CN104225879B - Embrace formula climber - Google Patents

Embrace formula climber Download PDF

Info

Publication number
CN104225879B
CN104225879B CN201410526478.8A CN201410526478A CN104225879B CN 104225879 B CN104225879 B CN 104225879B CN 201410526478 A CN201410526478 A CN 201410526478A CN 104225879 B CN104225879 B CN 104225879B
Authority
CN
China
Prior art keywords
arm
climber
left arm
circular hole
right inner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410526478.8A
Other languages
Chinese (zh)
Other versions
CN104225879A (en
Inventor
古秋生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Guangdong Construction Technology Co., Ltd.
Original Assignee
Foshan Minghui Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Minghui Construction Engineering Co Ltd filed Critical Foshan Minghui Construction Engineering Co Ltd
Priority to CN201410526478.8A priority Critical patent/CN104225879B/en
Publication of CN104225879A publication Critical patent/CN104225879A/en
Application granted granted Critical
Publication of CN104225879B publication Critical patent/CN104225879B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)
  • Steering Devices For Bicycles And Motorcycles (AREA)

Abstract

One kind embraces formula climber, in the upper end of " L " font internal left arm, the left arm of arc is set, in the right inner arm upper end of " J " font, the right arm of arc is set, a piece connecting shaft connects the lower end afterbody of the inner arm of left and right two, the two ends of a piece of " u "-shaped steel bomb piece are respectively pressed against the inner side of two inner arms of left and right, in left and right two, the upper end of inner arm respectively sets two pulleys in left and right, one tethers one end ties up to the upper end of internal left arm, the other end bypass respectively two pulleys in left and right it is backward under stretch and be connected on pedal after certain length, every pair of climber is made up of the climber of left and right two, during upward pole-climbing, two climbers in left and right are alternately moved up and are caught in after electric pole with upper pedal will be ridden, pedal is that the gravity of people is changed into inside between two arms by tether and pulley to encircle power, the body weight of people is bigger, encircle power also bigger, embrace also tighter.

Description

Embrace formula climber
Technical field:Formula climber is embraced the present invention relates to one kind, especially in left arm, internal left arm, right arm, the right side Armful formula climber of the compositions such as arm, left chain wheel, right pulley, pedal, steel bomb piece, handle.
Background technology:It is now cassette with climber, imprudence, which can skid, during pole-climbing causes danger.
The content of the invention:Formula climber is embraced it is an object of the invention to provide one kind, is worked swashing or declining or be parked in eminence Shi Junneng tightly embraces electric pole, is difficult to skid, technical scheme is described as follows in conjunction with accompanying drawing:In " L " font Internal left arm (4) upper end connection left arm of one arc (1), it is ring (2) to be set in internal left arm (4) upper end, is being to be set below ring (2) Left chain wheel (3) is put, one circular hole (14), (such as Fig. 2), in the right inner arm (10) of " J " font are set in the lower end afterbody of internal left arm (4) Upper end connection the right arm of one arc (12), right inner arm (10) upper end set right pulley (11), right pulley lower section set Handle (9), a circular hole (15), (such as Fig. 3), then by the circular hole of internal left arm (4) are set in the lower end afterbody of right inner arm (10) (14) and the circular hole (15) of right inner arm (10) overlaps into a circular hole, connecting shaft (6) passes through the circular hole overlapped internal left arm (4) Connected with right inner arm (10), (such as Fig. 1), it is that the other end bypasses right pulley on ring (2) that a tethers (7) one end, which is attached at, (11) further around cross left chain wheel (3) it is backward under stretch and certain length and one pedal (8) be set in the lower end of tether (7), in left arm (1) and the free end of right arm (12) respectively sets a rubber cushion (13), the two ends of a piece of " u "-shaped steel bomb piece (5) are respectively pressed against left inside The inner side of arm (4) and right inner arm (10).The middle part of " u "-shaped steel bomb piece (5) is connected axle (6) and clamped, internal left arm (4), left arm (1) and right inner arm (10), right arm (12) cross section be " u "-shaped structure, be made up of steel plate.Using such structure, if body When weight is stood on pedal (8) for 100 jin of people, nearly 200 jin of power of encircling can be produced between two arms, the body weight of people is bigger, production Raw power of encircling is also bigger, and embracing must be tighter, embraces formula climber and can be used for climbing for electric pole and trees.
Brief description of the drawings:In accompanying drawing, Fig. 1 is embraces the overall structure diagram of formula climber, and Fig. 2 is internal left arm and left arm Structural representation, Fig. 3 is right inner arm and the structural representation of right arm, and Fig. 4 is that left and right two inner arm and two slide and pedal, steel In the attachment structure schematic diagram of shell fragment, accompanying drawing, 1 is left arm, 2 be ring, 3 be left chain wheel, and 4 be right inner arm, and 5 be steel bomb piece, 6 It is connecting shaft, 7 be tether, and 8 be pedal, and 9 be handle, and 10 be right inner arm, and 11 be right pulley, and 12 be right arm, and 13 be rubber cushion, 14 It is axis hole with 15.
Embodiment:Formula climber is embraced according to what the technical scheme described in foregoing invention content was connected to, every pair is climbed Bar device is made up of left climber and right climber, and the handle of right climber is attached at below right inner arm, and the handle of left climber connects Knot is in the lower section of internal left arm, and left hand and right hand respectively holds a climber, during upward pole-climbing, and the climber of left and right two is alternately moved up and is caught in With will ride upper pedal after electric pole, pedal is that the gravity of people is changed into inside between two arms by tether and pulley to encircle Power, the body weight of people is bigger, and it is also bigger to encircle power, embraces also tighter, when right crus of diaphragm slams right climber, the ring that right climber is produced Embrace power to support people, now left foot unclamps, the pedal of left climber does not stress, and it is outside that steel bomb piece (5) produces two arms Elastic force two arms are outwards pushed open after certain distance, you can climber is taken out from electric pole, then by climber when climbing Move up, it is on the contrary then move down.

Claims (2)

1. one kind embrace formula climber, including internal left arm, left arm, left chain wheel, right inner arm, right arm, right pulley, tether, handle, Steel bomb piece, pedal, it is characterized in that in internal left arm (4) upper end connection left arm of one arc (1) of " L " font, on internal left arm (4) It is ring (2) to hold setting, is being the lower section setting left chain wheel (3) of ring (2), a circular hole is set in the lower end afterbody of internal left arm (4) (14) the right arm of an arc (12), is connected in the upper end of the right inner arm (10) of " J " font, right cunning is set in right inner arm (10) upper end Take turns (11), handle (9) is set in the lower section of right pulley, one circular hole (15) is set in the lower end afterbody of right inner arm (10), then will The circular hole (14) of internal left arm (4) and the circular hole (15) of right inner arm (10) overlap into a circular hole, and connecting shaft (6) passes through what is overlapped Circular hole connects internal left arm (4) and right inner arm (10), and it is that the other end is bypassed on ring (2) that a tethers (7) one end, which is attached at, Right pulley (11) further around cross left chain wheel (3) it is backward under stretch and certain length and one pedal (8), one be set in the lower end of tether (7) The two ends of piece " u "-shaped steel bomb piece (5) are respectively pressed against in the inner side of internal left arm (4) and right inner arm (10), " u "-shaped steel bomb piece (5) Portion is connected axle (6) and clamped.
2. embrace formula climber according to described in claim 1, it is characterised in that internal left arm (4), left arm (1) and right inner arm (10), the cross section of right arm (12) is " U " shape structure, is made up of steel plate.
CN201410526478.8A 2014-10-08 2014-10-08 Embrace formula climber Active CN104225879B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410526478.8A CN104225879B (en) 2014-10-08 2014-10-08 Embrace formula climber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410526478.8A CN104225879B (en) 2014-10-08 2014-10-08 Embrace formula climber

Publications (2)

Publication Number Publication Date
CN104225879A CN104225879A (en) 2014-12-24
CN104225879B true CN104225879B (en) 2017-08-04

Family

ID=52215331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410526478.8A Active CN104225879B (en) 2014-10-08 2014-10-08 Embrace formula climber

Country Status (1)

Country Link
CN (1) CN104225879B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107773928A (en) * 2016-08-28 2018-03-09 王建明 Hand-held climber
CN106390394B (en) * 2016-10-21 2018-09-28 国网四川省电力公司宜宾供电公司 Convenient adjustable pedals a shoes
CN107835385B (en) * 2017-10-26 2019-11-08 国网辽宁省电力有限公司经济技术研究院 Convertible steel pipe tower climbs detection device
CN108144266A (en) * 2018-01-04 2018-06-12 四川省达川中学 A kind of portable tool of climbing tree
CN112350209B (en) * 2020-09-25 2022-04-19 国网河南省电力公司民权县供电公司 High altitude construction electrical power rush-repair equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH441080A (en) * 1965-04-26 1967-07-31 Ceskoslovenske Energeticke Z G Climbing device for walking on masts
RU2075989C1 (en) * 1992-07-29 1997-03-27 Валентин Федорович Кузин Climbing claws
US7823845B2 (en) * 2002-05-09 2010-11-02 Dmr Holding Group, Llc Corner climber
CN200966880Y (en) * 2006-11-20 2007-10-31 深圳市水库小学 Pedal-type pole device for climbing
CN202844497U (en) * 2012-09-10 2013-04-03 河南省电力公司驻马店供电公司 Pole climbing device of power pole

Also Published As

Publication number Publication date
CN104225879A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104225879B (en) Embrace formula climber
CN203278094U (en) Power lines repair special-purpose ladder
CN204910647U (en) Anti -skid foot buckle
CN104353200A (en) Pole climbing operation safety belt with lifting belt
CN103594965B (en) Transmission line of electricity routing device
CN208260115U (en) A kind of physical training device that physical education uses
CN203469299U (en) Elastic body builder
CN203867453U (en) Lock head type ladder stand
CN214697660U (en) Telegraph pole structure for weak current system
CN204002522U (en) A kind of safe rope ladder for building operations
CN205924884U (en) Badminton racket
CN205411966U (en) Electric power communication tower's anti -falling device
CN206792877U (en) Dismountable trampoline hand-rest attachment structure
CN203315637U (en) Multifunctional arm strength trainer
CN202236968U (en) Deep well people tying device
CN205123117U (en) Portable cat ladder of composite insulator
CN203362016U (en) Portable telegraph pole climbing ladder stand
CN203213947U (en) Rope ladder
CN202028093U (en) Climbing pole device for training climbing capability
CN206825349U (en) A kind of damping "painted-face" character in opera
CN201526263U (en) Line compound insulator rope ladder for climbing to repair
CN202304646U (en) Special tool for extracting detonators
CN202044716U (en) Upper limb tractor with hooks
CN202777649U (en) Fitness ball
CN106621183A (en) Multi-functional dumbbell

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gu Qiusheng

Inventor before: Huang Zhikuan

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170706

Address after: 528211 Guangdong city in Foshan Province town of Nanhai District in Xiqiao City Guan Shan Road six No. 2 Lane Causeway Qiao Jane garden C block, the first floor of 30 shops

Applicant after: Foshan Minghui Construction Engineering Co., Ltd.

Address before: 533701 the Guangxi Zhuang Autonomous Region Debao County Zurong Street No. 133

Applicant before: Huang Zhikuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 528000 1504, room 1, Jia Bang gold center, 1 Shilong South Road, Nanhai District, Foshan, Guangdong, Guicheng.

Patentee after: China Guangdong Construction Technology Co., Ltd.

Address before: 528211 Shop No. 30 on the first floor of Block C of Qiaozhen Garden, No. 2, Six Alleys, Changdi Road, Guanshan District, Nanhai District, Foshan City, Guangdong Province

Patentee before: Foshan Minghui Construction Engineering Co., Ltd.

CP03 Change of name, title or address