of bottom of frame, and heating pad wall is parallel to Ground is arranged, and the first motion bracket is connected to bottom of frame by the first hydraulic cylinder;On the vehicle frame of chassis Being provided with combustion gas storage tank, the liquefied petroleum gas in combustion gas storage tank is delivered to gasifier by gas supply pipe, Fuel gas transmission that the gasifying liquefied petroleum gas of liquid is gaseous state to heating pad wall, and is installed on heating pad wall by gasifier There is the pressure fan being connected heating pad wall by the first air delivery pipe;Metallic fiber sintered felt is distributed in heating pad wall, In metallic fiber sintered felt surface combustion after combustion gas and air mixing, the infrared ray action of generation is in ground.
Further, the pipeline connecting gasifier and heating pad wall is provided with pressure-regulating valve and gaseous-pressure is opened Close, heating pad wall is provided with the gas electromagnetic valve for controlling heating pad wall combustion gas break-make.
Further, the driver's cabin of described chassis is provided with control station, control station is provided with utilization control The first hydraulicdirectional control valve that handle processed adjusts, for controlling the first hydraulic cylinder works.
Further, the second described hydraulic cylinder is controlled by the second hydraulicdirectional control valve arranged in driver's cabin.
The present invention compared with prior art has the advantage that
1) present invention uses the mode that preheating and heating rake teeth coordinate, initially with the mode pair of infra-red radiation Road surface preheats, and then utilizes the rake teeth with heating function to act on Colophonium cranium face, uses a device complete Become the work that in traditional operation, two steps just can complete, effectively saved the energy, improve working performance;
2) have employed hollow rake toothing, high-pressure hot wind can be acted on after heating pad wall preheats by rake teeth Road surface, road surface carries out harrowing during pine, can heat the bituminous concrete of rake teeth contact site simultaneously, Loosen so that Colophonium softens, it is simple to rake pine process, make heats more preferable;
3) use the mode of dual-heated, relatively prior art improves heating-up temperature or the way phase of heat time heating time Ratio, efficiently avoid bituminous paving and occurs that fire coking affects the situation of rake pine efficiency, saved the energy simultaneously, The abundant thermoplastic of Colophonium of energy road pavement relatively deep, makes rake pine effective;
4) carried out sufficient preheating and the heating process of rake pine process due to road pavement, made road surface fully soften, So during rake pine, it is difficult to smash the aggregate of old asphalt mixture, the grating of compound is destroyed little, just In the later use of waste material, protect pavement structure simultaneously;
5), after road surface fully softens, the resistance making rake teeth operationally face is less, is effectively improved rake teeth And the service life of its accessory structure, the effective utilization making device is higher;
6) whole device is integrated on a chassis, it is simple to manipulates it and works under various road conditions, and transition is convenient; Utilize hydraulic way to control the distance adjusting preheating device and spike up apparatus with ground, make integrally-built reliability Height, more convenient to operate.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the road surface pre-heating system structural representation of the present invention;
Fig. 3 is the Hot-blast Heating induction system structural representation of the present invention;
Fig. 4 is that the rake pine heating system of the present invention looks up structural representation;
Fig. 5 is the hydraulic control system configuration schematic diagram of the present invention;
In figure, label represents: 1 driver's cabin, 2 combustion gas storage tanks, 3 gas supply pipes, 4 fuel tanks, 5 hot blast conveying pipes, 6 air stovees, 7 burner hearths, 8 combustion fans, 9 burners, 10 second is empty Letter shoot, 11 aerators, 12 petroleum pipelines, 13 first belt wheels, 14 second belt wheels, 15 slow down Case, 16 second hydraulic cylinders, 17 motors, 18 air bells caps, 19 heating rake teeths, 20 first hydraulic cylinders, 21 first air delivery pipes, 22 heating pad walls, 23 pressure fan, 24 first motion brackets, 25 vehicle frames, 26 control stations, 27 first hydraulicdirectional control valves, 28 bearings, 29 feed screw nuts, 30 trip bolts, 31 turn-screws, 32 belts, 33 shaft couplings, 34 rake teeth installing plates, 35 second motion brackets, 36 second hydraulicdirectional control valves, 37 pressure-regulating valves, 38 gaseous-pressure switches, 39 gas electromagnetic valves, 40 air pressure switch, 41 gasifiers, 42 fuel nozzles, 43 joysticks;
Detailed description of the invention
During traditional bituminous paving rake pine, need road pavement to preheat, then carry out rake pine, need two Process.But, during the preheating of road surface, it is beneficial to rake pine for fully making bituminous paving obtain softening, frequently with to same One place carries out long-time heating or the method improving heating-up temperature: the common defects of both approaches is, consumption Taking the more energy, effect is unsatisfactory simultaneously, reason be long-time or under the effect of high temperature, asphalt road Easily there is coking phenomenon in face, has influence on rake pine process on the contrary;It addition, carry out rake pine after preheated, need more Coordinate closely, but can not accomplish effectively to coordinate in actual mechanical process so that road surface is multiple after softening to be become again Firmly, many troubles are brought to actual mechanical process.
For these problems, the present invention proposes a kind of spike up apparatus, uses integral structure, preheats and harrow pine Process slitless connection, makes road surface fully soften and is beneficial to harrow pine process, effectively protect pavement structure simultaneously, make Road surface operation can be carried out without any confusion.
As it is shown in figure 1, a kind of spike up apparatus that can simultaneously heat old asphalt concrete, including chassis, the end Road surface pre-heating system, Hot-blast Heating induction system are installed on the vehicle frame 25 of jiggering and harrow pine heating system: Rake pine heating system includes being arranged on bottom vehicle frame 25 and heating rake teeth 19 adjustable with ground distance, heating rake Tooth 19 inner hollow, heating rake teeth 19 can move along the direction being parallel to ground;Hot-blast Heating induction system bag Including air stove 6, the pressurization hot blast that air stove 6 provides flows to heat rake teeth 19 and from heating rake teeth 19 inside Act on ground;Road surface pre-heating system includes the heating pad wall 22 being arranged on bottom vehicle frame 25, heating pad wall 22 Between heating rake teeth 19 and driver's cabin 1, the distance scalable between itself and ground.
The operation principle of the present invention is, bituminous paving is carried out by the infrared ray produced by bituminous paving pre-heating system Rapidly pre-warming, then stretches into the deep layer of the bituminous paving being preheated softening by heating rake teeth 19, and Hot-blast Heating is defeated The hot blast sending system feed is discharged by the end of heating rake teeth 19 and bituminous paving deep layer is carried out post bake, By moving left and right of heating rake teeth 19, the bituminous paving softened is carried out rake pine simultaneously.
Road surface pre-heating system and rake pine heating system are integrated on the vehicle frame 25 of chassis, one in front and one in back arrange, Along with travelling forward of chassis, as long as adjusting preheating rate and speed, in the situation that chassis speed stabilizing travels Under, preheating and rake pine process can be made to closely cooperate, along with the traveling of vehicle, the rake pine on road surface can be completed, relatively Traditional mode is compared, and only can complete overall work by an equipment.
For road pavement carry out preheating for heating pad wall 22, heating pad wall 22 acts on by the way of infra-red radiation Road surface, infrared ray can reach the penetration capacity of 2~3 inches to bituminous concrete, wanting when meeting actually used Ask;And the distance between heating pad wall 22 and road surface can adjust, road conditions structure preferably in the case of, can be by Heating pad wall 22 adjust to road surface degree relatively, make infrared energy useful effect in ground, improve The pre-thermal efficiency;The position of heating pad wall 22 is relatively heated rake teeth 19 and is being transported forward closer to driver's cabin 1, such vehicle Cooperation is easily facilitated time dynamic.
In rake pine heating system, act on road surface for heating rake teeth 19, this is a kind of to arrange in rake teeth The structure of empty passage, the high-temperature hot-air of pressurization, when turning over rake road surface, is acted on it by its hollow structure by rake teeth In the pavement structure opened, make pavement structure obtain post bake and soften;Owing to pressurization hot blast directly acts on road Inside face, make hot blast and pavement structure can have contact area more abundant, wider array of, in the feelings ensureing hot blast temperature Under condition, post bake can make road surface reach good softening degree, so that rake pine process efficiency is higher.
For for heating rake teeth 19 provide high-pressure hot wind for Hot-blast Heating induction system, this system utilizes and arranges Air stove 6 on vehicle frame 25, the high temperature and high pressure gas produced in air stove 6 is supplied to heat rake teeth 19, By heating rake teeth 19 internal action on road surface.High temperature and high pressure gas can be produced by fuel oil burning and air mixing Raw, fuel oil volume after combustion increases generation high temperature, with the form of high pressure mixing flue gas after mixing with the air of conveying Output, makes road surface sufficiently be heated.
By integrated for said system on a chassis, the engagement process being not only convenient between system, also improve whole The mobility of device, it is simple to be transferred to operation section, can utilize the mode of automatic Pilot simultaneously, makes whole rake pine Process is automatically performed, and saves a large amount of manpower.
In order to make this device can more good berth, inventor further provides for following architectural feature:
Rake pine heating system also includes being arranged on the second motion bracket bottom vehicle frame 25 by the second hydraulic cylinder 16 35, the second motion bracket 35 is provided with the rake teeth installing plate 34 of setting parallel to the ground, rake teeth installing plate 34 Heating rake teeth 19 described in upper installation;Being provided with motor 17 on second motion bracket 35, motor 17 is by passing Motivation structure drives rake teeth installing plate 34 to move along chassis direct of travel on the second motion bracket 35.
Heating rake teeth 19 is to act on ground with the angle by close to ninety degrees, so that rake teeth can fully stretch into also Open road surface;In order to adjust heating rake teeth 19 approach degree, simultaneously facilitate the transfer process of chassis, arrange Second hydraulic cylinder 16 structure;When second hydraulic cylinder 16 extends or shrinks, the second motion bracket 35 can be adjusted And the distance between road surface, the most just have adjusted heating rake teeth 19 and stretches into the degree on road surface.Certainly heating rake teeth 19 Can also be tulwar shape, beneficially cutting process.For the ease of opening road surface, rake teeth needs certain reciprocating motion, In this programme, utilize motor 17 and drive mechanism, the torque axis of motor 17 is turned to rake teeth installing plate 34 Horizontal reciprocating movement, drives heating rake teeth 19 to move then.During reciprocating motion, can be with the second motion bracket 35 is fixing device, uses the various ways such as slot fit or tooth cooperation to realize.It addition, for ease of automatization Process, it is also possible to arrange sensor on the rake teeth 19 of part heating wherein, stretches into monitoring heating rake teeth 19 The amount of resistance on road surface, thus automatically or by operator manually adjust the degree of heat of road surface pre-heating system with Heating pad wall 22, distance between rake teeth installing plate 34 and ground, can complete actual work by optimum cooperation Make.
Drive mechanism includes the shaft coupling 33 being connected with motor 17, the moment of torsion that motor 17 is exported by shaft coupling 33 Pass to a reduction box 15, the output shaft of reduction box 15 is provided with the first belt wheel 13;The second described fortune On dynamic support 35, chassis direct of travel is provided with a pair turn-screw 31, the end peace of turn-screw 31 Equipped with the second belt wheel 14, connected by belt 32 between the first belt wheel 13 and the second belt wheel 14;Two transmissions Being symmetrically installed with feed screw nut 29 on leading screw 31, described rake teeth installing plate 34 is fixedly mounted on feed screw nut On 29.
As shown in Figure 4, one more preferably drive mechanism, is to utilize the transmission such as shaft coupling 33, belt wheel to turn round Square: be provided with turn-screw 31 on the second motion bracket 35, turn-screw 31 is arranged on the by bearing 28 On two motion brackets 35;As rake teeth installing plate 34 tracks, rake teeth installing plate 34 passes through trip bolt 30 are fixed on feed screw nut 29, thus are arranged on turn-screw 31;When motor 17 operates, lead to successively Cross shaft coupling 33, rotating speed is carried out reasonable adjusting by reduction box 15, then utilize the first belt wheel 13, belt 32, The cooperation of the second belt wheel 14, is converted to the rotation process of turn-screw 31;And turn-screw 31 is when rotating, Make the feed screw nut 29 on turn-screw 31 move, and drive rake teeth installing plate 34 to move, make heating rake teeth 19 act on road surface in the way of motion;By changing the rotation direction of motor 17, heating rake teeth 19 can be changed The direction of motion.
Being provided with fuel tank 4 on the vehicle frame 25 of chassis, fuel oil is flowed to by fuel tank 4 by petroleum pipeline 12 The burner 9 being arranged in air stove 6, burner 9 is arranged in oriented burner 9 and carries the combustion-supporting of air After blower fan 8, fuel oil and air mix in burner 9, sprayed in air stove 6 by fuel nozzle 42 and fire Burn;Being connected by the second air delivery pipe 10 in air stove 6 and have aerator 11, aerator 11 is to air stove 6 In blast air, the flue gas that air and fuel oil burning produce mixes in being incorporated in the burner hearth 7 of air stove 6 and carries out heat exchange Forming high-pressure hot wind, high-pressure hot wind is supplied to heat rake teeth 19 through hot blast conveying pipe 5.
As it is shown on figure 3, utilize sufficient space on vehicle frame 25, fuel tank 4 and air stove 6 structure are installed, Fuel oil is slowly transported in burner 9 by fuel feed pipe, and the effect of burner 9 is, by appropriate fuel oil And the air that combustion fan 8 provides mixes, then sprayed in air stove 6 by fuel nozzle 42.Combustion When oil burner nozzle 42 sprays fuel oil, make fuel oil be atomized shape, be separated into little granule, then light, same to vapour In car engine, combustion process is similar to, and fuel-oil atmozation provides burning condition more fully, with combustion fan 8 The partial air vigorous combustion provided, carries out heat transfer process in burner hearth 7, and volume increases suddenly, produces high temperature High pressure flue gas;Now recycling aerator 11 fills by carrying in air stove 6 in the second air delivery pipe 10 Foot air, is supplied to heat rake teeth 19 through hot blast conveying pipe 5 after mixing with flue gas, and completes the product of hot blast Raw, course of conveying.Combustion process and the blast of hot blast, temperature etc. can be controlled by adjusting twice intake.
Hot blast conveying pipe 5 passes perpendicularly through vehicle frame 25 and arranges, and hot blast conveying pipe 5 is by different pipeline slitless connections Forming, retractable but hot blast will not escape from pipeline junction;The lower end of hot blast conveying pipe 5 is provided with heat Fan housing 18, air bells cap 18 is up-small and down-big umbrella-shaped structure, and air bells cap 18 top is passed through with hot blast conveying pipe 5 Even, the rake teeth installing plate 34 described in the installation of lower end.
Hot blast conveying pipe 5, during carrying heat air delivery, also wants the problems faced to be, owing to heating rake teeth During 19 act on bottom surface, pavement structure difference can cause heating rake teeth 19 and move up and down, as hot blast is defeated Send pipe 5 to use rigidly connected mode, easily cause it and fracture.Use the structure of this slitless connection, can make Hot blast conveying pipe 5 stretches, then, when heating rake teeth 19 moves, hot blast conveying pipe 5 also will not be made to be affected. A kind of structure of slitless connection is, uses the pipeline of different tube diameters, the external diameter of the pipeline of relatively pipe with small pipe diameter and bigger pipe The internal diameter in road is similar and extend in bigger pipeline, makes the pipeline outer wall of relatively pipe with small pipe diameter be in close contact bigger pipeline Inwall and can slide, be consequently formed hot blast conveying pipe 5, and sealing structure can be added ensure the process in slip In sealing.Air bells cap 18 is installed in the bottom of hot blast conveying pipe 5, in order to coordinate with heating rake teeth 19. Air bells cap 18 is the most airtight, at its big end close installation rake teeth installing plate 34, rake teeth installing plate 34 outer wall Consolidation is held greatly with air bells cap 18, after making hot blast enter air bells cap 18, can only be through rake teeth installing plate 34 to enter Enter in heating rake teeth 19.
Multiple rows of multiple row installing hole is distributed on rake teeth installing plate 34, and described heating rake teeth 19 is solid by installing hole Dingan County is contained on rake teeth installing plate 34, and the high-pressure hot wind in air stove 6 is through hot blast conveying pipe 5, air bells cap 18, the installing hole on rake teeth installing plate 34, from the internal action of heating rake teeth 19 on ground.
An installing hole on rake teeth installing plate 34, a corresponding rake teeth, installing hole and heating rake teeth 19 hollow Passage docking, after hot blast enters into air bells cap 18, obtain part slow release, enter from installing hole equably In each heating rake teeth 19, then act on ground.
Heating pad wall 22 is arranged on the first motion bracket 24 bottom vehicle frame 25, and heating pad wall 22 is parallel to ground Arrange, and the first motion bracket 24 is connected to bottom vehicle frame 25 by the first hydraulic cylinder 20;In chassis Being provided with combustion gas storage tank 2 on vehicle frame 25, the liquefied petroleum gas in combustion gas storage tank 2 passes through gas supply pipe 3 Being delivered to gasifier 41, the fuel gas transmission that the gasifying liquefied petroleum gas of liquid is gaseous state is extremely heated by gasifier 41 Wall 22, and the pressure fan being connected heating pad wall 22 by the first air delivery pipe 21 is installed on heating pad wall 22 23;It is distributed in heating pad wall 22 after metallic fiber sintered felt, combustion gas and air mix at metallic fiber sintered felt Surface combustion, the infrared ray action of generation is in ground.
Heating pad wall 22 is arranged on the first motion bracket 24, uses Infrared Heating wall 22.It is the most abreast Face is arranged so that it is the part homogeneous heating of covering.Utilize the first hydraulic cylinder 20, the first motion bracket can be adjusted With the distance on ground, the most just have adjusted the distance of heating pad wall 22 and ground.The energy of heating pad wall 22 is from vehicle frame Combustion gas storage tank 2 on 25, wherein storage have liquefied petroleum gas, liquefied petroleum gas through gasification after at heating pad wall Vigorous combustion in 22, and pressure fan 23 by the first air delivery pipe 21 provide sufficient air to help Combustion process.Liquefied petroleum gas mixing air metallic fiber surface vigorous combustion in heating pad wall 22, metal Fiber felt as medium and heater element, service life length, burning fully, radiation efficiency is high, and burning produces Infra-red radiation penetration power is strong, it is easy to absorbed by bituminous concrete, so that road surface softens.Heating pad wall 22 big Little and its infrared intensity can be adjusted with air output during burning by the amount adjusting transportation of liquefied oil gas Whole, for different pavement structures, should suitably adjust.
The pipeline connecting gasifier 41 and heating pad wall 22 is provided with pressure-regulating valve 37 and gaseous-pressure is opened Close 38, heating pad wall 22 is provided with the gas electromagnetic valve 39 for controlling heating pad wall 22 combustion gas break-make.
Pressure-regulating valve 37 is used for regulating and stabilization of export gaseous-pressure, and gaseous-pressure switch 38 is used for detecting combustion The output pressure of gas, to provide switching signal for control system when output pressure is too low, and control system is in combustion gas Stopping supply during hypotony, gas electromagnetic valve 39 is used for controlling the break-make of heating pad wall 22 combustion gas.In pressure fan Being provided with air pressure switch 40 on 23, air pressure switch 40 is used for detecting the supply gas pressure of pressure fan 23, To there is provided switching signal for control system when output pressure is too low, control system is in pressure fan 23 hypotony Time stop supply, the effect of two pressure switches is all to ensure that enough burnup power is to reach the most radial State, prevents the bad condition of heating pad wall 22 radiant panel from occurring.
The driver's cabin 1 of chassis is provided with control station 26, control station 26 is provided with and utilizes joystick 43 The first hydraulicdirectional control valve 27 adjusted, works for controlling the first hydraulic cylinder 20;Second hydraulic cylinder 16 is by driving Sail the second hydraulicdirectional control valve 36 arranged in room 1 to control.
The control system integration of whole device is in the control station 26 of driver's cabin 1, by operator Whole device is made to work;Wherein for adjust heating pad wall 22 height for the first hydraulicdirectional control valve 27, such as Fig. 5 Shown in, for adjust heating rake teeth 19 height for the second hydraulicdirectional control valve 36;In addition, remainder Switch can also be integrated on control station 26, it is simple to the operation of driver.
Respectively switch, valve etc. in this programme, can manually control, it is also possible to uses automated control to realize: Integrated manipulator and display screen in control station 26, by the collection of running parameter in each system and control strategy Setting, make whole spike up apparatus automatically work;Driver can be observed the work of device the most on a display screen Make situation, can intervene in time when abnormal conditions occur, thus improve the automaticity of this device.

Claims (8)

1. can heat a spike up apparatus for old asphalt concrete, including chassis simultaneously, it is characterised in that Being provided with road surface pre-heating system, Hot-blast Heating induction system and rake pine heating on the vehicle frame (25) of chassis is System: rake pine heating system includes being arranged on vehicle frame (25) bottom and heating rake teeth (19) adjustable with ground distance, Heating rake teeth (19) inner hollow, heating rake teeth (19) can be moved along the direction being parallel to ground;Hot blast adds Heated conveying system includes that air stove (6), the pressurization hot blast that air stove (6) provides flow to heat rake teeth (19) And from heating rake teeth (19) internal action in ground;Road surface pre-heating system includes being arranged on vehicle frame (25) bottom Heating pad wall (22), heating pad wall (22) be positioned at heating rake teeth (19) and driver's cabin (1) between, its with Distance scalable between face;
Described rake pine heating system also includes being arranged on vehicle frame (25) bottom by the second hydraulic cylinder (16) Second motion bracket (35), the rake teeth that the second motion bracket (35) is provided with setting parallel to the ground is installed Plate (34), the heating rake teeth (19) described in the upper installation of rake teeth installing plate (34);Second motion bracket (35) On be provided with motor (17), motor (17) by drive mechanism drive rake teeth installing plate (34) second fortune Move along chassis direct of travel on dynamic support (35);
Described heating pad wall (22) is arranged on first motion bracket (24) of vehicle frame (25) bottom, heating Wall (22) is parallel to ground and arranges, and the first motion bracket (24) is connected to by the first hydraulic cylinder (20) Vehicle frame (25) bottom;The vehicle frame (25) of chassis is provided with combustion gas storage tank (2), combustion gas storage tank (2) liquefied petroleum gas in is delivered to gasifier (41), gasifier (41) by gas supply pipe (3) By fuel gas transmission that the gasifying liquefied petroleum gas of liquid is gaseous state to heating pad wall (22), and in heating pad wall (22) On be provided with by the first air delivery pipe (21) connect heating pad wall (22) pressure fan (23);Heating pad wall (22) it is distributed in after metallic fiber sintered felt, combustion gas and air mix in metallic fiber sintered felt surface combustion, The infrared ray action produced is in ground.
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 1, its feature exists simultaneously In, described drive mechanism includes the shaft coupling (33) being connected with motor (17), and shaft coupling (33) is by electricity The moment of torsion that machine (17) exports passes to a reduction box (15), and the output shaft of reduction box (15) is provided with First belt wheel (13);On described the second motion bracket (35), chassis direct of travel is provided with a pair biography Movable wire thick stick (31), the end of turn-screw (31) is provided with the second belt wheel (14), the first belt wheel (13) and Connected by belt (32) between second belt wheel (14);It is symmetrically installed with silk on two turn-screws (31) Thick stick nut (29), described rake teeth installing plate (34) is fixedly mounted on feed screw nut (29).
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 1, its feature exists simultaneously In, the vehicle frame (25) of described chassis is provided with fuel tank (4), fuel tank (4) passes through petroleum pipeline (12) fuel oil flows to the burner (9) being arranged in air stove (6), and burner is provided with on (9) After in burner (9), the combustion fan (8) of conveying air, fuel oil and air mix in burner (9), Burning in air stove (6) is sprayed into by fuel nozzle (42);Carried by the second air in air stove (6) Pipe (10) connects aerator (11), and aerator (11) blasts air in air stove (6), air with Carry out heat exchange in the mixed burner hearth (7) being incorporated in air stove (6) of the flue gas that fuel oil mixed combustion produces and form high pressure Hot blast, high-pressure hot wind is supplied to heat rake teeth (19) through hot blast conveying pipe (5).
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 3, its feature exists simultaneously In, described hot blast conveying pipe (5) passes perpendicularly through vehicle frame (25) and arranges, and hot blast conveying pipe (5) is by difference Pipeline slitless connection form, retractable but hot blast will not escape from pipeline junction;Hot blast conveying pipe (5) Lower end air bells cap (18) is installed, air bells cap (18) is up-small and down-big umbrella-shaped structure, air bells cap (18) Top and hot blast conveying pipe (5) company of passing through, the rake teeth installing plate (34) described in the installation of lower end.
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 4, its feature exists simultaneously In, multiple rows of multiple row installing hole, described heating rake teeth (19) are distributed on described rake teeth installing plate (34) Being fixedly mounted on rake teeth installing plate (34) by installing hole, the high-pressure hot wind in air stove (6) is through overheated Installing hole on wind conveying pipe (5), air bells cap (18), rake teeth installing plate (34), from heating rake teeth (19) Internal action on ground.
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 1, its feature exists simultaneously In, the pipeline connecting gasifier (41) and heating pad wall (22) is provided with pressure-regulating valve (37) and combustion Gas pressure switch (38), is provided with for controlling heating pad wall (22) combustion gas break-make in heating pad wall (22) Gas electromagnetic valve (39).
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 1, its feature exists simultaneously In, the driver's cabin (1) of described chassis is provided with control station (26), control station is provided with on (26) Utilize the first hydraulicdirectional control valve (27) that joystick (43) adjusts, for controlling the first hydraulic cylinder (20) Work.
Can heat the spike up apparatus of old asphalt concrete the most as claimed in claim 1, its feature exists simultaneously In, described the second hydraulic cylinder (16) is by the second hydraulicdirectional control valve (36) control arranged in driver's cabin (1) System.
CN201410719665.8A 2014-12-01 2014-12-01 A kind of spike up apparatus that can simultaneously heat old asphalt concrete Expired - Fee Related CN104452533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410719665.8A CN104452533B (en) 2014-12-01 2014-12-01 A kind of spike up apparatus that can simultaneously heat old asphalt concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410719665.8A CN104452533B (en) 2014-12-01 2014-12-01 A kind of spike up apparatus that can simultaneously heat old asphalt concrete

Publications (2)

Publication Number Publication Date
CN104452533A CN104452533A (en) 2015-03-25
CN104452533B true CN104452533B (en) 2016-08-24

Family

ID=52899234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410719665.8A Expired - Fee Related CN104452533B (en) 2014-12-01 2014-12-01 A kind of spike up apparatus that can simultaneously heat old asphalt concrete

Country Status (1)

Country Link
CN (1) CN104452533B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105319238A (en) * 2015-11-16 2016-02-10 长安大学 Infrared heating testing device and testing method for bituminous pavement
CN106087681A (en) * 2016-08-12 2016-11-09 山东省路桥集团有限公司 The loosening apparatus of Milled asphalt materials
CN106065557A (en) * 2016-08-12 2016-11-02 山东省路桥集团有限公司 Sheet pavement in-situ heat regeneration concurrent heating machine
CN107130506B (en) * 2017-07-07 2019-09-17 中航国际成套设备有限公司 Town road Rapid-Repair structure and its construction method
CN110644338B (en) * 2017-09-27 2021-03-19 苏州固特斯电子科技有限公司 Pavement blue flame thermal regeneration repairing machine
CN108221566A (en) * 2018-02-27 2018-06-29 广东华起建设工程有限公司 A kind of paver of synchronous spread heated bitumen
CN108999065B (en) * 2018-08-07 2020-01-24 扬州天达建设集团有限公司 Highway bituminous paving prosthetic devices
CN108999133B (en) * 2018-08-07 2020-05-01 四川双果公路工程有限公司 Highway pavement repairing method
CN108999132B (en) * 2018-08-07 2020-06-02 安徽诺乐知识产权服务有限公司 Highway pavement finishing method
CN108999066B (en) * 2018-08-07 2020-01-14 广州华南路桥实业有限公司 Highway road surface prosthetic devices
CN110700066B (en) * 2019-09-04 2021-11-12 合肥工业大学 Multifunctional asphalt pavement pit slot repairing vehicle based on electromagnetic heating
CN111501484A (en) * 2020-04-23 2020-08-07 江苏集萃道路工程技术与装备研究所有限公司 Heating device for giving consideration to secondary temperature raising and pavement thermal connection of asphalt mixture
CN111676774B (en) * 2020-05-08 2021-08-24 江苏集萃道路工程技术与装备研究所有限公司 Remixer
CN111576143A (en) * 2020-05-19 2020-08-25 知行良知实业股份有限公司 Preparation system and preparation method of drainage fully-regenerated material
CN113684746B (en) * 2021-09-02 2023-05-09 刘洪伟 Pavement maintenance device for road construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298751A (en) * 2008-06-20 2008-11-05 奔腾(国际)汽车科技有限公司 Asphalt pavement spike up apparatus
CN201610515U (en) * 2010-03-02 2010-10-20 南京英达公路养护车制造有限公司 Asphalt pavement spiking-up material-collecting vehicle for asphalt pavement on-site heat regeneration
KR101148258B1 (en) * 2008-09-12 2012-05-25 신운철 Dump style movable type ascon keeping warm vehicle
WO2012100285A1 (en) * 2011-01-27 2012-08-02 Herbert Johann Trimborn Apparatus for applying hot mix for tar sealed roads
CN202416139U (en) * 2011-12-30 2012-09-05 长安大学 Pavement thermal regeneration spike-up machine
CN204266083U (en) * 2014-12-01 2015-04-15 长安大学 A kind of spike up apparatus that simultaneously can heat old asphalt concrete

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298751A (en) * 2008-06-20 2008-11-05 奔腾(国际)汽车科技有限公司 Asphalt pavement spike up apparatus
KR101148258B1 (en) * 2008-09-12 2012-05-25 신운철 Dump style movable type ascon keeping warm vehicle
CN201610515U (en) * 2010-03-02 2010-10-20 南京英达公路养护车制造有限公司 Asphalt pavement spiking-up material-collecting vehicle for asphalt pavement on-site heat regeneration
WO2012100285A1 (en) * 2011-01-27 2012-08-02 Herbert Johann Trimborn Apparatus for applying hot mix for tar sealed roads
CN202416139U (en) * 2011-12-30 2012-09-05 长安大学 Pavement thermal regeneration spike-up machine
CN204266083U (en) * 2014-12-01 2015-04-15 长安大学 A kind of spike up apparatus that simultaneously can heat old asphalt concrete

Also Published As

Publication number Publication date
CN104452533A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104452533B (en) A kind of spike up apparatus that can simultaneously heat old asphalt concrete
CN100441776C (en) In-place heat regeneration asphalt pavement remixer
CN107524070B (en) A kind of multistage sheet pavement in-situ heat regeneration equipment
CN108867288B (en) Multi-functional maintenance car suitable for bituminous paving repairs
CN206289505U (en) Sheet pavement in-situ heat regeneration unit
CN105155391B (en) Hot blast for road surface hot recycling is layered reheating locomotive
CN206512578U (en) Local hot regenerating
CN103541303B (en) Continuous asphalt reworked material hot air circulation heating device
CN105926413A (en) Hotin-place recycling engine for pavement
CN103993549A (en) Infrared radiation and hot air composite heating asphalt pavement maintenance truck
CN201125361Y (en) Vehicle mounted type tar pavement maintenance car
CN108252188A (en) A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology
CN110685206A (en) Asphalt mixture combined type heating and stirring vehicle
CN204266083U (en) A kind of spike up apparatus that simultaneously can heat old asphalt concrete
CN202247652U (en) Heat regeneration milling machine
CN2900613Y (en) Blue flame road surface heating and repairing machine
CN100441777C (en) Tar pavement heat wind circulation heating equipment
CN207331411U (en) A kind of multistage sheet pavement in-situ heat regeneration equipment
CN201762647U (en) Bituminous pavement maintenance heating device
CN211113019U (en) Asphalt mixture combined type heating and stirring vehicle
CN203383132U (en) Hot air heater for walling crib pavement
CN207347899U (en) A kind of multistage sheet pavement in-situ heat regeneration equipment
CN203923866U (en) Infrared radiation and hot blast composite heating type asphalt pavement maintanance truck
CN205893870U (en) Bituminous mixture drying system
CN100453735C (en) Asphalt pavement mixture field heating regeneration heaters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20181201

CF01 Termination of patent right due to non-payment of annual fee