CN104278620B - The ball of Self-resetting can enter formula winged and wave shock insulation pier stud - Google Patents

The ball of Self-resetting can enter formula winged and wave shock insulation pier stud Download PDF

Info

Publication number
CN104278620B
CN104278620B CN201410514822.1A CN201410514822A CN104278620B CN 104278620 B CN104278620 B CN 104278620B CN 201410514822 A CN201410514822 A CN 201410514822A CN 104278620 B CN104278620 B CN 104278620B
Authority
CN
China
Prior art keywords
pier
bridge pier
cushion cap
bridge
resetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410514822.1A
Other languages
Chinese (zh)
Other versions
CN104278620A (en
Inventor
韩强
郭婕
曹馨予
贾俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201410514822.1A priority Critical patent/CN104278620B/en
Publication of CN104278620A publication Critical patent/CN104278620A/en
Application granted granted Critical
Publication of CN104278620B publication Critical patent/CN104278620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The ball of Self-resetting can enter formula winged and wave shock insulation pier stud, its for a kind of can the isolation structure that wave pier stud of Self-resetting, this shock insulation pier stud includes at the bottom of girder, bridge pier, cushion cap, the spherical pier of semi-convex formula, bridge pier wing plate, rubber spacer, hollow out hemisphere face cushion cap top, marmem shear studs, oblique section block.Bridge pier and the consolidation of cushion cap are changed producing into wave hinged by it.Embed cushion cap top at the bottom of the spherical pier of bridge pier and hollow out hemisphere.Both sides, top at the bottom of the spherical pier of bridge pier are bridge pier flange plates, and flange plate is by marmem shear studs and cushion cap anchor connection.Rubber spacer is arranged at the bottom of the spherical pier of semi-convex formula and hollows out between hemispherical top, between cushion cap and bridge pier wing plate, between bridge pier wing plate side and cushion cap block.The present invention makes pier column and basis separate, and waves filtering seismic energy, not only protects bridge pier but also protect basis;This structure has good society economic benefit, is worthy of popularization.

Description

The ball of Self-resetting can enter formula winged and wave shock insulation pier stud
Technical field
The present invention relates to science of bridge building and engineering technical field of isolation of crossing a river, especially relate to one Kind can Self-resetting wave shock insulation pier stud.
Background technology
China's most area is in earthquake-prone region, and particularly North China and southwest etc. is the strongest Earthquake region, when these regional Construction structures, it is necessary to consider the anti-seismic performance of structure and adopt Take rational version to reduce the destruction that earthquake brings.Nearly violent earthquake the most both domestic and external All show the serious consequence that science of bridge building destroys, it is necessary to it is taked effective earthquake resistant construction, To alleviate the destruction of bridge, keep transportation lifeline engineering disaster area weight after earthquake relief work and shake In building unimpeded.Different according to structural seismic mechanism, " antidetonation ", " shock-damping energy-dissipating " can be divided into " shock insulation " three kinds of modes.Bridge seismic isolation design be mainly bridge upper and lower part structure it Between, use various vibration absorption and isolation support to replace traditional axle beam support, with extending structure natural vibration period And the frequency range that the seismic energy that staggers is concentrated, dissipative part seismic energy simultaneously.Bridge ductility resists Shake and be mainly designed to utilize the plastic deformation of bridge pier, but the damage of Pier Reparation is difficult, can cause Bridge Structure Collapse time serious.Highly seismic region, centering is short Bridge pier, for ensureing safety when plastic hinge region moment of flexure is excessive, the method by increasing section area is non- The most uneconomical, and ductility is difficult to ensure that.For the problems referred to above, herein should by shock insulation thought For bridge pier position, propose a kind of can the isolation structure that wave pier stud of Self-resetting.Pier stud every The structure of shake can effectively discharge the moment of flexure at the bottom of pier, moulds thus without being formed bottom bridge pier Property hinge, the bridge pier efficiently controlled reaction in earthquake, thus protect bridge, reach The purpose of Bridge Earthquake Resistance Design.
Summary of the invention
In order to solve the problem that in the Bridge Earthquake Resistance Design illustrated in background technology, bridge pier exists, The present invention propose a kind of can the isolation structure that wave pier stud of Self-resetting, bridge can be improved Can quickly repair after shock resistance, and connection damage.Realize " energy dissipating " to exist with " shock insulation " Use in conjunction in bridge pier antidetonation, effective control structure destruction under geological process, it is ensured that knot The function recovered of structure.
For achieving the above object, the technical solution used in the present invention is the ball of Self-resetting can to enter formula Winged waves shock insulation pier stud, its be a kind of can the isolation structure that wave pier stud of Self-resetting, should Shock insulation pier stud includes at the bottom of girder 1, bridge pier 2, cushion cap 3, the spherical pier of semi-convex formula 5, bridge pier Wing plate 6, rubber spacer 7, hollow out hemispherical top 8, marmem shear studs 10, Oblique section block 12.It changes the mode that traditional bearing connects Dun Liang into pier consolidation, will Bridge pier 2 and the consolidation of cushion cap 3 change producing wave hinged into.
The bottom of bridge pier 2 is prefabricated at the bottom of the spherical pier of semi-convex formula 5;The top of cushion cap 3 is prefabricated into Hollow out hemispherical top 8;Bridge pier 2 is connected with cushion cap 3 in " ball enters formula " mode, fills out therebetween Fill rubber spacer 7 preferably complete both sliding and rotation and protect contact surface.Bridge pier ball Both sides, top at the bottom of shape pier are bridge pier flange plates, and flange plate passes through marmem shear studs 10 with cushion cap 3 anchor connection.Marmem shear studs 10 is remembered by pre-buried shape Recall alloy shear studs sleeve 9 and carry out positioning installation, and two ends are by end anchorage steel plate 11 anchor.The surrounding of cushion cap 3 has the oblique section block 12 higher than bridge pier flange plate, tiltedly Filled rubber bed course 7 between cross section block 12 and bridge pier wing plate 6 side.
Described rubber spacer 7 be arranged at the bottom of the spherical pier of semi-convex formula 5 and hollow out hemispherical top 8 it Between, between cushion cap 3 and bridge pier wing plate 6, between bridge pier wing plate 6 side and cushion cap block 12.
The radius R of 5 hemisphere at the bottom of the spherical pier of semi-convex formula1Bridge is less than radius or the minimum in cross section of pier Size, the depression radius R of cushion cap 32Less than the half of cushion cap thickness, and R1Less than R2.Described The rubber spacer 7 of filling thickness D between bridge pier wing plate 6 and cushion cap 3, by this most solid Fixed connected mode, pier stud reach " every " purpose shaken.
Rubber layer thickness D needs to meet rubber spacer 7 and cushion cap 3 contact surface when waving The demand of relative deformation.There are the bridge pier wing plate 6 stretched out, the width of bridge pier wing plate 6 in bridge pier 2 both sides L is more than bridge pier radius or the full-size in cross section, and bridge pier wing plate 6 height H is the cushion cap of 1/3~1/2 3 height.
Bridge pier wing plate 6 and cushion cap 3 are attached by marmem shear studs 10.Shape Memory alloy material (SMA) has shape memory effect and the phase transformation superelastic properties of uniqueness, Allow it to produce bigger recovery stress and recovery strain.Marmem shearing spiral shell Bolt 10 can provide pulling capacity and shearing resistance for bridge pier 2, helps bridge pier 2 to reset.Shape memory Alloy shear studs 10 is evenly arranged on bridge pier wing plate 6.
Cushion cap 3 surrounding is oblique section block 12, can use novel earthquake-proof link stopper form;This bevel Face block 12 by concrete wedge, vertical reinforcement, horizontal reinforcement, polystyrene foam every Form from block and anti-stick thin layer, there is resettability and easy prosthetic.By sacrificial structure The design philosophy of part, the width B of oblique section block 12 meets structural behaviour need under site ground motion Ask, as the secondary security perimeter of bridge pier antidetonation, limit displacement excessive when bridge pier waves, Under extreme case, oblique section block 12 can destroy, thus protects bridge structure main body.
The invention has the beneficial effects as follows:
The present invention can the isolation structure that wave pier stud of Self-resetting, damping under geological process Effect is notable, be mainly reflected in following some:
1. can be reduced to hinged, in earthquake bottom bridge pier due to the connected mode of bridge pier and cushion cap Moment of flexure be released, shake rear abutment and the basic not damaged in basis, integrity is preferable.And shake The design of existing conventional bridge pier is changed less by pendulum shock insulation, easily realizes, applied widely.
2. wave the ball of pier stud enter formula be connected under small angle tower can Self-resetting, bridge pier and cushion cap Between junction embed rubber spacer and be beneficial to wave, and have marmem shear studs to help Helping reset, cushion cap surrounding block limits bridge pier over-large displacement.Therefore, structure can realize on ground Waving of earthquake centre, reaches the effect of shock insulation.
3. traditional hinged changing into of pier beam is consolidated by the present invention, and bridge pier and girder junction are no longer Bearing is set, it is to avoid bearing sliding and girder relative displacement is excessive and falling of causing in earthquake Beam;Simultaneously because bearing exists endurance issues, the bearing phase under arms needs periodic detection also Change in time, and this structure well avoids problems.
4. the present invention is while meeting relevant design specification, makes pier column and basis separate, Wave filtering seismic energy, not only protect bridge pier but also protect basis.
5. present invention design makes structure bridge pier stress in earthquake little, therefore can reduce bridge pier Design section and arrangement of reinforcement;Shake rear abutment does not occurs or slight damage occurs, and repairs a little and just may be used Use, decrease the repair amount after shake and Financial cost, it is ensured that have a good transport and communication network, for After shake, valuable time has been won in earthquake relief work and post-disaster reconstruction.Therefore, this structure has good Good economic results in society, are worthy of popularization.
Accompanying drawing explanation
Fig. 1 is the isolation structure waving pier stud of Self-resetting can to indulge bridge to schematic cross-section;
Fig. 2 is can the isolation structure direction across bridge schematic cross-section that wave pier stud of Self-resetting;
Fig. 3 be can Self-resetting wave pier stud top view at rubber spacer;
Fig. 4 is the normal section schematic diagram of oblique section block.
In figure: 1, girder;2, bridge pier;3, cushion cap;4, bridge pier;5, semi-convex formula ball At the bottom of shape pier;6, bridge pier wing plate;7, rubber spacer;8, hemispherical top is hollowed out;9, shape Shape memory alloys shear studs sleeve;10, marmem shear studs;11, termination anchor Gu steel plate;12, oblique section block;L, pier wing plate width;H, pier wing plate thickness;R1、 The radius of a ball at the bottom of the spherical pier of semi-convex formula;R2, hollow out hemisphere face cushion cap heading radius;D, rubber Cushion thickness;B, block maximum cross-section, oblique section width.
Detailed description of the invention
The present invention a kind of under the natural disaster effects such as earthquake can Self-resetting wave pier stud Isolation structure, by waving the seismic energy that dissipates, reaches " energy dissipating " and " shock insulation " two Plant purpose.This structure be mainly used in science of bridge building and cross a river engineering seismic isolation technology it can also be used to In the frame-shear-wall structure that depth-width ratio is little.
As Figure 1-4, the present invention is can Self-resetting structure under the natural disaster effects such as earthquake A specific embodiment, make includes girder 1, bridge pier 2, cushion cap 3, semi-convex formula At the bottom of spherical pier 5, bridge pier wing plate 6, rubber spacer 7, hollow out hemispherical top 8, shape note Recall alloy shear studs 10, oblique section block 12.
Can the bridge pier structure of Self-resetting, change the mode that traditional bearing connects Dun Liang into Dun Liang Consolidation, changes by bridge pier 2 and the consolidation of cushion cap 3 as producing wave hinged into.
The bottom of bridge pier 2 is prefabricated at the bottom of the spherical pier of semi-convex formula 5;The top of cushion cap 3 is prefabricated into Hollow out hemispherical top 8;Bridge pier 2 is connected with cushion cap 3 in " ball enters formula " mode, fills out therebetween Fill rubber spacer 7 and preferably realize both sliding and rotation.Top two at the bottom of the spherical pier of bridge pier Side is bridge pier flange plate, and flange plate is by marmem shear studs 10 and cushion cap 3 anchor It is solidly connected.Marmem shear studs 10 is by pre-buried marmem shearing spiral shell Bolt sleeve 9 carries out positioning installation, and two ends are anchored by end anchorage steel plate 11. The surrounding of cushion cap 3 has the oblique section block 12 higher than bridge pier flange plate, oblique section block 12 He Filled rubber interlayer between bridge pier wing plate 6 side.
Described rubber spacer 7 be arranged at the bottom of the spherical pier of semi-convex formula 5 and hollow out hemispherical top 8 it Between, between cushion cap 3 and bridge pier wing plate 6, between bridge pier wing plate 6 side and cushion cap block 12.
The radius R of 5 hemisphere at the bottom of the spherical pier of semi-convex formula1Bridge is less than radius or the minimum in cross section of pier Size, the depression radius R of cushion cap 32Less than the half of cushion cap thickness, and R1Less than R2.Described The rubber spacer 7 of filling thickness D between bridge pier wing plate 6 and cushion cap 3, by this most solid Fixed connected mode, pier stud reach " every " purpose shaken.
Rubber layer thickness D needs to meet rubber spacer 7 and cushion cap 3 contact surface when waving The demand of relative deformation.There are the bridge pier wing plate 6 stretched out, the width of bridge pier wing plate 6 in bridge pier 2 both sides L is slightly less than the width of cushion cap 3 and more than bridge pier radius or the full-size in cross section, bridge pier wing plate 6 Highly H is cushion cap 3 height of 1/3~1/2.
Bridge pier wing plate 6 and cushion cap 3 are attached by marmem shear studs 10.Shape Memory alloy material (SMA) has shape memory effect and the phase transformation superelastic properties of uniqueness, Allow it to produce bigger recovery stress and recovery strain.Marmem shearing spiral shell Bolt 10 can provide pulling capacity and shearing resistance for bridge pier 2, helps bridge pier 2 to reset.Shape memory Alloy shear studs 10 is evenly arranged on bridge pier wing plate 6.
Cushion cap 3 surrounding is oblique section block 12, can use novel earthquake-proof link stopper form;This bevel Face block 12 by concrete wedge, vertical reinforcement, horizontal reinforcement, polystyrene foam every Form from block and anti-stick thin layer, there is resettability and easy prosthetic.By sacrificial structure The design philosophy of part, the width B of oblique section block 12 meets structural behaviour need under site ground motion Ask, it is provided that the secondary defence line of bridge pier quake-resistant safety, limit displacement excessive when bridge pier waves, Under extreme case, oblique section block 12 can destroy, thus protects bridge structure main body.
Under geological process, due to the effect of horizontal tilting moment, basis and the boundary of pier stud Getting a promotion at face, lifting and return repeatedly cause waving of pontic, and at the bottom of pier, internal force is (curved Square) it is released.Ball enters the location limit that the connection of formula can realize waving smoothly with pier stud Position.Marmem shear studs 10 earthquake energy in swing process, and about The bundle bridge pier edge of a wing, provides restoring force for bridge pier.It is excessive that the block 12 of cushion cap surrounding limits bridge pier Displacement, it is ensured that bridge pier reset.Bottom pier stud and cushion cap hinged, release moment of flexure at the bottom of pier, Reduce the size in pier stud cross section.Additionally, the shear studs 10 between cushion cap and pier stud wing plate Carry out disposing location by being embedded in basis and the sleeve in pier stud, do not expose, be difficult to aging Damage, its service life can be increased, be also easy to change.This structure not in use by bearing, Solve tradition bridge in bridge life cycle management, need the problem of replacing time, economic effect Benefit is greatly improved.The joint structure mode adaptive ability of Self-resetting is strong, is normally using lotus (such as Foundation displacement effect, carload, automobile braking force etc.) under load effect, pier stud with hold Do not separate between platform.Under little shake effect, bridge pier realizes knot by the deformation of rubber spacer Waving of structure, reduces the stress of main structure body;Under big shake effect, produce between pier shaft and cushion cap Raw bigger relative displacement and lift-off, now, marmem shear studs helps bridge pier Resetting, meanwhile, the oblique section block of cushion cap surrounding limits and bigger waves displacement.Due to bridge Pier is hinged with cushion cap, and release moment of flexure decreases structural earthquake stress, it is ensured that structure after shake Bearing capacity does not declines.The most not only protect bridge pier column but also protect cushion cap foundation, also Energy restrainer, it is possible to meet the high request of structural seismic performance.Can Self-resetting wave pier Post isolation structure all has good work under normal working load and accidental seismic loading Performance, is worth popularization and application in Practical Project.

Claims (6)

1. the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, it is characterised in that: this pier stud For a kind of can the isolation structure that wave pier stud of Self-resetting, this shock insulation pier stud include girder (1), (5), bridge pier wing plate (6), rubber at the bottom of bridge pier (2), cushion cap (3), the spherical pier of semi-convex formula Rubber cushion layer (7), hollow out hemispherical top (8), marmem shear studs (10), Oblique section block (12);It changes the mode that traditional bearing connects Dun Liang into pier consolidation, Bridge pier (2) and the consolidation of cushion cap (3) change into producing wave hinged;
The bottom of bridge pier (2) is prefabricated at the bottom of the spherical pier of semi-convex formula (5);Cushion cap (3) Top is prefabricated into and hollows out hemispherical top (8);Bridge pier (2) with " ball enters formula " mode with hold Platform (3) connects, and filled rubber bed course (7) realizes both sliding and rotation and protects therebetween Protect contact surface;Both sides, top at the bottom of the spherical pier of bridge pier are bridge pier flange plates, and flange plate passes through shape Memorial alloy shear studs (10) and cushion cap (3) anchor connection;Marmem shearing Bolt (10) carries out location peace by pre-buried marmem shear studs sleeve (9) Put, and two ends are anchored by end anchorage steel plate (11);The surrounding of cushion cap (3) There are the oblique section block (12) higher than bridge pier flange plate, oblique section block (12) and the bridge pier wing Filled rubber bed course (7) between plate (6) side.
The most according to claim 1 the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, It is characterized in that: described rubber spacer (7) be arranged on (5) at the bottom of the spherical pier of semi-convex formula and Hollow out between hemispherical top (8), between cushion cap (3) and bridge pier wing plate (6), bridge pier Between wing plate (6) side and cushion cap block (12).
The most according to claim 1 the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, It is characterized in that: the radius R of (5) hemisphere at the bottom of the spherical pier of semi-convex formula1Radius less than bridge pier Or the minimum dimension in cross section, the depression radius R of cushion cap (3)2Less than the half of cushion cap thickness, And R1Less than R2;The rubber of filling thickness D between described bridge pier wing plate (6) and cushion cap (3) Bed course (7), by this not exclusively fixing connected mode, pier stud reach " every " shake Purpose.
The most according to claim 1 the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, It is characterized in that: rubber layer thickness D needs to meet rubber spacer (7) and cushion cap (3) when waving The demand of the relative deformation of both contact surfaces;There is the bridge pier wing plate (6) stretched out bridge pier (2) both sides, The width L of bridge pier wing plate (6) is slightly less than the width of cushion cap (3) and is more than bridge pier radius or cuts The full-size in face, bridge pier wing plate (6) highly H be 1/3~1/2 cushion cap (3) highly.
The most according to claim 1 the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, It is characterized in that: bridge pier wing plate (6) and cushion cap (3) are by marmem shearing spiral shell Bolt (10) is attached;Marmem shear studs (10) can be bridge pier (2) Pulling capacity and shearing resistance are provided, help bridge pier (2) to reset;Marmem shear studs (10) it is evenly arranged on bridge pier wing plate (6).
The most according to claim 1 the ball of Self-resetting can enter formula winged and wave shock insulation pier stud, It is characterized in that: cushion cap (3) surrounding is oblique section block (12), can use novel earthquake-proof Link stopper form;This oblique section block (12) is by concrete wedge, vertical reinforcement, level Reinforcing bar, polystyrene foam spacing block and anti-stick thin layer composition, have resettability and Easily prosthetic;The width B of oblique section block (12) meets structural behaviour under site ground motion Demand, it is provided that the secondary defence line of bridge pier quake-resistant safety, limits displacement excessive when bridge pier waves, Under extreme case, oblique section block (12) can destroy, thus protects bridge structure main body.
CN201410514822.1A 2014-09-29 2014-09-29 The ball of Self-resetting can enter formula winged and wave shock insulation pier stud Active CN104278620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410514822.1A CN104278620B (en) 2014-09-29 2014-09-29 The ball of Self-resetting can enter formula winged and wave shock insulation pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410514822.1A CN104278620B (en) 2014-09-29 2014-09-29 The ball of Self-resetting can enter formula winged and wave shock insulation pier stud

Publications (2)

Publication Number Publication Date
CN104278620A CN104278620A (en) 2015-01-14
CN104278620B true CN104278620B (en) 2016-09-14

Family

ID=52253928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410514822.1A Active CN104278620B (en) 2014-09-29 2014-09-29 The ball of Self-resetting can enter formula winged and wave shock insulation pier stud

Country Status (1)

Country Link
CN (1) CN104278620B (en)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107873066B (en) * 2015-04-08 2021-08-10 汉堡-哈尔堡工业大学 Device for damping vibrations of a bridge
CN105297617B (en) * 2015-11-24 2017-04-19 北京工业大学 Double-column type swinging shock-insulation bridge pier structure system
CN105735111B (en) * 2016-04-03 2017-06-20 北京工业大学 Bridge pier bottom ellipsoid self-resetting swinging shock design method
CN105887665A (en) * 2016-04-12 2016-08-24 东南大学 Self-restoring rolling swinging shake-isolation bridge pier
CN106245969A (en) * 2016-07-21 2016-12-21 李洪涛 A kind of green energy conservation earthquake-resistant building structure
CN106087715B (en) * 2016-08-19 2018-09-21 南京工业大学 Damping device and damping method for assembled pier
CN107964868B (en) * 2017-12-06 2024-03-29 南昌大学 Self-resetting spring limiting buffering anti-seismic stop block anti-falling beam structure
CN108221646B (en) * 2018-01-03 2019-04-23 魏志峰 The bridge pier that can be rectified a deviation and reinforce in highway bridge construction
CN108360367B (en) * 2018-02-09 2019-06-07 石家庄铁道大学 A kind of antidetonation does not fall bridge pier
JP6901986B2 (en) * 2018-03-14 2021-07-14 公益財団法人鉄道総合技術研究所 Stopper and stopper mounting structure
CN108708388B (en) * 2018-04-10 2020-06-16 国核电力规划设计研究院有限公司 Tower foundation and preparation method thereof
CN108316131A (en) * 2018-04-17 2018-07-24 苏交科集团(甘肃)交通规划设计有限公司 A kind of precast block formula full prestressing pier structure and its method of construction
CN108532446B (en) * 2018-06-11 2023-08-29 华侨大学 Assembled steel bridge pier with self-resetting function
CN109137973A (en) * 2018-08-30 2019-01-04 北京工业大学 One kind being used for the prefabricated beam column flexural pivot attachment device of underground structure
CN109853385B (en) * 2019-04-02 2021-03-30 福州大学 Bridge tower transverse anti-seismic structure and design method thereof
CN110344515A (en) * 2019-08-13 2019-10-18 安徽新华学院 A kind of self-replaced type mill shock insulation pier device
CN111041978B (en) * 2019-12-11 2021-03-30 郑州第二市政建设集团有限公司 Anti-seismic pier column structure
CN111254815A (en) * 2020-03-04 2020-06-09 东南大学 Self-resetting prefabricated pier structure for single-pile foundation and assembling method thereof
CN112502035B (en) * 2020-12-08 2022-03-15 防灾科技学院 Assembled bridge double-column pier containing triple energy dissipation system
CN112854136B (en) * 2021-03-03 2022-08-30 青岛西海岸市政工程有限公司 Immersion corrosion degree protection device based on municipal bridge pier
CN113605218B (en) * 2021-08-06 2023-03-14 江苏开放大学(江苏城市职业学院) Swing self-reset rigid frame bridge double-limb thin-wall pier
CN113718639B (en) * 2021-08-26 2024-07-09 同济大学建筑设计研究院(集团)有限公司 Double-column type prefabricated swing pier multiple shock-absorbing structure system with replaceable prestressed tendons
CN114134798B (en) * 2021-12-09 2023-06-09 福州大学 Self-resetting, anti-overturning and efficient damping system for viaduct and construction method of system
CN114775413B (en) * 2022-05-11 2023-04-11 北京建筑大学 Existing pier anti-seismic performance improving structure and method based on inertial capacity shock insulation and swing
CN114922059A (en) * 2022-07-04 2022-08-19 哈尔滨工业大学 Rolling ball shock insulation support of cross-sliding fault structure
CN116335017B (en) * 2023-03-10 2023-11-14 天津大学 Full-assembled bridge structure system of separated type swing bearing platform
CN116289510B (en) * 2023-03-23 2023-11-14 天津大学 Full-assembled double-column bridge structural system based on bearing platform and pier top swing
CN116289509B (en) * 2023-03-23 2024-01-23 天津大学 Multistage limiting-self-resetting element for full-assembled bridge of swinging bearing platform
CN117385732B (en) * 2023-11-30 2024-06-04 石家庄铁道大学 Prefabricated assembly type swing pier structure system, installation method and application

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0770872A (en) * 1993-08-30 1995-03-14 Koei:Kk Thermally bondable woven and knitted fabric
JP3803153B2 (en) * 1996-12-26 2006-08-02 大林道路株式会社 Seismic structure of building
JP2006342508A (en) * 2005-06-07 2006-12-21 Zenitaka Corp Vibration reduction structure and vibration reduction construction method
TW200736469A (en) * 2006-03-30 2007-10-01 wen-xiang Li Universal seismic isolation device
CN101289868B (en) * 2008-06-11 2010-06-02 陈茂祥 Large earthquake resistance foundation structure of buildings
CN103362147B (en) * 2013-06-20 2016-04-27 上海师范大学 The multidirectional Self-resetting isolation structure of a kind of building
CN103882803B (en) * 2014-03-19 2016-11-09 浙江建科减震科技有限公司 A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier
CN104060687B (en) * 2014-07-03 2016-02-03 河北工程大学 The implementation method of controllable rotary Self-resetting elastic hinge structure and Self-resetting elastic hinge

Also Published As

Publication number Publication date
CN104278620A (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN104278620B (en) The ball of Self-resetting can enter formula winged and wave shock insulation pier stud
CN102304892B (en) External energy-consumption self-resetting bridge pier stud structure system and realization method thereof
CN105297617B (en) Double-column type swinging shock-insulation bridge pier structure system
CN108729344B (en) A kind of two-columned pier construction waving shock insulation use in conjunction
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN105672517A (en) Swing self-reset and self-standing type high-rise structure
CN107740626A (en) A kind of expansion cross-shaped steel SRC posts with multistage composite damper
CN105484152B (en) A kind of bridge pier of additional mild steel damper and cushion cap attachment structure
CN103088933A (en) Collaborative energy dissipation anti-buckling supporting construction member with major earthquake protection function
CN108660914B (en) A kind of queen post using TMD glissando waves bridge pier structure
CN103866687A (en) Energy-dissipation self-resetting bridge pier column structure
CN104563142B (en) Large-scale toppling unstable rock body associating safeguard structure and administering method
CN109610734A (en) A kind of reinforced concrete frame column with runback bit function
CN207130606U (en) Flexing suppress round end type concrete pier of steel tube and with cushion cap attachment structure
CN104405084A (en) Dual steel pipe-encased concrete anti-seismic column with built-in rubber mixture and construction method
CN104562922A (en) Locally-embedded steel pipe concrete column type aseismatic bridge pier
CN205712546U (en) One waves Self-resetting self-supporting tall and slender structure
CN113216387A (en) Controllable energy consumption swinging column base
CN106284396A (en) A kind of shock-proof type reinforced concrete structure post
CN113322986A (en) Pile-anchor-beam composite energy dissipation and shock absorption structure system and construction method
CN111074756A (en) Damping and energy-consuming assembled type swing pier component and construction method thereof
CN110847019A (en) Steel plate connection-based reinforced concrete hollow pipe pier joint connection mode and structure
CN107119677B (en) A kind of tubular pole stake top friction-shearing-type energy-consumption attachment device and its construction method
CN217174354U (en) Double-column type prefabricated swing pier multiple damping structure system with replaceable prestressed tendons
CN209780038U (en) Column end constraint rotating pipe body inner filling concrete swing column system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant