CN104389264A CN201410563020.XA CN201410563020A CN104389264A CN 104389264 A CN104389264 A CN 104389264A CN 201410563020 A CN201410563020 A CN 201410563020A CN 104389264 A CN104389264 A CN 104389264A
Authority
CN
China
Prior art keywords
wedge block
block
wedge
bottom deck
deck assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410563020.XA
Other languages
Chinese (zh)
Other versions
CN104389264B (en
Inventor
陈志勇
肖金平
曾庆冬
彭环云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Bi Engineering Technology Co., Ltd.
Original Assignee
陈志勇
肖金平
曾庆冬
彭环云
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈志勇, 肖金平, 曾庆冬, 彭环云 filed Critical 陈志勇
Priority to CN201410563020.XA priority Critical patent/CN104389264B/en
Publication of CN104389264A publication Critical patent/CN104389264A/en
Application granted granted Critical
Publication of CN104389264B publication Critical patent/CN104389264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an adjustable bridge support pad stone. The adjustable bridge support pad stone comprises a bottom plate component, a height adjusting component and a supporting block for supporting a bridge support. The height adjusting component comprises a wedge-shaped sliding block and an adjusting part, and the wedge-shaped sliding block is connected to the bottom plate component through the adjusting part and can be adjusted by the adjusting part to horizontally move; the supporting block is placed on the wedge-shaped face of the wedge-shaped sliding block and can vertically move along with horizontal moving of the wedge-shaped sliding block; a wedge-shaped sliding block limiting plate is arranged on the bottom plate component; and limiting parts are also arranged on the periphery of the supporting block. The adjustable bridge support pad stone has the beneficial effects that the support can be rapidly and safely leveled and replaced; construction equipment is simple; labor intensity is low; efficiency is high; and potential safety hazards of a bridge can be avoided.

Description

Adjustable bridge pad pinner
Technical field
The present invention relates to technical field of bridge construction, be specifically related to a kind of conveniently replaced adjustable bridge pad pinner with leveling bridge pad.
Background technology
Current bridge pad leveling generally all uses lift-up method to construct with replacing, namely adopts special Lifting Equipment by after bridge jacking, carries out leveling, replacing to bearing, and then the beam that falls.Whole process need special equipment is more, operation trouble, workload are large, and need the safety of accurate synchronization monitoring guarantee bridge, especially for big-and-middle-sized bridge, to equipment and construction requirement higher, otherwise very easily cause hinge seam cracking, the local accident such as concrete destruction; Meanwhile, when newly building bridge carries out bearing installation or bridge pier generation sedimentation, the normal phenomenon easily producing seat empty, because height of support cannot regulate, serious threat is to the operation security of bridge.
Therefore, change bearing mounting means, under bearing, adopt height-adjustable device, just when not jacking bridge, support leveling and replacing can be carried out quickly and safely, save substantial contribution, and reduce bridge security hidden danger.
Summary of the invention
The technical problem to be solved in the present invention overcomes the deficiencies in the prior art, provides one can carry out support leveling and replacing quickly and safely, construction equipment is simple, labour intensity is little, efficiency is high, can avoid the adjustable bridge pad pinner of bridge security hidden danger.
For solving the problems of the technologies described above, the technical scheme that the present invention proposes is:
A kind of adjustable bridge pad pinner, comprise bottom deck assembly, height adjustment assembly and the back-up block for supporting bridge bearing, described height adjustment assembly comprises wedge block and regulating part, described wedge block is connected on bottom deck assembly by regulating part and also can moves horizontally under the adjustment of regulating part, on the lozenges that described back-up block is positioned over wedge block and can moving horizontally and move up and down with wedge block, described bottom deck assembly is provided with wedge block limiting plate, and the surrounding of back-up block is also provided with locating part.
Further improvement as to technique scheme:
Described regulating part comprises the adjusting screw(rod) and nut that cooperatively interact, described wedge block inside is provided with cavity, do not rotate in the cavity that nut is fixed on wedge block, the end of thread of adjusting screw(rod) is connected with nut, and the adjustable side of adjusting screw(rod) passes the side of described bottom deck assembly.
Described bottom deck assembly is box structure, its side and top are provided with opening, described wedge block is positioned over box structure inside from side mouth, described adjusting screw(rod) is connected on the side plate relative with open side, described back-up block is positioned over wedge block from top open part, and the steel plate of box structure top surrounding forms described locating part.
Described wedge block limiting plate is arranged at the side mouth place of box structure.
Compared with prior art, the invention has the advantages that:
Bridge pad pinner of the present invention is an a kind of seat mounting apparatus newly, innovates bearing replacement and leveling construction method.Its frame mode adopting wedge block to combine with screw mechanism, realize the conversion of rotary motion and rectilinear motion, convert the rotation of adjusting screw(rod) to wedge block moving horizontally, and convert the difference in height of each for wedge block section to back-up block moving up and down by the back-up block above it, when not jacking bridge, can be quick, carry out support leveling and replacing safely, and do not affect the normal use of bearing, construction equipment is simple, height regulating mechanism is easy and simple to handle, internal activity part not only can be gone slick, and its position energy positive lock, firm in structure durable, have that labour intensity is little, efficiency is high, can substantial contribution be saved, and reduce the advantage of the potential safety hazards such as hinge seam cracking, local concrete destruction that bridge produces because of jacking.
Accompanying drawing explanation
Fig. 1 is main TV structure schematic diagram of the present invention.
Fig. 2 is side-looking structural representation of the present invention.
Fig. 3 is plan structure schematic diagram of the present invention.
Marginal data:
1, bottom deck assembly; 2, wedge block; 3, adjusting screw(rod); 4, nut; 5, back-up block; 6, locating part; 7, wedge block limiting plate.
Detailed description of the invention
For the ease of understanding the present invention, hereafter will do to describe more comprehensively, meticulously to the present invention in conjunction with Figure of description and preferred embodiment, but protection scope of the present invention is not limited to following specific embodiment.
As shown in Fig. 1 ~ Fig. 3, bridge pad pinner embodiment that one of the present invention is adjustable, comprise bottom deck assembly 1, height adjustment assembly and the back-up block 5 for supporting bridge bearing, height adjustment assembly comprises wedge block 2 and regulating part, regulating part one end is threaded with wedge block 2, the other end is connected on bottom deck assembly 1, wedge block 2 can move horizontally under the adjustment of regulating part, back-up block 5 is positioned on the lozenges of wedge block 2 by the locating part 6 that surrounding is arranged, and can moving horizontally and move up and down with wedge block 2, bottom deck assembly 1 is provided with wedge block limiting plate 7, and the highest line journey position of back-up block 5 is higher than the top of locating part 6, ensure that the top of back-up block 5 can contact with bridge pad.The present invention when not jacking bridge, can carry out support leveling and replacing, and does not affect the normal use of bearing quickly and safely, and construction equipment is simple, and height regulating mechanism is easy and simple to handle, and its position energy positive lock, firm in structure durable; Operator's labour intensity is little, efficiency is high, can save substantial contribution, and reduces the potential safety hazard such as hinge seam cracking, local concrete destruction that bridge produces because of jacking.
In the present embodiment, bottom deck assembly 1 is box structure, and internal cavities size and the wedge block 2 of box structure adapt, and ensures the stability that wedge block 2 moves horizontally.Side and the top of box structure are provided with opening, and bottom it, steel plate is bolted on the bearing cushion block on bridge pier or Guan Liang, and bottom inside is provided with the reinforcing rib that many have gradient.Wedge block 2 is the herringbone wedge shape part surrounded by steel plate, some support reinforcing plates are provided with in herringbone internal cavities, wedge block 2 is positioned on many reinforcing ribs in box structure from the side mouth of box structure, the side mouth place of box structure is also provided with wedge block limiting plate 7, ensures locking position accurately and reliably.In the present embodiment, regulating part comprises the adjusting screw(rod) 3 and nut 4 that cooperatively interact.Do not rotate in the tapered end that nut 4 is fixed on wedge block 2, the screw rod end of adjusting screw(rod) 3 is connected with nut 4, and the adjustable side side plate relative with open side from box structure passes, and is convenient to regulate.The outside surrounding of box structure is provided with some stiffeners.
In the present embodiment, the top open part of box structure bottom deck assembly 1 is equiped with two blocks of parallel steel plates, and another two blocks of relative side plates of two block plates and bottom deck assembly 1 form locating part 6 together.Back-up block 5 is elevated in the scope of locating part 6, guarantees safety.
the present invention is used for operating procedure when bearing is installed and changed:
1) bearing is installed: first, turn adjusting screw(rod) 3, wedge block 2 is moved to left, turns down back-up block 5, and bearing and bearing pad stone of the present invention are placed on design attitude; Then turn adjusting screw(rod) 3 in the other direction, wedge block 2 is moved to right, and height-regulating support block 5, to suitable travel position (shown in Fig. 1 dotted line position), makes bearing and bridge fit tightly; Finally the bottom of bottom deck assembly 1 is bolted on bearing cushion block.
2) replacing time: first, installs temporary support bottom bridge; Turn adjusting screw(rod) 3, wedge block 2 is moved to left, turns down back-up block 5, make holder top depart from bridge; More renew bearing; Then turn adjusting screw(rod) 3 in the other direction, wedge block 2 is moved to right, and height-regulating support block 5, to suitable travel position (shown in Fig. 1 dotted line position), makes bearing and bridge fit tightly.
The above is only the preferred embodiment of the present invention, protection scope of the present invention be not only confined to above-described embodiment, and all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, all should be considered as protection scope of the present invention.

Claims (4)

1. an adjustable bridge pad pinner, it is characterized in that: comprise bottom deck assembly (1), height adjustment assembly and the back-up block (5) for supporting bridge bearing, described height adjustment assembly comprises wedge block (2) and regulating part, described wedge block (2) is connected to bottom deck assembly (1) by regulating part and above also can moves horizontally under the adjustment of regulating part, on the lozenges that described back-up block (5) is positioned over wedge block (2) and can moving horizontally and move up and down with wedge block (2), described bottom deck assembly (1) is provided with wedge block limiting plate (7), the surrounding of back-up block (5) is also provided with locating part (6).
2. according to the adjustable bridge pad pinner described in claim 1, it is characterized in that: described regulating part comprises the adjusting screw(rod) (3) and nut (4) that cooperatively interact, described wedge block (2) inside is provided with cavity, do not rotate in the cavity that nut (4) is fixed on wedge block (2), the end of thread of adjusting screw(rod) (3) is connected with nut (4), and the adjustable side of adjusting screw(rod) (3) passes the side of described bottom deck assembly (1).
3. adjustable bridge pad pinner according to claim 2, it is characterized in that: described bottom deck assembly (1) is box structure, its side and top are provided with opening, described wedge block (2) is positioned over box structure inside from side mouth, described adjusting screw(rod) (3) is connected on the side plate relative with open side, described back-up block (5) is positioned over wedge block (2) from top open part, and the steel plate of box structure top surrounding forms described locating part (6).
4. according to the adjustable bridge pad pinner described in claim 3, it is characterized in that: described wedge block limiting plate (7) is arranged at the side mouth place of box structure.
CN201410563020.XA 2014-10-22 2014-10-22 Adjustable bridge pad pinner Active CN104389264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410563020.XA CN104389264B (en) 2014-10-22 2014-10-22 Adjustable bridge pad pinner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410563020.XA CN104389264B (en) 2014-10-22 2014-10-22 Adjustable bridge pad pinner

Publications (2)

Publication Number Publication Date
CN104389264A true CN104389264A (en) 2015-03-04
CN104389264B CN104389264B (en) 2016-04-27

Family

ID=52607217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410563020.XA Active CN104389264B (en) 2014-10-22 2014-10-22 Adjustable bridge pad pinner

Country Status (1)

Country Link
CN (1) CN104389264B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908984A (en) * 2016-06-02 2016-08-31 深圳市鹏城建筑集团有限公司 Device and method for adjusting flatness and height of prefabricated concrete column
CN107254848A (en) * 2017-07-05 2017-10-17 郑州市市政工程总公司 Building block system temporary support structure and its construction method
CN109338892A (en) * 2018-11-17 2019-02-15 湖南金海钢结构有限公司 A kind of steel structure bridge installation segmentation line style adjustment and integral bridge descending device
CN110541475A (en) * 2019-08-23 2019-12-06 中建科技(福州)有限公司 Device and method for adjusting flatness and height of precast concrete column
CN113931069A (en) * 2021-09-22 2022-01-14 中交广州航道局有限公司 Adjustable large-tonnage cushion block

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608425A (en) * 2009-07-07 2009-12-23 中铁大桥勘测设计院有限公司 A kind of novel bridge traverse load support
KR20100024732A (en) * 2008-08-26 2010-03-08 (주)씨씨엘 코리아 Seat apparatus for a bridge of i.l.m type and the method thereof
KR20100073881A (en) * 2008-12-23 2010-07-01 (주)씨씨엘 코리아 Dummy bearing for bridge using sand and upper structure of bridge supporting method thterewith
CN101768919A (en) * 2009-12-18 2010-07-07 上海市政工程设计研究总院 Rotary height-adjustable shock-resistant ball support
CN204252009U (en) * 2014-10-22 2015-04-08 陈志勇 Adjustable bridge pad pinner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100024732A (en) * 2008-08-26 2010-03-08 (주)씨씨엘 코리아 Seat apparatus for a bridge of i.l.m type and the method thereof
KR20100073881A (en) * 2008-12-23 2010-07-01 (주)씨씨엘 코리아 Dummy bearing for bridge using sand and upper structure of bridge supporting method thterewith
CN101608425A (en) * 2009-07-07 2009-12-23 中铁大桥勘测设计院有限公司 A kind of novel bridge traverse load support
CN101768919A (en) * 2009-12-18 2010-07-07 上海市政工程设计研究总院 Rotary height-adjustable shock-resistant ball support
CN204252009U (en) * 2014-10-22 2015-04-08 陈志勇 Adjustable bridge pad pinner

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908984A (en) * 2016-06-02 2016-08-31 深圳市鹏城建筑集团有限公司 Device and method for adjusting flatness and height of prefabricated concrete column
CN105908984B (en) * 2016-06-02 2018-01-23 深圳市鹏城建筑集团有限公司 A kind of device and method for adjusting precast concrete column flatness and height
CN107254848A (en) * 2017-07-05 2017-10-17 郑州市市政工程总公司 Building block system temporary support structure and its construction method
CN109338892A (en) * 2018-11-17 2019-02-15 湖南金海钢结构有限公司 A kind of steel structure bridge installation segmentation line style adjustment and integral bridge descending device
CN110541475A (en) * 2019-08-23 2019-12-06 中建科技(福州)有限公司 Device and method for adjusting flatness and height of precast concrete column
CN110541475B (en) * 2019-08-23 2020-12-08 中建科技(福州)有限公司 Device and method for adjusting flatness and height of precast concrete column
CN113931069A (en) * 2021-09-22 2022-01-14 中交广州航道局有限公司 Adjustable large-tonnage cushion block

Also Published As

Publication number Publication date
CN104389264B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104389264B (en) Adjustable bridge pad pinner
CN208379427U (en) A kind of adjustable bridge support adjustment cushion block
CN203701638U (en) Adjustable supporting device
CN103878570B (en) Coal Chemical Industry installs slag breaker Omnibearing adjustable fast junction apparatus with large-scale gasification furnace
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN111379953B (en) Bridge construction supporting equipment in field of bridge engineering
CN204252009U (en) Adjustable bridge pad pinner
CN205604068U (en) Bridge beam supports adjusts cushion with adjustable
CN104148863B (en) Anti-welding deformation fixture
CN203582329U (en) Leveling device for walking underframe of tower crane, walking underframe and tower crane
CN109629605A (en) Road inspection well well lid construction equipment and construction technology
CN203847932U (en) Sliding type camera support
CN204608527U (en) A kind of comprehensive device for regulating rail
CN204417935U (en) A kind of railway pushes away quarrel device and railway pushes away quarrel equipment
CN204609319U (en) A kind of large-tonnage tensioning construction adjusting device
CN204248869U (en) A kind of head repairing auxiliary device of flat machine
CN204608532U (en) A kind of device for regulating rail
CN209853576U (en) Multi-direction adjustable track fixing device
CN209038528U (en) A kind of lifting device of large-scale locking and arming mechanism
US20130101348A1 (en) Adjustable grate frames
CN203593924U (en) Railway track-laying track-adjusting device
CN103738863B (en) A kind of windbreak anchoring device for derrick crane
CN104831592A (en) All-dimensional track adjusting device
CN202183363U (en) Dismantling tool
CN104358235A (en) Bridge type trash removal machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171211

Address after: 410000 Hunan city high tech Development Zone Changsha Changsha Wenxuan Road No. 27 building 204 Yuyuan Lu Valley A2

Patentee after: Hunan Bi Engineering Technology Co., Ltd.

Address before: Is the 410000 street in Hunan province Changsha Liu Furong District No. 136 South Building 803 room

Co-patentee before: Xiao Jinping

Patentee before: Chen Zhiyong

Co-patentee before: Zeng Qingdong

Co-patentee before: Peng Huanyun

TR01 Transfer of patent right