CN104265302A - 顶管管节止退装置 - Google Patents

顶管管节止退装置 Download PDF

Info

Publication number
CN104265302A
CN104265302A CN201410382504.4A CN201410382504A CN104265302A CN 104265302 A CN104265302 A CN 104265302A CN 201410382504 A CN201410382504 A CN 201410382504A CN 104265302 A CN104265302 A CN 104265302A
Authority
CN
China
Prior art keywords
jacking
pipe
connector
pipe joint
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410382504.4A
Other languages
English (en)
Other versions
CN104265302B (zh
Inventor
徐连刚
黄德中
顾永辉
蒋威
李刚
舒钢强
王旋东
吴列成
范杰
吕锦
杨满满
蔡雯俊
田瑞端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunneling Shield Engineering Co Ltd
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunneling Shield Engineering Co Ltd
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunneling Shield Engineering Co Ltd, Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunneling Shield Engineering Co Ltd
Priority to CN201410382504.4A priority Critical patent/CN104265302B/zh
Publication of CN104265302A publication Critical patent/CN104265302A/zh
Application granted granted Critical
Publication of CN104265302B publication Critical patent/CN104265302B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种顶管管节止退装置,包括:机架,设置于后顶千斤顶与待顶进的管节之间,所述待顶进的管节两侧分别设有第一连接件,所述机架于所述待顶进的管节两侧分别设有一反力架,所述反力架上设有与所述第一连接件相对应的第二连接件。本发明的顶管管节止退装置,在顶管停止顶进,缩回后顶千斤顶前,通过在管节两侧设置的第一连接件与在反力架上设置的第二连接件的相互连接配合,借助反力架的反力体系来阻止后顶千斤顶缩回后通道中顶管机头及管节的后退。解决顶管下放管节施工的不足,合理有效的控制了顶管施工中缩回主顶千斤顶时候顶管机头和管节倒退的现象,确保了顶管正面土体的稳定及管线和前方土体的安全。

Description

顶管管节止退装置
技术领域
本发明涉及隧道工程施工领域,尤其是指一种顶管管节止退装置。
背景技术
顶管法隧道施工工艺由于其大尺寸设备及矩形顶管设备的推广已被大量应用于城市地下公路、人行通道、给排水管道等隧道工程。然而,由于顶管施工工艺的特殊性:在完成一节管节顶进后,下一节管节吊入井内前必须缩回后顶千斤顶,因顶管机头前段阻力非常大,此时顶管机头和管节会一起后退20~30cm,从而造成顶管机头和前方土体间的土压平衡受到破坏,易引起顶管机头前方的土体坍塌,造成路面和管线的沉降,严重时将影响路面交通及地下管线的安全。因此如何有效地防止或减少顶管在拼装管节过程中倒退的现象成为了工程界广为关注的问题。
目前对于顶管在缩回后顶千斤顶后的倒退,尚未形成明确统一的应对方法。通常只能采取迅速更换管节来减少顶管无后顶千斤顶支撑的时间。或是采用钢筋将管节与钢洞门焊接拉住作为临时拉杆止退装置,这种设置临时拉杆的工艺包括以下步骤:
1)准备物资
准备1.5mΦ28mm钢筋若干,电焊机,焊条等;
2)工艺流程
在将一节管节顶进到位后,缩回后顶前,在该钢洞门的上侧、左侧及右侧分别焊接两根Φ28mm钢筋,将钢筋另一端焊在管节钢套环的相应位置,从而形成顶管临时拉杆止退装置。在后一节管节吊入井中拼装完成,后顶千斤顶靠上管节,正式开顶前,将拉杆割除,直至该管节顶进完成,再重新烧焊拉杆如此反复。
但是,这种设置临时拉杆的形式,虽然一定程度上控制了顶管后退现象,但依然存在以下问题:
1)钢筋拉杆需反复焊接,切割,材料消耗量大,影响工程进度;
2)拉杆焊接质量不过关,容易拉断,严重时引起工程事故;
3)当顶管正面土压大时,存在将钢洞门拉出的风险,造成工程事故;
4)施工工期受天气影响较大。
发明内容
有鉴于上述问题,本发明提供了一种顶管管节止退装置,包括:
机架,设置于后顶千斤顶与待顶进的管节之间,所述待顶进的管节两侧分别设有第一连接件,所述机架于所述待顶进的管节两侧分别设有一反力架,所述反力架上设有与所述第一连接件相对应的第二连接件。
本发明的顶管管节止退装置,在顶管停止顶进,缩回后顶千斤顶前,通过在管节两侧设置的第一连接件与在反力架上设置的第二连接件的相互连接配合,借助反力架的反力体系来阻止后顶千斤顶缩回后通道中顶管机头及管节的后退。
本发明顶管管节止退装置的进一步改进在于,所述第一连接件为一插孔,所述第二连接件为与所述插孔相对应的止退销。
本发明顶管管节止退装置的进一步改进在于,所述第一连接件为一扣环,所述第二连接件为与所述扣环相对应的挂钩。
本发明顶管管节止退装置的进一步改进在于,所述第一连接件为一限位块,所述第二连接件为与所述限位块相对应的止退销。
本发明顶管管节止退装置的进一步改进在于,所述反力架包括:
两竖直支架,所述两竖直支架之间设有一水平支架,所述第二连接件设置于所述水平支架上;
斜支架,支撑于所述竖直支架靠近所述后顶千斤顶的侧部。
本发明的顶管管节止退装置,解决顶管下放管节施工的不足,合理有效的控制了顶管施工中缩回主顶千斤顶时候顶管机头和管节倒退的现象,确保了顶管正面土体的稳定及管线和前方土体的安全。具有以下优点与有益效果:
1.无需反复焊接、切割,节约成本;
2.止退效果显著,安全可靠,节约工期;
3.工期受外界因素影响小。
附图说明
图1是本发明顶管管节止退装置在始发工作井内的施工示意图。
图2是本发明顶管管节止退装置的侧视图。
图3是图1中A-A面的剖面图。
图4是本发明顶管管节止退装置的第二种实施例示意图。
图5是图4中B部分的放大示意图。
图6是本发明顶管管节止退装置的第三种实施例示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。
配合参看图1所示,始发工作井1内顶管施工时,管节20设置于顶进机的后顶千斤顶50与顶管机头60之间,后顶千斤顶50包括后靠510、主顶520以及顶块530,图中箭头方向为顶管顶进方向。
再配合参看图2所示,本发明的顶管管节止退装置2,包括机架10,设置于后顶千斤顶50与待顶进的管节210之间,结合图3所示,所述待顶进的管节210的两侧分别设有第一连接件211,所述机架10于所述待顶进的管节210的两侧分别设有一反力架30,再次结合图2所示,所述反力架30包括:
两竖直支架310,所述两竖直支架310之间设有一水平支架320,所述水平支架320上设有与所述待顶进的管节210的第一连接件211相对应的第二连接件321。在图3所示的实施例中,所述第一连接件211为一插孔,所述第二连接件321为与所述插孔相对应的止退销;
斜支架330,支撑于所述竖直支架310靠近所述后顶千斤顶50的侧部。
配合参看图4与图5所示,在本发明顶管管节止退装置的第二种实施例中,所述第一连接件211b为一扣环,所述第二连接件321b为与所述插孔相对应的挂钩。
配合参看图6所示,在本发明顶管管节止退装置的第三种实施例中,所述第一连接件211c为一限位块,所述第二连接件321c为与所述插孔相对应的止退销。
采用本发明的顶管管节止退装置进行顶管施工时,步骤如下:
完成一节管节顶进;
将反力架上设置的第二连接件与管节两侧设置的第一连接件相互连接;
缩回后顶千斤顶;
吊放管节及拼装;
伸出后顶千斤顶;
将反力架上设置的第二连接件与管节两侧设置的第一连接件相互分开,继续顶进;
循环上述步骤,直到施工完毕。
因此,本发明的顶管管节止退装置,在顶管停止顶进,缩回后顶千斤顶前,通过在管节两侧设置的第一连接件与在反力架上设置的第二连接件的相互连接配合,借助反力架的反力体系来阻止后顶千斤顶缩回后通道中顶管机头及管节的后退。解决顶管下放管节施工的不足,合理有效的控制了顶管施工中缩回主顶千斤顶时候顶管机头和管节倒退的现象,确保了顶管正面土体的稳定及管线和前方土体的安全。
以上所述仅是本发明的较佳实施例而已,并非对本发明做任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案的范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (5)

1.一种顶管管节止退装置,其特征在于包括:
机架,设置于顶管机的后顶千斤顶与待顶进的管节之间,所述待顶进的管节两侧分别设有第一连接件,所述机架于所述待顶进的管节两侧分别设有一反力架,所述反力架上设有与所述第一连接件相对应的第二连接件。
2.如权利要求1所述的顶管管节止退装置,其特征在于所述第一连接件为一插孔,所述第二连接件为与所述插孔相对应的止退销。
3.如权利要求1所述的顶管管节止退装置,其特征在于所述第一连接件为一扣环,所述第二连接件为与所述扣环相对应的挂钩。
4.如权利要求1所述的顶管管节止退装置,其特征在于所述第一连接件为一限位块,所述第二连接件为与所述限位块相对应的止退销。
5.如权利要求1至4中任一项所述的顶管管节止退装置,其特征在于所述反力架包括:
两竖直支架,所述两竖直支架之间设有一水平支架,所述第二连接件设置于所述水平支架上;
斜支架,支撑于所述竖直支架靠近所述后顶千斤顶的侧部。
CN201410382504.4A 2014-08-06 2014-08-06 顶管管节止退装置 Active CN104265302B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410382504.4A CN104265302B (zh) 2014-08-06 2014-08-06 顶管管节止退装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410382504.4A CN104265302B (zh) 2014-08-06 2014-08-06 顶管管节止退装置

Publications (2)

Publication Number Publication Date
CN104265302A true CN104265302A (zh) 2015-01-07
CN104265302B CN104265302B (zh) 2016-09-07

Family

ID=52156860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410382504.4A Active CN104265302B (zh) 2014-08-06 2014-08-06 顶管管节止退装置

Country Status (1)

Country Link
CN (1) CN104265302B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929647A (zh) * 2015-05-15 2015-09-23 中铁二局股份有限公司 顶管机止退装置及其安装方法
CN106351664A (zh) * 2016-10-25 2017-01-25 上海建科工程咨询有限公司 一种大直径顶管止退装置
CN106761774A (zh) * 2016-12-13 2017-05-31 中铁隧道勘测设计院有限公司 一种顶管法隧道工程用管节止退装置
CN109458493A (zh) * 2018-12-20 2019-03-12 上海市政建设有限公司 一种顶管止退限位装置及其使用方法
CN110195595A (zh) * 2019-05-09 2019-09-03 上海隧道工程有限公司 顶管机管片的止退装置及其使用方法
CN110761807A (zh) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 一种预制拼装式顶管的拼装系统及拼装方法
CN111335919A (zh) * 2020-03-20 2020-06-26 重庆渝高科技产业(集团)股份有限公司 预制管节顶推方法
CN111472789A (zh) * 2020-04-29 2020-07-31 安徽开源路桥有限责任公司 顶管施工工艺
CN111795207A (zh) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 超大始发井顶管施工方法
CN112412470A (zh) * 2020-10-21 2021-02-26 中建五局土木工程有限公司 顶管机和管节回退的施工装置及施工方法
CN112459798A (zh) * 2020-11-23 2021-03-09 上海隧道工程有限公司 顶管施工用自锁式止退装置及止退方法
CN112761667A (zh) * 2021-01-28 2021-05-07 安徽唐兴机械装备有限公司 一种顶管-半管节盾构兼容的多段管节安装装置
CN113216973A (zh) * 2021-04-23 2021-08-06 中铁工程装备集团有限公司 一种从下向上顶推式竖井掘进设备
CN113374489A (zh) * 2021-06-30 2021-09-10 中国建筑一局(集团)有限公司 一种顶管机始发防倒退装置及其制作方法和使用方法
CN113374932A (zh) * 2021-07-09 2021-09-10 中铁上海工程局集团有限公司 一种移动式顶管止退支架装置及止退方法
CN114526376A (zh) * 2022-01-12 2022-05-24 中建隧道建设有限公司 叠线顶管施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0206371B1 (de) * 1985-06-11 1988-07-13 Weiss Benedikt Schneidkopf für den Vortrieb vorgefertigter Betonrohre zur Herstellung von Stollen oder Tunneln
US5846027A (en) * 1996-02-22 1998-12-08 Toyo Technos Co., Ltd. Semi-shield method and apparatus for the same
KR20050093749A (ko) * 2005-09-02 2005-09-23 주식회사 동아지질 이중 터널굴착공법 및 이에 사용되는 굴착장치
CN201065991Y (zh) * 2007-12-05 2008-05-28 王玉雷 用于顶进施工的小口径柔性钢承口钢筋混凝土管
CN101922297A (zh) * 2010-08-23 2010-12-22 上海广联建设发展有限公司 地下暗埋箱涵或管道施工的同步牵引顶推掘进装置
CN201818900U (zh) * 2010-09-09 2011-05-04 上海水务建设工程有限公司 大口径顶管机出洞防偏差装置
CN103244126A (zh) * 2013-04-12 2013-08-14 上海交通大学 一种防止顶管机和管节后退的施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0206371B1 (de) * 1985-06-11 1988-07-13 Weiss Benedikt Schneidkopf für den Vortrieb vorgefertigter Betonrohre zur Herstellung von Stollen oder Tunneln
US5846027A (en) * 1996-02-22 1998-12-08 Toyo Technos Co., Ltd. Semi-shield method and apparatus for the same
KR20050093749A (ko) * 2005-09-02 2005-09-23 주식회사 동아지질 이중 터널굴착공법 및 이에 사용되는 굴착장치
CN201065991Y (zh) * 2007-12-05 2008-05-28 王玉雷 用于顶进施工的小口径柔性钢承口钢筋混凝土管
CN101922297A (zh) * 2010-08-23 2010-12-22 上海广联建设发展有限公司 地下暗埋箱涵或管道施工的同步牵引顶推掘进装置
CN201818900U (zh) * 2010-09-09 2011-05-04 上海水务建设工程有限公司 大口径顶管机出洞防偏差装置
CN103244126A (zh) * 2013-04-12 2013-08-14 上海交通大学 一种防止顶管机和管节后退的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐建忠: "土压平衡式矩形顶管在深覆土中的施工", 《建筑知识》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929647A (zh) * 2015-05-15 2015-09-23 中铁二局股份有限公司 顶管机止退装置及其安装方法
CN106351664A (zh) * 2016-10-25 2017-01-25 上海建科工程咨询有限公司 一种大直径顶管止退装置
CN106351664B (zh) * 2016-10-25 2018-09-25 上海建科工程咨询有限公司 一种大直径顶管止退装置
CN106761774A (zh) * 2016-12-13 2017-05-31 中铁隧道勘测设计院有限公司 一种顶管法隧道工程用管节止退装置
CN109458493A (zh) * 2018-12-20 2019-03-12 上海市政建设有限公司 一种顶管止退限位装置及其使用方法
CN110195595A (zh) * 2019-05-09 2019-09-03 上海隧道工程有限公司 顶管机管片的止退装置及其使用方法
CN110761807A (zh) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 一种预制拼装式顶管的拼装系统及拼装方法
CN111335919A (zh) * 2020-03-20 2020-06-26 重庆渝高科技产业(集团)股份有限公司 预制管节顶推方法
CN111472789B (zh) * 2020-04-29 2021-05-28 安徽开源路桥有限责任公司 顶管施工工艺
CN111472789A (zh) * 2020-04-29 2020-07-31 安徽开源路桥有限责任公司 顶管施工工艺
CN111795207A (zh) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 超大始发井顶管施工方法
CN111795207B (zh) * 2020-07-17 2022-03-22 中铁十二局集团有限公司 超大始发井顶管施工方法
CN112412470A (zh) * 2020-10-21 2021-02-26 中建五局土木工程有限公司 顶管机和管节回退的施工装置及施工方法
CN112459798A (zh) * 2020-11-23 2021-03-09 上海隧道工程有限公司 顶管施工用自锁式止退装置及止退方法
CN112761667A (zh) * 2021-01-28 2021-05-07 安徽唐兴机械装备有限公司 一种顶管-半管节盾构兼容的多段管节安装装置
CN112761667B (zh) * 2021-01-28 2022-12-27 安徽唐兴装备科技股份有限公司 一种顶管-半管节盾构兼容的多段管节安装装置
CN113216973A (zh) * 2021-04-23 2021-08-06 中铁工程装备集团有限公司 一种从下向上顶推式竖井掘进设备
CN113374489A (zh) * 2021-06-30 2021-09-10 中国建筑一局(集团)有限公司 一种顶管机始发防倒退装置及其制作方法和使用方法
CN113374932A (zh) * 2021-07-09 2021-09-10 中铁上海工程局集团有限公司 一种移动式顶管止退支架装置及止退方法
CN114526376A (zh) * 2022-01-12 2022-05-24 中建隧道建设有限公司 叠线顶管施工方法
CN114526376B (zh) * 2022-01-12 2024-03-29 中建隧道建设有限公司 叠线顶管施工方法

Also Published As

Publication number Publication date
CN104265302B (zh) 2016-09-07

Similar Documents

Publication Publication Date Title
CN104265302A (zh) 顶管管节止退装置
CN205152787U (zh) 桥梁防撞护栏修补移动台车
CN204920963U (zh) 矩形顶管止退结构
CN105369802A (zh) 拱桥斜桩成孔施工用支护及配筋构造
CN202954557U (zh) 用于脚手架的连墙件
CN103953359B (zh) 地下盾构拼装混凝土预制方涵
CN203907010U (zh) 一种用于软弱土层顶管施工的柔性连接装置
CN207261823U (zh) 一种土木工程用塑料管道扶持装置
CN207633226U (zh) 便于拆装的高稳定性桥梁支撑固定架
CN105927230A (zh) 一种单管互锁形成管幕的构筑方法
CN204827462U (zh) 水压爆破掏槽眼施工辅助平台
CN205189887U (zh) 隧道初期支护接地结构
CN108894235A (zh) 一种不带挡土板的框架锚杆装配式支护结构及施工方法
CN203795824U (zh) 悬挂式扣件脚手架搭设装置
CN204646267U (zh) 一种波纹钢隧道初期支护结构
CN205225282U (zh) 一种增强拱架间纵向力的支护结构
CN205088943U (zh) 脚手架支撑体系的顶部龙骨连接结构
CN204140090U (zh) 一种新型圆形钢管混凝土支架连接部件
CN203977300U (zh) 一种挂篮施工连续梁的附着式防护棚
CN203559432U (zh) 一种地下厂房拱顶
CN203742408U (zh) 一种拼接式防护窗
CN203569880U (zh) 脚手架连接机构
CN205224116U (zh) 一种基于三元乙丙橡胶止水条的横向接缝防水结构
CN103696786A (zh) 一种增强钢拱架间纵向稳定性的拱架连接方法
CN204082167U (zh) 一种隧道洞内超前大管棚的辅助定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant