CN104353200A - Pole climbing operation safety belt with lifting belt - Google Patents

Pole climbing operation safety belt with lifting belt Download PDF

Info

Publication number
CN104353200A
CN104353200A CN201410671169.XA CN201410671169A CN104353200A CN 104353200 A CN104353200 A CN 104353200A CN 201410671169 A CN201410671169 A CN 201410671169A CN 104353200 A CN104353200 A CN 104353200A
Authority
CN
China
Prior art keywords
belt
pole
waistband
enclosing
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410671169.XA
Other languages
Chinese (zh)
Inventor
高敬民
李士国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Qiuxian Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Qiuxian Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd, Qiuxian Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410671169.XA priority Critical patent/CN104353200A/en
Publication of CN104353200A publication Critical patent/CN104353200A/en
Pending legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a pole climbing operation safety belt with a lifting belt. The pole climbing operation safety belt comprises a waist belt and a pole surrounding belt, wherein the pole surrounding belt is firmly connected with the waist belt and sleeves an electric pole, at least one end of the pole surrounding belt is provided with a hook, at least one side of the waist belt is provided with a buckle ring matched with the hook, the pole surrounding belt is connected onto the waist belt in a crossed way after surrounding the electric pole for a circle for forming a pole holding ring, and the lifting belt provided with a wrist belt at one end is connected with the middle part of the pole surrounding belt in a sleeving way. The pole climbing operation safety belt with the lifting belt has the advantages that the use method is simple, the operation is easy, in addition, the full-force holding on the electric pole by a pole climber by two hands can be ensured, the slipping of the pole surrounding belt is prevented, and the pole surrounding belt can well and tightly hold the electric pole during downwards falling, so that the personnel safety of the pole climbers is ensured.

Description

Bar operation safety belt is stepped on elevator belt
Technical field
the present invention relates to a kind of safety belt, particularly relate to a kind of safety belt stepped on bar operation and use.
Background technology
in electric power overhaul construction, stepping on bar operation is modal high-rise working, is also the operation occurred frequently of falling from high altitude injury accident simultaneously.Therefore, the security protection of strengthening stepping on bar operating personnel seems particularly important.At present, stepping on bar operating personnel adopts climbers to step on bar and wear safety belt is used as necessary anti-falling protection instrument usually.The safety belt stepping on bar is generally divided into two parts, part binding is worn on (as belt type) on the body of pole climber, another part is enclosing belt, enclosing belt is enclosed within electric pole, and enclosing belt and waistband link together securely, be generally one end of enclosing belt and the side of waistband are sewn into one, the opposite side of waistband is fixedly connected with clasp, and the other end of enclosing belt arranges hook.When stepping on bar, be generally enclosing belt is walked around from the side fixed with waistband electric pole has clasp side to waistband, the hook on enclosing belt is hooked on the clasp of waistband.The effect of enclosing belt is the health for holding pole climber, and two are when human body drops suddenly, hold electric pole tightly with enclosing belt.In the process of ascending a height, need pole climber's hand-tight armful of electric pole, a hand upwards lifts enclosing belt along with the change of pole climber position, now, the hand of lift enclosing belt only plays to be helped the effect of electric pole and firmly can not firmly grasp electric pole, also causes impact to a certain degree to stepping on bar speed while reducing pole climber's safety coefficient; In addition, current enclosing belt is only contact with electric pole on the opposite of human body, the pin of pole climber come off climbers or climbers skid or fracture time, people knows from experience rapid decline, and enclosing belt does not have the effect of holding electric pole tightly, and height can be caused to fall accident; In addition, main stress point and the electric pole Long Term Contact of enclosing belt rub, and will very easily cause enclosing belt impaired, while increase replacement cost, also result in serious potential safety hazard.
Summary of the invention
the technical problem to be solved in the present invention be to provide a kind of can hold electric pole very well tightly step on bar operation safety belt, enclosing belt slippage can be prevented, make the both hands of pole climber help electric pole with all strength.
for solving the problems of the technologies described above, the technical solution used in the present invention is:
a bar operation safety belt is stepped on, the enclosing belt be enclosed within electric pole comprising waistband and be firmly connected with waistband with elevator belt; Described enclosing belt at least one end is provided with hook, and waistband at least side has and links up with the clasp matched; Described enclosing belt is cross connected to after one week on waistband around electric pole and forms pole circle, is also socketed with at the middle part of enclosing belt the elevator belt that there is wrist sleeve one end; In the middle part of described enclosing belt, cover has rubber tube; The side of described enclosing belt one end and waistband is fixed as one, and the opposite side of waistband is fixed with clasp, and the other end of enclosing belt is fixedly connected with the hook corresponding with clasp; The both sides of described waistband are all fixed with clasp, and all there is the hook corresponding with clasp at the two ends of enclosing belt.
owing to adopting technique scheme, the technological progress acquired by the present invention is:
pole climber uses the safety belt of band elevator belt at work, effectively can ensure that pole climber's both hands with all strength help electric pole, greatly reduce step on bar danger while also improve the speed of stepping on bar to a certain extent.When falling danger, the pole circle that enclosing belt intersects to form can make enclosing belt effectively hold electric pole tightly, adds the upwards lift effect of elevator belt and the rubbing action between rubber tube and electric pole, effectively can reduce the speed of falling.In addition, rubber tube can also slow down the wearing and tearing of safety belt, thus can extend the service life of safety belt, the replacement cost reducing safety belt, minimizing potential safety hazard.
Accompanying drawing explanation
fig. 1 is the structural representation stepping on bar operation safety belt of band elevator belt of the present invention;
in the accompanying drawings: 1, waistband, 2, enclosing belt, 3, wrist sleeve, 4, hook, 5, clasp, 6, rubber tube, 7, elevator belt.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further details:
as shown in Figure 1, this steps on the safety belt of bar operation band elevator belt used, comprises waistband 1, enclosing belt 2 and elevator belt 7; Waistband 1 and the enclosing belt 2 be enclosed within electric pole firmly link together; Enclosing belt 2 at least one end is provided with hook 4, and waistband 1 at least side has the clasp 5 matched with hook 4; Enclosing belt 2 forms pole circle being cross connected to after one week on waistband 1 around electric pole; The middle part cover of enclosing belt 2 has rubber tube 6, and the outside of rubber tube 6 is socketed with the elevator belt 7 that there is wrist sleeve 3 one end.All containing adjusting button on waistband 1, enclosing belt 2 and elevator belt 7, can be used to regulate its elasticity or length.
the structure of pole circle has two kinds, respectively:
be fixed as one in the side of enclosing belt 2 one end and waistband 1, the opposite side of waistband 1 is when being fixed with clasp 5, enclosing belt 2 have one end of hook 4 from the side fixing with waistband 1, arrive the opposite side of electric pole, then after one week, hook 4 is hooked on the clasp 5 of waistband 1 opposite side around electric pole, form pole circle;
all be fixed with clasp 5 in the both sides of waistband 1, enclosing belt 2 two ends are when all having a hook 4 corresponding with clasp 5, hook 4, being intersected at enclosing belt 2 two ends after one week around electric pole, is then connected on the offside clasp 5 on waistband 1 by enclosing belt 2, forms pole circle.
when carrying out stepping on bar operation, operating personnel first tightens the belt 1, above-mentioned a kind of mode is selected by enclosing belt 2 to form pole circle, gloves are entered in the wrist sleeve 3 of elevator belt 7 one end, now two hands of operating personnel simultaneously with all strength can help electric pole, instead of only have that a hand can hug electric pole, another hand is used for grabbing enclosing belt 2.In climbing process, operating personnel makes enclosing belt 2 move by the elevator belt 7 of moving belt wrist sleeve 3 thereupon, effectively can avoid enclosing belt 2 landing like this, reduce and climb danger, also improve the speed of stepping on bar to a certain extent simultaneously.When staff's climbers skid tenesmus, the pole circle that enclosing belt 2 is formed can under the effect of inertia of lapse rate, firmly hold electric pole tightly, add the upwards lift effect of elevator belt 7 and the rubbing action of rubber tube 6 and electric pole, the speed of falling of operating personnel all can be made to reduce to a safe speed.Rubber tube 6 in the wearing and tearing strengthened with also effectively slow down enclosing belt 2 during the rubbing action of electric pole, thus greatly reduce operating personnel step on bar accident rate, and the method cost is low, simple to operate.

Claims (4)

1. step on a bar operation safety belt, the enclosing belt (2) be enclosed within electric pole comprising waistband (1) and be firmly connected with waistband (1) with elevator belt; Described enclosing belt (2) at least one end is provided with hook (4), and waistband (1) at least side has the clasp (5) matched with hook (4); It is characterized in that: described enclosing belt (2) is cross connected to waistband (1) upper formation pole circle around electric pole after one week, be also socketed with the elevator belt (7) that there are wrist sleeve (3) one end at the middle part of enclosing belt (2).
2. band elevator belt according to claim 1 step on bar operation safety belt, it is characterized in that: described enclosing belt (2) middle part cover have rubber tube (6).
3. the band elevator belt according to any one of claim 1 or 2 step on bar operation safety belt, it is characterized in that: the side of described enclosing belt (2) one end and waistband (1) is fixed as one, the opposite side of waistband (1) is fixed with clasp (5), and the other end of enclosing belt (2) is fixedly connected with the hook (4) corresponding with clasp (5).
4. the band elevator belt according to any one of claim 1 or 2 step on bar operation safety belt, it is characterized in that: the both sides of described waistband (1) are all fixed with clasp (5), all there is the hook (4) corresponding with clasp (5) at the two ends of enclosing belt (2).
CN201410671169.XA 2014-11-21 2014-11-21 Pole climbing operation safety belt with lifting belt Pending CN104353200A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410671169.XA CN104353200A (en) 2014-11-21 2014-11-21 Pole climbing operation safety belt with lifting belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410671169.XA CN104353200A (en) 2014-11-21 2014-11-21 Pole climbing operation safety belt with lifting belt

Publications (1)

Publication Number Publication Date
CN104353200A true CN104353200A (en) 2015-02-18

Family

ID=52520563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410671169.XA Pending CN104353200A (en) 2014-11-21 2014-11-21 Pole climbing operation safety belt with lifting belt

Country Status (1)

Country Link
CN (1) CN104353200A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104707274A (en) * 2015-04-02 2015-06-17 国家电网公司 Buckle cap type rack
CN104888379A (en) * 2015-06-08 2015-09-09 国家电网公司 Safety belt for working high above ground
CN107970537A (en) * 2017-12-27 2018-05-01 上海智勇教育培训有限公司 A kind of building gravity ramp-down device and its elastic collar landing-gear
CN111714804A (en) * 2020-07-27 2020-09-29 北京京电电网维护集团有限公司 Safety belt
CN113750393A (en) * 2021-09-02 2021-12-07 广西电网有限责任公司防城港供电局 Concrete pole power failure climbing protection waist rope

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104707274A (en) * 2015-04-02 2015-06-17 国家电网公司 Buckle cap type rack
CN104707274B (en) * 2015-04-02 2017-12-22 国家电网公司 Cap covering type hanger
CN104888379A (en) * 2015-06-08 2015-09-09 国家电网公司 Safety belt for working high above ground
CN107970537A (en) * 2017-12-27 2018-05-01 上海智勇教育培训有限公司 A kind of building gravity ramp-down device and its elastic collar landing-gear
CN111714804A (en) * 2020-07-27 2020-09-29 北京京电电网维护集团有限公司 Safety belt
CN113750393A (en) * 2021-09-02 2021-12-07 广西电网有限责任公司防城港供电局 Concrete pole power failure climbing protection waist rope

Similar Documents

Publication Publication Date Title
CN104353200A (en) Pole climbing operation safety belt with lifting belt
CN105056464B (en) A kind of family fitness barbell that can be singly used
CN202504516U (en) Life escape backpack with slow descending and fixing belt functions
CN102107071A (en) G-shaped hand fastener
CN104225879B (en) Embrace formula climber
CN210963623U (en) Rope lifting device
CN102258831A (en) Rope brake descender and rope reeving method
CN204352409U (en) Bar operation safety belt is stepped on elevator belt
CN103272345A (en) Fall protection safety belt for pole and tower operation
CN204319558U (en) A kind of self-locking railing operation safety belt
CN201701665U (en) Self-locking type anti-falling safety belt for line concrete poles
CN102989095A (en) Antiskid electrician safety belt and method for climbing rod by using belt
CN109364440A (en) A kind of Electrician Operation step ladder
CN216986109U (en) Anti-falling device for power equipment
CN215781094U (en) Whole body safety belt for climbing operation
CN202637770U (en) Anti-skid climbing safety belt
CN203303528U (en) Upright inversed rescue safety harness
CN202605551U (en) Lifesaving descent control device
CN206120983U (en) Shaft tower anti -falling device that ascends a height
CN107854786A (en) A kind of anti-falling safe band whole link device gripped using opening
CN203329209U (en) Safety escape device
CN205031806U (en) Novel safety belt
CN200987866Y (en) Rope plate pole-climbing device
CN205095293U (en) Electric power construction safety belt
RU182599U1 (en) HOLDING ATTACHMENT

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150218

RJ01 Rejection of invention patent application after publication