CN104401839A - U-shaped elevator guide rail bracket - Google Patents
U-shaped elevator guide rail bracket Download PDFInfo
- Publication number
- CN104401839A CN104401839A CN201410619285.7A CN201410619285A CN104401839A CN 104401839 A CN104401839 A CN 104401839A CN 201410619285 A CN201410619285 A CN 201410619285A CN 104401839 A CN104401839 A CN 104401839A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- elevator
- shaped
- bottom plate
- shaped bottom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a U-shaped elevator guide rail bracket. The U-shaped elevator guide rail bracket is arranged between an elevator shaft wall and a guide rail and comprises a U-shaped bottom plate device, guide rail fixing plates and a steel expansion bolt which is connected between a U-shaped bottom plate and a shaft wall; the guide rail fixing plates are fixedly connected with the upper end and the lower end of the U-shaped bottom plate device respectively. By such structure, the distance between the guide rail and the shaft wall, and the distance between the two guide rail fixing plates on the U-shaped bottom plate device can be selectively adjusted according to actual mounting needs; the U-shaped elevator guide rail bracket is suitable for an elevator shaft with a ring beam structure, and the distance between every two ring beams of the elevator is greater than 2.5m or the number of the ring beams of the elevator is an odd number; furthermore, the whole device is simple in manufacturing process, convenient to assemble and disassemble and relatively low in cost; the defect that the elevator shaft is not reasonably arranged is overcome, and the requirement of national standard is met.
Description
technical field:
the present invention relates to a kind of U-shaped guide rail bracket of elevator.
background technology:
At present, due to improving constantly of building cost, existing all-concrete elevator hoistways just constantly reduces, the substitute is the hoistway adopting framed structure or collar tie beam to arrange, and the collar tie beam at scene is arranged also because of building structure itself, collar tie beam spacing is not quite reasonable, always has collar tie beam spacing more than 2.5 meters, or collar tie beam quantity is odd number, make during in-site installation cage guide, to meet the requirement that at least needs two rail bracketses are fixing of Standard single guide rail.
summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of manufacture craft, installation process is simple, the lower and U-shaped rail brackets that can be applicable in elevator hoistways that collar tie beam structure is odd number of cost.
For solving the problem, the present invention is achieved by the following technical solutions:
A kind of U-shaped guide rail bracket of elevator, be arranged between elevator shaft wall and guide rail, described rail brackets comprises U-shaped bottom plate apparatus, guide rail fixed plate and connects the steel expansion bolt between U-shaped base plate and well enclosure, and described guide rail fixed plate is fixedly connected with U-shaped bottom plate apparatus upper and lower end parts respectively.
As preferably, described U-shaped bottom plate apparatus is also included in the flange platform of the upper surface level that its upper and lower end parts laterally extends, thus described guide rail fixed plate can directly be fixed on flange platform, enhances the stability of guide rail fixed plate.
As preferably, for making the connection firm stable more between described flange platform and guide rail fixed plate, be bolted to connection between described flange platform and guide rail fixed plate.
As another kind of improved procedure, described U-shaped bottom plate apparatus also comprises the steel angle structure being welded thereon bottom, thus can select the steel angle structure of different length, then can adjust the distance between guide rail fixed plate and well enclosure at any time.
As preferably, for make between described steel angle structure and U-shaped bottom plate apparatus support beam can more firmly with stable connection, be also provided with a reinforcement angle steel be welded and fixed between described steel angle structure and U-shaped bottom plate apparatus.
As preferably, for making the firm structure in described angle and being connected between guide rail fixed plate more firmly, be bolted to connection between described steel angle structure and guide rail fixed plate.
Compared with prior art, usefulness of the present invention is: this U-shaped guide rail bracket of elevator, adopt the frame mode of U-shaped base arrangement and guide rail fixed plate combination, integral structure is fixed in well enclosure by steel expansion bolt, can need to select the distance between 2 guide rail fixed plate fixing on the distance between adjustment guide rail and well enclosure and U-shaped bottom plate apparatus according to actual installation, be applicable to collar tie beam structure and collar tie beam spacing is greater than 2.5M or collar tie beam quantity is the elevator hoistways of odd number, single unit system manufacture craft is simple in addition, easy installation and removal and cost is lower, not only overcome the unreasonable situation of elevator hoistways layout, and meet Standard.
accompanying drawing illustrates:
Below in conjunction with accompanying drawing, the present invention is further described:
Fig. 1 is the Facad structure schematic diagram of the first embodiment of the present invention;
Fig. 2 is the plan structure schematic diagram of the first embodiment of the present invention;
Fig. 3 is the Facad structure schematic diagram of another embodiment of the present invention;
Fig. 4 is the plan structure schematic diagram of another embodiment of the present invention;
In figure: 1, well enclosure; 2, guide rail; 3, U-shaped bottom plate apparatus; 4, guide rail fixed plate; 5, steel expansion bolt; 6, flange platform; 7, steel angle structure; 8, angle steel is strengthened.
detailed description of the invention:
Describe the present invention below in conjunction with the drawings and the specific embodiments:
A kind of U-shaped guide rail bracket of elevator of the present invention, as shown in Figure 1, embodiment is improved as the first, described U-shaped guide rail bracket of elevator, be arranged between elevator shaft wall 1 and guide rail 2, described rail brackets comprises U-shaped bottom plate apparatus 3, guide rail fixed plate 4 and the steel expansion bolt 5 connected between U-shaped base plate and well enclosure 1, described guide rail fixed plate 4 is fixedly connected with the upper and lower end parts of U-shaped bottom plate apparatus 3 respectively, described U-shaped bottom plate apparatus 3 is also included in the flange platform 6 of the upper surface level that its upper and lower end parts all laterally extends, thus described guide rail fixed plate can directly be fixed on flange platform, enhance the stability of guide rail fixed plate.Preferably, for making described flange platform can be connected firm stable more with between guide rail fixed plate, be bolted to connection between described flange platform 6 and guide rail fixed plate 4.
Embodiment is improved as another kind, described U-shaped guide rail bracket of elevator, be arranged between elevator shaft wall 1 and guide rail 2, described rail brackets comprises U-shaped bottom plate apparatus 3, guide rail fixed plate 4 and the steel expansion bolt 5 connected between U-shaped base plate and well enclosure 1, described guide rail fixed plate 4 is fixedly connected with the upper and lower end parts of U-shaped bottom plate apparatus 3 respectively, described U-shaped panel assembly 3 also comprises the steel angle structure 7 being welded thereon bottom, thus the steel angle structure of different length can be selected, then the distance between guide rail fixed plate and well enclosure can be adjusted at any time, for to make between described steel angle structure and U-shaped bottom plate apparatus support beam can more firmly with stable connection, also be provided with one between described steel angle structure 7 with U-shaped bottom plate apparatus 3 and be welded and fixed the reinforcement angle steel 8 be connected, preferably, for make described steel angle structure be connected between guide rail fixed plate more firm, be bolted to connection between described steel angle structure 7 and guide rail fixed plate 4.
In actual installation process, according to the on-the-spot needs of actual installation, collar tie beam structure is had and the larger hoistway of collar tie beam spacing and collar tie beam quantity are the hoistway of odd number for part, according to the span of the U-shaped bottom plate apparatus 3 that spacing and the quantity of hoistway collar tie beam select adjustment to be of convenient length, thus namely reach the object supporting fixed guide 4, also the Standard that cage guide is installed is met, guide rail fixed plate can also be adjusted in addition as required and be fixedly connected with position at U-shaped the structural of bottom plate apparatus both ends, namely the steel angle structure on the flange platform in the first embodiment and in the second embodiment changes guide rail fixed plate installation site thereon, thus the distance reached between adjustment guide rail and well enclosure, maximum using hoistway space resource.
It is emphasized that: be only preferred embodiment of the present invention above, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.
Claims (6)
1. a U-shaped guide rail bracket of elevator, be arranged between elevator shaft wall (1) and guide rail (2), it is characterized in that: described guide rail bracket of elevator comprises U-shaped bottom plate apparatus (3), guide rail fixed plate (4) and is fixedly connected with the steel expansion bolt (5) of U-shaped bottom plate apparatus (3) and well enclosure (1), and described guide rail fixed plate (4) is fixedly connected with the upper and lower end parts of U-shaped bottom plate apparatus (3) respectively.
2. U-shaped guide rail bracket of elevator according to claim 1, is characterized in that: described U-shaped bottom plate apparatus (3) is also included in the flange platform (6) of the upper surface level that its upper and lower end parts laterally extends.
3. U-shaped guide rail bracket of elevator according to claim 2, is characterized in that: be bolted to connection between described flange platform (6) and guide rail fixed plate (4).
4. U-shaped guide rail bracket of elevator according to claim 1, is characterized in that: described U-shaped bottom plate apparatus (3) also comprises the steel angle structure (7) being welded thereon bottom.
5. U-shaped guide rail bracket of elevator according to claim 4, is characterized in that: be also provided with a reinforcement angle steel (8) be welded and fixed between described steel angle structure (7) and U-shaped bottom plate apparatus (3).
6. U-shaped guide rail bracket of elevator according to claim 4, is characterized in that: be bolted to connection between described steel angle structure (7) and guide rail fixed plate (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410619285.7A CN104401839A (en) | 2014-11-07 | 2014-11-07 | U-shaped elevator guide rail bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410619285.7A CN104401839A (en) | 2014-11-07 | 2014-11-07 | U-shaped elevator guide rail bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104401839A true CN104401839A (en) | 2015-03-11 |
Family
ID=52639528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410619285.7A Pending CN104401839A (en) | 2014-11-07 | 2014-11-07 | U-shaped elevator guide rail bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104401839A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106185582A (en) * | 2016-08-31 | 2016-12-07 | 天津市奥瑞克电梯有限公司 | A kind of staircase upper rall assembly |
CN114803771A (en) * | 2022-05-24 | 2022-07-29 | 快意电梯股份有限公司 | Elevator guide rail distribution and guide rail bracket positioning method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU552267A1 (en) * | 1975-01-27 | 1977-03-30 | Центральное Проектно-Конструкторское Бюро По Лифтам Всесоюзного Объединения "Союзлифтмаш" | Device for fastening an elevator car cage |
CN101837918A (en) * | 2010-05-28 | 2010-09-22 | 江南嘉捷电梯股份有限公司 | Fixing structure of guide rail bracket of elevator |
CN202124387U (en) * | 2011-06-28 | 2012-01-25 | 苏州新达电扶梯部件有限公司 | Guide rail bracket for elevator car |
CN202953654U (en) * | 2012-10-26 | 2013-05-29 | 天津艾瑞斯集团有限公司 | Guide structure for household villa elevators |
CN203112283U (en) * | 2013-01-16 | 2013-08-07 | 杭州顺达伯耐特电梯有限公司 | Adjusting device for guide rail support |
CN203173635U (en) * | 2013-03-22 | 2013-09-04 | 苏州富士电梯有限公司 | Installation structure of span type elevator guide rail support |
CN203173636U (en) * | 2013-03-28 | 2013-09-04 | 苏州富士电梯有限公司 | Extending type installation structure of elevator guide rail supports |
CN203284002U (en) * | 2013-05-08 | 2013-11-13 | 江南嘉捷电梯股份有限公司 | Embedded channel, guide rail connection structure comprising embedded channel and elevator |
CN203568630U (en) * | 2013-09-27 | 2014-04-30 | 马登华 | Vibration and noise reduction device of elevator guide rail |
CN204185062U (en) * | 2014-11-07 | 2015-03-04 | 康力电梯股份有限公司 | U-shaped guide rail bracket of elevator |
-
2014
- 2014-11-07 CN CN201410619285.7A patent/CN104401839A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU552267A1 (en) * | 1975-01-27 | 1977-03-30 | Центральное Проектно-Конструкторское Бюро По Лифтам Всесоюзного Объединения "Союзлифтмаш" | Device for fastening an elevator car cage |
CN101837918A (en) * | 2010-05-28 | 2010-09-22 | 江南嘉捷电梯股份有限公司 | Fixing structure of guide rail bracket of elevator |
CN202124387U (en) * | 2011-06-28 | 2012-01-25 | 苏州新达电扶梯部件有限公司 | Guide rail bracket for elevator car |
CN202953654U (en) * | 2012-10-26 | 2013-05-29 | 天津艾瑞斯集团有限公司 | Guide structure for household villa elevators |
CN203112283U (en) * | 2013-01-16 | 2013-08-07 | 杭州顺达伯耐特电梯有限公司 | Adjusting device for guide rail support |
CN203173635U (en) * | 2013-03-22 | 2013-09-04 | 苏州富士电梯有限公司 | Installation structure of span type elevator guide rail support |
CN203173636U (en) * | 2013-03-28 | 2013-09-04 | 苏州富士电梯有限公司 | Extending type installation structure of elevator guide rail supports |
CN203284002U (en) * | 2013-05-08 | 2013-11-13 | 江南嘉捷电梯股份有限公司 | Embedded channel, guide rail connection structure comprising embedded channel and elevator |
CN203568630U (en) * | 2013-09-27 | 2014-04-30 | 马登华 | Vibration and noise reduction device of elevator guide rail |
CN204185062U (en) * | 2014-11-07 | 2015-03-04 | 康力电梯股份有限公司 | U-shaped guide rail bracket of elevator |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106185582A (en) * | 2016-08-31 | 2016-12-07 | 天津市奥瑞克电梯有限公司 | A kind of staircase upper rall assembly |
CN114803771A (en) * | 2022-05-24 | 2022-07-29 | 快意电梯股份有限公司 | Elevator guide rail distribution and guide rail bracket positioning method |
CN114803771B (en) * | 2022-05-24 | 2023-07-25 | 快意电梯股份有限公司 | Elevator guide rail distribution and guide rail bracket positioning method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103723590A (en) | Elevator leveling device | |
CN204185062U (en) | U-shaped guide rail bracket of elevator | |
CN104401839A (en) | U-shaped elevator guide rail bracket | |
KR101388823B1 (en) | Form device | |
CN202627494U (en) | Device for locating and supporting prefabricated concrete structure laminated slab | |
CN106641461A (en) | Bracket provided with three petroleum pipelines capable of being laid thereon | |
CN203173636U (en) | Extending type installation structure of elevator guide rail supports | |
CN206634889U (en) | Elevator hoistways ins and outs | |
CN102953674A (en) | Hoistway ladder stand device for pit service and maintenance | |
JP5936934B2 (en) | Panel holding structure | |
CN204803776U (en) | Bridge sound barrier structure | |
CN205472180U (en) | Gearless machine base | |
CN204002841U (en) | A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction | |
CN205739905U (en) | A kind of guide rail bracket of elevator | |
CN104291181A (en) | Guiding track support shared by elevator lift car and counter weight | |
CN109826448B (en) | Lifting, hoisting and positioning device for concrete wall panel | |
CN204022195U (en) | Lift car and counterweight share rail brackets | |
CN202346542U (en) | Combined guide rail bracket | |
CN105923558A (en) | Hoisting machine for sound barrier plates below high-voltage grid | |
CN104326331A (en) | Safety maintenance device of upper beam of elevator | |
CN203430006U (en) | Quick disassembly and assembly cantilever bracket for building outer wall construction | |
CN202014346U (en) | Outdoor-type floor mounting support without fixation for base stations | |
CN201746193U (en) | Elevator guide rail support frame | |
CN205742210U (en) | Z-shape steel bracket | |
CN103072869A (en) | Rope hanging plate assembly for installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150311 |
|
WD01 | Invention patent application deemed withdrawn after publication |