CN108252188A - A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology - Google Patents

A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology Download PDF

Info

Publication number
CN108252188A
CN108252188A CN201810045096.1A CN201810045096A CN108252188A CN 108252188 A CN108252188 A CN 108252188A CN 201810045096 A CN201810045096 A CN 201810045096A CN 108252188 A CN108252188 A CN 108252188A
Authority
CN
China
Prior art keywords
hot
heating
microwave
milling
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810045096.1A
Other languages
Chinese (zh)
Inventor
张江勇
任化杰
郑健龙
张陈
焦生杰
陆平
李家春
燕铎
李骁斐
吴振毅
樊丽丽
王贵
解睿
高子渝
顾海荣
张翼飞
于新
叶敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Study Of Jiangsu Road Engineering Technology And Equipment Co Ltd
Original Assignee
Study Of Jiangsu Road Engineering Technology And Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Study Of Jiangsu Road Engineering Technology And Equipment Co Ltd filed Critical Study Of Jiangsu Road Engineering Technology And Equipment Co Ltd
Priority to CN201810045096.1A priority Critical patent/CN108252188A/en
Publication of CN108252188A publication Critical patent/CN108252188A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/065Recycling in place or on the road, i.e. hot or cold reprocessing of paving in situ or on the traffic surface, with or without adding virgin material or lifting of salvaged material; Repairs or resurfacing involving at least partial reprocessing of the existing paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1004Reconditioning or reprocessing bituminous mixtures, e.g. salvaged paving, fresh patching mixtures grown unserviceable; Recycling salvaged bituminous mixtures; Apparatus for the in-plant recycling thereof
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/4866Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with solely non-vibratory or non-percussive pressing or smoothing means for consolidating or finishing
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/14Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces for heating or drying foundation, paving, or materials thereon, e.g. paint

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention discloses a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave, the Hot-blast Heating machine including being arranged on complete unit front end(1), Hot-blast Heating machine(1)Rear end be provided with microwave heating machine(2), microwave heating machine(2)Rear end be provided with microwave heating milling machine(3), microwave heating milling machine(3)Rear end or side be provided with the combination of dumper+multi-functional feeding machine filling(4), remixing regenerating device(5)It is arranged on the front end of complete unit.The invention also discloses a kind of complete unit construction technologies of the compound in-situ heat regeneration of novel hot-air microwave.A kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave and its construction technology of the present invention, realizes being precisely controlled for modularization partition heating temperature, it is ensured that the uniformity of entire heating surface;Have the adaptability such as good outer curve construction, wide-angle climbing and transition transport;Modular heating wall Variable power, intermittent-heating and group of planes control are realized, the efficiency of heating surface is high, heat penetration is deep, disease adaptability for working condition is strong.

Description

A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology
Technical field
The present invention relates to road maintenance equipment technical fields, and in particular to a kind of compound in-situ heat regeneration of novel hot-air microwave Complete unit further relates to the construction technology of the complete unit of the compound in-situ heat regeneration of this novel hot-air microwave.
Background technology
The huge maintenance work amount of Trunk highway highway especially highway, the maintenance project quality of high standard and super large Maintenance work environment under traffic conditions promotes us to seek a kind of new maintenance method --- and in-situ heat regeneration is a kind of Using dedicated On-site heat recycling equipment, bituminous paving is heated, milling and then incorporation are certain it is new gather materials, new pitch, Regenerative agent etc., it is disposable to realize to the old asphalt pavement in the range of the certain depth of surface again through mixing and stirring, paving, the processes such as rolling Raw technology.
Existing hot reproducer on the spot is primarily present following several respects defect both at home and abroad at present:
(1) road surface is burned, vegetation deterioration, environmental pollution.Road-surface heating machine is mostly red using combustion oil/gas open firing, combustion gas Outside line heating or extensive style high-power diesel Cycling hot-blast heating mode, bituminous paving heating temperature are not easy to accurately control, Yi Zao Aging, coking into bituminous paving, the pavement performance on road surface declines after regeneration;The construction high warm flue gas in periphery easily leads to greening Band, trees it is burned, and with a large amount of toxic blue smoke, pollute environment;
(2) heat penetration is inadequate, and adaptability for working condition is poor.Existing road-surface heating machine heat penetration is deep for 30mm~50mm, leads Regeneration thickness is caused to be only capable of being confined to 30mm~50mm, the disease of deep layer cannot be handled well, and adaptability for working condition is poor;
(3) interlayer temperature gradient is big, aggregate destructible during milling.According to statistics, bituminous paving top 10mm~20mm is thick Asphalt material temperature is excessively high (up to 240 DEG C), but the asphalt material temperature at the 30mm~50mm of lower part only has 70 DEG C~80 DEG C, layer Between temperature gradient it is big, heating it is uneven;And since near-bottom temperature is relatively low, the broken of grading of aggregates in milling process asphalt material is easily caused Bad (grey material occur) phenomenon, influences reproduction quality;
(4) step heating, layering milling process heat loss are big, time-consuming and laborious costly.
(5) virgin material addition is difficult, and thermal loss is big, and remixing regenerating device frequent intermittent operation influences reproduction quality.It is new at present The addition of asphalt is mostly completed using transhipment dumper, and can hold together the material of 200mm~300mm thickness after road-surface heating milling Heap, before transporting dumper filling, more road-surface heating machines and heating milling machine need to move forward 20m~30m, then transport self-unloading For vehicle again across thick material heap, ride in charging to the hopper of remixing regenerating device, causes remixing regenerating device frequently to stop in material heap Only operation, thick material heap is driven out to after charging, and then more heaters and heating milling machine retreat playback, resume operation, There are filling is difficult, interval time is long, heat scatters and disappears the defects of big, regeneration flatness is bad for this filling process;
(6) at present the remixing of hot reproducer on the spot overlay technique remixing process do not add it is a certain proportion of new Asphalt, and pave to form regeneration zone by remixing after adding in suitable regenerative agent, it is then overlayed on regeneration zone certain The completely new asphalt of thickness, and real meaning bilayer is not implemented and paves.
Invention content
The purpose of the present invention is overcoming the above-mentioned prior art insufficient, a kind of compound in-situ heat regeneration of novel hot-air microwave is provided Complete unit, smokeless environment-friendly, the thermal efficiency are high, heat penetration is moderate, interlayer temperature gradient is small, hot destruction of the milling without grading;Really It is up to standard to protect each link asphalt material temperature;Realize multiple degrees of freedom, multi-faceted feed, feed is precisely continuous, asphalt material temperature drop is small;It is real A kind of existing completely new filling remixing overlays regeneration technology, and the bilayer for realizing real meaning paves, and improves bituminous paving again Raw quality.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave, the hot wind including being arranged on complete unit front end Heater, the rear end of the Hot-blast Heating machine are provided with microwave heating machine, and the rear end of the microwave heating machine is provided with microwave and adds Hot milling machine, the rear end or side of the microwave heating milling machine are provided with dumper+multi-functional feeding machine filling combination, multiple Mix the front end that regenerating device is arranged on complete unit.
The Hot-blast Heating machine includes rack I, the front end of the rack I, least significant end and below between front-rear axle Be respectively arranged with hot air heating apparatus, the hot air heating apparatus include two oil-gas two-way burners of interlaced arrangement, two Hot-blast stove, two draught distributing boxs, two circulating fans and a Hot-blast Heating wall, the oil-gas two-way burner are located at the hot wind The front end of stove, the end of the hot-blast stove are connected with the draught distributing box, and circulating fan one end connection is arranged in the hot wind The return air channel of heating pad wall surrounding, the other end are connected with the hot-blast stove, and the top of the rack I is equipped with for the oil gas Gas tank assembly, gasifier and the fuel tank of dual burner energy resource supply.
The microwave heating machine includes rack II, and the lower section of the rack II is equipped with multigroup microwave heating wall I, the microwave Heating pad wall I includes main microwave heating wall I and two two side microwave heating walls I for being located at main I left and right sides of microwave heating wall, described Side microwave heating wall I is hinged with main microwave heating wall I.
The microwave heating milling machine includes rack III, and the front of the rack III is equipped with milling equipment, the rack III Rear be equipped with multigroup microwave heating wall II, the milling equipment is included positioned at the side milling plane device on both sides and positioned at intermediate main milling Device is dug, the left and right sides of the microwave heating wall II is equipped with Hot-blast Heating wall II, the Hot-blast Heating wall II and the microwave Heating pad wall II is hinged.
The dumper+multi-functional feeding machine filling combination includes dumper and multi-functional feeding machine, the multi-functional confession Material machine includes rack IV and the driver's cabin above it, and the forepart of the rack IV is equipped with hopper, and the bottom of the hopper is provided with Pivoting support assembly is fixed in basic feeding device, the end of the rack IV, and revolution carries material device and the pivoting support assembly It is hinged and passes through amplitude oil cylinder and be connected with the driver's cabin, the end of the basis feeding device is equipped with conveying to described time Turn to carry the flexible guide groove I for expecting device.
Two crawler units of the remixing regenerating device including rack V and below, V lower front portion of rack are set There is blender, the left and right sides of the blender is equipped with Hot-blast Heating wall III, is connected respectively behind the Hot-blast Heating wall III Motor exhaust insulated wall, V lower section middle part of the rack and adds between two crawler units equipped with multigroup microwave Hot wall III, the V lower section rear end of rack is equipped with level-one cloth spiral and level-one leveling screed, after the level-one screed Side is additionally provided with two level cloth spiral and secondary base paves screed is equipped with to transport between the left and right supporting beam of the rack V The horizontal feeding device of defeated asphalt material, the front end that the front end of the horizontal feeding device extends to the rack V are connected with transition Hopper, the horizontal feeding device rear end extend in front of the two level cloth spiral and are connected with material guide groove.
The conveying bottom plate of the horizontal feeding device between the transition hopper and blender is equipped with and opens automatically Open Dump gate.
The end that the revolution carries material device is equipped with conveying to the flexible guide groove II for crossing remixing regenerating device.
A kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, includes the following steps:
Step S11, heats old asphalt pavement using several Hot-blast Heating machines, and bituminous paving heat penetration is 40mm~50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm~50mm is not less than 85℃;
Step S12, after sending out 2.45GHz microwaves to several Hot-blast Heating machines heating using several microwave heating machines Old asphalt pavement carries out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature is not More than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S13 carries out the old asphalt pavement after heating and softening milling, and form one using microwave heating milling machine Trapezoidal ridge shape regenerates material heap, regenerates the mean temperature of material heap not less than 120 DEG C, microwave heating wall II sends out 2.45GHz microwaves pair The secondary benefit temperature heating for the regeneration material heap held together after milling, 10 DEG C~15 DEG C of regeneration material heap temperature raising, two sides Hot-blast Heating wall II High temperature hot gas carries out hot adhesion temperature raising to bituminous paving after milling;
Step S14, using a set of dumper+multi-functional feeding machine filling combination traveling in regeneration track or the lateral vehicle in left and right Road, the regeneration material heap continuously held together after milling directly add new pitch mixture or continuously to remixing regenerating devices Transition hopper adds new pitch mixture, new pitch mixture is accurately controlled to enter blender by the opening and closing of Dump gate;
Step S15 completes abundant uniform mixing and the formation one of reworked material and new pitch mixture using remixing regenerating device The trapezoidal ridge shape of item mixes and stirs material heap, forms material heap temperature generally not less than 150 DEG C, and may optionally utilize microwave heating wall III It sends out 2.45GHz microwaves to heat the temperature of benefit again for mixing and stirring material heap held together after remixing, material heap mean temperature is mixed and stirred after heating not Less than 160 DEG C, two sides Hot-blast Heating wall III and motor exhaust insulated wall heat the hot adhesion of bituminous paving after milling, The temperature of bituminous paving is not less than 120 DEG C after heating milling, and level-one cloth spiral and level-one leveling screed lift when paving, by Two level cloth spiral and secondary base pave screed complete cloth, pave precompressed, most obtain regeneration asphalt through grinding compacting afterwards Road surface.
A kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, includes the following steps:
Step S21, heats old asphalt pavement using several Hot-blast Heating machines, and bituminous paving heat penetration is 40mm~50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm~50mm is not less than 85℃;
Step S22, after sending out 2.45GHz microwaves to several Hot-blast Heating machines heating using several microwave heating machines Old asphalt pavement carries out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature is not More than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S23 carries out the old asphalt pavement after heating and softening milling, and form one using microwave heating milling machine Trapezoidal ridge shape regenerates material heap, regenerates the mean temperature of material heap not less than 120 DEG C, microwave heating wall II sends out 2.45GHz microwaves pair The secondary benefit temperature heating for the regeneration material heap held together after milling, 10 DEG C~15 DEG C of regeneration material heap temperature raising, two sides Hot-blast Heating wall II High temperature hot gas carries out hot adhesion temperature raising to bituminous paving after milling;
Step S24, it is lateral in regeneration track and left and right using several set dumpers+multi-functional feeding machine filling combination traveling The addition of the new pitch mixture at two positions is completed in track, wherein the regeneration material heap continuously held together after milling at one is direct New pitch mixture is added, another place continuously adds new pitch mixture, then by level to the transition hopper of remixing regenerating device Feeding device accurately controls new pitch mixture to transport backward;
Step S25 completes remixing regeneration using remixing regenerating device and surface overlays, dumper+multi-functional feeding machine simultaneously The regeneration material heap held together after filling combination transfer new pitch mixture to milling completes the two by the blender of remixing regenerating device One trapezoidal ridge shape of uniform mixing and formation mixes and stirs material heap, forms material heap temperature generally not less than 150 DEG C, and utilize microwave heating Wall III sends out 2.45GHz microwaves and the temperature of benefit again for mixing and stirring material heap held together after remixing is heated, and the average temperature of material heap is mixed and stirred after heating For degree not less than 160 DEG C, two sides Hot-blast Heating wall III and motor exhaust insulated wall add the hot adhesion of bituminous paving after milling Heat, the temperature of bituminous paving mixes and stirs material heap via level-one cloth spiral and level-one leveling ironing not less than 120 DEG C after heating milling Plate, which paves, forms remixing regeneration zone, dumper+multi-functional feeding machine filling combination transfer new pitch mixture to transition after precompressed Hopper, then new pitch mixture is accurately controlled to transport landing backward to remixing regeneration zone by horizontal feeding device, by two level Cloth spiral and secondary base, which pave, forms the thin wearing course of completely new pitch of " heat is to heat " after the cloth of screed, the precompressed that paves, Most reclaimed bituminous pavement is obtained through grinding compacting afterwards.
Beneficial effects of the present invention:
1st, Hot-blast Heating machine uses oil-gas two-way modularization Hot-blast Heating technology, passes through the modularization essence of several heaters The air entering and returning temperature of quasi- control hot wind, bituminous paving surface layer maximum temperature are no more than 180 DEG C, and bituminous paving heat penetration is 40mm ~50mm, the temperature in road surface at 40mm~50mm solve conventional fuel oil/gas open firing, Gas Infrared not less than 85 DEG C Line heating or the easily burned bituminous paving of extensive style high-power diesel Hot-blast Heating lead to the difficulty of environmental pollution and pavement performance decline Topic, while recycled by the waste heat circulation of modular heating wall surrounding, the heat leakage on equipment periphery is effectively reduced, avoids applying The high warm flue gas in work periphery easily lead to greenbelt, trees it is burned.
2nd, old asphalt pavement after microwave heating machine heats several Hot-blast Heating machines using 2.45GHz frequency microwaves into Row depth heats, and bituminous paving heat penetration is made to be promoted to 60mm, and old asphalt pavement surface layer maximum temperature is no more than 180 DEG C, road Temperature in face at 60mm is not less than 100 DEG C, and heating process smokeless environment-friendly, the thermal efficiency are high, heat penetration is moderate, interlayer temperature is terraced Spend small, solve in the market that unit heat depth is inadequate, the disease of deep layer cannot be handled well, adaptability for working condition difference and Since near-bottom temperature is relatively low, destruction (grey material occur) phenomenon of grading of aggregates in milling process asphalt material is easily caused, is influenced again The problem of raw quality.
3rd, microwave heating milling machine uses 2.45GHz frequency microwaves+modularization Hot-blast Heating mode, realizes milling respectively The hot adhesion heating of bituminous paving, heats smokeless environment-friendly, it is ensured that each after the pitch material heap reheating temperature raising and milling held together Link asphalt material temperature is up to standard, and it is big to solve layering milling process heat loss, it is time-consuming and laborious costly the problem of.
4th, the introducing of dumper+multi-functional feeding machine filling combination is, it can be achieved that arbitrary in the range of feeding device revolution, luffing The multiple degrees of freedom in region, multi-faceted feed, feed is accurate, the loss of asphalt material temperature drop is small, solves existing virgin material addition difficulty, heat Amount loss is big, and filling process remixing regenerating device frequent intermittent operation, construction flatness is bad, the problem of reproduction quality difference.
5th, remixing regenerating device uses 2.45GHz frequency microwaves+modularization Hot-blast Heating mode, holds together after realizing remixing respectively The pitch material heap selectivity risen heats the hot adhesion heating of bituminous paving after temperature raising and milling again, heats smokeless environment-friendly, really Protect that each link asphalt material temperature is up to standard, and using double screeds, double levelling designs, it can be achieved that a kind of completely new filling remixing adds Regeneration technology is spread, the bilayer for realizing real meaning paves, and improves the reproduction quality of bituminous paving.
Description of the drawings
Fig. 1 is the driving states schematic diagram of the complete unit of the compound in-situ heat regeneration of novel hot-air microwave of the present invention;
Fig. 2 is the job state schematic diagram of the complete unit of the compound in-situ heat regeneration of novel hot-air microwave of the present invention;
Fig. 3 is filling remixing Regeneration Construction Technique (the regeneration vehicle of the complete unit of the compound in-situ heat regeneration of novel hot-air microwave Road filling) schematic diagram;
Fig. 4 is filling remixing Regeneration Construction Technique (the lateral vehicle of the complete unit of the compound in-situ heat regeneration of novel hot-air microwave Road filling) schematic diagram;
Fig. 5 is that the filling remixing of the complete unit of the compound in-situ heat regeneration of novel hot-air microwave overlays Regeneration Construction Technique (again Raw track and lateral track while filling) schematic diagram;
Fig. 6 is the vertical view of Hot-blast Heating machine;
Fig. 7 is the stereogram (left front 45 °) of Hot-blast Heating machine;
Fig. 8 is the arrangement schematic diagram of the hot air heating apparatus of Hot-blast Heating machine;
Fig. 9 is the stereogram (left front 45 °) of microwave heating machine;
Figure 10 is the stereogram (left front 45 °) of microwave heating milling machine;
Figure 11 is the structural plan of dumper+multi-functional feeding machine filling combination;
Figure 12 is the luffing job state schematic diagram of multi-functional feeding machine;
Figure 13 is the revolution job state schematic diagram of multi-functional feeding machine;
Figure 14 is the front view of remixing regenerating device;
Figure 15 is the vertical view of remixing regenerating device;
Figure 16 is the stereogram (left front 45 °) of remixing regenerating device.
Reference numeral is as follows in figure:
1st, Hot-blast Heating machine, 1-1, hot air heating apparatus, 1-1-1, oil-gas two-way burner, 1-1-2, hot-blast stove, 1-1- 3rd, draught distributing box, 1-1-4, circulating fan, 1-1-5, Hot-blast Heating wall, 1-2, rack I, 1-3, gas tank assembly, 1-4, gasifier, 1- 5th, fuel tank, 2, microwave heating machine, 2-1, rack II, 2-2, microwave heating wall I, 2-2-1, main microwave heating wall I, 2-2-2, side Microwave heating wall I (2-2-2), 3, microwave heating milling machine, 3-1, rack III, 3-2, milling equipment, 3-2-1, side milling plane device, 3- 2-2, main milling device, 3-3, microwave heating wall II, 3-4, Hot-blast Heating wall II, the combination of 4, dumper+multi-functional feeding machine filling, 4-1, multi-functional feeding machine, 4-1-1, rack IV, 4-1-2, hopper, 4-1-3, basic feeding device, 4-1-4, pivoting support are total Into 4-1-5, revolution put forward material device, 4-1-6, driver's cabin, 4-1-7, amplitude oil cylinder, 4-1-8, flexible guide groove I, 4-1-9, flexibility Guide groove II, 4-2, dumper, 5, remixing regenerating device, 5-1, rack V, 5-2, blender, 5-3, Hot-blast Heating wall III, 5-4, hair Motivation tail gas insulated wall, 5-5, crawler unit, 5-6, microwave heating wall III, 5-7, level-one cloth spiral, 5-8, level-one are whole Flat screed, 5-9, two level cloth spiral, 5-10, secondary base pave screed, 5-11, horizontal feeding device, 5-12, transition Hopper, 5-13, material guide groove, 5-14, Dump gate, α, multi-functional feeding machine luffing filling angle, β, the revolution of multi-functional feeding machine add Expect angle.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings, and following embodiment is only used for clearly illustrating the present invention Technical solution, and be not intended to limit the protection scope of the present invention and limit the scope of the invention.As shown in Figures 1 to 5, novel hot-air of the invention is micro- The complete unit of the compound in-situ heat regeneration of wave, the Hot-blast Heating machine 1 including being arranged on complete unit front end, Hot-blast Heating machine 1 Rear end is provided with microwave heating machine 2, and the rear end of microwave heating machine 2 is provided with microwave heating milling machine 3, microwave heating milling machine 3 Rear end or side be provided with several set dumpers+multi-functional feeding machine fillings combinations 4, remixing regenerating device 5 is arranged on complete The front end of unit.
In order to overcome conventional fuel oil/gas open firing, gas-fired infrared heating or extensive style high-power diesel Hot-blast Heating Easy burned bituminous paving causes environmental pollution and pavement performance to decline, and it is green that the construction high warm flue gas in periphery is effectively avoided to easily lead to Change band, the burned problem of trees, the present embodiment use oil-gas two-way modularization Hot-blast Heating technology, pass through several heaters Modularization be precisely controlled the air entering and returning temperature of hot wind, bituminous paving surface layer maximum temperature is no more than 180 DEG C, bituminous paving heating Depth is 40mm~50mm, and the temperature at 40mm~50mm places is not less than 85 DEG C in road surface, heating process smokeless environment-friendly, the thermal efficiency Height, while recycled by the waste heat circulation of modular heating wall surrounding, effectively reduce the heat leakage on equipment periphery.Hot wind adds The concrete structure of heat engine is detailed further below.
As shown in Figure 6 to 8, Hot-blast Heating machine 1 of the invention is located at the front end of complete unit, is equipped with three groups of hot winds Heating unit 1-1, respectively between front-rear axle below the front end of Hot-blast Heating machine 1, least significant end and I 1-2 of rack, every group of heat Air heating device 1-1 by interlaced arrangement two oil-gas two-way burner 1-1-1, two hot-blast stove 1-1-2, two draught distributing boxs 1-1-3, two circulating fan 1-1-4 and a Hot-blast Heating wall 1-1-5 composition, oil-gas two-way burner 1-1-1 are located at hot wind The front end of stove 1-1-2, the end of hot-blast stove 1-1-2 are connected with draught distributing box 1-1-3, and the connection of circulating fan 1-1-4 one end is arranged in The return air channel of Hot-blast Heating wall 1-1-5 surroundings, the other end are connected with hot-blast stove 1-1-2.The top of I 1-2 of rack, which is equipped with, to be used In gas tank assembly 1-3, gasifier 1-4 and the fuel tank 1-5 of oil-gas two-way burner 1-1-1 energy resource supplies.
Inadequate in order to solve unit heat depth in the market, the disease of deep layer cannot be handled well, adaptability for working condition Difference and since near-bottom temperature is relatively low, easily cause destruction (grey material occur) phenomenon of grading of aggregates in milling process asphalt material, The problem of influencing reproduction quality, microwave heating machine 2 adds several Hot-blast Heating machines using 2.45GHz frequency microwaves in the present invention Old asphalt pavement after heat carries out depth heating, and electromagnetic energy is penetrated into media interior in the form of wave, make dielectric loss and Fever, does not need to high-temperature medium to conduct heat, smokeless nonflame, and will not cause the aging of bituminous paving, coking, by bituminous paving plus Hot depth is promoted to 60mm, and old asphalt pavement surface layer maximum temperature is no more than 180 DEG C, and the temperature in road surface at 60mm is not less than 100 DEG C, the heating process thermal efficiency is high, and heat penetration is moderate, and interlayer temperature gradient is small.The concrete structure of microwave heating machine is detailed as follows Thin description.
As shown in figure 9, the microwave heating machine 2 of the present invention is located at after several Hot-blast Heating machines 1, in II 2-1 of its rack Lower section be equipped with multigroup I 2-2 of microwave heating wall, every group of I 2-2 of microwave heating wall includes main I 2-2-1 and two position of microwave heating wall In I 2-2-2 of side microwave heating wall of its left and right sides, three's structure is identical, and two I 2-2-1 of side microwave heating wall and main microwave I 2-2-2 of heating pad wall is hinged, and microwave magnetron uses the microwave magnetron of 2.45GHz frequencies in I 2-2 of microwave heating wall.
Hot milling after bituminous paving heating is also the key link of in-situ heat regeneration, and existing mode of heating exists at present The problem of bituminous paving interlayer temperature gradient is big, the asphalt material temperature of bituminous paving top 10mm~20mm thickness are excessively high (up to 240 DEG C), but the asphalt material temperature at the 30mm~50mm of lower part only has 70 DEG C~80 DEG C, easily causes in milling process asphalt material Destruction (grey material occur) phenomenon of grading of aggregates.The microwave heating milling machine of the present invention uses 2.45GHz frequency microwaves+module Change Hot-blast Heating mode, realize the heat of bituminous paving after pitch material heap reheating temperature raising and milling that milling has been held together respectively Heating is bonded, heats smokeless environment-friendly, it is ensured that each link asphalt material temperature is up to standard, while solves layering milling process heat damage Lose it is big, it is time-consuming and laborious costly the problem of.Its concrete structure is detailed further below.
As shown in Figure 10, microwave heating milling machine 3 of the invention is located at after microwave heating machine 2, III 3-1's of its rack Front is equipped with milling equipment 3-2, and rear is equipped with multigroup II 3-3 of microwave heating wall;Milling equipment 3-2 includes the side milling positioned at both sides Dig device 3-2-1 and positioned at intermediate main milling device 3-2-2;Hot wind is equipped at left and right sides of every group of II 3-3 of microwave heating wall to add Hot II 3-4 of wall, II 3-4 of Hot-blast Heating wall are hinged with II 3-3 of microwave heating wall, the microwave magnetic control in II 3-3 of microwave heating wall Pipe uses the microwave magnetron of 2.45GHz frequencies.
In order to solve existing new pitch mixture addition need to across the material heap for having held together 200mm~300mm thickness after milling, There are security risks, and road-surface heating machine and heating milling machine need to move forward 20m~30m during filling in addition, because span causes greatly The scatter and disappear hopper of big problem and ride in material heap charging to remixing regenerating device of milling material heat necessarily lead to remixing again Life frequently stops operation, and influences the flatness to pave, the problem of the bad control of reproduction quality, dumper of the invention+more work( Multiple degrees of freedom, the multi-faceted feed of arbitrary region, supply in the range of the achievable feeding device revolution of energy feeding machine filling combination, luffing Material precisely, the loss of asphalt material temperature drop it is small, the continuous uninterrupted high-efficient homework of remixing regenerating device.Its concrete structure is shown in be retouched in detail as follows It states.
As shown in Figure 11 to Figure 13, dumper of the invention+multi-functional feeding machine filling combination 4 is located at remixing regenerating device 5 Front or adjacent left and right track diagonally forward, the IV 4-1-1 foreparts of rack of multi-functional feeding machine 4-1 be equipped with hopper 4- 1-2, basic feeding device 4-1-3 are located at the bottom of hopper 4-1-2, and pivoting support assembly 4- is fixed in the end of IV 4-1-1 of rack 1-4, revolution carry material device 4-1-5 and pivoting support assembly 4-1-4 and are hinged and pass through amplitude oil cylinder 4-1-7 and driver's cabin 4- 1-6 is connected, and the end of basic feeding device 4-1-3 is equipped with the flexible guide groove I that conveying carries material device 4-1-5 material leak-proofs to revolution 4-1-8, under the action of pivoting support assembly 4-1-4, revolution carries material device 4-1-5 around it with pivoting support assembly 4-1-4's The centre of gyration realizes the rotation of each 90 ° of β=left and right, and under the action of amplitude oil cylinder 4-1-7, it is opposite that revolution carries material device 4-1-5 Its tie point with pivoting support assembly 4-1-4 realizes that the luffing of α=0~35 ° up and down is adjusted.
In order to which the remixing of current hot reproducer on the spot is overcome to overlay the remixing process of technique, there is no add certain proportion New asphalt, and pave to form regeneration zone by remixing after adding in suitable regenerative agent, then on regeneration zone plus Certain thickness completely new asphalt is spread, and the defects of real meaning bilayer paves is not implemented, the present embodiment takes above-mentioned More set dumpers+Multi-functional feeding machine filling combination+Remixing regenerative combination scheme, introduces transition hopper and horizontal feeding device, Realize multiple spot feed, come solve the problems, such as in the prior art this, the concrete structure of remixing regenerating device 5 is shown in as detailed below.
As shown in Figure 14 to Figure 16, remixing regenerating device 5 of the invention is located at the least significant end of complete unit, in V 5- of its rack 1 lower front portion is equipped with blender 5-2, and the left and right sides of blender 5-2 is equipped with III 5-3 of Hot-blast Heating wall, III 5-3 of Hot-blast Heating wall Behind connect motor exhaust insulated wall 5-4 respectively, be equipped between two crawler unit 5-5 of middle part below V 5-1 of rack Microwave magnetron uses the microwave magnetron of 2.45GHz frequencies, machine in multigroup III 5-6 of microwave heating wall, III 5-6 of microwave heating wall Rear end is equipped with level-one cloth spiral 5-7 and level-one leveling screed 5-8 below V 5-1 of frame, at the rear of level-one screed 5-8 also It paves screed 5-10 equipped with two level cloth spiral 5-9 and secondary base, use is additionally provided between the left and right supporting beam of V 5-1 of rack In the horizontal feeding device 5-11 of conveying asphalt material, the front end of horizontal feeding device 5-11 extends to the front end company of V 5-1 of rack Transition hopper 5-12 is connected to, its rear end extends in front of two level cloth spiral 5-9 and is connected with material guide groove 5-13.
Further, the material leakage of filling process, the end that revolution carries material device 4-1-5 are equipped with conveying to transition in order to prevent II 4-1-9 of flexible guide groove of hopper 5-12, the conveying bottom of horizontal feeding device 5-11 between transition hopper 5-12 and blender 5-2 Plate, which is equipped with, automatically turns on Dump gate 5-14.
The operation principle of each equipment is as follows in a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave of the invention:
(1) Hot-blast Heating machine --- heat and soften bituminous paving
Gas tank assembly 1-3 is used for storing liquid liquefied petroleum gas, and liquid liquefied petroleum gas flows through gasifier 1-4 by liquid liquid Liquefied oil gas gasification is gaseous liquefied petroleum gas, is applicable in using multi-stage pressure regulating output oil-gas two-way burner 1-1-1 low Compression ignition gas.It is provided using fuel oil during diesel oil mode by fuel tank 1-5.Low-pressure fuel gas or diesel oil, which are sprayed into hot-blast stove 1-1-2, to burn, 500 DEG C~550 DEG C of high-temperature hot air is generated, high-temperature hot air is ejected into Hot-blast Heating wall 1-1-5 by draught distributing box 1-1-3 It is interior, be ejected into bituminous paving by draining version and multiple rows of array venthole built in heating pad wall at many levels, make bituminous paving temperature by Edge up height, and heating process bituminous paving surface layer maximum temperature is no more than 180 DEG C, and bituminous paving heat penetration is 40mm~50mm, Temperature in road surface at 40mm~50mm is not less than 85 DEG C.Unemployed high-temperature hot air (about 30%) passes through circulating fan 1-1-4 sends back to hot-blast stove 1-1-2 and heats again, forms hot-air cycle, can not only improve the thermal efficiency, but also can save disappearing for fuel Consumption.
(2) microwave heating machine --- deep layer heats road surface
Microwave heating machine, which is equipped with generating set, can convert diesel oil chemical energy energy 220V/380V electric energy, by electrical energy transportation To I 2-2 of microwave heating wall, the microwave electromagnetic energy of endlessly 2.45GHz frequencies is converted electrical energy into, electromagnetic energy leads to It crosses the media such as waveguide and is transmitted in the form of wave and penetrate into bituminous paving media interior, make dielectric loss and generate heat, show as pitch Pavement temperature increases.Old asphalt pavement after 2.45GHz frequency microwaves heat several Hot-blast Heating machines carries out depth heating, Bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature is no more than 180 DEG C, in road surface at 60mm Temperature is not less than 100 DEG C.
(3) microwave heating milling machine --- hot milling road surface, gather materials in heaps, microwave heating and interlayer thermal bonding heating
The preposition milling equipment 3-2 of microwave heating milling machine is responsible for the bituminous paving milling after heating and softening, and by old drip Cobalt blue pigment gathers materials in heaps, formation width 1100mm~1200mm, the trapezoidal material heap of thickness 200mm~250mm, microwave heating wall II 3-3 uninterruptedly exports 2.45GHz frequency microwaves electromagnetic energy and carries out 10 DEG C~15 DEG C of reheating temperature raising, two sides to material heap II 3-4 of Hot-blast Heating wall generates high temperature hot gas and carries out hot adhesion heating to bituminous paving after milling.
(4) dumper+multi-functional feeding machine filling combination --- addition new pitch mixture
For dumper for transporting, store new pitch mixture, and kept the temperature, when filling, lifts batch turning to multi-functional feed In the hopper 4-1-1 of machine 4-1, asphalt is first conveyed by basic feeding device 4-1-3 backward, flows through the flexibility of material leak-proof I 4-1-8 of guide groove enters revolution and carries material device 4-1-5, under the action of pivoting support assembly 4-1-4 and amplitude oil cylinder 4-1-7, returns Turn to carry material device 4-1-5 realizations multiple degrees of freedom, multi-party level amplitude revolution feed, finally via flexible II 4-1-9 fillings of guide groove extremely Material heap or filling are regenerated to the transition hopper 5-12 of remixing regenerating device 5, and blender is realized in the keying for passing through Dump gate 5-14 The selectivity feed of both 5-2 and horizontal feeding device 5-11.
(5) remixing regenerating device --- reworked material remixing is uniform, microwave heating, interlayer thermal bonding, paves
Dumper+multi-functional feeding machine filling combination 4 can convey the reworked material held together after new pitch mixture to milling Heap, the two doping is together laggard to go blender 5-2 uniform mixings, and it is in heaps that asphalt material gathered materials.To ensure that asphalt material is constructed Temperature is up to standard, and III 5-6 of microwave heating wall uninterruptedly exports 2.45GHz frequency microwaves electromagnetic energy and material heap is selected again Heat to property 10 DEG C or so of temperature raising, III 5-3 of two sides Hot-blast Heating wall and the motor exhaust insulated wall 5-4 that connects below are to milling Bituminous paving carries out hot adhesion heating after plane.Reworked material paves through level-one cloth spiral 5-7 clothes and level-one leveling screed 5-8 New remixing regeneration zone is formed after pre-compacted.Dumper+multi-functional feeding machine filling combination 4 can also convey new pitch mixture To transition hopper 5-12, conveyed backward by horizontal feeding device 5-11 driving asphalts, via the material guide groove 5-13 of end It slides to remixing regeneration zone, the precompressed that paves for the screed 5-10 that paves by two level cloth spiral 5-9 clothes and secondary base Real, so as to one thin wearing course of completely new pitch of generation of " heat is to heat ", the bilayer for realizing real meaning paves, and improves drip Green pavement recycling quality.
When being constructed using the complete unit of the compound in-situ heat regeneration of novel hot-air microwave of the present invention, it can carry out including filling Remixing regenerates and filling remixing overlays two kinds of techniques of regeneration.
A kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, referring to shown in Fig. 3 and Fig. 4, mainly Construction procedure is as follows:
Filling remixing regeneration technology includes the following steps:
Step S11, heats old asphalt pavement using several Hot-blast Heating machines 1, and bituminous paving heat penetration is 40mm~50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm~50mm is not less than 85℃;
Step S12, after sending out 2.45GHz microwaves to several heating of Hot-blast Heating machines 1 using several microwave heating machines 2 Old asphalt pavement carry out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature No more than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S13 carries out the old asphalt pavement after heating and softening milling, and form one using microwave heating milling machine 3 The trapezoidal ridge shape regeneration material heap of item, regenerates the mean temperature of material heap not less than 120 DEG C, II 3-3 of microwave heating wall sends out 2.45GHz Microwave heats the secondary benefit temperature of regeneration material heap held together after milling, and 10 DEG C~15 DEG C of regeneration material heap temperature raising, two sides hot wind adds Hot II 3-4 high temperature hot gas of wall carries out hot adhesion temperature raising to bituminous paving after milling;
Step S14, it is lateral in regeneration track or left and right using a set of dumper+4 traveling of multi-functional feeding machine filling combination Track, the regeneration material heap continuously held together after milling directly add new pitch mixture or continuously to remixing regenerating devices 5 Transition hopper 5-12 addition new pitch mixture, by the opening and closing of Dump gate 5-14 accurately control new pitch mixture enter stir Mix device 5-2;
Step S15 completes abundant uniform mixing and the formation one of reworked material and new pitch mixture using remixing regenerating device 5 The trapezoidal ridge shape of item mixes and stirs material heap, forms material heap temperature generally not less than 150 DEG C, and may optionally utilize microwave heating wall III 5-6 sends out 2.45GHz microwaves and the temperature of benefit again for mixing and stirring material heap held together after remixing is heated, and material heap mean temperature is mixed and stirred after heating Not less than 160 DEG C, two sides Hot-blast Heating wall III 5-3 and motor exhaust insulated wall 5-4 to after milling bituminous paving it is hot sticky Knot heating, the temperature of bituminous paving is not less than 120 DEG C after heating milling, and level-one cloth spiral 5-7 and level-one, which flatten, when paving presses Tablet 5-8 lifts, by two level cloth spiral 5-9 and secondary base pave screed 5-10 complete cloth, pave precompressed, most pass through afterwards Grinding compacting obtains reclaimed bituminous pavement;
A kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, ginseng are as shown in Figure 5, main to construct Step is as follows:
Step S21, heats old asphalt pavement using several Hot-blast Heating machines 1, and bituminous paving heat penetration is 40mm~50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm~50mm is not less than 85℃;
Step S22, after sending out 2.45GHz microwaves to several heating of Hot-blast Heating machines 1 using several microwave heating machines 2 Old asphalt pavement carry out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature No more than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S23 carries out the old asphalt pavement after heating and softening milling, and form one using microwave heating milling machine 3 The trapezoidal ridge shape regeneration material heap of item, regenerates the mean temperature of material heap not less than 120 DEG C, II 3-3 of microwave heating wall sends out 2.45GHz Microwave heats the secondary benefit temperature of regeneration material heap held together after milling, and 10 DEG C~15 DEG C of regeneration material heap temperature raising, two sides hot wind adds Hot II 3-4 high temperature hot gas of wall carries out hot adhesion temperature raising to bituminous paving after milling;
Step S24, using several set dumpers+4 traveling of multi-functional feeding machine filling combination in regeneration track and left and right sides The addition of the new pitch mixture at two positions is completed to track, wherein the regeneration material heap continuously held together after milling at one is straight Addition new pitch mixture is connect, another place continuously adds new pitch mixture to the transition hopper 5-12 of remixing regenerating device 5, then New pitch mixture is accurately controlled to transport backward by horizontal feeding device 5-11;
Step S25, using remixing regenerating device 5 simultaneously complete remixing regeneration and surface overlay, remixing regeneration refer to dumper+ The regeneration material heap held together after multi-functional 4 conveying new pitch mixture to milling of feeding machine filling combination, by stirring for remixing regenerating device 5 It mixes the uniform mixing of both device 5-2 completions and forms a trapezoidal ridge shape and mix and stir material heap, form material heap temperature generally not less than 150 DEG C, and may optionally utilize III 5-6 of microwave heating wall and send out 2.45GHz microwaves and mix and stir material heap again to what is held together after remixing Temperature heating is mended, material heap mean temperature is mixed and stirred after heating not less than 160 DEG C, III 5-3 of two sides Hot-blast Heating wall and motor exhaust Insulated wall 5-4 heats the hot adhesion of bituminous paving after milling, and the temperature of bituminous paving is mixed not less than 120 DEG C after heating milling It paves and remixing regeneration zone is formed after precompressed via level-one cloth spiral 5-7 and level-one leveling screed 5-8 with material heap, surface overlays Refer to that 4 conveying new pitch mixture of dumper+multi-functional feeding machine filling combination is filled to transition hopper 5-12, then by horizontal conveying Putting 5-11 accurately controls new pitch mixture to transport landing backward to remixing regeneration zone, by two level cloth spiral 5-9 and two Grade basis, which paves, forms the thin wearing course of completely new pitch of " heat is to heat " after the cloth of screed 5-10, the precompressed that paves, most afterwards through grinding Densification is real, obtains reclaimed bituminous pavement.
A kind of compound local hot reproduction construction method of novel hot-air microwave provided by the invention, utilizes several Hot-blast Heatings Machine heats old asphalt pavement, using oil-gas two-way modularization Hot-blast Heating technology, modularization be precisely controlled hot wind into Return air temperature, heating process smokeless environment-friendly, bituminous paving surface layer maximum temperature are no more than 180 DEG C, and bituminous paving heat penetration is 40mm~50mm, the temperature in road surface at 40mm~50mm are not less than 85 DEG C;Depth is carried out using several microwave heating machines to add Heat makes bituminous paving heat penetration be promoted to 60mm using 2.45GHz frequency microwaves, and old asphalt pavement surface layer maximum temperature does not surpass 180 DEG C are crossed, the temperature in road surface at 60mm is not less than 100 DEG C, and heating process smokeless environment-friendly, the thermal efficiency are high, heat penetration is fitted In, interlayer temperature gradient it is small, and the aging of bituminous paving, coking will not be caused;Utilize the disposable milling of microwave heating milling machine Depth realizes the drip that milling has been held together respectively up to 60mm, and using 2.45GHz frequency microwaves+modularization Hot-blast Heating mode The hot adhesion heating of bituminous paving after 10 DEG C~15 DEG C of cobalt blue pigment heap reheating temperature raising and milling, it is ensured that each link asphalt material Temperature is up to standard;Utilize arbitrary region in the range of the achievable feeding device revolution of dumper+multi-functional feeding machine filling combination, luffing Multiple degrees of freedom, multi-faceted feed, feed precisely, the loss of asphalt material temperature drop it is small, it is difficult to solve the addition of existing virgin material, heat damage It loses greatly, filling process remixing regenerating device frequent intermittent operation, construction flatness is bad, the problem of reproduction quality difference, and using double Screed, double levelling designs, take into account the regeneration of filling remixing and filling remixing overlays two kinds of techniques of regeneration, realize real meaning Bilayer paves, and improves the reproduction quality of bituminous paving.
The above is only the preferred embodiment of the present invention, for those skilled in the art, Without departing from the principles of the invention, several improvements and modifications can also be made, these improvements and modifications also should be regarded as this hair Bright protection domain.

Claims (10)

1. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave, it is characterised in that:Including being arranged on complete unit most The Hot-blast Heating machine of front end(1), the Hot-blast Heating machine(1)Rear end be provided with microwave heating machine(2), the microwave heating machine (2)Rear end be provided with microwave heating milling machine(3), the microwave heating milling machine(3)Rear end or side be provided with from It unloads+multi-functional feeding machine filling combination(4), remixing regenerating device(5)It is arranged on the front end of complete unit.
2. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 1, it is characterised in that:Institute State Hot-blast Heating machine(1)Including rack I(1-2), the rack I(1-2)Front end, least significant end and below front-rear axle it Between be respectively arranged with hot air heating apparatus(1-1), the hot air heating apparatus(1-1)Two oil-gas two-ways including interlaced arrangement Burner(1-1-1), two hot-blast stoves(1-1-2), two draught distributing boxs(1-1-3), two circulating fans(1-1-4)With a heat Wind heating pad wall(1-1-5), the oil-gas two-way burner(1-1-1)Positioned at the hot-blast stove(1-1-2)Front end, the hot wind Stove(1-1-2)End and the draught distributing box(1-1-3)It is connected, the circulating fan(1-1-4)One end connection is arranged in described Hot-blast Heating wall(1-1-5)The return air channel of surrounding, the other end and the hot-blast stove(1-1-2)It is connected, the rack I(1- 2)Top be equipped with for the oil-gas two-way burner(1-1-1)The gas tank assembly of energy resource supply(1-3), gasifier(1-4) And fuel tank(1-5).
3. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 1, it is characterised in that:Institute State microwave heating machine(2)Including rack II(2-1), the rack II(2-1)Lower section be equipped with multigroup microwave heating wall I(2-2), The microwave heating wall I(2-2)Including main microwave heating wall I(2-2-1)It is located at main microwave heating wall I with two(2-2-1)It is left Two side microwave heating walls I on right side(2-2-2), the side microwave heating wall I(2-2-1)With main microwave heating wall I(2-2-2) It is hinged.
4. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 1, it is characterised in that:Institute State microwave heating milling machine(3)Including rack III(3-1), the rack III(3-1)Front be equipped with milling equipment(3-2), institute State rack III(3-1)Rear be equipped with multigroup microwave heating wall II(3-3), the milling equipment(3-2)Including being located at both sides Side milling digs device(3-2-1)With the main milling device positioned at centre(3-2-2), the microwave heating wall II(3-3)The left and right sides it is equal Equipped with Hot-blast Heating wall II(3-4), the Hot-blast Heating wall II(3-4)With the microwave heating wall II(3-3)It is hinged.
5. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 1, it is characterised in that:Institute State dumper+multi-functional feeding machine filling combination(4)Including dumper(4-2)With multi-functional feeding machine(4-1), it is described multi-functional Feeding machine(4-1)Including rack IV(4-1-1)With the driver's cabin above it(4-1-6), the rack IV(4-1-1)Forepart set There is hopper(4-1-2), the hopper(4-1-2)Bottom be provided with basic feeding device(4-1-3), the rack IV(4-1- 1)End fix pivoting support assembly(4-1-4), turn round and carry material device(4-1-5)With the pivoting support assembly(4-1-4) It is hinged and passes through amplitude oil cylinder(4-1-7)With the driver's cabin(4-1-6)It is connected, the basis feeding device(4-1-3) End be equipped with conveying to it is described revolution carry material device(4-1-5)Flexible guide groove I(4-1-8).
6. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 1, it is characterised in that: The remixing regenerating device(5)Including rack V(5-1)Two crawler units below(5-5), the rack V(5-1) Lower front portion is equipped with blender(5-2), the blender(5-2)The left and right sides be equipped with Hot-blast Heating wall III(5-3), the heat Wind heating pad wall III(5-3)Behind respectively connect motor exhaust insulated wall(5-4), the rack V(5-1)In the middle part of lower section and Positioned at two crawler units(5-5)Between be equipped with multigroup microwave heating wall III(5-6), the rack V(5-1)Lower section Rear end is equipped with level-one cloth spiral(5-7)Screed is flattened with level-one(5-8), the level-one screed(5-8)Rear also set There is two level cloth spiral(5-9)It paves screed with secondary base(5-10), the rack V(5-1)Left and right supporting beam between Equipped with the horizontal feeding device for conveying asphalt material(5-11), the horizontal feeding device(5-11)Front end extend to it is described Rack V(5-1)Front end be connected with transition hopper(5-12), the horizontal feeding device(5-11)Rear end extends to described two Grade cloth spiral(5-9)Front is connected with material guide groove(5-13).
7. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 6, it is characterised in that:Position In the transition hopper(5-12)And blender(5-2)Between the horizontal feeding device(5-11)Conveying bottom plate be equipped with Automatically turn on Dump gate(5-14).
8. a kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave according to claim 5, it is characterised in that:Institute It states revolution and carries material device(4-1-5)End be equipped with conveying to cross remixing regenerating device(5)Flexible guide groove II(4-1-9).
9. a kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, it is characterised in that:Include the following steps:
Step S11 utilizes several Hot-blast Heating machines(1)Old asphalt pavement is heated, bituminous paving heat penetration is 40mm ~ 50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm ~ 50mm is not less than 85 ℃;
Step S12 utilizes several microwave heating machines(2)2.45GHz microwaves are sent out to several Hot-blast Heating machines(1)After heating Old asphalt pavement carry out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature No more than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S13 utilizes microwave heating milling machine(3)Milling is carried out to the old asphalt pavement after heating and softening, and forms one Trapezoidal ridge shape regenerates material heap, regenerates the mean temperature of material heap not less than 120 DEG C, microwave heating wall II(3-3)It is micro- to send out 2.45GHz Wave heats the secondary benefit temperature of regeneration material heap held together after milling, 10 DEG C ~ 15 DEG C of regeneration material heap temperature raising, two sides Hot-blast Heating wall Ⅱ(3-4)High temperature hot gas carries out hot adhesion temperature raising to bituminous paving after milling;
Step S14 is combined using a set of dumper+multi-functional feeding machine filling(4)Traveling is in regeneration track or the lateral vehicle in left and right Road, the regeneration material heap continuously held together after milling directly add new pitch mixture or continuously to remixing regenerating devices(5) Transition hopper(5-12)New pitch mixture is added, passes through Dump gate(5-14)Opening and closing accurately control new pitch mixture into Enter blender(5-2);
Step S15 utilizes remixing regenerating device(5)Complete the abundant uniform mixing of reworked material and new pitch mixture and formation one Trapezoidal ridge shape mixes and stirs material heap, forms material heap temperature generally not less than 150 DEG C, and may optionally utilize microwave heating wall III(5- 6)It sends out 2.45GHz microwaves to heat the temperature of benefit again for mixing and stirring material heap held together after remixing, material heap mean temperature is mixed and stirred after heating Not less than 160 DEG C, two sides Hot-blast Heating wall III(5-3)With motor exhaust insulated wall(5-4)To bituminous paving after milling Hot adhesion heats, and the temperature of bituminous paving is not less than 120 DEG C after heating milling, level-one cloth spiral when paving(5-7)And level-one Flatten screed(5-8)Lift, by two level cloth spiral(5-9)It paves screed with secondary base(5-10)Complete cloth, booth Precompressed is spread, most obtains reclaimed bituminous pavement through grinding compacting afterwards.
10. a kind of complete unit construction technology of the compound in-situ heat regeneration of novel hot-air microwave, it is characterised in that:Including following step Suddenly:
Step S21 utilizes several Hot-blast Heating machines(1)Old asphalt pavement is heated, bituminous paving heat penetration is 40mm ~ 50mm, old asphalt pavement surface layer maximum temperature are no more than 180 DEG C, and the temperature in road surface at 40mm ~ 50mm is not less than 85 ℃;
Step S22 utilizes several microwave heating machines(2)2.45GHz microwaves are sent out to several Hot-blast Heating machines(1)After heating Old asphalt pavement carry out depth heating, bituminous paving heat penetration is made to be promoted to 60mm, old asphalt pavement surface layer maximum temperature No more than 180 DEG C, the temperature in road surface at 60mm is not less than 100 DEG C;
Step S23 utilizes microwave heating milling machine(3)Milling is carried out to the old asphalt pavement after heating and softening, and forms one Trapezoidal ridge shape regenerates material heap, regenerates the mean temperature of material heap not less than 120 DEG C, microwave heating wall II(3-3)It is micro- to send out 2.45GHz Wave heats the secondary benefit temperature of regeneration material heap held together after milling, 10 DEG C ~ 15 DEG C of regeneration material heap temperature raising, two sides Hot-blast Heating wall Ⅱ(3-4)High temperature hot gas carries out hot adhesion temperature raising to bituminous paving after milling;
Step S24 is combined using several set dumper+multi-functional feeding machine fillings(4)Traveling is lateral in regeneration track and left and right The addition of the new pitch mixture at two positions is completed in track, wherein the regeneration material heap continuously held together after milling at one is direct New pitch mixture is added, another place is continuously to remixing regenerating device(5)Transition hopper(5-12)New pitch mixture is added, Again by horizontal feeding device(5-11)Accurate control new pitch mixture transports backward;
Step S25 utilizes remixing regenerating device(5)Remixing regeneration is completed simultaneously and surface overlays, and dumper+multi-functional feeding machine adds Material combination(4)The regeneration material heap held together after conveying new pitch mixture to milling, by remixing regenerating device(5)Blender(5-2) It completes the uniform mixing of the two and forms a trapezoidal ridge shape to mix and stir material heap, form material heap temperature generally not less than 150 DEG C, and sharp With microwave heating wall III(5-6)It sends out 2.45GHz microwaves to heat the temperature of benefit again for mixing and stirring material heap held together after remixing, after heating Material heap mean temperature is mixed and stirred not less than 160 DEG C, two sides Hot-blast Heating wall III(5-3)With motor exhaust insulated wall(5-4)It is right The hot adhesion heating of bituminous paving after milling, the temperature of bituminous paving mixes and stirs material heap via one not less than 120 DEG C after heating milling Grade cloth spiral(5-7)Screed is flattened with level-one(5-8)It paves and remixing regeneration zone, dumper+multi-functional confession is formed after precompressed Material machine filling combines(4)New pitch mixture is conveyed to transition hopper(5-12), then by horizontal feeding device(5-11)Accurate control New pitch mixture processed transports landing to remixing regeneration zone backward, by two level cloth spiral(5-9)It paves with secondary base Screed(5-10)Cloth, the thin wearing course of completely new pitch of " heat is to heat " is formed after the precompressed that paves, most obtained afterwards through grinding compacting To reclaimed bituminous pavement.
CN201810045096.1A 2018-01-17 2018-01-17 A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology Pending CN108252188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810045096.1A CN108252188A (en) 2018-01-17 2018-01-17 A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810045096.1A CN108252188A (en) 2018-01-17 2018-01-17 A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology

Publications (1)

Publication Number Publication Date
CN108252188A true CN108252188A (en) 2018-07-06

Family

ID=62726732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810045096.1A Pending CN108252188A (en) 2018-01-17 2018-01-17 A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology

Country Status (1)

Country Link
CN (1) CN108252188A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183583A (en) * 2018-09-29 2019-01-11 江苏集萃道路工程技术与装备研究所有限公司 It is layered hot milling equipment, the complete unit of the compound in-situ heat regeneration of hot wind and microwave and its construction in layer method
CN110095503A (en) * 2019-05-13 2019-08-06 合肥工业大学 A kind of application method of the infrared nondestructive failure detector for Modified Bitumen Pavement
CZ309008B6 (en) * 2020-12-15 2021-11-18 FUTTEC a.s. Method of repairing asphalt surfaces and the equipment for this
CN115677272A (en) * 2022-10-21 2023-02-03 山东高速集团有限公司 Preparation and construction method of recycled asphalt mixture based on microwave heating

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4347016A (en) * 1980-08-21 1982-08-31 Sindelar Robert A Method and apparatus for asphalt paving
CN1540099A (en) * 2003-10-26 2004-10-27 鞍山森远高等级公路养护机械制造有限 Heater of heat recovery for asphalt pavement
CN201495485U (en) * 2009-08-07 2010-06-02 南京英达公路养护车制造有限公司 Hot air circulation type asphalt mixture carrier belt heater
CN103147381A (en) * 2013-03-26 2013-06-12 重庆交通大学 Asphalt pavement in-place hot recycling heating device
CN105442422A (en) * 2015-12-25 2016-03-30 鞍山森远路桥股份有限公司 Heating-milling machine for asphalt pavements
CN106192700A (en) * 2016-07-12 2016-12-07 河北森远路桥工程有限公司 A kind of asphalt concrete pavement in-situ heat regeneration method of low energy consumption
CN106868983A (en) * 2017-01-13 2017-06-20 吉林省嘉鹏集团有限公司 Sheet pavement in-situ heat regeneration construction method
CN107254828A (en) * 2017-08-07 2017-10-17 江苏集萃道路工程技术与装备研究所有限公司 A kind of complete unit of microwave in-situ heat regeneration and its construction technology
CN208604463U (en) * 2018-01-17 2019-03-15 江苏集萃道路工程技术与装备研究所有限公司 A kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4347016A (en) * 1980-08-21 1982-08-31 Sindelar Robert A Method and apparatus for asphalt paving
CN1540099A (en) * 2003-10-26 2004-10-27 鞍山森远高等级公路养护机械制造有限 Heater of heat recovery for asphalt pavement
CN201495485U (en) * 2009-08-07 2010-06-02 南京英达公路养护车制造有限公司 Hot air circulation type asphalt mixture carrier belt heater
CN103147381A (en) * 2013-03-26 2013-06-12 重庆交通大学 Asphalt pavement in-place hot recycling heating device
CN105442422A (en) * 2015-12-25 2016-03-30 鞍山森远路桥股份有限公司 Heating-milling machine for asphalt pavements
CN106192700A (en) * 2016-07-12 2016-12-07 河北森远路桥工程有限公司 A kind of asphalt concrete pavement in-situ heat regeneration method of low energy consumption
CN106868983A (en) * 2017-01-13 2017-06-20 吉林省嘉鹏集团有限公司 Sheet pavement in-situ heat regeneration construction method
CN107254828A (en) * 2017-08-07 2017-10-17 江苏集萃道路工程技术与装备研究所有限公司 A kind of complete unit of microwave in-situ heat regeneration and its construction technology
CN208604463U (en) * 2018-01-17 2019-03-15 江苏集萃道路工程技术与装备研究所有限公司 A kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183583A (en) * 2018-09-29 2019-01-11 江苏集萃道路工程技术与装备研究所有限公司 It is layered hot milling equipment, the complete unit of the compound in-situ heat regeneration of hot wind and microwave and its construction in layer method
WO2020062891A1 (en) * 2018-09-29 2020-04-02 江苏集萃道路工程技术与装备研究所有限公司 Apparatus for hot milling by layer, hot air-microwave composite hot in-place recycling machine set and by-layer processing method thereof
CN109183583B (en) * 2018-09-29 2020-07-21 江苏集萃道路工程技术与装备研究所有限公司 Layered hot milling equipment, hot air microwave composite in-situ heat regeneration complete set unit and layered construction method thereof
CN110095503A (en) * 2019-05-13 2019-08-06 合肥工业大学 A kind of application method of the infrared nondestructive failure detector for Modified Bitumen Pavement
CN110095503B (en) * 2019-05-13 2021-08-13 合肥工业大学 Use method of infrared nondestructive inspection device for modified asphalt pavement
CZ309008B6 (en) * 2020-12-15 2021-11-18 FUTTEC a.s. Method of repairing asphalt surfaces and the equipment for this
CN115677272A (en) * 2022-10-21 2023-02-03 山东高速集团有限公司 Preparation and construction method of recycled asphalt mixture based on microwave heating
CN115677272B (en) * 2022-10-21 2024-03-22 山东高速集团有限公司 Preparation and construction method of regenerated asphalt mixture based on microwave heating

Similar Documents

Publication Publication Date Title
CN108252188A (en) A kind of complete unit of the compound in-situ heat regeneration of novel hot-air microwave and its construction technology
CN109183583B (en) Layered hot milling equipment, hot air microwave composite in-situ heat regeneration complete set unit and layered construction method thereof
CN107254827A (en) A kind of microwave in-place regeneration formula asphalt pavement maintanance truck and construction method
CN107254828B (en) Microwave in-situ heat regeneration complete set unit and construction process thereof
CN108867288A (en) A kind of Multifunctional curing vehicle suitable for asphalt pavement repairing
CA1117339A (en) Microwave method and apparatus for reprocessing pavements
CN102660917B (en) Heat insulation recycling transport vehicle for hot air circulation asphalt mixture
CN207419210U (en) A kind of novel microwave heats remixing regenerating device
CN106223179A (en) Road surface hot recycling machine and road surface hot reproduction construction method
CN207130584U (en) A kind of microwave in-place regeneration formula asphalt pavement maintanance truck
CN110409269A (en) A method of it is promoted for old asphalt mixture temperature after harrowing pine
CN105200898A (en) Asphalt pavement in-situ heat regenerator with asphalt smoke dust recycling function
CN107366211A (en) A kind of bituminous concrete in-situ heat regeneration is layered heating in reciprocating mode technique
CN208023383U (en) A kind of modularization subregion heated air circulation type asphalt pavement heater
CN208604463U (en) A kind of complete unit of compound in-situ heat regeneration of novel hot-air microwave
CN109554998A (en) A kind of microwave tunnel heater
CN201180251Y (en) Sheet pavement heating apparatus for thermal regeneration vehicle for heating sheet pavement on site
CN107254829B (en) Novel microwave heating re-mixing regenerator and material adding and re-mixing regeneration process thereof
CN207130588U (en) A kind of complete unit of microwave in-situ heat regeneration
CN201648926U (en) Movable bakeout repair equipment for bituminous pavements
CN106065557A (en) Sheet pavement in-situ heat regeneration concurrent heating machine
CN111501484A (en) Heating device for giving consideration to secondary temperature raising and pavement thermal connection of asphalt mixture
CN205934656U (en) Bituminous paving hot in -Place recycling concurrent heating machine
CN202730595U (en) Hot air circulating type asphalt mixture heat-preservation and recycling transport vehicle
CN101255675A (en) Sheet pavement in-situ heat regeneration vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination