CN108560423A - A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier - Google Patents

A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier Download PDF

Info

Publication number
CN108560423A
CN108560423A CN201810110414.8A CN201810110414A CN108560423A CN 108560423 A CN108560423 A CN 108560423A CN 201810110414 A CN201810110414 A CN 201810110414A CN 108560423 A CN108560423 A CN 108560423A
Authority
CN
China
Prior art keywords
pier
finish rolling
deformed bar
rolling deformed
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810110414.8A
Other languages
Chinese (zh)
Other versions
CN108560423B (en
Inventor
王震宇
蔡忠奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengqin Conjugate Technology Co., Ltd.
Original Assignee
Sichuan Mobile Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Mobile Engineering Consulting Co Ltd filed Critical Sichuan Mobile Engineering Consulting Co Ltd
Priority to CN201810110414.8A priority Critical patent/CN108560423B/en
Publication of CN108560423A publication Critical patent/CN108560423A/en
Application granted granted Critical
Publication of CN108560423B publication Critical patent/CN108560423B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

The invention discloses the construction method of a kind of regular reinforcement and finish rolling deformed bar hybrid reinforcement section assembling pier, which includes that muscle and unbonded prestressing tendon are indulged in two kinds of perforations of concrete bearing platform, prefabricated subsection reinforced concrete knoll body and each prefabricated subsection of connection.Arrange that metal bellows carrys out reserving hole channel in cushion cap and prefabricated subsection pier body, first by each prefabricated subsection pier body vertical pile when construction, and unbonded prestressing tendon is made to penetrate the duct reserved on section, then carries out tensioning, each segment pier body is connected as entirety, is closed in duct without being in the milk;Then according to certain allocation ratio, regular reinforcement and finish rolling deformed bar are penetrated into duct vertically and carry out pressure grouting, ultimately forms the section assembling pier of hybrid reinforcement.

Description

A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier
Technical field
The present invention relates to a kind of construction method of Precast Concrete Segmental Bridges concrete pier, more particularly to a kind of regular reinforcement with The construction method of finish rolling deformed bar hybrid reinforcement assembly pier.
Background technology
Bridge collapse caused by the natural calamities such as earthquake and war is also required to carry out using the quick building technology of bridge tight It is anxious to rebuild.Precast Concrete Segmental Bridges bridge is tied to form one of the effective scheme to meet the demand, and applications well foreground is benefited In following major advantage:(1) most components are made of industrialization and mechanization is assembled, have efficiency of construction outstanding; (2) the site operation period is short and is influenced by season and weather small;(3) component makes and curing condition is good so durability is high, Life cycle management maintenance cost reduces;(4) small to bridge site periphery ecological environment, living environment and existing Coherent traffic noise.
Currently, realizing that the technology that bridge superstructure is quickly built is more mature using Precast Concrete Segmental Bridges, it is compared Under, the practical engineering application of precast assembly pier is but more rare, studies carefully the main reason is that grinding about the novel pier anti-seismic performance Hair and application still more lack.China is located in the intersection of circum-Pacific seismic belt and Mediterranean-Himalaya earthquake zone, is Earthquake disaster one of the countries with the most serious ... in the world.However, the research and invention of most of existing assembled pier are directed generally to carry The convenience for construction of such high pier reduces degree of injury after pier itself shake, and not to pier under seismic stimulation maximum displacement response And residual displacement is carried out at the same time effective control after shake.
Have studies have shown that maximum displacement response and its discrete when can effectively reduce pier shake by improving pier post-yield stiffness Property, while significantly improving pier self-resetting capability, ensuring functionality after bridge structure shake.Using Precast Concrete Segmental Bridges technology to realize The efficient and green construction of reinforced concrete knoll, while pier post-yield stiffness is significantly improved to improve pier itself anti-seismic performance and oneself Reseting performance, China to entering traffic infrastructure Large scale construction have practical significance outstanding.But at present for carrying High this problem of assembly pier post-yield stiffness also lacks ripe solution.
Invention content
The present invention is remaining after solving maximum displacement response when being difficult to reduce pier shake simultaneously in existing assembled pier technology and shaking This problem of displacement.Regular reinforcement yield strength standard value is between 400MPa ~ 500MPa, the yield strength of finish rolling deformed bar Standard value is between 785MPa ~ 1200MPa, the two elasticity modulus having the same.Therefore, when mixing proposed by the invention is matched When the assembled pier of muscle suffers disaster from an earthquake, the regular reinforcement configured in pier will take the lead in surrendering, and dissipate ground by elastic-plastic deformation Face movement is input to the energy in bridge structure, to be conducive to reduce the dynamic responses such as bridge displacement and acceleration;Ordinary steel After muscle surrender, finish rolling deformed bar remains to keep elastic stage, and when earthquake intensity continues to increase, pier dynamic response of the displacement increases Greatly, the tensile stress level of finish rolling deformed bar will continue growing at this time, and pier horizontal bearing capacity increases therewith, to be conducive to improve Pier post-yield stiffness.The present invention by using regular reinforcement and finish rolling deformed bar hybrid reinforcement scheme, improve pier surrender after Rigidity reduces the pier discreteness that elastoplasticity maximum power responds under macroseism, helps to realize antidetonation of the assembled pier based on performance Design;The raising of pier post-yield stiffness can also effectively improve pier body automatic recovery ability, significantly reduce residual deformation after pier shake, improve Functional and recoverability after bridge structure shake;In addition, the construction method of assembly pier according to the present invention is simple and direct feasible, construction Difficulty is small, efficient, it is ensured that pier high efficiency and greenization are built.
The present invention provides a kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier, including as follows Step:
Step 1, the specific bit lower end anchorage of metal bellows and unbonded prestressing tendon 7 being positioned in concrete bearing platform 1 It sets, and pours the concrete of cushion cap;
Step 2 makes the prefabricated subsection 4 of assembled pier shaft 2, and is made respectively by built-in metal bellows and pvc pipe described pre- Stay ripple duct 5 and presstressed reinforcing steel duct 8;
Step 3 stacks each prefabricated subsection 4 successively, and presstressed reinforcing steel is made to pass through the presstressed reinforcing steel duct 8 of each segment center; During assembly, epoxy resin is uniformly brushed on the Mosaic face between bottommost segment and cushion cap, between two adjacent segments;
Step 4, tensioning unbonded prestressing tendon 7 carry out sealing off and covering anchorage to presstressed reinforcing steel top anchorage groove 3;
Perforation is indulged muscle 6 and is put into the ripple duct 5 of pier by step 5, and so that each perforation is indulged muscle and be located at duct center, wherein It includes regular reinforcement and finish rolling deformed bar that muscle is indulged in perforation;For high pier, using welding point or reinforced bar mechanical connector pair Regular reinforcement carries out spreading, and spreading is carried out to finish rolling deformed bar using spiral shape connector;
Step 6 is in the milk to ripple duct 5 using strength cement-based grouting material;Several grouting should be vertically uniformly arranged along pier shaft Hole, by the way of packer grouting and/or pressure grouting carries out grouting operation.
The present invention provides a kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement, including concrete bearing platform (1), assembled pier shaft(2), perforation indulge muscle(6)And unbonded prestressing tendon(7);The assembly pier shaft(2)By one or one The above prefabricated subsection(4)Muscle is indulged in composition, the perforation(6)It is mixed by two kinds of reinforcing bars of regular reinforcement and finish rolling deformed bar, And and unbonded prestressing tendon(7)Together by concrete bearing platform(1)And each assembled pier shaft(2)It is connected to become complete pier system.
Each prefabricated subsection(4)Geometric dimension, reinforcement detailing and material therefor can be identical, to reduce assembled difficulty, improve Construction efficiency;Also can be different, to reduce the prefabricated cost of pier.Each prefabricated subsection(4)Upper and lower end face can be plane, it is neighbouring The shearing generated under geological process is effectively transmitted by friction shear resisting mechanism between two segment;In addition, according to Aseismic Design needs, Prefabricated subsection(4)Upper and lower end face single or multiple shear keies can also be set, in this way, the neighbouring two segment phase after assembly Mutually occlusion, can effectively improve the shear-carrying capacity at splicing seams.
Muscle is indulged in perforation(6)The type of regular reinforcement used be HRB400, HRB500, HRBF400, HRBF500, HRB400E, HRB500E、HRBF400E、HRBF500E.Muscle is indulged in perforation(6)The type of finish rolling deformed bar used be PSB785, PSB830, PSB930、PSB1080、PSB1200。
Concrete bearing platform(1), each prefabricated subsection(4)Reserved ripple duct(5).Reserved ripple duct(5)Using pre-buried The mode of circular metal bellows realizes that ripple pipe diameter should be, whereindMuscle diameter is indulged to penetrate through, takes ordinary steel The greater of muscle and finish rolling deformed bar.Metal bellows used should meet specification《Metal bellows for prestressed concrete(JG 225-2007)》Requirement.The length of embedding bellows is not less than 36 in cushion capd,dMuscle diameter is indulged to penetrate through, takes regular reinforcement With the greater of finish rolling deformed bar.In addition, finish rolling deformed bar lower end should use the nut anchor mating with the muscle material, to increase Strong anchoring property.
Unbonded prestressing tendon(7)Lower end pour in concrete bearing platform(1)In, muscle beam sequentially passes through each pre- when pier assembly Segment processed(4)In reserve inner wall smooth presstressed reinforcing steel duct(8), muscle beam top is positioned over the presstressed reinforcing steel of top segment Anchorage groove(3)In, it waits for carrying out sealing off and covering anchorage after the completion of tension of prestressed tendon.Unbonded prestressing tendon(7)Presstressed reinforcing steel class used Type is steel strand wires, prestressing force spiral or FRP presstressed reinforcing steels.
The present invention compares the prior art and has the following advantages:
The longitudinal reinforcement of the present invention is mixed by the high finish rolling deformed bar of the lower regular reinforcement of yield point and yield point, can Pier post-yield stiffness is significantly improved, to reduce pier maximum displacement response and its discreteness under seismic stimulation, and is effectively improved Pier self-resetting capability reduces residual deformation after shake, improves functionality after bridge structure shake.
By adjusting the allocation ratio of regular reinforcement and fining twisted steel, it can be achieved that after to the surrender bearing capacity of pier, surrender Effective control of rigidity, peak value bearing capacity and limiting displacement drift, to realize the design under the more performance standards of pier.
The carried pier itself of the present invention with hysteretic energy ability outstanding, can effectively absorb and dissipate earthquake when be input to bridge The energy of girder construction, there is no need to which energy-consumption damper or shock isolating pedestal is in addition arranged, to reduce bridge construction cost.
Pier is indulged muscle and is wrapped up by high-strength grout, and still has metal bellows and stirrup restraint except grouting material, therefore in earthquake Compressive buckling destruction will not generally occur for vertical muscle under effect;On the other hand, the high-strength grout by metal bellows constraint can be with Concrete participates in being pressurized together, thus concrete compression stress level with relatively low, extent of the destruction is little.Therefore pier proposed by the present invention It is small that difficulty is repaired after shake, helps to realize the fast quick-recovery of disaster area bridge transportation network.
The carried pier of the present invention is simple in assembled process, and performance accuracy is of less demanding when to assembly;And transport and lifting when without Large scale equipment is needed, construction is flexible, efficient, helps to realize bridge Fast Construction.
Description of the drawings
Fig. 1 is the assembled pier sectional view of hybrid reinforcement;
Fig. 2 is single prefabricated subsection stereoscopic schematic diagram;
The assembled pier cross-sectional view of Fig. 3 hybrid reinforcements;
Fig. 4 is the assembled pier construction process schematic diagram of hybrid reinforcement of the present invention;
Fig. 5 is the assembled pier sectional view of hybrid reinforcement described in embodiment 2;
Fig. 6 is the assembled pier sectional view of hybrid reinforcement described in embodiment 3.
The label of each component is as follows in attached drawing:1. cushion cap;2. assembled pier shaft;3. presstressed reinforcing steel anchorage groove;4. prefabricated section Section;5. reserved ripple duct;6. muscle is indulged in perforation;7. unbonded prestressing tendon;8. presstressed reinforcing steel duct;9. metal bellows;10. Regular reinforcement;11. finish rolling deformed bar;12. stirrup.
Specific implementation mode
Below in conjunction with attached drawing detailed description of the present invention embodiment, the invention will be further described.Phase in each attached drawing Same label indicates identical element.The following examples are exemplary, it is intended to explain the present invention, and should not be understood as to this The limitation of invention.
The construction method of embodiment 1, regular reinforcement and the assembled pier of finish rolling deformed bar hybrid reinforcement is as shown in Figure 4:It is first First, pier cushion cap foundation is poured, ripple duct is reserved when pouring, anchored to penetrate through in vertical muscle insertion basis;Then, assembled pier bottom Segment, and remaining assembled segment successively, make presstressed reinforcing steel duct of the presstressed reinforcing steel from segment(8)In pass through;After the completion of to be assembled, Tensioned prestressing bar;Finally, muscle merging is indulged into perforation and reserves ripple duct(5)In, and pressure grouting is carried out to duct, it is ensured that it fills Slurry is full closely knit.Perforation indulges muscle by grouting material around, metal bellows(9)And stirrup(12)Constraint, therefore earthquake make Compressive buckling damage is not susceptible under.Moreover, because the collaboration resistance to compression of grouting material, coagulation soil compressive stress and plasticity damage when earthquake Wound is little.Therefore such pier has functional after good shake, helps to realize unimpeded after the shake of important bridge structure.
Embodiment 2, as shown in figure 5, the present embodiment and previous embodiment 1 the difference is that, regular reinforcement and finish rolling Only there are one prefabricated subsections for the pier shaft of the assembled pier of spiral hybrid reinforcement(4).It, can will be whole when pier slenderness ratio is not more than 6 A pier shaft is prefabricated as an entire segment progress, and pier assembly efficiency so can be improved.Moreover, because pier slenderness ratio is not more than 6, because The size and weight of this entire segment are unlikely to excessive and are difficult to transport, is assembled.When using same as Example 2 or similar set When meter, arrangement and method for construction, it should be noted that the size and weight of prefabricated pier shaft segment meet relevant traffic transport law, and are no more than and hang Load the limitation of heavy equipment tonnage.
Embodiment 3, as shown in fig. 6, the present embodiment and previous embodiment 1 the difference is that, regular reinforcement and finish rolling Spiral only penetrates through several segments in assembled 2 lower part of pier shaft, without being arranged along entire pier shaft.For cantilever pier, under geological process Pier bottom moment of flexure is maximum, is gradually reduced from the upward moment of flexure of pier bottom.According to pier Bending moment distribution when Aseismic Design, longitudinal steel can be gradually decreased The muscle ratio of reinforcement, and finally blocked at certain reasonable altitudes.The determination of rebar truncated position should meet corresponding Aseismic Design rule Model provides.When the height of regular reinforcement and the assembled pier of finish rolling deformed bar hybrid reinforcement is larger, can protected using this scheme Steel using amount is effectively reduced under the premise of card anti-seismic performance is constant, accelerates construction progress, increases economic efficiency.
Embodiment 4, as shown in Figure 1, the present invention provides a kind of assembly of regular reinforcement and finish rolling deformed bar hybrid reinforcement Pier, including concrete bearing platform(1), assembled pier shaft(2), perforation indulge muscle(6)And unbonded prestressing tendon(7).Assembled pier shaft is by one The single prefabricated subsection of fixed number amount(4)It vertically stacks together, and passes through unbonded prestressing tendon(7)It is whole that tensioning becomes pier.Respectively Prefabricated subsection(4)The rectangular section of identical size is all had, and each segmental height is identical.Segmental height is section long sideTimes, pier plastic hinge can so fully carried out to ensure energy dissipation ability and make single segment volume and again Amount is small and easy to assembly.As shown in Fig. 2, each prefabricated subsection(4)There is the reserved wave of identical quantity in same cross-sectional location arrangements Canal(5).Therefore, it can ensure that reserved ripple duct after assembly(5)And presstressed reinforcing steel duct(8)Up and down.It waits for each prefabricated Segment(4)Assembly is completed and the complete presstressed reinforcing steel of tensioning(6)Afterwards, muscle is indulged into perforation(7)Ripple duct is reserved in merging.If single perforation Vertical muscle(7)Length is less than pier shaft height, then indulges muscle to penetrating through by way of mechanical connection, welding or binding connection(7)It carries out Spreading.The connection extension operation that muscle is indulged in perforation should meet corresponding specification regulation.Muscle is indulged in perforation(7)By common hot rolled ribbed bars with Finish rolling deformed bar mixes, and the two ratio of reinforcement ratio is between 0.5 ~ 2.0.Two kinds of reinforcing bars of mixed configuration can effectively improve pier Post-yield stiffness, improve pier anti-seismic performance and self-resetting capability to comprehensive.As shown in figure 3, on section, between two kinds of vertical muscle Every arrangement.
Finally illustrate, above example is only used to illustrate the technical scheme of the present invention and unrestricted.

Claims (10)

1. the construction method of a kind of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier, includes the following steps:
Step 1, the specific bit lower end anchorage of metal bellows and unbonded prestressing tendon 7 being positioned in concrete bearing platform 1 It sets, and pours the concrete of cushion cap;
Step 2 makes the prefabricated subsection 4 of assembled pier shaft 2, and is made respectively by built-in metal bellows and pvc pipe described pre- Stay ripple duct 5 and presstressed reinforcing steel duct 8;
Step 3 stacks each prefabricated subsection 4 successively, and presstressed reinforcing steel is made to pass through the presstressed reinforcing steel duct 8 of each segment center; During assembly, epoxy resin is uniformly brushed on the Mosaic face between bottommost segment and cushion cap, between two adjacent segments;
Step 4, tensioning unbonded prestressing tendon 7 carry out sealing off and covering anchorage to presstressed reinforcing steel top anchorage groove 3;
Perforation is indulged muscle 6 and is put into the ripple duct 5 of pier by step 5, and so that each perforation is indulged muscle and be located at duct center, wherein It includes regular reinforcement and finish rolling deformed bar that muscle is indulged in perforation;For high pier, using welding point or reinforced bar mechanical connector pair Regular reinforcement carries out spreading, and spreading is carried out to finish rolling deformed bar using spiral shape connector;
Step 6 is in the milk to ripple duct 5 using strength cement-based grouting material;Several grouting should be vertically uniformly arranged along pier shaft Hole, by the way of packer grouting and/or pressure grouting carries out grouting operation.
2. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:It is described it is assembled pier shaft 2 is by one or more than one prefabricated subsection 4 forms, the perforation indulge muscle 6 by regular reinforcement and Two kinds of reinforcing bars of finish rolling deformed bar mix, and with unbonded prestressing tendon 7 together by concrete bearing platform 1 and each assembled pier shaft 2 are connected to become complete pier system, and under the operating mode of assembled pier shaft 2 there are one prefabricated subsection 4, other steps are constant, step 3 For 4 bottom of prefabricated subsection is overlayed on concrete bearing platform 1, presstressed reinforcing steel is made to pass through the presstressed reinforcing steel of each segment center Duct 8;During assembly, epoxy resin is uniformly brushed on the Mosaic face between prefabricated subsection 4 and cushion cap.
3. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:The assembly pier shaft 2 is made of two or more prefabricated subsections 4, the perforation indulge muscle 6 by regular reinforcement and Two kinds of reinforcing bars of finish rolling deformed bar mix, and with unbonded prestressing tendon 7 together by concrete bearing platform 1 and each assembled pier shaft 2 are connected to become complete pier system, and regular reinforcement only penetrates through several segments in assembled 2 lower part of pier shaft with finish rolling deformed bar, without edge Entire pier shaft arrangement.
4. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:Between 0.5 ~ 2.0, regular reinforcement exists with finish rolling deformed bar for regular reinforcement and finish rolling deformed bar ratio of reinforcement ratio It arranged for interval and/or is arranged symmetrically in plane.
5. the assembled pier of a kind of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement, feature exist In:The upper and lower end face of prefabricated subsection 4 is plane or the single or multiple shear keies of setting.
6. the construction method of the regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier according to claim 1-5, It is characterized in that:Perforation indulge muscle 6 used in regular reinforcement type be HRB400, HRB500, HRBF400, HRBF500, HRB400E, HRB500E, HRBF400E or HRBF500E;Perforation indulge muscle 6 used in finish rolling deformed bar type be PSB785, PSB830, PSB930, PSB1080 or PSB1200.
7. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:Reserved ripple duct 5 uses pre-buried circular metal bellows, ripple pipe diameter should be, whereindFor perforation Vertical muscle diameter.
8. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:The length of embedding bellows is not less than 36 in cushion capd,dMuscle diameter is indulged to penetrate through.
9. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:Finish rolling deformed bar lower end uses the nut anchor mating with the muscle material, to enhance anchoring property.
10. the construction method of regular reinforcement according to claim 1 and finish rolling deformed bar hybrid reinforcement assembly pier, special Sign is:Presstressed reinforcing steel type used in unbonded prestressing tendon 7 is steel strand wires, prestressing force spiral or FRP presstressed reinforcing steels.
CN201810110414.8A 2018-02-05 2018-02-05 Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier Active CN108560423B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810110414.8A CN108560423B (en) 2018-02-05 2018-02-05 Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810110414.8A CN108560423B (en) 2018-02-05 2018-02-05 Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier

Publications (2)

Publication Number Publication Date
CN108560423A true CN108560423A (en) 2018-09-21
CN108560423B CN108560423B (en) 2020-06-30

Family

ID=63531099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810110414.8A Active CN108560423B (en) 2018-02-05 2018-02-05 Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier

Country Status (1)

Country Link
CN (1) CN108560423B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457597A (en) * 2018-10-22 2019-03-12 北京工业大学 A kind of flat assembly prefabrication and assembly construction hollow pier splicing structure and its practice
CN109778681A (en) * 2019-03-04 2019-05-21 北京工业大学 A kind of modularization Precast Concrete Segmental Bridges railway solid pier
CN110004837A (en) * 2019-05-14 2019-07-12 北京交通大学 A kind of bridge pier precast assembly segment, bridge pier and its construction method
CN110042741A (en) * 2019-03-12 2019-07-23 中国矿业大学 A kind of casing constraint Precast Concrete Segmental Bridges pier stud and its construction method
CN110158475A (en) * 2019-05-21 2019-08-23 北京工业大学 A kind of prefabricated assembled bridge substructure and its construction method
CN110468961A (en) * 2019-08-29 2019-11-19 哈尔滨工业大学 A kind of postposition in the built-in corrugated steel pipe of prefabricated beam column indulges the assembly concrete frame structure and preparation method thereof of muscle
CN110524677A (en) * 2019-08-29 2019-12-03 哈尔滨工业大学 It is a kind of using fining twisted steel and the precast concrete column of built-in corrugated steel pipe and preparation method thereof
CN111335153A (en) * 2020-03-10 2020-06-26 西南交通大学 Assembled hollow pier and construction method thereof
CN111877140A (en) * 2020-01-10 2020-11-03 中国国家铁路集团有限公司 Connecting structure for segment prefabricated assembled pier combination and construction method
CN113202017A (en) * 2020-03-17 2021-08-03 中国铁路设计集团有限公司 Connecting structure between prefabricated assembled pier stud and top cap and construction method
CN113202016A (en) * 2020-03-14 2021-08-03 中国铁路设计集团有限公司 Prefabricated assembled hollow pier suitable for high-earthquake area and construction method
CN113699876A (en) * 2021-09-24 2021-11-26 江苏瑞沃建设集团有限公司 Pier is assembled in prefabricated of segment of vertical continuous band tenon fourth of twelve earthly branches structure
CN115110432A (en) * 2022-07-28 2022-09-27 北京城建设计发展集团股份有限公司 Installation method of vertical prestressed steel strand for connecting prefabricated bridge pier
CN115125866A (en) * 2022-08-10 2022-09-30 北京城建设计发展集团股份有限公司 Method for connecting prefabricated vase piers through unbonded prestressed tendons and steel bars
CN116537244A (en) * 2023-07-06 2023-08-04 交通运输部公路科学研究所 Combined underwater bridge Liang Zhuangji and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203684076U (en) * 2014-01-26 2014-07-02 招商局重庆交通科研设计院有限公司 Bridge pier formed by splicing prefabricated steel fiber self-compacting concrete segments
CN104343080A (en) * 2014-09-29 2015-02-11 北京工业大学 Method for constructing segmental prefabricating and assembling swing foundation pier
CN205576723U (en) * 2016-02-15 2016-09-14 上海应用技术学院 Adoption is excelled in prefabrication of fibre mortar and bellows joint and is assembled pier
WO2016178451A2 (en) * 2015-05-04 2016-11-10 삼성물산 (주) Psc structure formed from triangular net arrangement, and construction method therefor
WO2017059421A1 (en) * 2014-10-02 2017-04-06 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Reno Deconstructable support column structures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203684076U (en) * 2014-01-26 2014-07-02 招商局重庆交通科研设计院有限公司 Bridge pier formed by splicing prefabricated steel fiber self-compacting concrete segments
CN104343080A (en) * 2014-09-29 2015-02-11 北京工业大学 Method for constructing segmental prefabricating and assembling swing foundation pier
WO2017059421A1 (en) * 2014-10-02 2017-04-06 Board Of Regents Of The Nevada System Of Higher Education, On Behalf Of The University Of Nevada, Reno Deconstructable support column structures
WO2016178451A2 (en) * 2015-05-04 2016-11-10 삼성물산 (주) Psc structure formed from triangular net arrangement, and construction method therefor
CN205576723U (en) * 2016-02-15 2016-09-14 上海应用技术学院 Adoption is excelled in prefabrication of fibre mortar and bellows joint and is assembled pier

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457597A (en) * 2018-10-22 2019-03-12 北京工业大学 A kind of flat assembly prefabrication and assembly construction hollow pier splicing structure and its practice
CN109778681A (en) * 2019-03-04 2019-05-21 北京工业大学 A kind of modularization Precast Concrete Segmental Bridges railway solid pier
CN110042741A (en) * 2019-03-12 2019-07-23 中国矿业大学 A kind of casing constraint Precast Concrete Segmental Bridges pier stud and its construction method
CN110004837A (en) * 2019-05-14 2019-07-12 北京交通大学 A kind of bridge pier precast assembly segment, bridge pier and its construction method
CN110158475A (en) * 2019-05-21 2019-08-23 北京工业大学 A kind of prefabricated assembled bridge substructure and its construction method
CN110524677A (en) * 2019-08-29 2019-12-03 哈尔滨工业大学 It is a kind of using fining twisted steel and the precast concrete column of built-in corrugated steel pipe and preparation method thereof
CN110468961A (en) * 2019-08-29 2019-11-19 哈尔滨工业大学 A kind of postposition in the built-in corrugated steel pipe of prefabricated beam column indulges the assembly concrete frame structure and preparation method thereof of muscle
CN111877140A (en) * 2020-01-10 2020-11-03 中国国家铁路集团有限公司 Connecting structure for segment prefabricated assembled pier combination and construction method
CN111335153A (en) * 2020-03-10 2020-06-26 西南交通大学 Assembled hollow pier and construction method thereof
CN113202016A (en) * 2020-03-14 2021-08-03 中国铁路设计集团有限公司 Prefabricated assembled hollow pier suitable for high-earthquake area and construction method
CN113202017A (en) * 2020-03-17 2021-08-03 中国铁路设计集团有限公司 Connecting structure between prefabricated assembled pier stud and top cap and construction method
CN113699876A (en) * 2021-09-24 2021-11-26 江苏瑞沃建设集团有限公司 Pier is assembled in prefabricated of segment of vertical continuous band tenon fourth of twelve earthly branches structure
CN115110432A (en) * 2022-07-28 2022-09-27 北京城建设计发展集团股份有限公司 Installation method of vertical prestressed steel strand for connecting prefabricated bridge pier
CN115125866A (en) * 2022-08-10 2022-09-30 北京城建设计发展集团股份有限公司 Method for connecting prefabricated vase piers through unbonded prestressed tendons and steel bars
CN116537244A (en) * 2023-07-06 2023-08-04 交通运输部公路科学研究所 Combined underwater bridge Liang Zhuangji and construction method thereof

Also Published As

Publication number Publication date
CN108560423B (en) 2020-06-30

Similar Documents

Publication Publication Date Title
CN208280001U (en) A kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement
CN108560423A (en) A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier
CN103882803B (en) A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier
CN106012809B (en) Restorative procedure after a kind of steel fibrous composite material concrete combination column and its shake
CN208280002U (en) A kind of assembled concrete pier system of mixed configuration FRP tendons and regular reinforcement
CN104727441B (en) Prestress assembled concrete beam column joint structure and construction method thereof
CN108316130A (en) A kind of assembled pier of regular reinforcement and finish rolling deformed bar hybrid reinforcement
CN102979221B (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN108252203A (en) A kind of assembled concrete pier system of mixed configuration FRP tendons and regular reinforcement
CN105002914B (en) Deformation-controllable prestressed concrete cantilever supporting structure and design and construction method thereof
CN102409606A (en) Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN107119799A (en) The prestressing force assembling type node construction and its construction method of beam-ends friction energy-dissipating
CN208668683U (en) The built-in built-in steel plate combined shear wall of presstressed reinforcing steel steel pipe concrete frame
CN207228402U (en) The reinforced concrete shear wall of built-in prestress steel diagonal brace
CN202990170U (en) Shear wall structure collocating cross oblique internal prestress
CN106381804B (en) A kind of precast assembly bridge pier and its Joining Technology using U-shaped reinforcement fabrication
CN108678227A (en) A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar
CN108374332A (en) A kind of bridge substructure and its construction method using ultra-tough fiber concrete
CN108678225A (en) The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN208668684U (en) Prestressed steel pipe concrete frame double steel plate shear wall built in one kind
CN108678223A (en) A kind of recoverable steel pipe concrete frame compound shear wall and the practice
CN206941799U (en) The prestressing force assembling type node construction of beam-ends friction energy-dissipating
CN110029728A (en) A kind of function of the aerial construction of band can restore assembly concrete frame foot joint
CN104631618B (en) Swing infilled wall frame structure with high shock resistance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181109

Address after: Room 105-47474, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant after: Hengqin Conjugate Technology Co., Ltd.

Address before: 610213 South section of Tianfu Avenue, Tianfu New District, Chengdu City, Sichuan Province 2039 and 1609, 16th floor, Meihai Tang Center (Tianfu Chuangke)

Applicant before: Sichuan Mobile Engineering Consulting Co., Ltd.