CN104452521A - 融雪不结冰的公路 - Google Patents

融雪不结冰的公路 Download PDF

Info

Publication number
CN104452521A
CN104452521A CN201410794935.1A CN201410794935A CN104452521A CN 104452521 A CN104452521 A CN 104452521A CN 201410794935 A CN201410794935 A CN 201410794935A CN 104452521 A CN104452521 A CN 104452521A
Authority
CN
China
Prior art keywords
heating
highway
snow
materials
pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410794935.1A
Other languages
English (en)
Inventor
杨立斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410794935.1A priority Critical patent/CN104452521A/zh
Publication of CN104452521A publication Critical patent/CN104452521A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • E01C11/26Permanently installed heating or blowing devices ; Mounting thereof
    • E01C11/265Embedded electrical heating elements ; Mounting thereof

Abstract

融雪不结冰的公路,其特征是:由公路路面施工前预将发热电缆或发热扁带等发热材料铺设在公路中,距路面表面3公分-10公分之间,按照路面宽度不同分别铺设数量不等的发热电缆或发热扁带等发热材料,两端接好控制开关和电源,当冬季下雪时,开启控制开关,电源里的电通过控制开关进入发热电缆和发热扁带等发热材料形成电组,使发热电缆和热扁带等发热材料产生热量传输到路面,使路面保持1℃-5℃的温度融化积雪,保证路面不结冰,这样,高速公路和普通公路就不会封路,不会影响人们的正常安全出行。

Description

融雪不结冰的公路
技术领域:融雪不结冰的公路属于国家基础公路领域,广泛应用于各种国道、省道和高速公路等的基础建设工程。
背景技术:通过国内外全面检索,融雪不结冰的公路广泛适用于各种冬季下雪的公路和高速公路的基础建设,用量非常大,适用于寒冷的地区,由于下雪后的公路和高速公路积雪或积雪融后形成的路面结冰现象,导致汽车不能通行,甚至有些高速由于安全问题而导致封路,影响了人们的正常出行和安全出行,为此,我通过努力开发研制出了融雪不结冰的公路。经过检索查新,本行业中还未出现相同类型的发明和创造。
发明内容:本发明的内容是针对上述存在的问题,结合目前人们的安全准时出行的实际需要,我通过不断努力开发研制出了融雪不结冰的公路。
融雪不结冰的公路,其特征是:由公路路面施工前预将发热电缆或发热扁带等发热材料铺设在公路中,距路面表面3公分-10公分之间,按照路面宽度不同分别铺设数量不等的发热电缆或发热扁带等发热材料,两端接好控制开关和电源,当冬季下雪时,开启控制开关,电源里的电通过控制开关进入发热电缆和发热扁带等发热材料形成电组,使发热电缆和热扁带等发热材料产生热量传输到路面,使路面保持1℃-5℃的温度融化积雪,保证路面不结冰,这样,高速公路和普通公路就不会封路,不会影响人们的正常安全出行。
融雪不结冰的公路与现有技术相比具有以下优点:
1、即使在下雪时和下雪后的恶劣天气下也能正常通行;
2、大大降低和减少了雪中和雪后公路和高速公路上的交通事故;
3、保障了人们的准确出行和物流的正常高效。
附图说明:
附图为融雪不结冰的公路示意图。
1、电源       2、控制开关   3、公路
4、发热电缆等发热材料
具体实施方式:现以附图为例说明:当冬季下雪时,通过接通控制开关(2),电流通过电源(1)进入铺设在公路路面下的3-10公分发热电缆等发热材料(4)产生热量传递到公路(3),使公路(3)保持均衡的1℃-5℃的温度融化雪花,使公路(3)不结冰,保证车辆正常通行。

Claims (1)

1.融雪不结冰的公路,其特征是:由公路路面施工前预将发热电缆或发热扁带等发热材料铺设在公路中,距路面表面3公分-10公分之间,按照路面宽度不同分别铺设数量不等的发热电缆或发热扁带等发热材料,两端接好控制开关和电源,当冬季下雪时,开启控制开关,电源里的电通过控制开关进入发热电缆和发热扁带等发热材料形成电组,使发热电缆和热扁带等发热材料产生热量传输到路面,使路面保持1℃-5℃的温度融化积雪,保证路面不结冰,这样,高速公路和普通公路就不会封路,不会影响人们的正常安全出行。
CN201410794935.1A 2014-12-12 2014-12-12 融雪不结冰的公路 Pending CN104452521A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410794935.1A CN104452521A (zh) 2014-12-12 2014-12-12 融雪不结冰的公路

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410794935.1A CN104452521A (zh) 2014-12-12 2014-12-12 融雪不结冰的公路

Publications (1)

Publication Number Publication Date
CN104452521A true CN104452521A (zh) 2015-03-25

Family

ID=52899222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410794935.1A Pending CN104452521A (zh) 2014-12-12 2014-12-12 融雪不结冰的公路

Country Status (1)

Country Link
CN (1) CN104452521A (zh)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080241780A1 (en) * 2007-03-30 2008-10-02 Michael Dyer Surface Warming Air Blanket
CN104005318A (zh) * 2014-05-16 2014-08-27 上海市政工程设计研究总院(集团)有限公司 一种应用于市政道路的电融雪沥青混凝土路面

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080241780A1 (en) * 2007-03-30 2008-10-02 Michael Dyer Surface Warming Air Blanket
CN104005318A (zh) * 2014-05-16 2014-08-27 上海市政工程设计研究总院(集团)有限公司 一种应用于市政道路的电融雪沥青混凝土路面

Similar Documents

Publication Publication Date Title
CN204690575U (zh) 一种用于桥面融雪化冰的电加热式铺装结构
CN102815893B (zh) 一种具有除冰雪功能的沥青混合料及其制备方法
CN103243628B (zh) 主动防御道路、桥梁、场道冰雪灾害的设施及其施工方法
CN104005318A (zh) 一种应用于市政道路的电融雪沥青混凝土路面
CN206127822U (zh) 一种具有辅助电加热功能的铺面融冰雪装置
CN110965424A (zh) 一种主动式融雪化冰路面结构及其铺筑工艺
CN205617181U (zh) 一种便于微波加热融雪的钢渣沥青混合料路面结构
CN107059542B (zh) 一种基于发热电缆的融冰雪路面及其施工方法
CN202131554U (zh) 一种路面主动保温防滑设施
CN105256694A (zh) 一种路面导电抗滑磨耗层及其制备方法
CN107178022A (zh) 一种道路桥梁路面施工方法
CN104672929A (zh) 一种抗凝冰沥青材料的制备方法
CN204491357U (zh) 道路桥梁双向热管除雪降温系统
CN104631277B (zh) 一种路面施工方法
CN205223791U (zh) 防路面结冰道路
CN104452521A (zh) 融雪不结冰的公路
CN205115953U (zh) 一种用于沥青桥面铺装融雪除冰的装置
CN203904798U (zh) 一种应用于市政道路的电融雪沥青混凝土路面
CN102086623A (zh) 道路融雪化冰碳纤维加热系统
CN202989723U (zh) 融雪装置
CN201158793Y (zh) 交流电热式道桥清冰雪装置
CN205874971U (zh) 一种功能型桥面铺装结构
CN205990576U (zh) 一种自发光发热路面
CN103911934A (zh) 融雪装置
CN210395035U (zh) 适用于寒冷地区的道路路面结构及智能融雪化冰处理系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150325