CN104420841B - 带压起下生产管柱的方法 - Google Patents

带压起下生产管柱的方法 Download PDF

Info

Publication number
CN104420841B
CN104420841B CN201310388632.5A CN201310388632A CN104420841B CN 104420841 B CN104420841 B CN 104420841B CN 201310388632 A CN201310388632 A CN 201310388632A CN 104420841 B CN104420841 B CN 104420841B
Authority
CN
China
Prior art keywords
flow string
pressure
tubing
packer
string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310388632.5A
Other languages
English (en)
Other versions
CN104420841A (zh
Inventor
杨海军
田友仁
刘玉刚
马新民
孙延明
冯英杰
徐宝财
林仁峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310388632.5A priority Critical patent/CN104420841B/zh
Publication of CN104420841A publication Critical patent/CN104420841A/zh
Application granted granted Critical
Publication of CN104420841B publication Critical patent/CN104420841B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Treating Waste Gases (AREA)

Abstract

本发明公开了一种带压起下生产管柱的方法,是为降低带压作业的风险、防止压井带来的储层污染而设计的。本方法先用电缆或连续油管将过油管封隔器输送至需起下的生产管柱的下方并座封,隔离产层与生产管柱间的压力通道;再井口放压,检测过油管封隔器密封情况;然后,上不压井起下作业机及井口防喷器等,进行正常的起下生产管柱的作业。本方法能降低带压起下生产管柱的作业风险,通过不压井防止储层污染,保证后期产能,减少起下生产管柱周期,降低作业成本。

Description

带压起下生产管柱的方法
技术领域
本发明涉及一种带压起下生产管柱的方法,属于天然气开发及储气库注采生产技术领域。
背景技术
在天然气开发及储气库生产过程中,常用压井、修井和钻井的方法起下排卤管柱或油管柱等生产管柱,或是利用不压井作业机带压起下生产管柱。第一种方法作业风险小,但压井耗费人力物力,污染且危害储层,影响后期产能。第二种方法虽能避免上述技术弊端,但作业风险较大。
发明内容
本发明的目的在于提供一种带压起下生产管柱的方法,以降低带压作业的风险,防止压井带来的储层污染。
本发明的具体技术内容如下:
本方法先用电缆或连续油管将过油管封隔器输送至需起下的生产管柱的下方并座封,隔离产层与生产管柱间的压力通道;再井口放压,检测过油管封隔器密封情况;然后,上不压井起下作业机及井口防喷器等,进行正常的起下生产管柱的作业。
本方法能降低带压起下生产管柱的作业风险,通过不压井防止储层污染保证后期产能,减少起下生产管柱周期,降低作业成本。
附图说明
图1、2分别为带压起下生产管柱座封前、后示意图。
具体实施方式
实施例:
参照图1和2对本发明的实施例进一步说明:
图中所示为保护液1、表层套管2、生产套管3、生产管柱4、滑套5、封隔器6、过油管封隔器7及电缆或连续油管8。
本方法先用电缆或连续油管8将过油管封隔器7输送至需起下的生产管柱的下方并座封,隔离产层与生产管柱4间的压力通道;再井口放压,检测过油管封隔器7密封情况;然后,上不压井起下作业机及井口防喷器等,进行正常的起下生产管柱4的作业。
本方法的具体操作步骤如下:
1)实施前,确认天然气或储气库井区域目的层压力为10MPa,生产套管3尺寸为7”,生产管柱4尺寸为31/2”,过油管封隔器(或过生产管柱)7的封隔器胶筒外径为21/2”,生产套管3内坐封后的耐压为14MPa;
用连接井口防喷管的电缆或连续油管8将过油管封隔器7下至生产管柱4下方10-15米处,通过电缆或连续油管8发信号,座封油管封隔器7;
2)井口放压至8MPa,关井30分钟,观察井口压力是否有上涨趋势,若无变化说明过油管封隔器7密封符合要求;
3)打开滑套5,利用空气或氮气将生产管柱4与生产套管3环空间的保护液1排出;
4)安装井口防喷器,上不压井起下钻装置,起下生产管柱4;
5)用电缆或连续油管8解封过油管封隔器7,并将其提出井,然后恢复生产。

Claims (1)

1.一种带压起下生产管柱的方法,其特征在于本方法先用电缆或连续油管(8)将过油管封隔器(7)输送至需起下的生产管柱的下方并坐封,隔离产层与生产管柱(4)间的压力通道;再井口放压,检测过油管封隔器(7)密封情况;然后,上不压井起下作业机及井口防喷器,进行正常的起下生产管柱(4)的作业,其具体操作步骤如下:
1)实施前,确认天然气或储气库井区域目的层压力为10MPa,生产套管(3)尺寸为7”,生产管柱(4)尺寸为31/2”,过油管封隔器(7)或过生产管柱的封隔器胶筒外径为21/2”,生产套管(3)内坐封后的耐压为14MPa;
用连接井口防喷管的电缆或连续油管(8)将过油管封隔器(7)下至生产管柱(4)下方10-15米处,通过电缆或连续油管(8)发信号,坐封过油管封隔器(7);
2)井口放压至8MPa,关井30分钟,观察井口压力是否有上涨趋势,若无变化说明过油管封隔器(7)密封符合要求;
3)打开滑套(5),利用空气或氮气将生产管柱(4)与生产套管(3)环空间的保护液(1)排出;
4)安装井口防喷器,上不压井起下钻装置,起下生产管柱(4);
5)用电缆或连续油管(8)解封过油管封隔器(7),并将其提出井,然后恢复生产。
CN201310388632.5A 2013-08-30 2013-08-30 带压起下生产管柱的方法 Active CN104420841B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310388632.5A CN104420841B (zh) 2013-08-30 2013-08-30 带压起下生产管柱的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310388632.5A CN104420841B (zh) 2013-08-30 2013-08-30 带压起下生产管柱的方法

Publications (2)

Publication Number Publication Date
CN104420841A CN104420841A (zh) 2015-03-18
CN104420841B true CN104420841B (zh) 2017-04-05

Family

ID=52970879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310388632.5A Active CN104420841B (zh) 2013-08-30 2013-08-30 带压起下生产管柱的方法

Country Status (1)

Country Link
CN (1) CN104420841B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868729A (zh) * 2018-06-12 2018-11-23 中国石油集团渤海钻探工程有限公司 一种压裂完井工艺方法
US11808129B2 (en) 2022-03-07 2023-11-07 Saudi Arabian Oil Company Autonomous pressure triggered well livening tool with exothermic nitrogen producing chemistry

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6374925B1 (en) * 2000-09-22 2002-04-23 Varco Shaffer, Inc. Well drilling method and system
US20070240884A1 (en) * 2005-10-18 2007-10-18 Fehres Neil E Pivoting pipe handler for off-line make up of drill pipe joints
CN102561975B (zh) * 2012-01-04 2014-08-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 密闭油管内举升带压修井工艺
CN202900149U (zh) * 2012-11-12 2013-04-24 中国石油天然气股份有限公司 带压作业用可通过式油管堵塞器

Also Published As

Publication number Publication date
CN104420841A (zh) 2015-03-18

Similar Documents

Publication Publication Date Title
AU2009201332B2 (en) System and method for thru tubing deepening of gas lift
GB2478426B (en) Flushing procedure for rotating control device
EA200700698A1 (ru) Способ бурения поглощающей формации
WO2009042121A3 (en) Externally activated seal system for wellhead
CN105804680A (zh) 一种油气田带压修井作业装置及方法
CN104420841B (zh) 带压起下生产管柱的方法
CN205605156U (zh) 一种油气田带压修井作业装置
CN204984329U (zh) 一种内置式连续油管悬挂器
CN104879098B (zh) 一种同心双管气井生产管柱
CN104074487B (zh) 拖动式封隔器
CN205154043U (zh) 一种煤层气井的工艺管柱及其封堵装置
CN203452663U (zh) 可带压起下的生产管柱
CN204327046U (zh) 一种旁通管密封装置
UA103542C2 (ru) Способ завершения скважины
CN104895536B (zh) 一种注采气井变径完井的方法及注采管柱
CN202673207U (zh) 一种分段冲砂工具
CN204677154U (zh) 新型压裂专用封隔器
CN200971775Y (zh) 一种井下负压解堵提排工具
CN104265231A (zh) 循环堵塞器及其使用方法
CN202467750U (zh) 井下防漏失装置
CN204082082U (zh) 循环堵塞器
CN206338058U (zh) 直斜井管内封下采上工艺管柱
CN202596664U (zh) 一种井口防回流阀
CN205387931U (zh) 一种分层采油装置
CN204436348U (zh) 一种用于垂直井的顶部充填工具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant