CN104314005A - Embedding positioning construction method for vertical multi-bundle pre-stressed steel strand - Google Patents

Embedding positioning construction method for vertical multi-bundle pre-stressed steel strand Download PDF

Info

Publication number
CN104314005A
CN104314005A CN201410478637.1A CN201410478637A CN104314005A CN 104314005 A CN104314005 A CN 104314005A CN 201410478637 A CN201410478637 A CN 201410478637A CN 104314005 A CN104314005 A CN 104314005A
Authority
CN
China
Prior art keywords
bearing plate
orientation tool
pressure bearing
plate orientation
positioning tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410478637.1A
Other languages
Chinese (zh)
Other versions
CN104314005B (en
Inventor
丁得志
李定有
周海峰
杨维双
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201410478637.1A priority Critical patent/CN104314005B/en
Publication of CN104314005A publication Critical patent/CN104314005A/en
Application granted granted Critical
Publication of CN104314005B publication Critical patent/CN104314005B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses an embedding positioning construction method for a vertical multi-bundle pre-stressed steel strand. The method comprises the steps of manufacturing a vertical mold tool, that is, designing the shape and the size of a pressure bearing plate according to an upper structure, manufacturing a pressure bearing plate positioning tool by using bamboo plywood and square timber according to the proportion of 1:1, and cutting the pressure bearing plate positioning tool into seven small blocks; mounting the small pressure bearing plate positioning tool blocks, that is, mounting the small pressure bearing plate positioning tool blocks at the top end of a template one by one according to determined control points on the basis of an established lower structure template and a threaded lower steel strand, processing a mortise-and-tenon joint by using the square timber on the pressure bearing plate positioning tool to control the overall accuracy of the pressure bearing plate positioning tool, and reinforcing the mortise-and-tenon joint and the established lower structure template together for subsequent process construction. The problems that the vertical multi-bundle pre-stressed steel strand is difficult to position and the accuracy cannot be guaranteed in construction are solved. The method has the characteristics of high construction speed, accurate positioning and simple and convenient mounting, the whole positioning working period is eliminated, the stability is high, the embedding quality of an embedded part is effectively guaranteed, and the positioning tool can be reused.

Description

A kind of pre-buried positioning construction method of vertical multi beam prestress wire
Technical field
The present invention relates to a kind of pre-buried positioning construction method of vertical multi beam prestress wire.
Background technology
Along with fast development and the construction of Chinese bridge cause, high, new, sharp object of construction production continues to bring out along with project organization and aesthetic, the continuous novelty of design, more and more higher to the precision controlling of engineering in construction, construction period, especially the accuracy of built-in fitting location is difficult to ensure, the pre-buried location of vertical multi beam prestress wire, and the accuracy of its location directly affects the installation location of superstructure.In current work progress, major part is all adopt groined type reinforcing bar to fix, this kind of fixing reliability not only lacking firm position, and may cause the damage of bellows in groined type reinforcement welding fixation procedure.
Summary of the invention
Its object of the present invention is just the pre-buried positioning construction method providing a kind of vertical multi beam prestress wire, solve vertical multi beam prestress wire location difficulty in construction and precision controlling cannot guaranteed problem, have that speed of application is fast, accurate positioning, feature be simply and easily installed, and save the overall work cycle of location, there is good stability, effectively ensure that the pre-buried quality of built-in fitting, orientation tool can be reused.
Realize above-mentioned purpose and the technical scheme taked, comprise step,
1) formwork erection instrument is made
According to design shape and the size of superstructure bearing plate, be made into 1:1 ratio bearing plate orientation tool with bamboo slab rubber and the lumps of wood, then bearing plate orientation tool is cut into 7 fritters;
2) bearing plate orientation tool is installed
Based on substructure shuttering and bottom steel strand, on template top by determining that position, control point installs bearing plate orientation tool one by one, utilize the lumps of wood on bearing plate orientation tool to be processed into Tenon to control the overall precision of bearing plate orientation tool, the construction of next step operation together with then reinforcing with substructure shuttering, can be carried out.
Compared with prior art the present invention has the following advantages.
1, the present invention utilizes the orientation tool of making, vertical multi beam prestress wire location difficulty in construction is effectively avoided and precision controlling cannot guaranteed problem according to the using method construction drafted, save the overall work cycle of location simultaneously, there is good stability, and effectively ensure that the pre-buried quality of built-in fitting, orientation tool can be reused, and turnover is installed all very simple and convenient, has obvious economic benefit and technology to ensure;
2, simplicity of design of the present invention, orientation tool makes material requested and machining tool and is and on-the-spotly often uses, and processing is simple, and speed of application is fast, be conducive to the control overflow of precision in constructing.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1 is bearing plate orientation tool front schematic view in the present invention;
Fig. 2 is bearing plate orientation tool reverse side schematic diagram in the present invention.
Detailed description of the invention
This device comprises step,
1) formwork erection instrument is made
According to design shape and the size of superstructure bearing plate, be made into 1:1 ratio bearing plate orientation tool with bamboo slab rubber and the lumps of wood, then bearing plate orientation tool is cut into 7 fritters, as shown in Figure 1;
2) bearing plate orientation tool is installed
Based on substructure shuttering and bottom steel strand, on template top by determining that position, control point installs bearing plate orientation tool one by one, utilize the lumps of wood on bearing plate orientation tool to control the overall precision of bearing plate orientation tool, the construction of next step operation together with then reinforcing with substructure shuttering, can be carried out.
Preformed hole diameter on described bearing plate orientation tool is less than position, the hole diameter 1 centimetre on bearing plate; Described bearing plate orientation tool bottom concrete structure vertical prestressing bellows diameter is less than position, the hole diameter 2 centimetres on bearing plate.
Vertical multi beam prestressing force orientation tool, it is the relative position in conjunction with the design size of concrete segment pre-buried steel twisted wire and the preformed hole position of upper end steel work bearing plate, bamboo slab rubber is utilized to make bearing plate orientation tool by steel superstructure bearing plate geomery with the ratio of 1:1 row, effectively control the positioning precision of concrete segment pre-buried steel twisted wire with this bearing plate orientation tool, make it that steel superstructure can be made after concreting completes can to realize accurate installation smoothly.
1, bearing plate orientation tool is made
According to design shape and the size of superstructure bearing plate, bamboo slab rubber and the lumps of wood is utilized to be made into 1:1 ratio bearing plate orientation tool, bearing plate orientation tool makes reserving hole by the basis designing preformed hole position size reducing 1 centimetre, so both can ensure the positioning precision of vertical multi beam prestress wire, also effectively prevent due to the large factor of manual operation error, again bearing plate orientation tool is cut into 7 fritters, be convenient to having bad luck and installing of orientation tool, as shown in Figure 1;
2, bearing plate orientation tool is installed
Based on substructure shuttering and bottom steel strand, on template top by determining that position, control point installs bearing plate orientation tool one by one, the lumps of wood on bearing plate orientation tool is utilized to be processed into Tenon to control the overall precision of orientation tool, the described lumps of wood is arranged on bearing plate orientation tool reverse side, Tenon is processed in connection between the lumps of wood of 1 fritter bearing plate orientation tool reverse side and the lumps of wood of another 1 fritter bearing plate orientation tool reverse side, as shown in Figure 2, then reinforce with substructure shuttering together with can carry out the construction of next step operation.
Strictly must control anchor point in construction and installation process, in the assembled process of 7 fritter, carry out closed sign between block and block, be convenient to assembled putting in place, reduce the impact that assembled error is brought.

Claims (2)

1. a pre-buried positioning construction method for vertical multi beam prestress wire, is characterized in that, comprise step,
1) formwork erection instrument is made
According to design shape and the size of superstructure bearing plate, be made into 1:1 ratio bearing plate orientation tool with bamboo slab rubber and the lumps of wood, then bearing plate orientation tool is cut into 7 fritters;
2) bearing plate orientation tool is installed
Based on substructure shuttering and bottom steel strand, on template top by determining that position, control point installs bearing plate orientation tool one by one, utilize the lumps of wood on bearing plate orientation tool to be processed into Tenon to control the overall precision of bearing plate orientation tool, the construction of next step operation together with then reinforcing with substructure shuttering, can be carried out.
2. the pre-buried positioning construction method of a kind of vertical multi beam prestress wire according to claim 1, is characterized in that, the preformed hole diameter on described bearing plate orientation tool is less than position, the hole diameter 1 centimetre on bearing plate; Described bearing plate orientation tool bottom concrete structure vertical prestressing bellows diameter is less than position, the hole diameter 2 centimetres on bearing plate.
CN201410478637.1A 2014-09-19 2014-09-19 A kind of pre-buried positioning construction method of vertical multi beam prestress wire Active CN104314005B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410478637.1A CN104314005B (en) 2014-09-19 2014-09-19 A kind of pre-buried positioning construction method of vertical multi beam prestress wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410478637.1A CN104314005B (en) 2014-09-19 2014-09-19 A kind of pre-buried positioning construction method of vertical multi beam prestress wire

Publications (2)

Publication Number Publication Date
CN104314005A true CN104314005A (en) 2015-01-28
CN104314005B CN104314005B (en) 2016-11-30

Family

ID=52369306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410478637.1A Active CN104314005B (en) 2014-09-19 2014-09-19 A kind of pre-buried positioning construction method of vertical multi beam prestress wire

Country Status (1)

Country Link
CN (1) CN104314005B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758838A (en) * 2016-12-26 2017-05-31 河南省交通规划设计研究院股份有限公司 A kind of precompressed steel strand wires safety control

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736701A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Bridge steel and concrete mixing section constructing method
KR101001905B1 (en) * 2009-07-01 2010-12-17 (주)하경엔지니어링 Steel plate girder bridge construction method with fixing its ends
CN202298463U (en) * 2011-10-26 2012-07-04 柳州欧维姆机械股份有限公司 Vertical prestressed anchoring system
KR101223699B1 (en) * 2012-05-10 2013-01-28 주식회사 젬콘 Prestressed steel girder and it's manufacture and construction method which used pretensioning steel plate
CN103924679A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars
CN103924520A (en) * 2014-04-10 2014-07-16 中交一公局第一工程有限公司 Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN103924676A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestressed connecting joint for concrete beam and circular steel pipe concrete column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101001905B1 (en) * 2009-07-01 2010-12-17 (주)하경엔지니어링 Steel plate girder bridge construction method with fixing its ends
CN101736701A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Bridge steel and concrete mixing section constructing method
CN202298463U (en) * 2011-10-26 2012-07-04 柳州欧维姆机械股份有限公司 Vertical prestressed anchoring system
KR101223699B1 (en) * 2012-05-10 2013-01-28 주식회사 젬콘 Prestressed steel girder and it's manufacture and construction method which used pretensioning steel plate
CN103924520A (en) * 2014-04-10 2014-07-16 中交一公局第一工程有限公司 Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN103924679A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars
CN103924676A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestressed connecting joint for concrete beam and circular steel pipe concrete column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758838A (en) * 2016-12-26 2017-05-31 河南省交通规划设计研究院股份有限公司 A kind of precompressed steel strand wires safety control
CN106758838B (en) * 2016-12-26 2018-07-20 河南省交通规划设计研究院股份有限公司 A kind of precompressed steel strand wires safety control

Also Published As

Publication number Publication date
CN104314005B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN201649633U (en) Steel formwork for forming building stair treads
CN201443203U (en) Mold of preformed hole of cast-in-place reinforced concrete slab
CN204781624U (en) Floor elevation and roughness controlling means
CN204530742U (en) A kind of adjustable suspension column
CN105332510A (en) Construction method of complicated beam column joint core area
CN105113786A (en) Pad block support system for supporting fixed adjustable cast-in-situ stair formwork
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN104763082A (en) Upper and lower connecting structure of assembled shearing force wall
CN103737718B (en) Prefabricated reinforced concrete hollow column template and preparation method thereof
CN203238953U (en) Embedded sleeve positioning device
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN203878872U (en) Floorslab steel bar supporting stirrup
CN106906747A (en) A kind of column and bent cap splicing structure
CN204645333U (en) Fabricated shear wall levels syndeton
CN205907609U (en) Supplementary utensil in pre -buried hole of bridge supporting base stone location
CN104314005A (en) Embedding positioning construction method for vertical multi-bundle pre-stressed steel strand
CN102912977A (en) Mold used for pouring shaped stair
CN204960309U (en) Fixed adjustable cast -in -place stair template is propped up to establish and is used cushion braced system
CN102121312B (en) Construction process for concrete bargeboard in pseudo-classic architecture
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN105298118B (en) The template that a kind of cast-in-place concrete stair is marked time
CN205476528U (en) Precast pile device of taking one's place fast
CN202644563U (en) Installation device for embedded foundation bolt of small facility
CN203769332U (en) Building form or floor construction control device
CN203296377U (en) Forming concrete mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Dingyou

Inventor after: Ding Dezhi

Inventor after: Fang Zijian

Inventor after: Huang Wenguo

Inventor after: Huang Zongguang

Inventor after: Zhou Haifeng

Inventor after: Li Hui

Inventor after: Yang Weishuang

Inventor before: Ding Dezhi

Inventor before: The inventor has waived the right to be mentioned

Inventor before: Li Dingyou

Inventor before: Zhou Haifeng

Inventor before: Yang Weishuang

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant