CN104229621B - Large Precast Members hanging apparatus and method - Google Patents

Large Precast Members hanging apparatus and method Download PDF

Info

Publication number
CN104229621B
CN104229621B CN201410420095.2A CN201410420095A CN104229621B CN 104229621 B CN104229621 B CN 104229621B CN 201410420095 A CN201410420095 A CN 201410420095A CN 104229621 B CN104229621 B CN 104229621B
Authority
CN
China
Prior art keywords
fixed block
shaped
falling
bar
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410420095.2A
Other languages
Chinese (zh)
Other versions
CN104229621A (en
Inventor
王琨
焦彦波
汉方
郑斌
尚延利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Original Assignee
SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HARBOUR ENGINEERING GROUP Co Ltd filed Critical SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Priority to CN201410420095.2A priority Critical patent/CN104229621B/en
Publication of CN104229621A publication Critical patent/CN104229621A/en
Application granted granted Critical
Publication of CN104229621B publication Critical patent/CN104229621B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Large Precast Members hanging apparatus and method, relate to Large Precast Members hoisting technology field, particularly belongs to a kind of devices and methods therefor using the suspension rod of falling T-shaped to carry out large scale prefabricated part lifting.There is the bar of falling T-shaped (5) and auxiliary device, it is characterized in that, described auxiliary device includes fixed block (2) and locked instrument, locked instrument is the pin (4) of pin-and-hole (3) and the matched use being welded on the bar of falling T-shaped, fixed block is provided with jack (6), fixed block is positioned at T prefix (1) upside of the bar of falling T-shaped, and the bar of falling T-shaped is provided above rotary handle (7).Its hanging method, including the installing under water of the land installation of suspender and component, the step such as excision under water of suspender.There is good effect easy and simple to handle, safe and reliable, that work efficiency is high.

Description

Large Precast Members hanging apparatus and method
Technical field
The present invention relates to Large Precast Members hoisting technology field, particularly belong to a kind of use suspension rod of falling T-shaped and carry out large-scale The devices and methods therefor of prefabricated component lifting.
Background technology
At present, along with the development of water transport engineering project technology, concrete lifting component technology is increasingly mature, but at harbour, code It is all to use suspension ring and " suspension rod of falling T-shaped " to carry out concrete lifting component as suspender that head builds the central overwhelming majority, is using " T-shaped suspension rod " lifting time, because its hole for hoist is reserved relatively deep, easily cause land peace suspender, to pluck suspender difficulty, work efficiency under water low etc. Phenomenon.
Summary of the invention
It is an object of the invention to provide a kind of novel Large Precast Members hanging apparatus and method, to reach operation letter List is quick, reduce cost, increase substantially the purpose of work efficiency.
Large Precast Members hanging apparatus provided by the present invention, has the bar of falling T-shaped and auxiliary device, it is characterised in that Described auxiliary device includes fixed block and locked instrument, and locked instrument is the pin-and-hole being welded on the bar of falling T-shaped and joins therewith Closing the pin used, fixed block is provided with jack, and fixed block is positioned on the upside of the T prefix of the bar of falling T-shaped, and the bar of falling T-shaped is provided above Rotary handle.
Large Precast Members hanging method provided by the present invention, it is characterised in that comprise the steps:
1) the land installation of suspender
Step 1-1, the suspension rod of falling T-shaped and auxiliary device are winched to above component by operator simultaneously, and workmen is same by it Step moves to component and reserves directly over hole for hoist;
Step 1-2, makes fixed block and T prefix on same level axis, and the big hook of crane ship is slowly drop down on component Fang Jinhang coarse positioning;
Step 1-3, crane ship continues to weigh in the hand hook, and workmen is keeping fixed block and the T prefix shape at same level axis Under state, fixed block and T-shaped bar are put into component and reserves hole for hoist, and pinned in pin is inserted the jack of fixed block;
Step 1-4, after fixed block arrives position of rotation, stops declining, will pull out on pin, and T-shaped bar is rotated 90 by workman Degree, makes T prefix vertical with the axis of fixed block, and pin is stayed in pin-and-hole, and workman withdraws scene, and crane ship starts lifting;
2) component is installed under water and suspender is extractd
Step 2-1, Large Precast Members is hoisted under water by crane ship, and Divers will be pre-under the guidance of technical staff Component processed is arranged on design attitude;
Step 2-2, after component installation, crane ship is weighed hook in the hand and is relaxed one's efforts to steel wire rope, and Divers puts in place;
Step 2-3, Divers the bar of falling T-shaped is rotated to fixed block same level axis, insert pin, and withdraw To safety zone;
Step 2-4, because fixed block can keep the suspension rod of falling T-shaped vertical center in hole for hoist reserved by component, crane ship can Successfully suspender is left the water;
Step 2-5, enters the lifting flow process of next component.
Present invention effectively prevents existing Large Precast Members hoisting process to install, extract the hole clipping etc. that T-shaped bar easily occurs The generation of phenomenon, is effectively shortened the bottom time of Divers, reduces the probability of happening of bends, has ensured its people Body safety;This method has good effect easy and simple to handle, safe and reliable, that work efficiency is high.
Accompanying drawing explanation
Accompanying drawing part discloses the specific embodiment of the present invention, wherein
Fig. 1, fixed block top view of the present invention;
Fig. 2, the structural representation of hanging apparatus of the present invention;
Fig. 3, hanging apparatus of the present invention enters concrete test block view;
Fig. 4, view after T-shaped bar 90-degree rotation of the present invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, Large Precast Members hanging apparatus provided by the present invention, there is the bar of falling T-shaped 5 and auxiliary Device, wherein, described auxiliary device includes fixed block 2 and locked instrument, and locked instrument is the pin being welded on the bar of falling T-shaped The pin 4 of hole 3 and matched use, fixed block is provided with jack 6, and fixed block is positioned on the upside of the T prefix 1 of the bar of falling T-shaped, The bar of falling T-shaped is provided above rotary handle 7.
Large Precast Members hanging method provided by the present invention, is first the land installation of suspender, and operator will fall T-shaped suspension rod and auxiliary device winch to above component simultaneously, and workmen is synchronized to move to component and reserves directly over hole for hoist; Making fixed block and T prefix on same level axis, the big hook of crane ship is slowly drop down to above component carry out coarse positioning.
As it is shown on figure 3, after hanging apparatus carries out coarse positioning above component 8, crane ship continues to weigh in the hand hook, workmen exists Keep fixed block and T prefix when same level axis, fixed block and T-shaped bar are put into component and reserves hole for hoist 9 In, and is pinned in pin is inserted the jack of fixed block, fixed block and the close contact of reserved hole for hoist during this, simultaneously Serve the effect of location, it is to avoid the hole clipping phenomenon that T-shaped bar displacement causes.
As shown in Figure 4, after fixed block arrives position of rotation, stopping declining, will pull out on pin, T-shaped bar is rotated 90 by workman Degree, makes T prefix vertical with the axis of fixed block, and pin is stayed in pin-and-hole, and workman withdraws scene, and crane ship starts lifting.
After Large Precast Members is hoisted under water by crane ship, Divers under the guidance of technical staff by prefabricated components It is arranged on design attitude;After component installation, crane ship is weighed hook in the hand and is relaxed one's efforts to steel wire rope, and now Divers is by the bar of falling T-shaped Rotate to parallel with fixed block, insert pin, and withdraw to safety zone;Because fixed block can keep the suspension rod of falling T-shaped in lifting Vertical center in hole, suspender can successfully be left the water by crane ship.
The hanging apparatus of the present invention, coordinates the reserved hole for hoist in Large Precast Members to use, and the most efficiently, safety can Lean on.

Claims (2)

1. a Large Precast Members hanging apparatus, has the bar of falling T-shaped (5) and auxiliary device, it is characterised in that described is auxiliary Helping device to include fixed block (2) and locked instrument, locked instrument is the pin-and-hole (3) being welded on the bar of falling T-shaped and matched The pin (4) used, fixed block is provided with jack (6), and fixed block is positioned at T prefix (1) upside of the bar of falling T-shaped, on the bar of falling T-shaped Side arranges rotary handle (7).
2. a Large Precast Members hanging method, it is characterised in that comprise the steps:
1) the land installation of suspender
Step 1-1, the suspension rod of falling T-shaped and auxiliary device are winched to component (8) top by operator simultaneously, and workmen is same by it Step moves to component and reserves directly over hole for hoist (9);
Step 1-2, makes fixed block and T prefix on same level axis, and the big hook of crane ship is slowly drop down to above component enter Row coarse positioning;
Step 1-3, crane ship continues to weigh in the hand hook, workmen when keeping fixed block and T prefix at same level axis, Fixed block and T-shaped bar are put into component and reserves hole for hoist, and pinned in pin is inserted the jack of fixed block;
Step 1-4, after fixed block arrives position of rotation, stops declining, will pull out on pin, and workman, by T-shaped bar 90-degree rotation, makes T Prefix is vertical with the axis of fixed block, and pin is stayed in pin-and-hole, and workman withdraws scene, and crane ship starts lifting;
2) component is installed under water and suspender is extractd
Step 2-1, Large Precast Members is hoisted under water by crane ship, Divers under the guidance of technical staff by prefabricated structure Part is arranged on design attitude;
Step 2-2, after component installation, crane ship is weighed hook in the hand and is relaxed one's efforts to steel wire rope, and Divers puts in place;
Step 2-3, Divers the bar of falling T-shaped is rotated to fixed block same level axis, insert pin, and withdraw to peace Region-wide;
Step 2-4, because fixed block can keep the suspension rod of falling T-shaped vertical center in hole for hoist, crane ship can be successfully by suspender Leave the water;
Step 2-5, enters the lifting flow process of next component.
CN201410420095.2A 2014-08-25 2014-08-25 Large Precast Members hanging apparatus and method Expired - Fee Related CN104229621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410420095.2A CN104229621B (en) 2014-08-25 2014-08-25 Large Precast Members hanging apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410420095.2A CN104229621B (en) 2014-08-25 2014-08-25 Large Precast Members hanging apparatus and method

Publications (2)

Publication Number Publication Date
CN104229621A CN104229621A (en) 2014-12-24
CN104229621B true CN104229621B (en) 2016-08-24

Family

ID=52218654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410420095.2A Expired - Fee Related CN104229621B (en) 2014-08-25 2014-08-25 Large Precast Members hanging apparatus and method

Country Status (1)

Country Link
CN (1) CN104229621B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236256A (en) * 2015-11-13 2016-01-13 中国船舶重工集团公司第七二六研究所 Underwater hoisting device and fast connecting device thereof
CN108033355A (en) * 2017-12-11 2018-05-15 合肥中科离子医学技术装备有限公司 A kind of through hole suspender and its application method
CN108016985A (en) * 2017-12-13 2018-05-11 广新海事重工股份有限公司 A kind of simple easily container examination box hanger

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2834441B2 (en) * 1996-06-12 1998-12-09 正秋 水田 Hanging equipment
CN101857169B (en) * 2010-06-07 2012-07-25 孙效 Sling tool using interstitial hole
CN201746225U (en) * 2010-07-22 2011-02-16 卫华集团有限公司 Twist lock connection device of upper and lower crane bodies and crane using same
CN201817192U (en) * 2010-08-05 2011-05-04 中建筑港集团有限公司 Large-tonnage concrete block lifting appliance
CN201864459U (en) * 2010-11-26 2011-06-15 贵阳铝镁设计研究院 Buckle type hoisting and fastening device for hoisting electrode of large diameter
CN202625591U (en) * 2012-05-24 2012-12-26 无锡西姆莱斯石油专用管制造有限公司 Saw blade lifting device for sampling saw
CN204022268U (en) * 2014-08-25 2014-12-17 山东港湾建设集团有限公司 Large Precast Members hanging apparatus

Also Published As

Publication number Publication date
CN104229621A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN203284095U (en) Tower crane for cooling tower
CN103939299B (en) The split type mounting process of a kind of offshore wind turbine
CN204355946U (en) A kind of device lifting large wt pts
CN104229621B (en) Large Precast Members hanging apparatus and method
CN203247009U (en) Automatic detacher of under water hanging object
CN204375432U (en) Spent fuel dry-type storage project underwater operation platform device for hoisting
CN204281112U (en) Special lifting lifting system processed by a kind of wheel
CN104016243B (en) Boiler cable shaft hanging apparatus
CN109292040A (en) A kind of multi-faceted full-rotating rudder paddle block installation method
CN204475266U (en) Automatic disconnecting type water-permeable frame group polishing apparatus
CN201334306Y (en) Hoisting machine for upright post member
CN204281054U (en) A kind of small-sized caisson suspender
CN103922232B (en) A kind of tower crane fall tower process
CN202346601U (en) Movable balance weight hoisting device for gantry crane
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN203877726U (en) Multi-hoisting-point hoisting beam for turning over and hoisting equipment
CN204022268U (en) Large Precast Members hanging apparatus
CN202785542U (en) Reactor dome hanging basket
CN103979442A (en) Method for lifting Fischer-Tropsch reactor by 6400t hydraulic combined crane
CN108163142A (en) A kind of hanging method of stern springboard
CN211169515U (en) Lifting device for adjusting hydraulic cylinder of universal mill
CN202864681U (en) Plate hook for tubular pile
CN104925644B (en) Cathode conductive assembly overturning, inverting and hoisting construction method
CN106760617B (en) A kind of inspection platform translation construction method
CN205218474U (en) Piston servomotor shifts out device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20200825