CN104263969A - Furnace pipe device and method for preparing ultra-high purity aluminum - Google Patents

Furnace pipe device and method for preparing ultra-high purity aluminum Download PDF

Info

Publication number
CN104263969A
CN104263969A CN201410454924.9A CN201410454924A CN104263969A CN 104263969 A CN104263969 A CN 104263969A CN 201410454924 A CN201410454924 A CN 201410454924A CN 104263969 A CN104263969 A CN 104263969A
Authority
CN
China
Prior art keywords
flue
hole
furnace pipe
furnace
crucible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410454924.9A
Other languages
Chinese (zh)
Other versions
CN104263969B (en
Inventor
赵玉涛
梁向锋
贾志宏
张力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinhai Aluminium Industry Co ltd
Original Assignee
Jiangsu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University filed Critical Jiangsu University
Priority to CN201410454924.9A priority Critical patent/CN104263969B/en
Publication of CN104263969A publication Critical patent/CN104263969A/en
Application granted granted Critical
Publication of CN104263969B publication Critical patent/CN104263969B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention belongs to the technical field of metal purification, and relates to a furnace pipe device and a method for preparing ultra-high purity aluminum. The furnace pipe device is characterized by sequentially comprising a furnace pipe outer frame, a thin-wall seal sleeve and a graphite crucible from outside to inside, wherein a hinge furnace lid is arranged at the upper part of the furnace pipe; a water inlet hole, a water outlet hole, an observation hole, an air exhaust hole, an air inlet hole, an exhaust vent, a temperature measuring hole and a pressure measuring hole are formed in the furnace lid; a rubber seal strip is arranged between the furnace lid and the furnace pipe outer frame; and the furnace lid is connected and fastened with the furnace pipe through buckles and bolts. The furnace pipe device disclosed by the invention is capable of melting aluminum one time; the crystal is 65Kg; the height of a crystal aluminum ingot can reach 90cm; the single production can be increased by 2.5 times in comparison with that of a conventional high-purity aluminum production technology; an argon protection environment is only kept in the furnace pipe; the furnace pipe device has no environmental requirements on heating and electromagnetic stirring devices, and is strong in continuous working ability; compared with a conventional production technology, the furnace pipe device and the method have the advantages that the power consumption is reduced by 2/3; and the energy consumption cost is saved by 3/5.

Description

A kind of flue apparatus and method for the preparation of ultra-pure aluminum
Technical field
The invention belongs to purification of metals technical field, relate to a kind of directional freeze in argon shield prepare ultra-pure aluminum flue apparatus and method.
Technical background
Segregation method is utilized to extract ultra-pure aluminum application comparatively general in the prior art, Chinese patent literature CN101191160 describes one " device for extracting high pure aluminum ", theoretical according to segregation at this device, the method of lift in utilization, refer to a kind of flue tube structure for extracting rafifinal in that patent, this structure only has metal shell and plumbago crucible composition, flue upper cover is without any specified otherwise, there is certain shortcoming in a kind of like this structure, if metal shell is too thin, be not enough to the weight carrying crucible and aluminium ingot, easy generation crucible bursts, the danger that aluminium liquid is revealed, if metal shell is too thick, aluminium liquid solidifies from top to bottom gradually, but due to the restriction of radiating condition, aluminium liquid is still in the condition of high temperature, and heat is difficult to scatter and disappear through metal shell, and cause cooling performance poor, refining effect is poor, and the production cycle is long.
Find the patent retrieval of now having announced, Chinese patent literature CN101696472A describes one " purification method of ultra-pure aluminum ", and this technology is loaded in purification furnace by raw material refined aluminium, vacuumizes, and use gas furnace heat fused; Move in crystal growing furnace by purification furnace again, in purification furnace, the rotary motion in crystal growing furnace well heater of aluminium liquid, by the heat dissipation capacity of crystallization control stove, reaches refining effect; Refer to a kind of vacuum purification furnace in this patent, but do not illustrate the sealing method of this purification furnace and the internal structure of purification furnace, different purification furnace structures directly can affect the refining effect of rafifinal.
Further retrieval finds, Chinese patent literature CN101748281 describes one " vacuum purifying device of high-purity aluminium ", heating unit, whipping appts and adiabatic apparatus are all placed in vacuum environment by this device, and according to directional freeze principle, method growth pattern is drawn under employing, prepare rafifinal, although this invention is rational in infrastructure, but the space of vacuum oven is large, for reaching the vacuum tightness of production requirement, need use two-stage vacuum pump, required vaccum-pumping equipment power is high, and condition of high vacuum degree is also difficult to ensure, causes purification efficiency to reduce.
Summary of the invention
Technical problem to be solved by this invention is, not enough for prior art, and provide a kind of structure simple, refining effect is good, and energy-conservation, efficient, is prepared a kind of flue device of ultra-pure aluminum under argon shield by directional solidification technique.
For solving the problems of the technologies described above, flue device ecto-entad of the present invention is followed successively by flue outside framework, thin-walled seal cartridge, plumbago crucible; Flue device top is hinge type bell, and bell is provided with prosopyle, posticum, vision slit, aspirating hole, air inlet port, venting hole, thermometer hole and pressure tap; The rubber weather strip that width is 1 ~ 3cm is installed between bell and flue outside framework.
Flue outside framework is made up of three parts from top to bottom, and top is step-like sidewall seal ring set, and middle part to be formed by connecting inversed taper platform shape by radial steel plate by 4 blocks of longitudinal steel plates, forms bottom the flue of lower end with same steel plate and longitudinal Plate Welding; Flue outside framework material is high temperature steel, and thickness is 0.3cm ~ 0.8cm, and sidewall seal ring set diameter is 25cm ~ 40cm, and length is 0.1m ~ 0.4m, and mid diameter is 20cm ~ 32cm, and length is 0.5m ~ 1.3m, and base diameter is equal with longitudinal steel plate lower end diameter; Flue outside framework mainly plays carrying effect, load-bearing 150Kg ~ 300Kg; Thin-walled seal cartridge is at flue housing internal layer, and top is connected with the sidewall seal ring set of flue housing by seamless welding, makes flue inside become sealed environment; Thin-walled seal cartridge material is high temperature steel, and thickness is 0.06cm ~ 0.15cm, and length is 0.5m ~ 1.4m; Innermost layer is high purity graphite crucible, and crucible is close to inside thin-walled seal cartridge, and plumbago crucible top is furnished with the graphite cover of middle with hole, and the purity of plumbago crucible reaches 99.9wt% ~ 99.999wt%, crucible wall thickness 2cm ~ 3cm, internal diameter 15cm ~ 23cm, external diameter 19cm ~ 29cm.
The hinge type bell on flue top is two-layer up and down, edge seal, and centre is empty hollow bell, prosopyle is connected with die cavity in bell with posticum, and object is when solidifying Purification of Aluminum, forms directed cooling environment at flue top, reduce temperature of aluminum liquid, improve purification efficiency; Vision slit is communicated to flue inside, and pass through metal clip at vision slit end rubber sheet gasketing and transparent glass fastening, play sealing function, vision slit diameter is 1.5cm ~ 4cm; Aspirating hole is communicated to flue inside, and outside is connected with vacuum pump, and effect vacuumized flue inside before fusing aluminium ingot; Pressure tap, air inlet port and venting hole share a passage, are communicated to flue inside, install four-way interface in passage outer end, air inlet and exhaust control respectively, inlet mouth outer end is connected with argon bottle, and the object of inlet mouth is after flue inside is evacuated, and passes into argon shield; Venting port object is that flue internal gas expands when aluminium liquid melts, and release gas decompression, prevents flue dilatational strain; The external tensimeter of pressure tap, measures flue air pressure inside value in real time, ensures aluminium liquid purification quality; Thermometer hole is communicated to flue inside, installs thermopair, measures flue internal temperature in real time, ensures purification efficiency.
Between flue housing and bell, rubber seal is installed, and both connect by buckle bolt fastening, ensure the sealing effectiveness of flue.
The operation steps of purification flue:
(1) feed, require: in crucible, aluminium material the end of from up, fill intensive, aluminium material can't be made to be stuck in plumbago crucible and to make aluminium material not arrive crucible bottom.
(2) cover graphite cover, at sidewall seal ring set surface mounting rubber weather strip, then cover bell, guarantee the stopping property of boiler clothing inside.
(3) close vent valve and argon gas cut-in valve, open vacuum pump and take out valve.
(4) open vacuum pump, after 8 ~ 15 minutes, make pressure gauge registration be 0.001MPa ~ 0.01MPa.
(5) open argon gas cut-in valve, close vacuum pump and take out valve, open argon gas and pass into switch until weather gage registration is 0.1MPa ~ 0.15MPa.
(6) close argon gas cut-in valve, then start to add hot melt aluminium.
(7), after aluminium ingot fusing, open water intaking valve and outlet valve, lift is started to flue, purifies.
Compared with prior art, advantage of the present invention is: the present invention adopts flue outside framework to carry flue and aluminium liquid weight, reduces the load metamorphism of thin-walled sealing boiler clothing, uses thin-walled sealing boiler clothing flue can be made to form good sealed environment on the one hand; Can effectively prevent inner crucible to be oxidized on the other hand, extend pot life; In addition, when flue pulls out from induction stirring process furnace, use thin-walled sealing boiler clothing can accelerate the cooling performance having gone out oven body part, improve the purification efficiency of aluminium ingot; Two-layer up and down, edge seal, centre is empty hollow bell, water-in is connected with die cavity in bell with water outlet, stores cooling circulating water at bell inner chamber, forms directed cooling environment, reduce temperature of aluminum liquid, improve purification efficiency, flue upper operating room temps can be reduced, for operator provides safe Working environment simultaneously; The present invention is for vacuumizing, and the melting purifying plant of logical argon shield, relative to traditional vacuum oven, in this invention, flue space is little, and required vaccum-pumping equipment power is low, and argon gas intake is few, easy and simple to handle, and reach energy-saving effect, greatly reduce production cost, pass into argon gas and can dilute air remaining in flue, reduce oxygen concentration, in addition, the flue being connected with argon gas can prevent boiler clothing distortion at high temperature, extends the work-ing life of purification flue; The present invention designs disposable molten aluminium, crystallization is 65Kg, and crystallization aluminium ingot height reaches 90cm, and relative to conventional rafifinal production technology, single output can improve 2.5 times; Current conventional ultra-pure aluminum production technology, smelting apparatus, whipping appts and crystallization apparatus all under vacuum conditions, continuous seepage ability, vacuum environment is easily destroyed; Only allow in flue and keep argon shield environment, do not have environmental requirement to heating and electromagnetic mixing apparatus, non-stop run ability is strong, with conventional manufacturing techniques ratio, reduces power consumption 2/3, energy efficient cost 3/5.
attached body explanation
Fig. 1, Fig. 2 are the flue tube structure schematic diagram that the present invention extracts ultra-pure aluminum; Fig. 3 is the flue pictorial diagram that the present invention extracts ultra-pure aluminum.
1. bell; 2. rubber weather strip; 3. high purity graphite packing; 4. seamless welding interface; 5. flue outside framework;
6. thin-walled seal cartridge; 7. plumbago crucible; 8. graphite cover; 9. prosopyle; 10. posticum; Aspirating hole; Air inlet port; Pressure tap; Venting hole; Thermometer hole; Vision slit.
Embodiment
The purification flue of 60Kg capacity is all adopted in following examples.
The flue tube structure preparing ultra-pure aluminum adopted in following examples is as shown in Figure 1: flue device ecto-entad be followed successively by flue outside framework 5., thin-walled seal cartridge 6., plumbago crucible 7.; Flue top be hinge type bell 1., 9. bell is provided with prosopyle, posticum 10., vision slit, aspirating hole, air inlet port, venting hole, thermometer hole, pressure tap form; Rubber weather strip is installed 2. between bell and flue outside framework, and both connect by buckle bolt fastening; 5. flue outside framework is made up of three parts from top to bottom, and top is step-like sidewall seal ring set, and middle part to be formed by connecting inversed taper platform shape by radial steel plate by 4 blocks of longitudinal steel plates, forms bottom the flue of lower end with same steel plate and longitudinal Plate Welding; Thin-walled seal cartridge is 6. at flue outside framework 5. internal layer, and 4. top be connected with flue outside framework sidewall seal ring set 5. by seamless welding, makes flue inside become sealed environment; Innermost layer be high purity graphite crucible 7., plumbago crucible be 7. close to thin-walled seal cartridge 6. inner side, 8. plumbago crucible top be furnished with the graphite cover of middle with hole; 1. the hinge type bell on flue top is two-layer up and down, edge seal, and centre is empty hollow bell, prosopyle 9. with posticum 10. with bell 1. in die cavity be connected; Vision slit is communicated to flue inside, passes through metal clip fastening at vision slit end rubber sheet gasketing and transparent glass; Aspirating hole is communicated to flue inside, and outside is connected with vacuum pump; Pressure tap, air inlet port and venting hole share a passage, are communicated to flue inside, install four-way interface in passage outer end, and air inlet and exhaust control respectively, and inlet mouth outer end is connected with argon bottle, the external tensimeter of pressure tap; Thermometer hole is communicated to flue inside, installs thermopair.
Embodiment 1: select purity to be the refined aluminium of 4N3,
(1) feed, require: in crucible, aluminium material the end of from up, fill intensive, aluminium material can't be made to be stuck in plumbago crucible and to make aluminium material not arrive crucible bottom.
(2) cover graphite cover, at sidewall seal ring set surface mounting rubber weather strip, then cover bell, guarantee the stopping property of boiler clothing inside.
(3) close vent valve and argon gas cut-in valve, open vacuum pump and take out valve.
(4) open vacuum pump, after 10 minutes, make pressure gauge registration be 0.0015Mpa.
(5) open argon gas cut-in valve, close vacuum pump and take out valve, open argon gas and pass into switch until weather gage registration is 0.1Mpa.
(6) close argon gas cut-in valve, then start to add hot melt aluminium.
(7), after aluminium ingot fusing, open water intaking valve and outlet valve, lift is started to flue, purifies.
Can obtain the ultra-pure aluminum of more than 5N, Inorganic Material Analysis test center of Shanghai silicate institute of attached Chinese Academy of Sciences analytical test report is as following table one.
Embodiment 2: select purity to be the refined aluminium of 4N6,
(1) feed, require: in crucible, aluminium material the end of from up, fill intensive, aluminium material can't be made to be stuck in plumbago crucible and to make aluminium material not arrive crucible bottom.
(2) cover graphite cover, at sidewall seal ring set surface mounting rubber weather strip, then cover bell, guarantee the stopping property of boiler clothing inside.
(3) close vent valve and argon gas cut-in valve, open vacuum pump and take out valve.
(4) open vacuum pump, after 12 minutes, make pressure gauge registration be 0.001Mpa.
(5) open argon gas cut-in valve, close vacuum pump and take out valve, open argon gas and pass into switch until weather gage registration is 0.15Mpa.
(6) close argon gas cut-in valve, then start to add hot melt aluminium.
(7), after aluminium ingot fusing, open water intaking valve and outlet valve, lift is started to flue, purifies.
Can obtain the ultra-pure aluminum of more than 5N5, Inorganic Material Analysis test center of Shanghai silicate institute of attached Chinese Academy of Sciences analytical test report is as following table two.
 
table one GDMS analysis report list unit: ppm
table two GDMS analysis report list? unit: ppm

Claims (7)

1. for the preparation of a flue device for ultra-pure aluminum, it is characterized in that, flue device ecto-entad is followed successively by flue outside framework, thin-walled seal cartridge and plumbago crucible; Flue top is hinge type bell.
2. a kind of flue device for the preparation of ultra-pure aluminum according to claim 1, it is characterized in that: flue outside framework is made up of three parts from top to bottom, top is step-like sidewall seal ring set, middle part to be formed by connecting inversed taper platform shape by radial steel plate by 4 blocks of longitudinal steel plates, forms bottom the flue of lower end with same steel plate and longitudinal Plate Welding; Flue outside framework material is high temperature steel, and thickness is 0.3cm ~ 0.8cm, and sidewall seal ring set diameter is 25cm ~ 40cm, and length is 0.1m ~ 0.4m, and mid diameter is 20cm ~ 32cm, and length is 0.5m ~ 1.3m, and base diameter is equal with longitudinal steel plate lower end diameter; Flue outside framework mainly plays carrying effect, load-bearing 150Kg ~ 300Kg.
3. a kind of flue device for the preparation of ultra-pure aluminum according to claim 1, is characterized in that: thin-walled seal cartridge is at flue housing internal layer, and top is connected with the sidewall seal ring set of flue housing by seamless welding, makes flue inside become sealed environment; Thin-walled seal cartridge material is high temperature steel, and thickness is 0.06cm ~ 0.15cm, and length is 0.5m ~ 1.4m.
4. a kind of flue device for the preparation of ultra-pure aluminum according to claim 1, it is characterized in that: innermost layer is high purity graphite crucible, crucible is close to inside thin-walled seal cartridge, plumbago crucible top is furnished with the graphite cover of middle with hole, the purity of plumbago crucible reaches 99.9wt% ~ 99.999wt%, crucible wall thickness 2cm ~ 3cm, internal diameter 15cm ~ 23cm, external diameter 19cm ~ 29cm.
5. a kind of flue device for the preparation of ultra-pure aluminum according to claim 1 is characterized in that: described bell is provided with prosopyle, posticum, vision slit, aspirating hole, air inlet port, venting hole, thermometer hole, pressure tap; Bell is two-layer up and down, edge seal, and centre is empty hollow bell, and prosopyle is connected with die cavity in bell with posticum, and object is when solidifying Purification of Aluminum, forms directed cooling environment at flue top, reduces temperature of aluminum liquid, improves purification efficiency; Vision slit is communicated to flue inside, and pass through metal clip at vision slit end rubber sheet gasketing and transparent glass fastening, play sealing function, vision slit diameter is 1.5cm ~ 4cm; Aspirating hole is communicated to flue inside, and outside is connected with vacuum pump, and effect vacuumized flue inside before fusing aluminium ingot; Pressure tap, air inlet port and venting hole share a passage, are communicated to flue inside, install four-way interface in passage outer end, air inlet and exhaust control respectively, air inlet port outer end is connected with argon bottle, and the object of air inlet port is after flue inside is evacuated, and passes into argon shield; Venting hole object is that flue internal gas expands when aluminium liquid melts, and release gas decompression, prevents flue dilatational strain; The external tensimeter of pressure tap, measures flue air pressure inside value in real time, ensures aluminium liquid purification quality; Thermometer hole is communicated to flue inside, installs thermopair, measures flue internal temperature in real time, ensures purification efficiency.
6. a kind of flue device for the preparation of ultra-pure aluminum according to claim 1 is characterized in that: between flue outside framework and bell, install the rubber seal that width is 1 ~ 3cm, and both connect fastening by buckle bolt.
7. use flue device as claimed in claim 1 to prepare the method for ultra-pure aluminum, it is characterized in that step is as follows:
(1) feed, require: in crucible, aluminium material the end of from up, fill intensive, aluminium material can't be made to be stuck in plumbago crucible and to make aluminium material can not arrive crucible bottom;
(2) cover graphite cover, at the sidewall seal ring set surface mounting rubber weather strip of flue outside framework, then cover bell, guarantee the stopping property of boiler clothing inside;
(3) close vent valve and argon gas cut-in valve, open vacuum pump and take out valve;
(4) open vacuum pump, after 8 ~ 15 minutes, make pressure gauge registration be 0.001Mpa ~ 0.01Mpa;
(5) open argon gas cut-in valve, close vacuum pump and take out valve, open argon gas and pass into switch until weather gage registration is 0.1Mpa ~ 0.15MPa;
(6) close argon gas cut-in valve, then start to add hot melt aluminium;
(7), after aluminium ingot fusing, open water intaking valve and outlet valve, lift is started to flue, purifies.
CN201410454924.9A 2014-09-09 2014-09-09 A kind of flue apparatus and method for the preparation of ultra-pure aluminum Expired - Fee Related CN104263969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410454924.9A CN104263969B (en) 2014-09-09 2014-09-09 A kind of flue apparatus and method for the preparation of ultra-pure aluminum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410454924.9A CN104263969B (en) 2014-09-09 2014-09-09 A kind of flue apparatus and method for the preparation of ultra-pure aluminum

Publications (2)

Publication Number Publication Date
CN104263969A true CN104263969A (en) 2015-01-07
CN104263969B CN104263969B (en) 2016-04-27

Family

ID=52155541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410454924.9A Expired - Fee Related CN104263969B (en) 2014-09-09 2014-09-09 A kind of flue apparatus and method for the preparation of ultra-pure aluminum

Country Status (1)

Country Link
CN (1) CN104263969B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017151288A1 (en) * 2016-02-29 2017-09-08 Asml Netherlands B.V. Method and apparatus for purifying target material for euv light source
CN108251658A (en) * 2018-02-05 2018-07-06 江苏金海铝业有限公司 A kind of method of directional solidification extraction ultra-pure aluminum under electromagnetic agitation
CN112708778A (en) * 2020-12-04 2021-04-27 宁波锦越新材料有限公司 Electron-grade ultra-high-purity aluminum crystallization device
CN114525387A (en) * 2022-04-08 2022-05-24 佛山市明富兴金属材料有限公司 Magnetic core vacuum heat treatment device and process
CN115323191A (en) * 2022-08-16 2022-11-11 武汉拓材科技有限公司 Ultrahigh-purity aluminum vacuum purification device and purification process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2409470Y (en) * 1999-12-29 2000-12-06 李连付 Hydrogen protecting furnace for pressurizing sintering diamond products
CN200943097Y (en) * 2006-06-15 2007-09-05 山西太钢不锈钢股份有限公司 Intermediate frequency heating graphite furnace lining
CN201003067Y (en) * 2006-11-25 2008-01-09 佟福斌 Highly pure aluminium extraction apparatus
CN101191160A (en) * 2006-11-25 2008-06-04 佟福斌 Device for extracting high pure aluminum

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2409470Y (en) * 1999-12-29 2000-12-06 李连付 Hydrogen protecting furnace for pressurizing sintering diamond products
CN200943097Y (en) * 2006-06-15 2007-09-05 山西太钢不锈钢股份有限公司 Intermediate frequency heating graphite furnace lining
CN201003067Y (en) * 2006-11-25 2008-01-09 佟福斌 Highly pure aluminium extraction apparatus
CN101191160A (en) * 2006-11-25 2008-06-04 佟福斌 Device for extracting high pure aluminum

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017151288A1 (en) * 2016-02-29 2017-09-08 Asml Netherlands B.V. Method and apparatus for purifying target material for euv light source
US10455680B2 (en) 2016-02-29 2019-10-22 Asml Netherlands B.V. Method and apparatus for purifying target material for EUV light source
US11317501B2 (en) 2016-02-29 2022-04-26 Asml Netherlands B.V. Method of purifying target material for an EUV light source
CN108251658A (en) * 2018-02-05 2018-07-06 江苏金海铝业有限公司 A kind of method of directional solidification extraction ultra-pure aluminum under electromagnetic agitation
CN112708778A (en) * 2020-12-04 2021-04-27 宁波锦越新材料有限公司 Electron-grade ultra-high-purity aluminum crystallization device
CN114525387A (en) * 2022-04-08 2022-05-24 佛山市明富兴金属材料有限公司 Magnetic core vacuum heat treatment device and process
CN115323191A (en) * 2022-08-16 2022-11-11 武汉拓材科技有限公司 Ultrahigh-purity aluminum vacuum purification device and purification process thereof

Also Published As

Publication number Publication date
CN104263969B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104263969B (en) A kind of flue apparatus and method for the preparation of ultra-pure aluminum
CN201960107U (en) Mechanical-stirring and combined pressure-casting device for ceramic-particle strengthened aluminum-base composite material
CN203286888U (en) Fully-closed magnesium alloy vacuum melting furnace
CN102560160B (en) Aluminum alloy vacuum standing, gas removal and smelting device
CN207188781U (en) Molten steel bottom drain bag with vacuum
CN104232932B (en) A kind of purifying plant of rafifinal and using method thereof
CN106917138A (en) For the polycrystalline cast ingot furnace body of oversize silicon ingot
CN106111935A (en) A kind of preparation method of reinforced type magnesium yttrium neodymium alloy laminated composite plate
CN201138138Y (en) Polycrystalline silicon segregating and cogging furnace without need of moving component
CN205262181U (en) Excel in production facility of aluminum alloy of tombarthite
CN203144557U (en) Bidirectional enhanced gas cooling device in crystal growth device
CN201962405U (en) Induction melting polysilicon ingot furnace with bottom heat radiation
CN210877466U (en) Integrated double-flow phi 180mm red copper/zinc white copper horizontal continuous casting unit
CN103498194A (en) Directional solidification equipment and method for preparing polycrystalline silicon by equipment
CN206843565U (en) A kind of vacuum melting casting device of melting and casting copper alloy
CN203489668U (en) Vacuum induction cold crucible casting device
CN203501759U (en) Resistance type smelting furnace for magnesium alloy
CN101660200A (en) Method for growing polycrystalline silicon ingot under slight positive pressure state and ingot furnace
CN201964759U (en) Casting melting furnace
CN207016892U (en) A kind of polycrystalline cast ingot furnace body for oversize silicon ingot
CN203231636U (en) Improved vacuum melting furnace for heavy nickel alloy
CN201261067Y (en) Water cooling base plate for directional solidification steel ingot
CN201592242U (en) Vacuum negative pressure self-pouring device for smelting crucible
CN110296602A (en) A kind of aluminium melting furnace burner taken out convenient for material
CN203440400U (en) Amorphous base metal smelting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180205

Address after: Zhenjiang City, Jiangsu province 212009 District No. 42 Dingmao pan Zong Lu

Patentee after: JIANGSU JINHAI ALUMINIUM INDUSTRY CO.,LTD.

Address before: Zhenjiang City, Jiangsu Province, 212013 Jingkou District Road No. 301

Patentee before: Jiangsu University

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427