CN104281886B - 一种配电网架空输电线污秽沉降指数预测方法 - Google Patents
一种配电网架空输电线污秽沉降指数预测方法 Download PDFInfo
- Publication number
- CN104281886B CN104281886B CN201410472760.2A CN201410472760A CN104281886B CN 104281886 B CN104281886 B CN 104281886B CN 201410472760 A CN201410472760 A CN 201410472760A CN 104281886 B CN104281886 B CN 104281886B
- Authority
- CN
- China
- Prior art keywords
- mrow
- msub
- mtr
- mtd
- filthy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004062 sedimentation Methods 0.000 title claims abstract description 36
- 230000005540 biological transmission Effects 0.000 title claims abstract description 15
- 238000013277 forecasting method Methods 0.000 title claims abstract description 6
- 238000005183 dynamical system Methods 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 3
- 238000005311 autocorrelation function Methods 0.000 claims description 2
- 238000005314 correlation function Methods 0.000 claims description 2
- 230000002411 adverse Effects 0.000 abstract description 3
- 238000012544 monitoring process Methods 0.000 abstract description 2
- 238000003556 assay Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Other Investigation Or Analysis Of Materials By Electrical Means (AREA)
Abstract
本发明属于输配电监测技术领域,特别涉及一种配电网架空输电线污秽沉降指数预测方法。包括以下步骤:步骤一:建立污秽沉降指数演化系统的时间序列;步骤二:重构时间序列(1)所代表的污秽沉降指数演化非线性动力学系统的相空间;步骤三:计算相空间中下一时刻的相点;步骤四:计算污秽沉降指数预测值。本发明预测精确,通过建立适合工程实际应用的输电线污秽沉降指数预测模型,有效地解决了对污秽沉降指数的精确预测。对沿海、沿江等配电网自然气象条件恶劣多变的地区,可以实现完整可靠的预测体系,不受恶劣环境的影响。
Description
技术领域
本发明属于输配电监测技术领域,特别涉及一种配电网架空输电线污秽沉降指数预测方法。
背景技术
配电网架空输电线在运行过程中,由于导线表面的污秽沉降,会导致导线加快老化,电晕放电损失增加等不利影响,目前,针对导线表面污秽沉降导致导线损伤和电晕增加的评估方法主要是通过对导线表面沉降了一定污秽时其电晕特性的试验测定方法方面的研究。
针对沿海和多雾霾环境的挑战,导线表而附着的污秽物严重影响输电线路的电晕特性,需要深入开展其影响规律的基础性问题。
发明内容
针对现有技术的不足,本发明提供一种配电网架空输电线污秽沉降指数预测方法,通过建立适合工程实际应用的输电线污秽沉降指数预测模型,以有效地解决对污秽沉降指数的精确预测。
本发明的技术方案实现的步骤如下:
一种配电网架空输电线污秽沉降指数预测方法,包括以下步骤:
步骤一:建立污秽沉降指数演化系统的时间序列:
在固定时间间隔对污秽沉降量、温度、湿度、风速、PM2.5值进行测量,将污秽沉降量的测量值与历史测量最大值的比作为污秽沉降指数,即:
则,在一系列时刻t1,t2,...,tn(n为自然数,n=1,2,…)得到污秽沉降指数、温度、湿度、风速、PM2.5时间序列:
步骤二:重构时间序列(1)所代表的污秽沉降指数演化非线性动力学系统的相空间SY:
PZi为重构的时间序列相空间相内的相点,i=1,2,…,N,N表示第N时刻,τit和mit为第it个时间序列的延迟时间和嵌入维数,重构相空间的嵌入维数m=m1+m2+...+m5;第it个时间序列的嵌入维数mit由下式决定:
其中:PZi(mit+1)是(mit+1)维重构的系统相空间中的第i个相点,n(i,mit)是在mi维系统相空间中使相点是相点PZi(mit)的最邻近点的整数,it=1,2,…,5;
延迟时间τit的选择采用自相关函数法,选取自相关函数:
取自相关函数第一个过零点时对应的τit为延迟时间,其中,j=1,2,…,mit-1;
步骤三:计算相空间中下一时刻的相点:
在相空间SY中计算各相点到中心相点PZC之间的欧氏距离di=||PZi-PZC||,找出PZC的参考向量集RS(C)={RZ1,RZ2,…,RZN},由RS(C)用下式计算相空间中下一时刻的相点PZ′C:
dmin为邻域中各点到中心点的空间距离和最小距离,即min{di=||PZi-PZC||},L为预测调节参数,一般取L≥1;
步骤四:计算污秽沉降指数预测值:
将步骤三中计算得到的PZ′C作为相空间(2)中的第N+1个相点PZN+1,则可得:
令τit=1(it=1,2,…,5),可得z1,N+1即为污秽沉降指数预测值。
本发明的优点及有益效果如下:
(1)、预测精确,本发明通过建立适合工程实际应用的输电线污秽沉降指数预测模型,有效地解决了对污秽沉降指数的精确预测。
(2)、对沿海、沿江等配电网自然气象条件恶劣多变的地区,可以实现完整可靠的预测体系,不受恶劣环境的影响。
附图说明:
图1为本发明污秽沉降指数预测流程图
具体实施方式:
实施例1:
下面结合实施例和附图对本发明加以详细说明。
如图1所示,一种配电网架空输电线污秽沉降指数预测方法,包括以下步骤:
步骤一:建立污秽沉降指数演化系统的时间序列:
本实施例中,在30个等间隔的时间段内测量污秽沉降量、温度、湿度、风速、PM2.5值,并将各时刻测得的污秽沉降量折算为污秽沉降指数:
则得到由污秽沉降指数、温度、湿度、风速、PM2.5的测量数据构成的一个5维时间序列:
式中,ki=1,2,...,30;
步骤二:重构时间序列(7)所代表的污秽沉降指数演化非线性动力学系统的相空间:
由下式:
求得延迟时间τit=2和嵌入维数mit=5对时间序列进行相空间重构,it=1,2,…,5,得到相空间:
步骤三:计算相空间中下一时刻的相点:
选取PZ3为相空间中心点,计算各相点与PZ3之间的di=||PZi-PZ3||,得到参考向量集RS(3)={RZ1,RZ2,…,RZN},取L=1.321,计算相空间中下一时刻的相点PZ′3:
步骤四:计算污秽沉降指数预测值:
令PZN+1=PZ′3,可得:取τit=1(it=1,2,…,5),解得的z1,N+1,即为污秽沉降指数预测值。
Claims (1)
1.一种配电网架空输电线污秽沉降指数预测方法,其特征在于包括以下步骤:
步骤一:建立污秽沉降指数演化系统的时间序列:
在固定时间间隔对污秽沉降量、温度、湿度、风速、PM2.5值进行测量,将污秽沉降量的测量值与历史测量最大值的比作为污秽沉降指数,即:
则,在一系列时刻t1,t2,...,tn(n为自然数,n=1,2,…)得到污秽沉降指数、温度、湿度、风速、PM2.5时间序列:
<mrow>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>z</mi>
<msub>
<mn>1</mn>
<mn>1</mn>
</msub>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>1</mn>
<mn>2</mn>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>1</mn>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mi>z</mi>
<msub>
<mn>2</mn>
<mn>1</mn>
</msub>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>2</mn>
<mn>2</mn>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>2</mn>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mi>z</mi>
<msub>
<mn>3</mn>
<mn>1</mn>
</msub>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>3</mn>
<mn>2</mn>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>3</mn>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mi>z</mi>
<msub>
<mn>4</mn>
<mn>1</mn>
</msub>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>4</mn>
<mn>2</mn>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>4</mn>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mi>z</mi>
<msub>
<mn>5</mn>
<mn>1</mn>
</msub>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>5</mn>
<mn>2</mn>
</msub>
<mo>,</mo>
<mo>...</mo>
<mo>,</mo>
<mi>z</mi>
<msub>
<mn>5</mn>
<mi>n</mi>
</msub>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
</mrow>
步骤二:重构时间序列(1)所代表的污秽沉降指数演化非线性动力学系统的相空间SY:
PZi为重构的时间序列相空间相内的相点,i=1,2,…,N,N表示第N时刻,τit和mit为第it个时间序列的延迟时间和嵌入维数,重构相空间的嵌入维数m=m1+m2+...+m5;第it个时间序列的嵌入维数mit由下式决定:
<mrow>
<mi>M</mi>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mrow>
<mi>N</mi>
<mo>-</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mi>&tau;</mi>
</mrow>
</mfrac>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mrow>
<mi>N</mi>
<mo>-</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mi>&tau;</mi>
</mrow>
</munderover>
<mi>&alpha;</mi>
<mrow>
<mo>(</mo>
<mi>i</mi>
<mo>,</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>3</mn>
<mo>)</mo>
</mrow>
</mrow>
其中:PZi(mit+1)是(mit+1)维重构的系统相空间中的第i个相点,n(i,mit)是在mi维系统相空间中使相点是相点PZi(mit)的最邻近点的整数,it=1,2,…,5;
延迟时间τit的选择采用自相关函数法,选取自相关函数:
<mrow>
<msubsup>
<mi>C</mi>
<mrow>
<mi>z</mi>
<mi>z</mi>
</mrow>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</msubsup>
<mrow>
<mo>(</mo>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mi>N</mi>
</mfrac>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mrow>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>1</mn>
</mrow>
</munderover>
<mrow>
<mo>(</mo>
<msub>
<mi>PZ</mi>
<mi>i</mi>
</msub>
<mo>-</mo>
<mover>
<mrow>
<mi>P</mi>
<mi>Z</mi>
</mrow>
<mo>&OverBar;</mo>
</mover>
<mo>)</mo>
</mrow>
<mrow>
<mo>(</mo>
<msub>
<mi>PZ</mi>
<mrow>
<mi>i</mi>
<mo>+</mo>
<msub>
<mi>j&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>-</mo>
<mover>
<mrow>
<mi>P</mi>
<mi>Z</mi>
</mrow>
<mo>&OverBar;</mo>
</mover>
<mo>)</mo>
</mrow>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>4</mn>
<mo>)</mo>
</mrow>
</mrow>
取自相关函数第一个过零点时对应的τit为延迟时间,其中,j=1,2,…,mit-1;
步骤三:计算相空间中下一时刻的相点:
在相空间SY中计算各相点到中心相点PZC之间的欧氏距离di=||PZi-PZC||,找出PZC的参考向量集RS(C)={RZ1,RZ2,…,RZN},由RS(C)用下式计算相空间中下一时刻的相点PZ′C:
<mrow>
<msubsup>
<mi>PZ</mi>
<mi>C</mi>
<mo>&prime;</mo>
</msubsup>
<mo>=</mo>
<mfrac>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<msub>
<mi>RZ</mi>
<mi>i</mi>
</msub>
<msup>
<mi>e</mi>
<mrow>
<mo>-</mo>
<mi>L</mi>
<mrow>
<mo>(</mo>
<msub>
<mi>d</mi>
<mi>i</mi>
</msub>
<mo>-</mo>
<msub>
<mi>d</mi>
<mi>min</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</msup>
</mrow>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<msup>
<mi>e</mi>
<mrow>
<mo>-</mo>
<mi>L</mi>
<mrow>
<mo>(</mo>
<msub>
<mi>d</mi>
<mi>i</mi>
</msub>
<mo>-</mo>
<msub>
<mi>d</mi>
<mi>min</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</msup>
</mrow>
</mfrac>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>5</mn>
<mo>)</mo>
</mrow>
</mrow>
dmin为邻域中各点到中心点的空间距离中的最小距离,即min{di=||PZi-PZC||},L为预测调节参数,L≥1;
步骤四:计算污秽沉降指数预测值:
将步骤三中计算得到的PZ′C作为相空间(2)中的第N+1个相点PZN+1,则可得:
<mrow>
<msub>
<mi>S</mi>
<mi>Y</mi>
</msub>
<mo>=</mo>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>PZ</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mn>1</mn>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mn>1</mn>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mn>1</mn>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mn>...</mn>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>PZ</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>i</mi>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>i</mi>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mn>1</mn>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mn>...</mn>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>PZ</mi>
<mi>N</mi>
</msub>
<mo>=</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mn>1</mn>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>PZ</mi>
<mrow>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>=</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mn>1</mn>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mn>1</mn>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mn>1</mn>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<msub>
<mi>z</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
<mo>,</mo>
<mi>N</mi>
<mo>+</mo>
<mn>1</mn>
<mo>-</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>m</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>&tau;</mi>
<mrow>
<mi>i</mi>
<mi>t</mi>
</mrow>
</msub>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>-</mo>
<mo>-</mo>
<mo>-</mo>
<mrow>
<mo>(</mo>
<mn>6</mn>
<mo>)</mo>
</mrow>
</mrow>
令τit=1(it=1,2,…,5),可得z1,N+1即为污秽沉降指数预测值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410472760.2A CN104281886B (zh) | 2014-09-16 | 2014-09-16 | 一种配电网架空输电线污秽沉降指数预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410472760.2A CN104281886B (zh) | 2014-09-16 | 2014-09-16 | 一种配电网架空输电线污秽沉降指数预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104281886A CN104281886A (zh) | 2015-01-14 |
CN104281886B true CN104281886B (zh) | 2018-02-09 |
Family
ID=52256746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410472760.2A Active CN104281886B (zh) | 2014-09-16 | 2014-09-16 | 一种配电网架空输电线污秽沉降指数预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104281886B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003067343A1 (de) * | 2002-02-05 | 2003-08-14 | Mir-Chem Gmbh | Verfahren zum vorhersagen/steuern eines dynamischen prozesses |
CN101187991A (zh) * | 2007-12-18 | 2008-05-28 | 华南理工大学 | 一种腐蚀深度的混沌预测方法 |
CN101793907A (zh) * | 2010-02-05 | 2010-08-04 | 浙江大学 | 一种风电场短期风速预测方法 |
CN101853573A (zh) * | 2010-05-19 | 2010-10-06 | 北京科技大学 | 一种城市快速路短时交通信息预测系统及方法 |
CN101893674A (zh) * | 2010-07-12 | 2010-11-24 | 沈阳工业大学 | 一种区域电网污闪指数预测方法 |
CN103268519A (zh) * | 2013-04-26 | 2013-08-28 | 哈尔滨工程大学 | 基于改进Lyapunov指数的电力系统短期负荷预测方法及装置 |
-
2014
- 2014-09-16 CN CN201410472760.2A patent/CN104281886B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003067343A1 (de) * | 2002-02-05 | 2003-08-14 | Mir-Chem Gmbh | Verfahren zum vorhersagen/steuern eines dynamischen prozesses |
CN101187991A (zh) * | 2007-12-18 | 2008-05-28 | 华南理工大学 | 一种腐蚀深度的混沌预测方法 |
CN101793907A (zh) * | 2010-02-05 | 2010-08-04 | 浙江大学 | 一种风电场短期风速预测方法 |
CN101853573A (zh) * | 2010-05-19 | 2010-10-06 | 北京科技大学 | 一种城市快速路短时交通信息预测系统及方法 |
CN101893674A (zh) * | 2010-07-12 | 2010-11-24 | 沈阳工业大学 | 一种区域电网污闪指数预测方法 |
CN103268519A (zh) * | 2013-04-26 | 2013-08-28 | 哈尔滨工程大学 | 基于改进Lyapunov指数的电力系统短期负荷预测方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104281886A (zh) | 2015-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102170130B (zh) | 一种风电功率短期预测方法 | |
CN111353652B (zh) | 一种风电出力短期区间预测方法 | |
CN104299044A (zh) | 基于聚类分析的风功率短期预测系统及预测方法 | |
CN104299034B (zh) | 基于bp神经网络的三芯电缆导体暂态温度计算方法 | |
CN105719029B (zh) | 一种基于风速波动特征提取的风电功率组合预测方法 | |
CN105095668B (zh) | 基于亚洲极涡因子的电网覆冰长期预报方法 | |
CN102938562B (zh) | 一种区域内风电总功率的预测方法 | |
CN103020743B (zh) | 风电场超短期风速预测方法 | |
CN106897793B (zh) | 一种可保证安全距离的基于遗传算法的风电场风力发电机排布优化方法 | |
CN103872678A (zh) | 一种基于变电站量测的负荷模型辨识方法 | |
CN104849776A (zh) | 一种结合动态修正的电网高低温精细化预警方法 | |
CN104732300A (zh) | 一种基于模糊分区理论的神经网络风功率短期预测方法 | |
CN108549962A (zh) | 基于历史分段序列搜索和时序稀疏化的风电功率预测方法 | |
CN105488589A (zh) | 一种基于遗传模拟退火算法的电网线损管理评价方法 | |
CN108615087A (zh) | 一种光伏组件温度短期预测方法及其预测系统 | |
CN104050379A (zh) | 一种基于arma模型的海洋波浪波高预测方法 | |
CN105356500A (zh) | 一种多光伏区域电网电压稳定性裕度预测方法 | |
CN105046383A (zh) | 一种基于集合经验模态分解和相关向量机的风电功率实时预测方法 | |
CN104281886B (zh) | 一种配电网架空输电线污秽沉降指数预测方法 | |
CN104467601A (zh) | 一种基于wams的同步发电机参数辨识及控制方法 | |
CN104410508B (zh) | 基于电力线通信的电力线网络拓扑感知方法及装置 | |
CN102904252B (zh) | 求解含分布式电源的配电网不确定性潮流的方法 | |
CN107301478A (zh) | 一种电缆线路短时负荷预测方法 | |
CN104377668A (zh) | 一种基于二次数据变换的线路电流差动保护方法 | |
CN104281884B (zh) | 一种配电网避雷器故障风险指数预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |