CN104333180A - 重型整体运输发电机在电厂安装方法 - Google Patents
重型整体运输发电机在电厂安装方法 Download PDFInfo
- Publication number
- CN104333180A CN104333180A CN201410718912.2A CN201410718912A CN104333180A CN 104333180 A CN104333180 A CN 104333180A CN 201410718912 A CN201410718912 A CN 201410718912A CN 104333180 A CN104333180 A CN 104333180A
- Authority
- CN
- China
- Prior art keywords
- generator
- coupling
- steam turbine
- remove
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Manufacture Of Motors, Generators (AREA)
- Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)
Abstract
本发明的目的是提供一种重型整体运输发电机在电厂安装方法,本安装方法针对重型整体运输发电机的结构以及与电厂厂房基础的装配关系制定,依据本发明施工,达到保证发电机转子与发电机定子之间正确的装配关系,使发电机达到性能指标要求,保证对轮及轴系对中质量,保证各轴瓦载荷分布正常,保证机组轴系振动指标优秀;保证整体运输发电机与基础之间的二次浇筑质量,达到快速安装的目的。
Description
技术领域:本发明涉及一种重型整体运输发电机在电厂安装方法。
背景技术:燃气联合循环电站效率高、污染排放低,符合国家能源政策要求,项目审批快,具有广泛的市场前景;传统的分体运输、现场组装结构形式的发电机安装周期长,难以适应燃气电站的建设节奏,新建的燃气电站及燃气联合循环电站对配套的发电机提出整体运输到现场且实施快速安装的要求;
由于整体安装发电机需要在工厂内完成总装,该型发电机采用座式轴承座结构,为满足整体运输、整体安装的需求,采用定子外机座结构延伸方法形成底架结构,形成座式轴承座、大端盖、小端盖的安装接口,底架结构具备发电机在工厂内总装所需的结构需求,转子由产品轴瓦支撑,定、转子中心要形成冷态相对预移量,使发电机在正常发电时,热态定、转子中心重合,整体运输至现场;由于简化了现场安装步骤,所以整体安装结构发电机能够大幅度缩短现场安装施工周期;
这种发电机需要设置运输锁定装置,使吊装、运输过程中发电机转子与发电机定子可靠的相对固定,防止发电机转子因惯性力窜动引起轴瓦或其它结构的损伤,并维持发电机转子与发电机定子之间正确的相对位置;在现场安装过程中,运输锁定装置也要维持发电机转子与发电机定子之间正确的相对位置,且不得与原动机转轴等结构产生结构干涉,并能够在原动机与整体安装发电机对轮完毕后方便的拆除;
由于这种重型整体运输发电机的结构以及与电厂厂房基础的装配关系、安装调整方法与以往的发电机都不一样,而且还存在运输锁定装置的限制与影响,如果安装步骤处理不当,极易造成对轮偏差,使轴系对中不良,各轴瓦载荷分布严重偏离正常范围,影响轴承失稳转速,引起振动超标甚至造成机组无法启动运行;也可能造成整体运输发电机与基础之间的二次浇筑质量问题,进而影响到轴系振动指标,安装过程也可能造成发电机底架的载荷分布不合理,必须用反复增减调成垫片来消除影响,增加了大量后续调整工作,也增加后续调整时间,达不到快速安装的目的,造成项目拖期,带来直接与间接经济损失。
发明内容:本发明的目的是提供一种重型整体运输发电机在电厂安装方法,本安装方法针对这种重型整体运输发电机的结构以及与电厂厂房基础的装配关系制定,依据本发明施工,达到保证发电机转子与发电机定子之间正确的装配关系,使发电机达到性能指标要求,保证对轮及轴系对中质量,保证各轴瓦载荷分布正常,保证机组轴系振动超标优秀;保证整体运输发电机与基础之间的二次浇筑质量,达到快速安装的目的,保证造成项目按期完成,避免造成直接与间接经济损失。
本发明的技术方案为:一种重型整体运输发电机在电厂安装方法,上述方法包括以下步骤:
步骤一:拆除轴瓦润滑保护结构,拆除轴向定位螺栓和轴向定位块;
步骤二:就位初步调平,用千斤顶支撑发电机吊攀;按图纸位置要求将垫铁安放在座板下,将调整垫片安放在发电机与座板之间;通过调整垫铁及发电机的位置使的拖动端轴承座高程及励端轴承座高程满足安装说明书要求,通过调整垫铁使发电机联轴器及汽轮机联轴器对中且发电机联轴器及汽轮机联轴器之间的下张口数值满足安装说明书要求;拆除拖动端锁定装置和励端锁定装置,把紧地脚螺母;浇筑基础二次灌浆混凝土;
步骤三:基础二次灌浆混凝土养生后,移开千斤顶,在盘车情况下检查发电机联轴器及汽轮机联轴器对中且发电机联轴器及汽轮机联轴器之间的下张口数值,通过调整调整垫片使之满足安装说明书要求,安装连接销钉。
技术效果:为保护轴颈及轴瓦该重型整体运输发电机安装有轴瓦润滑保护结构,安装前必须拆除,避免结构干涉,拆除轴向定位螺栓和轴向定位块避免与燃机联轴器发生干涉,保证安装步骤实施;用千斤顶支撑发电机吊攀,使发电机底架两端悬空,在发电机转子及轴承座的重力作用下,发电机底架两端会产生轻微向下挠曲变形,该状态一直保持到二次灌浆混凝土养生结束,当移开千斤顶后,千斤顶的支撑力消失,在发电机底架弹性变形反力作用下,使基础对发电机底架的支撑力分布形成两端较高、中部较低的分布状态,达到使发电机轴承座得到可靠支撑的效果,使轴承座支撑刚度达到设计要求,保证发电机转子运行可靠,避免振动;如不采用该方法,则必须在二次灌浆混凝土养生结束后,从新吊起发电机、调整全部基础垫片分布,浪费大量人力物力、耗费大量时间;把紧地脚螺母后浇筑基础二次灌浆混凝土,当二次灌浆混凝土膨胀量发生偏差时可以起到辅助控制作用,避免偏差过大;该方法针对轻型整体运输燃机发电机的结构特点,合理运用锁定装置,大幅度简化了发电机安装步骤,如以往技术的穿转子、轴承座调整、气隙调整、装配端盖、气封调整、油封调整、装配刷架等,该方法只运用了以往技术部分步骤结合新结构所必须进行的步骤的合理组合分配,使基础对发电机底架的支撑力分布形成两端较高、中部较低的分布状态,达到使发电机轴承座得到可靠支撑的效果,使轴承座支撑刚度达到设计要求,节约了现场安装时间,保证了安装质量。
附图说明:
图1为步骤1示意图。
图2为步骤2示意图。
图3为步骤3示意图。
具体实施方式:一种重型整体运输发电机在电厂安装方法,其特征是:上述方法包括以下步骤:
步骤一如图1所示:拆除轴瓦润滑保护结构1,拆除轴向定位螺栓2和轴向定位块3;
步骤二如图2所示:就位初步调平,用千斤顶17支撑发电机吊攀4;按图纸位置要求将垫铁5安放在座板6下,将调整垫片7安放在发电机与座板6之间;通过调整垫铁5及发电机的位置使的拖动端轴承座高程8及励端轴承座高程9满足安装说明书要求,通过调整垫铁5使发电机联轴器10及汽轮机联轴器11对中且发电机联轴器10及汽轮机联轴器11之间的下张口12数值满足安装说明书要求;拆除拖动端锁定装置13和励端锁定装置14,把紧地脚螺母15;浇筑基础二次灌浆混凝土;
步骤三如图3所示:基础二次灌浆混凝土养生后,移开千斤顶17,在盘车情况下检查发电机联轴器10及汽轮机联轴器11对中且发电机联轴器10及汽轮机联轴器11之间的下张口12数值,通过调整调整垫片7使之满足安装说明书要求,安装连接销钉16。为保护轴颈及轴瓦该重型整体运输发电机安装有轴瓦润滑保护结构,安装前必须拆除,避免结构干涉,拆除轴向定位螺栓和轴向定位块避免与燃机联轴器发生干涉,保证安装步骤实施;用千斤顶支撑发电机吊攀,使发电机底架两端悬空,在发电机转子及轴承座的重力作用下,发电机底架两端会产生轻微向下挠曲变形,该状态一直保持到二次灌浆混凝土养生结束,当移开千斤顶后,千斤顶的支撑力消失,在发电机底架弹性变形反力作用下,使基础对发电机底架的支撑力分布形成两端较高、中部较低的分布状态,达到使发电机轴承座得到可靠支撑的效果,使轴承座支撑刚度达到设计要求,保证发电机转子运行可靠,避免振动;如不采用该方法,则必须在二次灌浆混凝土养生结束后,从新吊起发电机、调整全部基础垫片分布,浪费大量人力物力、耗费大量时间;把紧地脚螺母后浇筑基础二次灌浆混凝土,当二次灌浆混凝土膨胀量发生偏差时可以起到辅助控制作用,避免偏差过大;该方法针对轻型整体运输燃机发电机的结构特点,合理运用锁定装置,大幅度简化了发电机安装步骤,如以往技术的穿转子、轴承座调整、气隙调整、装配端盖、气封调整、油封调整、装配刷架等,该方法只运用了以往技术部分步骤结合新结构所必须进行的步骤的合理组合分配,使基础对发电机底架的支撑力分布形成两端较高、中部较低的分布状态,达到使发电机轴承座得到可靠支撑的效果,使轴承座支撑刚度达到设计要求,节约了现场安装时间,保证了安装质量。
Claims (1)
1.一种重型整体运输发电机在电厂安装方法,其特征是:包括以下步骤:
步骤一:拆除轴瓦润滑保护结构(1),拆除轴向定位螺栓(2)和轴向定位块(3);
步骤二:就位初步调平,用千斤顶(17)支撑发电机吊攀(4);按图纸位置要求将垫铁(5)安放在座板(6)下,将调整垫片(7)安放在发电机与座板(6)之间;通过调整垫铁(5)及发电机的位置使的拖动端轴承座高程(8)及励端轴承座高程(9)满足安装说明书要求,通过调整垫铁(5)使发电机联轴器(10)及汽轮机联轴器(11)对中且发电机联轴器(10)及汽轮机联轴器(11)之间的下张口(12)数值满足安装说明书要求;拆除拖动端锁定装置(13)和励端锁定装置(14),把紧地脚螺母(15);浇筑基础二次灌浆混凝土;
步骤三:基础二次灌浆混凝土养生后,移开千斤顶(17),在盘车情况下检查发电机联轴器(10)及汽轮机联轴器(11)对中且发电机联轴器(10)及汽轮机联轴器(11)之间的下张口(12)数值,通过调整垫片(7)使之满足安装说明书要求,安装连接销钉(16)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410718912.2A CN104333180B (zh) | 2014-12-02 | 2014-12-02 | 重型整体运输发电机在电厂安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410718912.2A CN104333180B (zh) | 2014-12-02 | 2014-12-02 | 重型整体运输发电机在电厂安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104333180A true CN104333180A (zh) | 2015-02-04 |
CN104333180B CN104333180B (zh) | 2017-03-01 |
Family
ID=52407853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410718912.2A Active CN104333180B (zh) | 2014-12-02 | 2014-12-02 | 重型整体运输发电机在电厂安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104333180B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923557A (zh) * | 2018-08-13 | 2018-11-30 | 中车株洲电机有限公司 | 一种永磁电机及其模块式转子结构 |
CN111219252A (zh) * | 2019-11-28 | 2020-06-02 | 中国电建集团河南工程有限公司 | 重型燃气轮机安装施工方法 |
CN111490649A (zh) * | 2020-04-22 | 2020-08-04 | 中国能源建设集团天津电力建设有限公司 | 一种660mw级双水内冷发电机安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101598621A (zh) * | 2009-06-30 | 2009-12-09 | 上海电气电站设备有限公司 | 一种改善励磁机转子轴振的方法 |
CN202395630U (zh) * | 2011-11-21 | 2012-08-22 | 哈尔滨电机厂有限责任公司 | 隐极同步发电机转轴联轴器锁定结构 |
CN103196432A (zh) * | 2012-01-06 | 2013-07-10 | 上海信慧电力科技有限公司 | 一种用于发电机对轮轴系的对中仪测量及调整方法 |
JP2014003781A (ja) * | 2012-06-18 | 2014-01-09 | Toshiba Corp | 回転電機の輸送・据付方法および回転電機一体化ユニット |
-
2014
- 2014-12-02 CN CN201410718912.2A patent/CN104333180B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101598621A (zh) * | 2009-06-30 | 2009-12-09 | 上海电气电站设备有限公司 | 一种改善励磁机转子轴振的方法 |
CN202395630U (zh) * | 2011-11-21 | 2012-08-22 | 哈尔滨电机厂有限责任公司 | 隐极同步发电机转轴联轴器锁定结构 |
CN103196432A (zh) * | 2012-01-06 | 2013-07-10 | 上海信慧电力科技有限公司 | 一种用于发电机对轮轴系的对中仪测量及调整方法 |
JP2014003781A (ja) * | 2012-06-18 | 2014-01-09 | Toshiba Corp | 回転電機の輸送・据付方法および回転電機一体化ユニット |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108923557A (zh) * | 2018-08-13 | 2018-11-30 | 中车株洲电机有限公司 | 一种永磁电机及其模块式转子结构 |
CN111219252A (zh) * | 2019-11-28 | 2020-06-02 | 中国电建集团河南工程有限公司 | 重型燃气轮机安装施工方法 |
CN111490649A (zh) * | 2020-04-22 | 2020-08-04 | 中国能源建设集团天津电力建设有限公司 | 一种660mw级双水内冷发电机安装方法 |
CN111490649B (zh) * | 2020-04-22 | 2022-07-12 | 中国能源建设集团天津电力建设有限公司 | 一种660mw级双水内冷发电机安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104333180B (zh) | 2017-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102155496B (zh) | 一种确定风电锁紧盘过盈量的方法 | |
WO2014002296A1 (ja) | 再生エネルギー型発電装置の軸系組立て方法及び軸系組立て治具 | |
CN104333180A (zh) | 重型整体运输发电机在电厂安装方法 | |
CN102324799A (zh) | 一种风力发电机组用发电机减振支撑 | |
CN104362806A (zh) | 轻型整体运输燃机发电机在电厂安装方法 | |
US20150037166A1 (en) | Wind turbine tower having floating platform | |
CN201696220U (zh) | 用于通信塔架的垂直轴风力发电机组 | |
CN105298754A (zh) | 风力发电机及风力发电机组 | |
CN105464899A (zh) | 风力发电机及风力发电机组 | |
CN205101174U (zh) | 风力发电机及风力发电机组 | |
CN106662077A (zh) | 具有直接驱动的发电机的风力发电设备 | |
CN103956865A (zh) | 水轮发电机定转子同机坑内叠装磁轭工艺方法 | |
CN202438552U (zh) | 一种法兰环轧机的传动轴结构 | |
CN205190114U (zh) | 风力发电机及风力发电机组 | |
CN103452765A (zh) | 一种风力发电机组 | |
CN109973313A (zh) | 一种无主轴的直驱永磁风力发电机 | |
CN208330469U (zh) | 一种微型涡轮发电机 | |
CN103174606A (zh) | 风电机组传动系统 | |
CN104333181B (zh) | 轻型整体运输燃机发电机在工厂内总装配方法 | |
CN202305209U (zh) | 一种风力发电机组齿轮箱试验台 | |
CN202914557U (zh) | 一种联轴器 | |
CN206723266U (zh) | 一种汽轮机组轴瓦挡油环 | |
US20140140817A1 (en) | Micro gas turbine having compact structure | |
CN205592223U (zh) | 采用新型密封装置的zgm113中速磨煤机液压缸 | |
CN204535991U (zh) | 一种风电齿轮箱非扭矩载荷动态加载装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |