CN104361450A - Data processing device in project management system - Google Patents

Data processing device in project management system Download PDF

Info

Publication number
CN104361450A
CN104361450A CN201410641617.1A CN201410641617A CN104361450A CN 104361450 A CN104361450 A CN 104361450A CN 201410641617 A CN201410641617 A CN 201410641617A CN 104361450 A CN104361450 A CN 104361450A
Authority
CN
China
Prior art keywords
project
user
instruction
approval
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410641617.1A
Other languages
Chinese (zh)
Inventor
王捷
邵文晋
杨友乐
潘登
张治忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID ZHEJIANG YUEQING POWER SUPPLY Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
STATE GRID ZHEJIANG YUEQING POWER SUPPLY Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID ZHEJIANG YUEQING POWER SUPPLY Co Ltd, State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical STATE GRID ZHEJIANG YUEQING POWER SUPPLY Co Ltd
Priority to CN201410641617.1A priority Critical patent/CN104361450A/en
Publication of CN104361450A publication Critical patent/CN104361450A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a data processing device in a project management system. The data processing device comprises an examination and approval module, an implementation module and a final settlement module. The examination and approval module is used for receiving an instruction, input by a user, for examination and approval on first content of a first project in the project management system, then sends an examination and approval request to a user with a examination and approval permission and receives a result instruction which is input by the user with the examination and approval permission and obtained after examination and approval on the first content. The implementation module is used for receiving the instruction which is input by the user and instructs that the first project enter an implementation process, monitoring the implementation process of the first project and displaying the implementation conditions of the first project. The final settlement module is used for receiving an instruction which is input by the user and used for conducting final settlement on the first project and displaying the final settlement content of the first project. The data processing device can process mass data generated in the project management system, and improve the work efficiency of project management staff.

Description

Data processing equipment in a kind of Engineering Project Mgmt System
Technical field
The present invention relates to data processing field, particularly relate to the data processing equipment in a kind of Engineering Project Mgmt System.
Background technology
In recent years, electric power enterprise is under the guidance of the Scientific Outlook on Development, and carry forward vigorously collectivized operation, intensivization development, lean management and Standardization Construction, enterprise is constantly fast-developing.Power engineering construction project is one of power grid enterprises' main business.In an Engineering Project Mgmt System, a large amount of information datas will certainly be produced.In order to increase work efficiency, effective process be carried out to the mass data in an Engineering Project Mgmt System and is necessary.
Summary of the invention
The object of this invention is to provide the data processing equipment in a kind of Engineering Project Mgmt System, object is that the mass data to producing in Engineering Project Mgmt System effectively processes.
For solving the problems of the technologies described above, the invention provides the data processing equipment in a kind of Engineering Project Mgmt System, comprising:
Approval module, for receive user's input the instruction that Section 1 object first content in described Engineering Project Mgmt System is examined after, send approval request to the user with the power of examination and approval, there is described in reception the instruction of result after the examining described first content of user's input of the power of examination and approval;
Implement module, described first project of instruction for receiving user's input enters the instruction of implementation process, monitors described Section 1 object implementation process, shows described Section 1 object performance;
Final accounts module, for receiving the instruction described first project being carried out to final accounts of user's input, shows described Section 1 object final accounts content.
Alternatively, receive the instruction that described Section 1 object first content is examined of user's input in described approval module before, also comprise:
Item selection module, for receiving the instruction importing described first project, revise and cancel of user's input.
Alternatively, described approval module comprises:
Import data cell, for receiving the instruction for described approval module importing examination & approval data of user's input, described examination & approval data are the data message to be examined of described Section 1 object first content;
Transmitting element, for receive described user input importing data instruction after, send approval request to the described user with the power of examination and approval;
Receiving element, for having the instruction of the result after the examining described first content of user's input of the power of examination and approval described in receiving.
Alternatively, described approval module for receive user's input the instruction that Section 1 object first content in described Engineering Project Mgmt System is examined after, send approval request to the user with the power of examination and approval, the instruction of result received after the examining described first content of described user input comprises:
Described approval module specifically for, after receiving the instruction that the Section 1 object project scheduling in described Engineering Project Mgmt System, Xiang Mingda, Project design, the Project design contract of authorization, the construction contract of authorization, acceptance report, assets disposal and project final accounting are examined of user's input, send approval request to the user with the power of examination and approval, receive the instruction of the result after the examination & approval of described user input.
Alternatively, described enforcement module enters the instruction of implementation process for described first project of instruction receiving user's input, monitors described Section 1 object implementation process, carries out display comprise described Section 1 object performance:
Described enforcement module specifically for, described first project of instruction receiving user's input enters the instruction of implementation process, monitors the investment situation in described first project implementation process, project progress, use of funds situation, implementation status and service efficiency and shows.
Alternatively, described final accounts module for receive user input the instruction of final accounts is carried out to described first project after, display is carried out to described Section 1 object final accounts content and comprises:
Described final accounts module specifically for, receive user's input the instruction of final accounts is carried out to described first project after, the actual building cost of described first project in whole implementation process and results form investment are shown.
Alternatively, also comprise:
Resources sharing module, for receiving the instruction inquired about described Section 1 object first data of user's input, shows described first data to described user.
Alternatively, also comprise:
Prompting module, for obtaining the enforcement timing node of each sub-item in the project scheduling after examination & approval, sends reminder announced at described timing node place to enforcement execution side.
Data processing equipment in Engineering Project Mgmt System provided by the present invention, after approval module wherein can be used for receiving the instruction examined Section 1 object first content in described Engineering Project Mgmt System of user's input, send approval request to the user with the power of examination and approval, receive the instruction of result after described user input described first content is examined; Implement the instruction described first project being entered to implementation process that module can be used for receiving user's input, monitor described Section 1 object implementation process, described Section 1 object performance is shown; Final accounts module can be used for receive user input the instruction of final accounts is carried out to described first project after, described Section 1 object final accounts content is shown.By this data processing equipment, the mass data produced in Engineering Project Mgmt System is processed, the flow process of comparatively mixed and disorderly project examination can be made to become more clear, the situation of the project implementation process and final accounts process is made quasi real time to show user, so that relevant staff's Timeliness coverage problem carries out work arrangements, improve the work efficiency of Project Management personnel.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of a kind of embodiment of data processing equipment in Engineering Project Mgmt System provided by the present invention;
Fig. 2 is the structured flowchart of the another kind of embodiment of data processing equipment in Engineering Project Mgmt System provided by the present invention.
Embodiment
In order to make those skilled in the art person understand the present invention program better, below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in Figure 1, this device comprises the structured flowchart of a kind of embodiment of the data processing equipment in Engineering Project Mgmt System provided by the present invention:
Approval module 101, for receive user's input the instruction that Section 1 object first content in described Engineering Project Mgmt System is examined after, send approval request to the user with the power of examination and approval, there is described in reception the instruction of result after the examining described first content of user's input of the power of examination and approval;
Implement module 102, described first project of instruction for receiving user's input enters the instruction of implementation process, monitors described Section 1 object implementation process, shows described Section 1 object performance;
Final accounts module 103, for receiving the instruction described first project being carried out to final accounts of user's input, shows described Section 1 object final accounts content.
Data processing equipment in Engineering Project Mgmt System provided by the present invention, after approval module wherein can be used for receiving the instruction examined Section 1 object first content in described Engineering Project Mgmt System of user's input, send approval request to the user with the power of examination and approval, receive the instruction of result after described user input described first content is examined; Implement the instruction described first project being entered to implementation process that module can be used for receiving user's input, monitor described Section 1 object implementation process, described Section 1 object performance is shown; Final accounts module can be used for receive user input the instruction of final accounts is carried out to described first project after, described Section 1 object final accounts content is shown.By this data processing equipment, the mass data produced in Engineering Project Mgmt System is processed, the flow process of comparatively mixed and disorderly project examination can be made to become more clear, the situation of the project implementation process and final accounts process is made quasi real time to show user, so that relevant staff's Timeliness coverage problem carries out work arrangements, improve the work efficiency of Project Management personnel.
As shown in Figure 2, this device comprises the structured flowchart of the another kind of embodiment of the data processing equipment in Engineering Project Mgmt System provided by the present invention:
Item selection module 201, for receiving the instruction importing described first project, revise and cancel of user's input;
Approval module 202, for receive user's input the instruction that the Section 1 object project scheduling in described Engineering Project Mgmt System, Xiang Mingda, Project design, the Project design contract of authorization, the construction contract of authorization, acceptance report, assets disposal and project final accounting are examined after, send approval request to the user with the power of examination and approval, receive the instruction of the result after the examination & approval of described user input.
Wherein, project scheduling examination & approval are used for realizing examining the procedure of engineering project annual plan, comprise all departments and report annual plan, the examination & verification of relevant competent authorities, the establishment of annual plan balance, office leader examination & verification etc.;
Xiang Mingda examination & approval are used for the procedure examination & approval realizing changing engineering project, comprise, Project Cost, content alteration newly-increased to project and cancellation etc. and examine;
Project design examination & approval are used for realizing examining the procedure of Project design, comprise detailed estimated cost, main equipment inventory, tear used equipment open, permit and support the examination & approval of bundling project etc. the need of going into operation;
The examination & approval of the Project design contract of authorization are used for realizing examining the procedure of design entrusting contract;
The examination & approval of the construction contract of authorization are used for realizing the procedure examination & approval to the construction contract of authorization;
Acceptance report examination & approval are used for realizing the examination & approval to final acceptance of construction report, comprise the relevant informations such as final acceptance of construction report, quantities;
Asset disposal approval is for tearing used equipment open when Project design book comprises, and after final acceptance of construction examination & approval terminate, automatically initiate assets disposal flow process, assets disposal flow process is examined the disposal options of tearing used equipment open;
Project final accounting examination & approval are used for realizing examining the procedure of project final accounting, comprise the examination & approval to project final accounting book and complete report.
Further, described approval module 202 can also specifically be divided into following unit:
Import data cell 2021, for receiving the instruction for described approval module importing examination & approval data of user's input, described examination & approval data are the data message to be examined of described Section 1 object first content;
Transmitting element 2022, for receive described user input importing data instruction after, send approval request to the described user with the power of examination and approval;
Receiving element 2023, for having the instruction of the result after the examining described first content of user's input of the power of examination and approval described in receiving.
Implement module 203, described first project of instruction for receiving user's input enters the instruction of implementation process, monitors the investment situation in described first project implementation process, project progress, use of funds situation, implementation status and service efficiency and shows;
This enforcement module can carry out dynamically following the tracks of to whole project implementation process comprehensively, in real time, relevant departments are made to grasp each side situations such as practical matter object use of funds situation and service efficiency in time, and can Timeliness coverage Problems existing, and make the decision-making of Rapid Science.
Final accounts module 204, for receive user's input the instruction of final accounts is carried out to described first project after, the actual building cost of described first project in whole implementation process and results form investment are shown.
Preferably, Engineering Project Mgmt System provided by the invention can further include:
Resources sharing module 205, for receiving the instruction inquired about described Section 1 object first data of user's input, shows described first data to described user;
Prompting module 206, for obtaining the enforcement timing node of each sub-item in the project scheduling after examination & approval, sends reminder announced at described timing node place to enforcement execution side.
Data processing equipment in Engineering Project Mgmt System provided by the present invention, after approval module wherein can be used for receiving the instruction examined Section 1 object first content in described Engineering Project Mgmt System of user's input, send approval request to the user with the power of examination and approval, receive the instruction of result after described user input described first content is examined; Implement the instruction described first project being entered to implementation process that module can be used for receiving user's input, monitor described Section 1 object implementation process, described Section 1 object performance is shown; Final accounts module can be used for receive user input the instruction of final accounts is carried out to described first project after, described Section 1 object final accounts content is shown.By this data processing equipment, the mass data produced in Engineering Project Mgmt System is processed, the flow process of comparatively mixed and disorderly project examination can be made to become more clear, the situation of the project implementation process and final accounts process is made quasi real time to show user, so that relevant staff's Timeliness coverage problem carries out work arrangements, improve the work efficiency of Project Management personnel.
In addition, related data can be shown for user by arranging resources sharing module, facilitating user to inquire about, realizing resources sharing.Prompting module can send reminder announced to its execution side in the enforcement timing node place of each sub-item in the project scheduling after examination & approval, this execution can be reached make a policy in time, avoid engineering project information and feed back problem not prompt enough, improve the efficiency of work.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiment, between each embodiment same or similar part mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (8)

1. the data processing equipment in Engineering Project Mgmt System, is characterized in that, comprising:
Approval module, for receive user's input the instruction that Section 1 object first content in described Engineering Project Mgmt System is examined after, send approval request to the user with the power of examination and approval, there is described in reception the instruction of result after the examining described first content of user's input of the power of examination and approval;
Implement module, described first project of instruction for receiving user's input enters the instruction of implementation process, monitors described Section 1 object implementation process, shows described Section 1 object performance;
Final accounts module, for receiving the instruction described first project being carried out to final accounts of user's input, shows described Section 1 object final accounts content.
2. data processing equipment as claimed in claim 1, is characterized in that, before receiving the instruction examined described Section 1 object first content of user's input, also comprises in described approval module:
Item selection module, for receiving the instruction importing described first project, revise and cancel of user's input.
3. data processing equipment as claimed in claim 1, it is characterized in that, described approval module comprises:
Import data cell, for receiving the instruction for described approval module importing examination & approval data of user's input, described examination & approval data are the data message to be examined of described Section 1 object first content;
Transmitting element, for receive described user input importing data instruction after, send approval request to the described user with the power of examination and approval;
Receiving element, for having the instruction of the result after the examining described first content of user's input of the power of examination and approval described in receiving.
4. the data processing equipment as described in claim 1 or 3, it is characterized in that, described approval module for receive user's input the instruction that Section 1 object first content in described Engineering Project Mgmt System is examined after, send approval request to the user with the power of examination and approval, the instruction of result received after the examining described first content of described user input comprises:
Described approval module specifically for, after receiving the instruction that the Section 1 object project scheduling in described Engineering Project Mgmt System, Xiang Mingda, Project design, the Project design contract of authorization, the construction contract of authorization, acceptance report, assets disposal and project final accounting are examined of user's input, send approval request to the user with the power of examination and approval, receive the instruction of the result after the examination & approval of described user input.
5. data processing equipment as claimed in claim 1, it is characterized in that, described enforcement module enters the instruction of implementation process for described first project of instruction receiving user's input, monitors described Section 1 object implementation process, carries out display comprise described Section 1 object performance:
Described enforcement module specifically for, described first project of instruction receiving user's input enters the instruction of implementation process, monitors the investment situation in described first project implementation process, project progress, use of funds situation, implementation status and service efficiency and shows.
6. data processing equipment as claimed in claim 1, is characterized in that, described final accounts module for receive user's input the instruction of final accounts is carried out to described first project after, display is carried out to described Section 1 object final accounts content and comprises:
Described final accounts module specifically for, receive user's input the instruction of final accounts is carried out to described first project after, the actual building cost of described first project in whole implementation process and results form investment are shown.
7. data processing equipment as claimed in claim 1, is characterized in that, also comprise:
Resources sharing module, for receiving the instruction inquired about described Section 1 object first data of user's input, shows described first data to described user.
8. data processing equipment as claimed in claim 4, is characterized in that, also comprise:
Prompting module, for obtaining the enforcement timing node of each sub-item in the project scheduling after examination & approval, sends reminder announced at described timing node place to enforcement execution side.
CN201410641617.1A 2014-11-07 2014-11-07 Data processing device in project management system Pending CN104361450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410641617.1A CN104361450A (en) 2014-11-07 2014-11-07 Data processing device in project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410641617.1A CN104361450A (en) 2014-11-07 2014-11-07 Data processing device in project management system

Publications (1)

Publication Number Publication Date
CN104361450A true CN104361450A (en) 2015-02-18

Family

ID=52528708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410641617.1A Pending CN104361450A (en) 2014-11-07 2014-11-07 Data processing device in project management system

Country Status (1)

Country Link
CN (1) CN104361450A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106779325A (en) * 2016-11-29 2017-05-31 河北建筑工程学院 A kind of engineering management monitoring system and method
CN107609837A (en) * 2017-08-04 2018-01-19 鸿鑫互联科技(北京)股份有限公司 Affixed one's seal in a kind of project management the control method and system of examination & verification
CN109118169A (en) * 2018-07-28 2019-01-01 万翼科技有限公司 Amending method, device and the computer readable storage medium of nodal information
CN111292012A (en) * 2020-03-09 2020-06-16 山东浪潮通软信息科技有限公司 Sharing management method, system and system construction method supporting fixed assets

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003323532A (en) * 2002-05-01 2003-11-14 Izumi Uzuhara Project management system
CN1462974A (en) * 2003-06-19 2003-12-24 Tcl王牌电子(深圳)有限公司 Intelligent method and device for managing production technology information
CN101576981A (en) * 2009-06-25 2009-11-11 中国软件评测中心 Scene-type service system
CN102831505A (en) * 2012-08-20 2012-12-19 南京徐工汽车制造有限公司 Management system and management method for enterprise information
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003323532A (en) * 2002-05-01 2003-11-14 Izumi Uzuhara Project management system
CN1462974A (en) * 2003-06-19 2003-12-24 Tcl王牌电子(深圳)有限公司 Intelligent method and device for managing production technology information
CN101576981A (en) * 2009-06-25 2009-11-11 中国软件评测中心 Scene-type service system
JP2013134686A (en) * 2011-12-27 2013-07-08 Maeda Corp Process management system, management terminal, and process management method
CN102831505A (en) * 2012-08-20 2012-12-19 南京徐工汽车制造有限公司 Management system and management method for enterprise information

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张迪: ""通信工程项目管理系统的设计与实现"", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106779325A (en) * 2016-11-29 2017-05-31 河北建筑工程学院 A kind of engineering management monitoring system and method
CN107609837A (en) * 2017-08-04 2018-01-19 鸿鑫互联科技(北京)股份有限公司 Affixed one's seal in a kind of project management the control method and system of examination & verification
CN109118169A (en) * 2018-07-28 2019-01-01 万翼科技有限公司 Amending method, device and the computer readable storage medium of nodal information
CN111292012A (en) * 2020-03-09 2020-06-16 山东浪潮通软信息科技有限公司 Sharing management method, system and system construction method supporting fixed assets

Similar Documents

Publication Publication Date Title
Tappin et al. The application of an industry level participatory ergonomics approach in developing MSD interventions
CN104361450A (en) Data processing device in project management system
CN106355339A (en) Purchase and warehouse output and input management system for office supplies
CN104992301A (en) Flow circulation control method and apparatus for project management of beyond enterprise/organization
Dorca et al. Agile approach with Kanban in information security risk management
CN106296285A (en) Procurement inquiry method and system based on purchasing system
Rezaei The Evaluation of Implementing IT Governance Controls
CN108537703A (en) A kind of the training and examination data managing method and relevant apparatus of fire units
Gavil The FTC's Study and Advocacy Authority in Its Second Century: A Look Ahead
Alp et al. Scope management and change control process study for project-based companies in the construction and engineering industries
JP2008257541A (en) Delivery vehicle driving employee management system
Bilton Community health needs assessment
Kersley et al. The asset management journey: a case study of network rail's journey supported by an excellence model
Wang et al. Benchmarking health technology assessment agencies—methodological challenges and recommendations
Thalang et al. Quality of work life indicators as a corporate social responsibility (CSR) of electrical and electronics private organizations in Thailand
Al-Hammad et al. OUTSOURCING OF MAINTENANCE SERVICES.
Magalhães et al. Indicators and managing for results: filling the gap in coach transport services
Tworek et al. Risk management in construction enterprises in Śląskie and Małopolskie voivodships in Poland
CN102708437A (en) Tracing system of enterprise working progress
Mahncke The Applicability of ISO/IEC27014: 2013 For Use Within General Medical Practice
Hriciková et al. National Cyber Security Organisation, Slovakia
Urbaniak Sustainability as Criteria of Evaluation of Suppliers
Pfitzinger et al. Orchestration of service design and service transition
Li et al. The engagement of small to medium enterprises for managing waste in building retrofit projects
Haidinger et al. Securing fair working conditions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150218

RJ01 Rejection of invention patent application after publication