CN103882803B - A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier - Google Patents
A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier Download PDFInfo
- Publication number
- CN103882803B CN103882803B CN201410103221.1A CN201410103221A CN103882803B CN 103882803 B CN103882803 B CN 103882803B CN 201410103221 A CN201410103221 A CN 201410103221A CN 103882803 B CN103882803 B CN 103882803B
- Authority
- CN
- China
- Prior art keywords
- bridge pier
- power consumption
- reinforced concrete
- replaceable
- reinforcing steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910001294 Reinforcing steel Inorganic materials 0.000 title claims abstract description 19
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 28
- 238000010276 construction Methods 0.000 claims abstract description 11
- 210000003205 muscle Anatomy 0.000 claims abstract description 11
- 238000000034 method Methods 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims abstract description 5
- 230000015271 coagulation Effects 0.000 claims description 5
- 238000005345 coagulation Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 238000005452 bending Methods 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000011372 high-strength concrete Substances 0.000 claims description 3
- 230000035939 shock Effects 0.000 abstract description 4
- 238000013016 damping Methods 0.000 abstract description 3
- 238000010521 absorption reaction Methods 0.000 abstract 1
- 230000006378 damage Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000000837 restrainer Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410103221.1A CN103882803B (en) | 2014-03-19 | 2014-03-19 | A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410103221.1A CN103882803B (en) | 2014-03-19 | 2014-03-19 | A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103882803A CN103882803A (en) | 2014-06-25 |
CN103882803B true CN103882803B (en) | 2016-11-09 |
Family
ID=50951906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410103221.1A Active CN103882803B (en) | 2014-03-19 | 2014-03-19 | A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103882803B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104294753B (en) * | 2014-09-06 | 2016-05-04 | 安徽省交通建设有限责任公司 | A kind of hollow pier stud syndeton of bridge prefabrication and construction |
CN104278620B (en) * | 2014-09-29 | 2016-09-14 | 北京工业大学 | The ball of Self-resetting can enter formula winged and wave shock insulation pier stud |
CN104963280B (en) * | 2015-06-25 | 2016-10-05 | 华侨大学 | A kind of Novel circular steel cylinder pier |
CN105586828B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | Bridge pier power consumption and the anti-crushed structure of built-in Wasted-energy steel plate and viscoelastic material layer |
CN105735110B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | Bridge pier power consumption and the anti-crushed structure of the replaceable built-in rod iron damper of composite plate |
CN105714674B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | The bridge pier power consumption of the replaceable built-in power consumption reinforcing bar of composite plate and anti-crushed structure |
CN105735109B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | Bridge pier power consumption and the anti-crushed structure of built-in rod iron damper and viscoelastic material |
CN105672120B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | Bridge pier power consumption and the anti-crushed structure of the replaceable built-in anti-buckling support of composite plate |
CN105696457B (en) * | 2016-02-26 | 2017-08-25 | 东南大学 | Bridge pier power consumption and the anti-crushed structure of Wasted-energy steel plate built in replaceable composite plate |
CN105735108B (en) * | 2016-02-26 | 2017-06-16 | 东南大学 | Built-in anti-buckling support and the bridge pier power consumption of viscoelastic material layer and anti-crushed structure |
CN108035200A (en) * | 2018-01-08 | 2018-05-15 | 国储运通轨道交通科技有限公司 | Bridge-type longeron damper rail system |
CN108301318B (en) * | 2018-01-11 | 2019-07-23 | 旗舰集团有限公司 | A kind of bridge |
CN108086140A (en) * | 2018-01-31 | 2018-05-29 | 福建工程学院 | A kind of assembled bridge pier structure of steel pipe socket |
CN109555011B (en) * | 2019-01-17 | 2023-08-01 | 长安大学 | Combined structure of full-prefabricated bridge pier and bearing platform and manufacturing and assembling method |
CN110541355B (en) * | 2019-09-30 | 2023-12-29 | 华侨大学 | FRP constraint concrete hollow self-resetting-mild steel extrusion energy dissipation pier structure |
CN114908661B (en) * | 2022-05-17 | 2023-07-21 | 华设设计集团股份有限公司 | Rubber energy consumption self-resetting socket pier connection structure and assembly method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100570231B1 (en) * | 2005-07-09 | 2006-04-11 | 우경건설 주식회사 | Structure section extension equipment and an extension method of construction using ps steel materials and a steel plate |
CN201024538Y (en) * | 2007-04-06 | 2008-02-20 | 北京工业大学 | Prefabricated prestressed concrete structural beam, column mixed connection node |
JP5118594B2 (en) * | 2008-09-19 | 2013-01-16 | 東日本旅客鉄道株式会社 | Structure of pedestal paragraph |
CN102409606B (en) * | 2011-07-29 | 2014-01-01 | 清华大学 | Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system |
CN103243814B (en) * | 2013-05-29 | 2015-06-03 | 吕西林 | Function recoverable prefabricate column base node |
-
2014
- 2014-03-19 CN CN201410103221.1A patent/CN103882803B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103882803A (en) | 2014-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103882803B (en) | A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier | |
CN208280001U (en) | A kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement | |
CN105297617B (en) | Double-column type swinging shock-insulation bridge pier structure system | |
CN108560423A (en) | A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier | |
CN104895249B (en) | It is a kind of can in-situ immobilization combination suspension column | |
CN103866687B (en) | A kind of energy-consumption self-resetting bridge pier column structure | |
CN104727441A (en) | Prestress assembled concrete beam column joint structure and construction method thereof | |
CN103132602A (en) | Self-resetting frame joint | |
CN103711329B (en) | The method of outer subsides steel reinforced concrete framework method ruggedized construction | |
CN105484152B (en) | A kind of bridge pier of additional mild steel damper and cushion cap attachment structure | |
CN107237402A (en) | A kind of low damage Self-resetting assembly concrete two-way frame bean column node | |
CN104674941A (en) | Tubular structure system capable of restoring functions | |
CN103628587A (en) | Self-reset girder-grid friction wall structural system | |
CN104746773A (en) | Prefabricated assembled type self-resetting shear wall structure | |
CN106382041A (en) | Assembling type swing self-resetting steel support structure system | |
CN208309799U (en) | A kind of prestressing force Self-resetting assembly concrete frame foot joint | |
CN103669567B (en) | Easily steel hetermorphiscal column-prestressing force accentric support frame is repaired after a kind of shake | |
CN203583708U (en) | Self-resetting beam-grid friction wall structural system | |
CN104060724B (en) | A kind of composite energy-dissipating type shear wall | |
CN108316130A (en) | A kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement | |
CN105201095B (en) | A kind of high-rise building constraint support anti-seismic structure and preparation method | |
CN204876196U (en) | Prefabricated assembled is from restoring to throne shear wall structure | |
CN203403558U (en) | Shear wall | |
CN102936966A (en) | Steel frame canopy guard structure of single-layer purlin masonry house and construction method thereof | |
CN110029728A (en) | A kind of function of the aerial construction of band can restore assembly concrete frame foot joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Niu Inventor after: Fu Long Inventor after: Li Lin Inventor before: He Haoxiang Inventor before: Lv Yongwei Inventor before: Li Ruifeng Inventor before: Chen Kui |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161017 Address after: 312000 Zhejiang, Keqiao, West Ring Road, science and Technology Park, 4# floor, building 1, Applicant after: ZHEJIANG JIANKE DAMPING SCIENCE & TECHNOLOGY CO.,LTD. Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100 Applicant before: Beijing University of Technology |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A replaceable transverse prestressed tendon self resetting energy dissipation pier Effective date of registration: 20211129 Granted publication date: 20161109 Pledgee: Shaoxing Branch of Industrial Bank Co.,Ltd. Pledgor: ZHEJIANG JIANKE DAMPING SCIENCE & TECHNOLOGY CO.,LTD. Registration number: Y2021330002389 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20221213 Granted publication date: 20161109 Pledgee: Shaoxing Branch of Industrial Bank Co.,Ltd. Pledgor: ZHEJIANG JIANKE DAMPING SCIENCE & TECHNOLOGY CO.,LTD. Registration number: Y2021330002389 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |