CN104328786B - 超深预应力管桩桩芯清土施工方法 - Google Patents
超深预应力管桩桩芯清土施工方法 Download PDFInfo
- Publication number
- CN104328786B CN104328786B CN201410711209.9A CN201410711209A CN104328786B CN 104328786 B CN104328786 B CN 104328786B CN 201410711209 A CN201410711209 A CN 201410711209A CN 104328786 B CN104328786 B CN 104328786B
- Authority
- CN
- China
- Prior art keywords
- mud
- pile
- pipe
- stake
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/08—Removing obstacles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种超深预应力管桩桩芯清土施工方法。步骤包括:配备高压水泵、污水泵,设置沉淀池及排浆沟槽;将桩头部分杂土清理出,再向桩芯内注入少许水,待桩管内杂土初步溶解后,根据桩管内泥浆稠度及泥浆高度逐渐将水注入管桩内,最终达将土体稀释成可用污水泵泵出的泥浆;用污水泵将泥浆抽出,排放到排浆沟槽流入沉淀池;抽出部分泥浆后再向桩管内部注入高压水,进行冲洗管壁泥土,再用污水泵将管内的泥浆抽出,如此循环冲排洗内壁,最终达到符合要求的填芯高度及施工质量要求;桩芯清土高度验收后,及时进入下一道桩芯浇灌工序施工。本发明保证了施工全过程处于安全、稳定、快速、优质可控状态,清孔质量高。
Description
技术领域
本发明涉及管桩施工方法,具体是一种超深预应力管桩桩芯清土施工方法。
背景技术
预应力离心混凝土管桩基础(以下简称管桩),管桩与基础连接一般采用C40填芯混凝土,填芯常规施工高度基本为2m。目前,对预应力管桩与基础连接部位的填芯混凝土的高度要求更高,填芯混凝土高度的增加使现有的人工清桩芯土工艺不再适用,而且随着清理预应力管桩内的杂土难度增加,随着管桩内深度增加,人工降效,势必会影响工程进度。当桩基送桩深度超4.5m、高程土质以粉土为主时,地下水位较高致使管桩内泥土较多,清孔工作量更大。
发明内容
本发明涉旨在解决目前管桩施工存在的桩内深度杂土难以清理,影响施工进程的问题,而提供一种采用高压冲洗、循环泵抽泥浆清土的超深预应力管桩桩芯清土施工方法。
本发明解决所述问题采用的技术方案是:
一种超深预应力管桩桩芯清土施工方法,按下述步骤进行:
(1)施工现场配备高压水泵、污水泵,设置沉淀池及排浆沟槽,排浆沟槽与沉淀池相连;
(2)布置高压水管,先将桩头部分杂土清理出,再将高压水管端头放入管桩内,防止在桩孔内的土体没有初步形成泥浆就外流出管桩;
(3)向桩芯内高压注水清洗桩芯:调节高压泵水管流速控制阀,使高压泵供水压强在0.2MPa以下,先向桩管内注入少许水,待预应力桩管内杂土初步溶解后,再根据桩管内泥浆的稠度及泥浆的高度调改泵压,逐渐将水注入管桩内,最终达将土体稀释成可用污水泵泵出的泥浆;
(4)清理桩孔内壁:将桩孔顶部300mm高淤泥挖出;
(5)污水泵抽出泥浆:向桩孔内高压注水后,待泥浆深度达到1.0m后用污水泵将泥浆抽出,排放到排浆沟槽流入沉淀池,抽出部分泥浆后再向桩管内部注入高压水,进行冲洗管壁泥土,再用污水泵将管内的泥浆抽出,如此循环冲排洗内壁,最终达到符合设计要求的填芯高度及质施工质量要求;
(6)桩芯高度验收和桩孔内壁效果验收:桩芯高度验收合格后,桩芯内壁清水清洗,然后用泵抽出;
(7)向桩芯内壁注清水:控制高压水泵的注水压强及注水量,确保管桩内水及淤泥不外溢,在刚开始注水时其注水压强不应大于0.2MPa,注入少量水将接近桩头处的土体液化后,根据管内泥浆量调整泵压冲洗管桩,保证管内泥浆不外溢,且达到可泵状态;
(8)桩芯清土完成后,再次验收桩孔清理高度及内壁,之后进行地基验槽,进入下一道桩芯浇灌工序施工,防止重复清孔降水。
采用上述技术方案的本发明,与现有技术相比,其有益效果是:
使桩芯一次清理到位,减少劳动力投入的同时更保证了施工进度,为下一步基础施工提供了保障;施工全过程处于安全、稳定、快速、优质的可控状态,清孔质量高。
附图说明
图1是本发明实施例工艺流程图;
图2是本发明实施例的桩芯清孔示意图;
图中:1-预应力管桩,2-高压水管,3-排污管,4-污水泵,5-预留桩芯土。
具体实施方式
以下结合附图及实施例详述本发明,所举之例不对本发明构成任何限制。
参见图1、图2,本实施例给出的超深预应力管桩桩芯清土施工方法,涉及桩基送桩深度4.5m,其按下述步骤进行:
(1)施工准备:高压水泵、污水泵4调试运转正常;在施工现场闲置角落设置3.5m×3.5m×2m的沉淀池,做好排水措施,在靠近临时道路处设计排浆沟槽,排浆沟槽与沉淀池相连。
(2)高压水泵就位:将调试运转正常的高压水泵布置在周围桩体较多部位,这样既便于施工,同时也减少移动高压水泵的频率,起到节约了施工时间的效果。
(3)高压水管布置(端头放入桩孔内):在放置高压水管2之前,宜人工先将桩头部分杂土清理出200—350mm,然后再将高压水管2端头放入预应力管桩1内(这样是为了防止在桩孔内的土体没有初步形成泥浆就外流出管桩)。
(4)向桩芯内高压注水清洗桩芯:调节高压泵水管水流速控制阀,使高压泵水压供水压强在0.2MPa以下,注入少许水待预应力管桩1内杂土初步溶解后,再根据桩管内泥浆的稠度及泥浆的高度调改泵压,逐渐将水注入管桩内,最终达将土体稀释成可用污水泵4泵出的泥浆。
(5)清理桩孔内壁:采用直径200mm半球形勺子将桩孔顶部300mm高淤泥挖出放置在料斗中运出,防止高压注水后污水外溢。
(6)污水泵抽出泥浆:向桩孔内高压注水后,待泥浆深度达到1.0m后用污水泵4将泥浆抽出,排放到排浆沟槽流入沉淀池,抽出部分泥浆后再向桩管内部注入高压水,进行冲洗管壁泥土,再用污水泵4将管内的泥浆抽出,如此循环冲排洗内壁,最终达到符合设计要求的填芯高度及质施工质量要求。
(7)桩芯高度验收:考虑到管桩内预留桩芯土5土压力上浮因素,桩芯高度在设计图纸要求的基础上相应增加500㎜,即清土高度L=设计高度+0.5m;桩孔内壁效果验收:桩芯高度验收合格后,桩芯内壁应及时用清水清洗,然后用泵抽出。
(8)高压水泵向桩芯内壁注清水:控制高压水泵的注水压强及注水量,确保管桩内水及淤泥不外溢,在刚开始注水时其注水压强不应大于0.2MPa,注入少量水将接近桩头处的土体液化后,根据管内泥浆量调整泵压冲洗管桩,且不可急于求成,在初始冲水就将土体液化达到可泵的泥浆,要给予管桩内土体有液化、冲切的时间,保证管内泥浆不外溢,且达到可泵状态;
若管桩内淤泥过多,采用直径200mm半球形勺子将淤泥挖出放置在料斗中运出。
(9)桩芯清土完成后,应再次对桩孔清理高度及内壁进行验收。
(10)进行下一道工序施工:桩芯清土完成验收后应及时进行地基验槽,进入下一道桩芯浇灌工序施工,防止重复清孔降水。
Claims (1)
1.一种超深预应力管桩桩芯清土施工方法,其特征在于,按下述步骤进行:
(1)施工现场配备高压水泵、污水泵,设置沉淀池及排浆沟槽,排浆沟槽与沉淀池相连;
(2)布置高压水管,先将桩头部分杂土清理出,再将高压水管端头放入管桩内,防止在桩孔内的土体没有初步形成泥浆就外流出管桩;
(3)向桩芯内高压注水清洗桩芯:调节高压泵水管流速控制阀,使高压泵供水压强在0.2MPa以下,先向桩管内注入少许水,待预应力桩管内杂土初步溶解后,再根据桩管内泥浆的稠度及泥浆的高度调改泵压,逐渐将水注入管桩内,最终将土体稀释成可用污水泵泵出的泥浆;
(4)清理桩孔内壁:将桩孔顶部300mm高淤泥挖出;
(5)污水泵抽出泥浆:向桩孔内高压注水后,待泥浆深度达到1.0m后用污水泵将泥浆抽出,排放到排浆沟槽流入沉淀池,抽出部分泥浆后再向桩管内部注入高压水,进行冲洗管壁泥土,再用污水泵将管内的泥浆抽出,如此循环冲排洗内壁,最终达到符合设计要求的填芯高度及施工质量要求;
(6)桩芯高度验收和桩孔内壁效果验收:桩芯高度验收合格后,桩芯内壁清水清洗,然后用泵抽出;
(7)向桩芯内壁注清水:控制高压水泵的注水压强及注水量,确保管桩内水及淤泥不外溢,在刚开始注水时其注水压强不应大于0.2MPa,注入少量水将接近桩头处的土体液化后,根据管内泥浆量调整泵压冲洗管桩,保证管内泥浆不外溢,且达到可泵状态;
(8)桩芯清土完成后,再次验收桩孔清理高度及内壁,之后进行地基验槽,进入下一道桩芯浇灌工序施工,防止重复清孔降水。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410711209.9A CN104328786B (zh) | 2014-12-01 | 2014-12-01 | 超深预应力管桩桩芯清土施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410711209.9A CN104328786B (zh) | 2014-12-01 | 2014-12-01 | 超深预应力管桩桩芯清土施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104328786A CN104328786A (zh) | 2015-02-04 |
CN104328786B true CN104328786B (zh) | 2016-08-17 |
Family
ID=52403586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410711209.9A Active CN104328786B (zh) | 2014-12-01 | 2014-12-01 | 超深预应力管桩桩芯清土施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104328786B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105714826A (zh) * | 2016-04-20 | 2016-06-29 | 上海宝冶集团有限公司 | 预应力混凝土管桩桩芯清孔装置及操作方法 |
CN107542093B (zh) * | 2016-06-23 | 2020-04-14 | 中国二十冶集团有限公司 | 一种冲孔灌注桩清底方法 |
CN106193027A (zh) * | 2016-08-31 | 2016-12-07 | 中建四局第建筑工程有限公司 | 一种预应力管桩桩身缺陷修复方法及装置 |
CN107059957A (zh) * | 2017-05-15 | 2017-08-18 | 中国十七冶集团有限公司 | 管桩质量缺陷检测装置及利用该装置的纠偏处理方法 |
CN109208604A (zh) * | 2017-06-30 | 2019-01-15 | 中国二十冶集团有限公司 | 清理phc管桩桩芯中海砂的方法 |
JP2020023789A (ja) * | 2018-08-06 | 2020-02-13 | ジャパンパイル株式会社 | 円筒材内面洗浄装置 |
CN111139831B (zh) * | 2019-11-21 | 2021-04-27 | 中国建筑第四工程局有限公司 | 一种桩芯清理方法 |
CN111121730B (zh) * | 2020-02-25 | 2022-05-17 | 中国海洋大学 | 适用于浅水粘性海床的底边界层原位观测系统与其布设方法 |
CN113250199A (zh) * | 2021-06-21 | 2021-08-13 | 柴成杰 | 一种电动桩芯掏土工具 |
CN114541398A (zh) * | 2022-03-04 | 2022-05-27 | 西安建筑科技大学 | 一种预制管桩深处桩芯土清理装置 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5951207A (en) * | 1997-03-26 | 1999-09-14 | Chevron U.S.A. Inc. | Installation of a foundation pile in a subsurface soil |
JP2003094236A (ja) * | 2001-09-18 | 2003-04-03 | Taiyu Kk | 地中埋設小径管の切断装置 |
CN202936795U (zh) * | 2012-12-03 | 2013-05-15 | 中建五局第三建设有限公司 | 高压逆冲洗桩机具 |
CN203977422U (zh) * | 2014-08-11 | 2014-12-03 | 重庆工商职业学院 | 建筑桩基泥浆护壁钻孔沉渣处理装置 |
-
2014
- 2014-12-01 CN CN201410711209.9A patent/CN104328786B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104328786A (zh) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104328786B (zh) | 超深预应力管桩桩芯清土施工方法 | |
CN103437351B (zh) | 灌注桩桩身偏斜及断裂补救处理方法 | |
CN103541359B (zh) | 灌注桩质量缺陷补救处理方法 | |
CN103924987B (zh) | 一种smw工法桩盾构洞门防渗水结构及其施工方法 | |
CN105821830A (zh) | 一种用于低渗透性土坡的增渗虹吸排水系统 | |
CN102051879B (zh) | 土层锚杆施工工艺 | |
CN204491646U (zh) | 一种高水位地区围护体堵漏装置 | |
CN104947652A (zh) | 长螺旋钻孔水泥浆护壁式植入管桩的施工装置及施工方法 | |
CN103643690A (zh) | 一种深基坑勘探孔涌水处理方法 | |
CN103031847A (zh) | 变径搭接组合式孔口管灌浆法 | |
CN107461182B (zh) | 分层压裂防砂方法 | |
CN110438986B (zh) | 一种钻孔灌注桩断桩接桩结构及方法 | |
CN105178966A (zh) | 矿山立井井筒的破壁注浆堵水工艺 | |
CN203891785U (zh) | 水文水井管内投砾专用接头管总成 | |
CN104594369B (zh) | 喀斯特地区高压群孔置换灌浆方法及其结构 | |
CN103790150B (zh) | 一种基于双井组合式回灌的沉降控制方法 | |
CN108396728A (zh) | 用于填海筑岛能排水的多功能管桩的施工装置及施工方法 | |
CN109137919A (zh) | 一种适用深井接地极钢套管的底部注浆系统及注浆方法 | |
CN112983435B (zh) | 一种隧道突涌体开挖方法 | |
CN110761291B (zh) | 一种应用于岩溶富水区深基坑的抗浮防水系统及方法 | |
CN112031811B (zh) | 一种崖壁涌水注浆封堵系统及方法 | |
CN204825813U (zh) | 消力池底板加固结构 | |
CN106869092B (zh) | 一种消力池底板加固结构的施工方法 | |
CN208578025U (zh) | 一种用于填海筑岛能排水的多功能管桩的施工装置 | |
CN110700243A (zh) | 一种处理混凝土灌注桩桩底沉渣的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20220909 Granted publication date: 20160817 |