CN104242462A - 一种基于wams和scada综合数据的电网强迫振荡源定位方法 - Google Patents
一种基于wams和scada综合数据的电网强迫振荡源定位方法 Download PDFInfo
- Publication number
- CN104242462A CN104242462A CN201410525783.5A CN201410525783A CN104242462A CN 104242462 A CN104242462 A CN 104242462A CN 201410525783 A CN201410525783 A CN 201410525783A CN 104242462 A CN104242462 A CN 104242462A
- Authority
- CN
- China
- Prior art keywords
- data
- wams
- electrical network
- oscillation
- scada
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本申请通过综合利用广域测量系统(WAMS)和电力数据采集与监控系统(SCADA)数据,对振荡源进行快速准确定位。主要原理为:首先采用基于500kV电网WAMS数据的能量流函数法定位振荡源的大致方向,然后针对三种常见的振荡源的性质采用三种不同的精确振荡源定位方法,采用基于SCADA数据的振荡极值点判断方法计算局部弱联系电网的联络线,判断是否弱联系电网存在振荡;采用发电机励磁电压相位的WAMS数据的相角来判断是否由于发电机励磁系统引发振荡;采用发电机组的调门或导叶开度的SCADA数据的极值点计算方法来判断是否由于机组原动机引发电网振荡。
Description
技术领域
本发明属于电力系统动态监测领域,具体涉及一种基于广域测量系统(即WAMS)和电力数据采集与监控系统(即SCADA)综合数据的电网强迫振荡源定位方法。
背景技术
电网低频振荡的原因大部分为某振荡源强迫振荡引起的。从历史统计看,南方电网的功率振荡基本上都为振荡源引起的强迫振荡,而引起电网振荡的强迫振荡源集中于以下三种情况,从南方电网的情况看,此三种情况导致的电网振荡占90%以上:
1.由于弱联系的区域电网的扰动的频率和主网的某一振荡特质频率接近,引发主网振荡。
2.由于发电机组的调门问题,导致原动机输出有功周期性振荡,其频率接近于电网的特征频率,引发主网振荡。
3.由于发电机的励磁调节器问题,出现正反馈,引发主网振荡。
本发明重点提出针对以上三种原因引起的电网振荡的快速定位方法,保证在电网出现振荡时能快速找到引起振荡的原因,有利于及时处理并快速恢复电网稳定,意义重大。
现有专利和论文在定位振荡源时都是单一的方法,采用单一的数据源,主要是采用PMU数据的波形进行分析,进行定位。虽然原理正确,但是由于电网安装PMU装置的厂站非常有限,如果振荡源厂站没有PMU装置,则不能正确定位,如果振荡源厂站没有PMU,就只能大概判断振荡源的方位,所以实用价值不大。
发明内容
为解决现有技术存在的上述问题,本发明公开了一种基于WAMS和SCADA综合数据的电网强迫振动源定位方法。
本发明具体采用以下技术方案:
一种基于WAMS和SCADA综合数据的电网强迫振动源定位方法,其特征在于:综合利用WAMS数据和SCADA数据进行定位判断。首先利用WAMS数据定位电网振荡源的方向和大致区域,再利用SCADA数据或PMU数据精确找到振荡原因。
基于WAMS和SCADA综合数据的电网强迫振动源定位方法包括以下步骤:
第一步:当电网主网出现振荡时,利用电网的WAMS数据,对振荡源进行初步定位:
通过计算电网关键节点所连接支路的势能流入、流出节点情况在线判断振荡源的大致方位,其中,所述关键节点所连接支路的势能函数通过如下方程描述:
ΔVPEi(t)为支路ij的i节点的势能,ΔVPEj(t)为j节点的势能,ΔPij为支路ij两端的有功差,ΔPji为支路ji两端的有功差,为i节点电压相角,为j节点电压相角,为i节点电压相角的偏导,为j节点电压相角的偏导,积分时间为观察时间窗口,根据势能的变化和能量的消耗的趋势判断出振荡源方向;
第二步:定位振荡源的大致方位后,针对三种引起振荡的振荡源进行详细定位:
2.1采用弱联系区域电网联络线的SCADA有功数据,利用SCADA数据振荡检查算法判断弱联系区域电网是否存在大于设定阈值的有功振幅,如果该弱联系区域电网出现大于设定阈值的有功振幅,且大于其余地方的有功振幅,则认为主网振荡是该弱联系区域电网引起的;
2.2通过SCADA数据采集的机组的调门开度,判断所述开度是否出现周期性振荡,如果出现周期性振荡,则认为电网主网振荡是由于机组的原动机的振荡引起的;
2.3通过WAMS采集的发电机励磁数据,根据励磁电压的相位判断电力系统稳定器PSS对电网的阻尼是否为负,如果阻尼为负,则认为是由于振荡是由于发电机电力系统稳定器PSS引起的。
其中,本申请所述电网关键节点是指在电网稳定计算中用户需要重点关注的电网节点,通常为电气连接薄弱和稳定密切相关的计算节点。本领域技术人员清楚如何电网关键节点的选取,这是本领域的现有技术。
本发明具有以下有益技术效果:本发明能解决电网目前大部分情况下不能准确定位电网振荡源的难题。由于现有的技术在定位电网振荡源上严重依靠WAMS数据,但是具有WAMS数据的厂站是少部分的,所以实用价值不大。本发明就能解决WAMS数据不能正确定位的缺陷。在电网振荡发生时,能够协助电网运行人员快速找到引起电网振荡的原因,并及时处理。能够避免因振荡引起电网重大事故。直接的效益是提高电网运行人员的工作效率,间接效益是提高电网运行的稳定,避免重大电网事故发生。
附图说明
图1为振荡源定位方法流程图;
图2为SCADA数据的振荡检查算法流程图。
具体实施方案
下面结合说明书附图,对本发明的技术方案作进一步详细介绍。
如附图1所示为本发明基于WAMS和SCADA综合数据的电网强迫振动源定位方法流程图,所述的电网强迫振动源定位方法包括以下步骤:
第一步:当电网主网出现振荡时,利用电网的WAMS数据(一般只有500KV厂站及重要的220KV厂站装有PMU数据),采用能量函数算法,对振荡源进行初步定位。其定位方法描述如下:
强迫功率振荡外施扰动产生的能量必然通过扰动源所在节点注入系统,而系统阻尼耗散的能量由所有机组和网络共同分担,外施扰动注入系统的能量以势能非周期分量的形式在网络中传播,因此网络中各支路势能变化情况与强迫功率振荡扰动源位置间存在较为明显的关系,通过关键节点所连接支路的势能流入、流出节点情况可以在线判断扰动源的大致方位。各支路的势能函数可以如下方程描述:
ΔVPEi(t)为支路ij的i节点的势能,ΔVPEj(t)为j节点的势能,ΔPij为线路两端的有功差,ΔPji为支路ji两端的有功差,该值为ΔPij的相反数,为i节点电压相角,为j节点电压相角,为i节点电压相角的偏导,为j节点电压相角的偏导,积分时间为观察时间窗口;外施扰动做功注入系统的能量通过势能在网络中传播,同时,各机组间的振荡动能也表现在势能的周期性变化上,即系统势能变化可以看作由两部分组成:一部分是伴随周期性振荡存在的周期性能量变化;另一部分是由于外施扰动注入系统,并在网络中传播消耗的能量,排除势能周期分量的影响,可以得到电网各关键节点的势能传播衰减方向,势能的衰减方向的反方向就是振荡源的大致方向。所以,根据势能的变化和能量的消耗的趋势判断出振荡源方向。
由于安装PMU的厂站数有限,所以能否立即准确定位到振荡源完全依赖于引发振荡的厂站是否装有PMU。所以仅仅采用基于WAMS数据的振荡源判断方法在实际应用中作用是非常有限,如果振荡源厂站没有PMU,就只能大概判断振荡源的方位。所以在本方法中,定位振荡源的大致方位作为第一步。
第二步:定位振荡源的大致方位后,同时针对以上三种引起振荡的方法进行详细定位:
针对由于第1种原因(弱联系的区域电网引起)的振荡,采用弱联系区域电网联络线的SCADA有功数据,利用SCADA数据振荡检查算法(见图2,其中计算函数的输入为(Pk,tk),其中Pk是设备的有功值,tk是量测采集的时间),如果设备的有功在设定的时间周期内,连续交替出现2个正向及反向集值点(即有功曲线呈现明显的周期波动),则判断弱联系电网是否的存在较大的有功振幅,如果该电网出现较大有功振幅,且大于其余地方振幅。则认为主网振荡是该区域电网引起的。
针对由于第2种原因(发电机组原动机输出引起)的振荡,采用发电机组原动机的输出阀门开度数据的SCADA数据进行判断,水电机组采用水轮机的导叶开度数据,火电机组采用汽轮机的调门开度数据,基于以上数据利用SCADA数据振荡检查算法(见图2,其中计算函数的输入为(Pk,tk),其中Pk是设备的有功值,tk是量测采集的时间),判断发电机组原动机输出功率是否的存在振荡情况,如果开度存在明显的振荡情况,则认为主网振荡是该发电机组引起的。
针对由于第3种原因(发电机组PSS引起)的振荡,采用发电机组励磁电压和PSS的WAMS的波形数据进行比较,当PSS电压波形的相位和发电机励磁电压波形的相位差小于90度大于-90度时,则认为PSS装置对电网的阻尼为负阻尼,主网振荡是该发电机组引起的。
本发明申请人结合说明书附图对本发明的实施例做了详细的说明与描述,但是本领域技术人员应该理解,以上实施例仅为本发明的优选实施方案,详尽的说明只是为了帮助读者更好地理解本发明精神,而并非对本发明保护范围的限制,相反,任何基于本发明的发明精神所作的任何改进或修饰都应当落在本发明的保护范围之内。
Claims (3)
1.一种基于WAMS和SCADA综合数据的电网强迫振动源定位方法,其特征在于:综合利用WAMS系统中的相量测量单元WAMS数据和SCADA数据,首先利用WAMS数据定位电网振荡源的方向和大致区域,再利用SCADA数据或WAMS数据精确找到振荡原因。
2.根据权利要求1所述的电网强迫振动源定位方法,其特征在于,所述定位方法包括以下步骤:
第一步:当电网主网出现振荡时,利用电网的WAMS数据,对振荡源进行初步定位:
通过计算电网关键节点所连接支路的势能流入、流出节点情况在线判断振荡源的大致方位,其中,所述关键节点所连接支路的势能函数通过如下方程描述:
ΔVPEi(t)为支路ij的i节点的势能,ΔVPEj(t)为j节点的势能,ΔPij为支路ij两端的有功差,ΔPji为支路ij从j端至i端两端的有功差,i为i节点电压相角,j为j节点电压相角,为i节点电压相角的偏导,为j节点电压相角的偏导,积分时间为观察时间窗口,根据势能的变化和能量的消耗的趋势判断出振荡源方向;
第二步:定位振荡源的大致方位后,针对三种引起振荡的振荡源进行详细定位:
2.1采用弱联系区域电网联络线的SCADA有功数据,利用SCADA数据振荡检查算法判断弱联系区域电网是否存在大于设定阈值的有功振幅,如果该弱联系区域电网出现大于设定阈值的有功振幅,且大于其余地方的有功振幅,则认为主网振荡是该弱联系区域电网引起的;
2.2通过SCADA数据采集的机组的调门开度,判断所述开度是否出现周期性振荡,如果出现周期性振荡,则认为电网主网振荡是由于机组的原动机的振荡引起的;
2.3通过WAMS采集的发电机励磁数据,根据励磁电压的相位判断电力系统稳定器PSS对电网的阻尼是否为负,如果阻尼为负,则认为是由于振荡是由于发电机电力系统稳定器PSS引起的。
3.根据权利要求2所述的电网强迫振动源定位方法,其特征在于:
在第一步中,将势能变化看作由两部分组成:一部分是伴随周期性振荡存在的周期性能量变化;另一部分是在电网中传播并消耗的能量;当所述关键节点所连接支路的势能在电网中传播并逐渐消耗时,排除势能周期分量的影响,得到电网各关键节点的势能传播衰减方向,势能的衰减方向的反方向就是振荡源的大致方向。
在第二步中,当PSS电压波形的相位和发电机励磁电压波形的相位差小于90度大于-90度时,则认为PSS装置对电网的阻尼为负阻尼。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410525783.5A CN104242462B (zh) | 2014-10-08 | 2014-10-08 | 一种基于wams和scada综合数据的电网强迫振荡源定位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410525783.5A CN104242462B (zh) | 2014-10-08 | 2014-10-08 | 一种基于wams和scada综合数据的电网强迫振荡源定位方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104242462A true CN104242462A (zh) | 2014-12-24 |
CN104242462B CN104242462B (zh) | 2016-04-20 |
Family
ID=52230036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410525783.5A Active CN104242462B (zh) | 2014-10-08 | 2014-10-08 | 一种基于wams和scada综合数据的电网强迫振荡源定位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104242462B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104638663A (zh) * | 2015-02-09 | 2015-05-20 | 南京南瑞继保电气有限公司 | 一种功率振荡控制方法 |
CN105823985A (zh) * | 2016-03-11 | 2016-08-03 | 国网新疆电力公司电力科学研究院 | 一种基于wams动态数据的发电机励磁系统在线监测与评估系统 |
CN105844542A (zh) * | 2016-03-30 | 2016-08-10 | 东北石油大学 | 基于wams的电网单一大扰动在线检测方法 |
US10027119B2 (en) | 2016-05-28 | 2018-07-17 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for multiple distributed energy resources |
US10452032B1 (en) | 2016-09-08 | 2019-10-22 | PXiSE Energy Solutions, LLC | Optimizing power contribution of distributed energy resources for real time power demand scheduling |
CN110417030A (zh) * | 2019-07-03 | 2019-11-05 | 东南大学 | 一种电力系统强迫振荡的分布式定位方法及系统 |
CN110492497A (zh) * | 2019-08-16 | 2019-11-22 | 国网河南省电力公司电力科学研究院 | 一种发电机组功率振荡综合诊断方法及系统 |
CN110571848A (zh) * | 2019-08-19 | 2019-12-13 | 江苏方天电力技术有限公司 | 一种适用于强迫振荡分布式定位的自适应电网划分方法 |
US10599175B1 (en) | 2017-02-28 | 2020-03-24 | PXiSE Energy Solutions, LLC | Time synchronized frequency and voltage regulation of electric power balancing areas |
US10615604B2 (en) | 2016-05-28 | 2020-04-07 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US10990072B2 (en) | 2017-11-28 | 2021-04-27 | PXiSE Energy Solutions, LLC | Maintaining power grid stability using predicted data |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
CN114165382A (zh) * | 2021-11-24 | 2022-03-11 | 华电电力科学研究院有限公司 | 水电机组绝对效率测试方法和系统 |
CN117129755A (zh) * | 2023-10-24 | 2023-11-28 | 南方电网科学研究院有限责任公司 | 宽频振荡广域监测系统和宽频振荡源定位方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090222144A1 (en) * | 2008-03-04 | 2009-09-03 | Washington State University | Systems and methods for electromechanical oscillation monitoring |
CN103178519A (zh) * | 2013-03-06 | 2013-06-26 | 中国南方电网有限责任公司 | 基于scada数据实时定位电力系统功率振荡扰动源的方法 |
-
2014
- 2014-10-08 CN CN201410525783.5A patent/CN104242462B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090222144A1 (en) * | 2008-03-04 | 2009-09-03 | Washington State University | Systems and methods for electromechanical oscillation monitoring |
CN103178519A (zh) * | 2013-03-06 | 2013-06-26 | 中国南方电网有限责任公司 | 基于scada数据实时定位电力系统功率振荡扰动源的方法 |
Non-Patent Citations (2)
Title |
---|
李文锋等: "基于WAMS的电力系统功率振荡分析与振荡源定位(1)割集能量法", 《中国电机工程学报》 * |
梁寿愚等: "基于SCADA数据的实时定位电网低频振荡扰动源算法及其实现", 《南方电网技术》 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104638663A (zh) * | 2015-02-09 | 2015-05-20 | 南京南瑞继保电气有限公司 | 一种功率振荡控制方法 |
CN104638663B (zh) * | 2015-02-09 | 2017-02-22 | 南京南瑞继保电气有限公司 | 一种功率振荡控制方法 |
CN105823985A (zh) * | 2016-03-11 | 2016-08-03 | 国网新疆电力公司电力科学研究院 | 一种基于wams动态数据的发电机励磁系统在线监测与评估系统 |
CN105823985B (zh) * | 2016-03-11 | 2018-06-26 | 国网新疆电力公司电力科学研究院 | 一种基于wams动态数据的发电机励磁系统在线监测与评估系统 |
CN105844542A (zh) * | 2016-03-30 | 2016-08-10 | 东北石油大学 | 基于wams的电网单一大扰动在线检测方法 |
CN105844542B (zh) * | 2016-03-30 | 2020-04-14 | 东北石油大学 | 基于wams的电网单一大扰动在线检测方法 |
US10027119B2 (en) | 2016-05-28 | 2018-07-17 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for multiple distributed energy resources |
US10714938B2 (en) | 2016-05-28 | 2020-07-14 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for multiple distributed energy resources |
US10615604B2 (en) | 2016-05-28 | 2020-04-07 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US10452032B1 (en) | 2016-09-08 | 2019-10-22 | PXiSE Energy Solutions, LLC | Optimizing power contribution of distributed energy resources for real time power demand scheduling |
US10599175B1 (en) | 2017-02-28 | 2020-03-24 | PXiSE Energy Solutions, LLC | Time synchronized frequency and voltage regulation of electric power balancing areas |
US10990072B2 (en) | 2017-11-28 | 2021-04-27 | PXiSE Energy Solutions, LLC | Maintaining power grid stability using predicted data |
CN110417030A (zh) * | 2019-07-03 | 2019-11-05 | 东南大学 | 一种电力系统强迫振荡的分布式定位方法及系统 |
CN110492497A (zh) * | 2019-08-16 | 2019-11-22 | 国网河南省电力公司电力科学研究院 | 一种发电机组功率振荡综合诊断方法及系统 |
CN110492497B (zh) * | 2019-08-16 | 2022-04-22 | 国网河南省电力公司电力科学研究院 | 一种发电机组功率振荡综合诊断方法及系统 |
CN110571848A (zh) * | 2019-08-19 | 2019-12-13 | 江苏方天电力技术有限公司 | 一种适用于强迫振荡分布式定位的自适应电网划分方法 |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
CN114165382A (zh) * | 2021-11-24 | 2022-03-11 | 华电电力科学研究院有限公司 | 水电机组绝对效率测试方法和系统 |
CN114165382B (zh) * | 2021-11-24 | 2023-06-20 | 华电电力科学研究院有限公司 | 水电机组绝对效率测试方法和系统 |
CN117129755A (zh) * | 2023-10-24 | 2023-11-28 | 南方电网科学研究院有限责任公司 | 宽频振荡广域监测系统和宽频振荡源定位方法 |
CN117129755B (zh) * | 2023-10-24 | 2024-01-19 | 南方电网科学研究院有限责任公司 | 宽频振荡广域监测系统和宽频振荡源定位方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104242462B (zh) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104242462B (zh) | 一种基于wams和scada综合数据的电网强迫振荡源定位方法 | |
Wang et al. | Location methods of oscillation sources in power systems: a survey | |
US9037425B2 (en) | Method for determining position of forced power oscillation disturbance source in regional interconnected power grid | |
CN102035203B (zh) | 一种快速求取联络线暂态稳定极限传输功率的计算方法 | |
CN106786608B (zh) | 一种适用于分布式电源接入的不确定谐波潮流计算方法 | |
CN102999809B (zh) | 一种用于间歇性电源高渗透电网规划的安全性评估方法 | |
CN104638646A (zh) | 基于复杂网络理论计及校正控制的电网连锁故障模拟方法 | |
CN103279035A (zh) | 考虑wams信号时延的电力系统广域输出反馈控制方法 | |
WO2017101945A1 (en) | Estimation of power quality at point of common coupling | |
CN103390899B (zh) | 一种评估互联大电网中强迫振荡影响的方法 | |
An et al. | Power system wideband oscillation estimation, localization, and mitigation | |
CN105356457A (zh) | 一种电网事故恢复备用容量充裕度评估方法 | |
CN106410788A (zh) | 基于传输介数的电网关键线路辨识方法 | |
CN104283208B (zh) | 大型电网概率性可用输电能力的分解协调计算方法 | |
CN101841154A (zh) | 输电网严重故障后的电压稳定裕度实时评估与最优控制方法 | |
CN105243214B (zh) | 一种互联电网强迫功率振荡节点敏感性评估方法 | |
Vilchez et al. | Impact of renewable energy generation technologies on the power quality of the electrical power systems | |
CN104330671B (zh) | 一种冲激扰动引发的交流联络线功率波动的评估分析方法 | |
CN105140918A (zh) | 一种包含统一潮流控制器的随机最优潮流计算方法 | |
Robert et al. | Hydro power plant modeling for generation control applications | |
Shi et al. | Analytical approach to estimating the probability of transient stability under stochastic disturbances | |
Wu et al. | A novel active islanding fault detection based on even harmonics injection and set-membership filtering | |
CN104362666A (zh) | 一种风电场低压切机紧急控制方法 | |
Huang et al. | Analysis of dynamic interaction in wind-storage virtual synchronous generator integrated system | |
Yi et al. | A new approach for identifying coherent generator groups in large scale power systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |