CN104213933A - Prearranged retractable mine lifesaving pipeline - Google Patents

Prearranged retractable mine lifesaving pipeline Download PDF

Info

Publication number
CN104213933A
CN104213933A CN201410444357.9A CN201410444357A CN104213933A CN 104213933 A CN104213933 A CN 104213933A CN 201410444357 A CN201410444357 A CN 201410444357A CN 104213933 A CN104213933 A CN 104213933A
Authority
CN
China
Prior art keywords
pipeline
cable
plug
telescopic tube
retractable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410444357.9A
Other languages
Chinese (zh)
Other versions
CN104213933B (en
Inventor
王雅君
王自成
李海瑞
褚凤琴
王亚慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410444357.9A priority Critical patent/CN104213933B/en
Publication of CN104213933A publication Critical patent/CN104213933A/en
Application granted granted Critical
Publication of CN104213933B publication Critical patent/CN104213933B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a prearranged retractable mine lifesaving pipeline. The prearranged retractable mine lifesaving pipeline comprises a pipe and a line. The pipe comprises a plurality of retractable pipes which are mutually connected through flanges, and the retractable pipes are connected through elbow connecting pieces or multi-way connecting pieces at positions of turnings or junctions between a shaft and roadways; the line is formed by a plurality of sections of cables packaged in the pipe in a connecting manner, and the length of the line is larger than the maximum extension length of the pipe; each section of cable comprises two power lines and eight data lines which are packaged in an outer sheath. The prearranged retractable mine lifesaving pipeline has the advantages that the structure is simple, the pipeline is convenient to use, the explosion-proof performance is high, the communication can be enabled to be smooth when underground accidents occur, the timely, accurate and effective rescue is facilitated, and the safety of underground miners is further guaranteed.

Description

The scalable mine life saving pipeline of presetting system
Technical field
The invention belongs to equipment technology field, mine, the scalable mine life saving pipeline of especially a kind of presetting system.
Background technology
In mining industry, down-hole accident happens occasionally, underground labour and ground out of touch, the position residing for underground labour cannot be determined, oxygen supply of can not ventilating in time, provide drinking-water and food and cause casualties.In order to reduce mine down-hole accident casualties, can in down-hole, each tunnel be preset leads to the lifesaving pipeline on ground, once have an accident, by information under lifesaving pipeline production wells, and by oxygen, water, liquid food, power supply etc. from introducing down-hole, ground.
But down-hole accident is all often caused by situations such as exploding, cave in, adopt that common pipeline is subject to the shock and vibration of air-flow, tunnel caves in displacement extrusion shearing pipeline, pipe-line can be caused seriously to damage, can not life-saving functions be realized.
Summary of the invention
The object of the present invention is to provide the scalable mine life saving pipeline of a kind of presetting system, its structure is simple, easy to use, anti-knock properties are strong, and when can ensure that down-hole has an accident, communication is unimpeded, be beneficial to timely, accurate and effective suing and labouring, make the how a safety assurance of down-hole absence from work without reason.
The technical solution adopted in the present invention is achieved in that the scalable mine life saving pipeline of a kind of presetting system, it comprises pipeline and circuit two parts, it is characterized in that: described pipeline comprises some by the interconnective telescopic tube of flange, corner or vertical shaft with between tunnel intersection telescopic tube by bend connecting fitting or lead to fitting more and be connected; The extra heavy pipe that telescopic tube is set with by a tubule and two ends is formed, the two ends fixed piston ring of tubule, and piston ring is provided with 1 ~ 4 cannelure, in each cannelure, install O-ring seal; The medial extremity fixed cover of extra heavy pipe stops the end cap of piston ring on tubule, the outboard end mounting flange of extra heavy pipe; Described circuit is formed by connecting by the cable that some sections are encapsulated in pipeline, and the length of circuit is greater than pipeline maximum extension length; Every section of cable all comprises and is encapsulated in two power lines in oversheath and eight data lines; Plug is installed in one end of cable, the other end of cable installs the socket corresponding with plug, rotatable lock nut fixed by the plug or socket of cable one end, socket corresponding to the cable other end or plug have the external screw thread corresponding with lock nut internal thread.
Further, vertical shaft pipelines is set with one at interval of 1 ~ 3 telescopic tube below flange and lifts ring, two drag ropes be connected respectively to lift ring both sides earrings on pipeline flexible is lifted in vertical shaft.
The invention has the advantages that:
1, form telescopic tube, the bend connecting fitting of pipeline and lead to fitting more plastic material can be used to make; Plastic material has scalable, flexible feature in certain amplitude; especially the telescopic tube forming pipe main body has significantly scalability; mine blast the accident such as to cave in time; pipeline can be out of shape in stretch bending; but it can ensure the sealing performance that pipeline connects all the time, in pipeline, the length of circuit is greater than pipeline maximum extension length, and circuit has enough spread lengths; under the protection of conduit enclosure, also can not there is phenomenon of rupture in circuit.
2, tubule and its two ends piston ring, extra heavy pipe and end cap, fixing between extra heavy pipe and flange can adopt hot-melt adhesive paste, make easily, with low cost, can in various mines wide popularization and application.
3, pipeline is formed by connecting by some telescopic tubes, circuit is formed by connecting by some cables be encapsulated in pipeline, and in down-hole along with the propelling of work plane, pipeline and circuit can follow lengthening at any time, underworkings does not deposit dead angle, greatly enhances mine accident security performance.
Although 4, pipeline is formed by connecting by some telescopic tubes, can be provided with on sealing mat, piston ring at flange connections and be provided with O-ring seal, whole seal for pipe joints is functional, in pipeline except circuit, also has very large ventilation space, after generation accident of mine disaster, can realize writing to each other by circuit, can also by pipeline to delivered downhole air, water or liquid food.Wrecked personnel's time-to-live can be extended, race against time to rescue.
Accompanying drawing explanation
Fig. 1 is the scalable mine life saving pipeline of presetting system of the present invention and mine cross-sectional view;
Fig. 2 is that the present invention two saves telescopic tube connection connection status perspective view;
Fig. 3 is telescopic tube cross-sectional view of the present invention;
Fig. 4 is bend connecting fitting perspective view of the present invention;
Fig. 5, Fig. 6 and Fig. 7 of the present inventionly lead to fitting perspective view three kinds more;
Fig. 8 is the perspective view of the present invention's one section of cable;
Fig. 9 is that the present invention lifts ring and two drag rope perspective view.
In figure: 1-telescopic tube, 2-bend connecting fitting, 3-leads to fitting more, 4-tubule, 5-extra heavy pipe, 6-piston ring, 7-cannelure, 8-O-ring seal, 9-end cap, 10-flange, 11-plug, 12-socket, 13-lock nut, 14-external screw thread, 15-lifts ring, 16-drag rope, 17-earrings.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described.
As shown in Figures 1 to 9, the scalable mine life saving pipeline of a kind of presetting system, it comprises pipeline and circuit two parts, described pipeline comprises some by the interconnective telescopic tube 1 of flange, corner or vertical shaft with between tunnel intersection telescopic tube by bend connecting fitting 2 or lead to fitting 3 more and be connected; The extra heavy pipe 5 that telescopic tube 1 is set with by a tubule 4 and two ends is formed, the two ends fixed piston ring 7 of tubule 4, and piston ring 7 is provided with two cannelures 7, in each cannelure 7, install O-ring seal 8; The medial extremity fixed cover of extra heavy pipe 5 stops the end cap 9 of piston ring 6 on tubule 4, the outboard end mounting flange 10 of extra heavy pipe 5; Described circuit is formed by connecting by the cable that some sections are encapsulated in pipeline, and the length of circuit is greater than pipeline maximum extension length; Every section of cable all comprises and is encapsulated in two power lines in oversheath and eight data lines; Plug 11 is installed in one end of cable, the other end of cable installs the socket 12 corresponding with plug 11, rotatable lock nut 13 fixed by the socket 12 of cable one end, the plug 11 that the cable other end is corresponding has the external screw thread 14 corresponding with lock nut 13 internal thread.Vertical shaft pipelines is set with one at interval of 2 ~ 3 telescopic tubes 1 below flange 10 and lifts ring 15, two drag ropes 16 be connected respectively to lift ring 15 both sides earrings 17 on pipeline flexible is lifted in vertical shaft.
Finally should be noted that; above detailed description of the invention is only in order to illustrate technical scheme of the present invention; but not limiting the scope of the invention; the simple modification that those of ordinary skill in the art carries out technical scheme of the present invention or equivalently to replace, does not all depart from essence and the scope of technical solution of the present invention.

Claims (2)

1. the scalable mine life saving pipeline of presetting system, it comprises pipeline and circuit two parts, it is characterized in that: described pipeline comprises some by the interconnective telescopic tube of flange, corner or vertical shaft with between tunnel intersection telescopic tube by bend connecting fitting or lead to fitting more and be connected; The extra heavy pipe that telescopic tube is set with by a tubule and two ends is formed, the two ends fixed piston ring of tubule, and piston ring is provided with 1 ~ 4 cannelure, in each cannelure, install O-ring seal; The medial extremity fixed cover of extra heavy pipe stops the end cap of piston ring on tubule, the outboard end mounting flange of extra heavy pipe; Described circuit is formed by connecting by the cable that some sections are encapsulated in pipeline, and the length of circuit is greater than pipeline maximum extension length; Every section of cable all comprises and is encapsulated in two power lines in oversheath and eight data lines; Plug is installed in one end of cable, the other end of cable installs the socket corresponding with plug, rotatable lock nut fixed by the plug or socket of cable one end, socket corresponding to the cable other end or plug have the external screw thread corresponding with lock nut internal thread.
2. the scalable mine life saving pipeline of presetting system according to claim 1, it is characterized in that: on vertical shaft pipelines, below flange, be set with one at interval of 1 ~ 3 telescopic tube lift ring, two drag ropes be connected respectively to lift ring both sides earrings on pipeline flexible is lifted in vertical shaft.
CN201410444357.9A 2014-08-26 2014-08-26 Prearranged retractable mine lifesaving pipeline Expired - Fee Related CN104213933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410444357.9A CN104213933B (en) 2014-08-26 2014-08-26 Prearranged retractable mine lifesaving pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410444357.9A CN104213933B (en) 2014-08-26 2014-08-26 Prearranged retractable mine lifesaving pipeline

Publications (2)

Publication Number Publication Date
CN104213933A true CN104213933A (en) 2014-12-17
CN104213933B CN104213933B (en) 2017-01-11

Family

ID=52095800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410444357.9A Expired - Fee Related CN104213933B (en) 2014-08-26 2014-08-26 Prearranged retractable mine lifesaving pipeline

Country Status (1)

Country Link
CN (1) CN104213933B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905836A (en) * 2018-01-03 2018-04-13 中国科学院武汉岩土力学研究所 Mine disaster lifesaving appliance and mine disaster lifesaving system
CN109057856A (en) * 2018-07-02 2018-12-21 昆明理工大学 Extension type lightweight survival capsule in a kind of tunnel
CN110067593A (en) * 2019-06-05 2019-07-30 中交一公局海威工程建设有限公司 Tunnel pipe for escaping

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641187A (en) * 2003-08-22 2005-07-20 福建亚通新材料科技股份有限公司 Mine emergency rescue pipeline
CN201280949Y (en) * 2008-12-26 2009-07-29 杭州萧宏建设集团有限公司 Downhole safety rescue ventilating duct
CN101793161A (en) * 2010-03-30 2010-08-04 蔡学成 Safe escape device used in coal mine or tunnel
CN201554979U (en) * 2009-12-08 2010-08-18 新疆天业(集团)有限公司 Telescopic pipeline connecting part
CN201650346U (en) * 2009-12-25 2010-11-24 杨连平 Underground lifesaving device
CN201991553U (en) * 2011-03-21 2011-09-28 中铁十二局集团第二工程有限公司 Safe escape device suitable to IV-, V- and VI-grade surrounding rock districts of tunnels
CN103452583A (en) * 2013-09-02 2013-12-18 江苏中煤机电科技有限公司 Coal mine ventilation lifesaving pipeline
CN203476382U (en) * 2013-08-16 2014-03-12 煤炭工业合肥设计研究院 Emergency escape and rescue system used for underground mine engineering
CN204060778U (en) * 2014-08-26 2014-12-31 王雅君 The scalable mine life saving pipeline of presetting system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641187A (en) * 2003-08-22 2005-07-20 福建亚通新材料科技股份有限公司 Mine emergency rescue pipeline
CN201280949Y (en) * 2008-12-26 2009-07-29 杭州萧宏建设集团有限公司 Downhole safety rescue ventilating duct
CN201554979U (en) * 2009-12-08 2010-08-18 新疆天业(集团)有限公司 Telescopic pipeline connecting part
CN201650346U (en) * 2009-12-25 2010-11-24 杨连平 Underground lifesaving device
CN101793161A (en) * 2010-03-30 2010-08-04 蔡学成 Safe escape device used in coal mine or tunnel
CN201991553U (en) * 2011-03-21 2011-09-28 中铁十二局集团第二工程有限公司 Safe escape device suitable to IV-, V- and VI-grade surrounding rock districts of tunnels
CN203476382U (en) * 2013-08-16 2014-03-12 煤炭工业合肥设计研究院 Emergency escape and rescue system used for underground mine engineering
CN103452583A (en) * 2013-09-02 2013-12-18 江苏中煤机电科技有限公司 Coal mine ventilation lifesaving pipeline
CN204060778U (en) * 2014-08-26 2014-12-31 王雅君 The scalable mine life saving pipeline of presetting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905836A (en) * 2018-01-03 2018-04-13 中国科学院武汉岩土力学研究所 Mine disaster lifesaving appliance and mine disaster lifesaving system
CN109057856A (en) * 2018-07-02 2018-12-21 昆明理工大学 Extension type lightweight survival capsule in a kind of tunnel
CN110067593A (en) * 2019-06-05 2019-07-30 中交一公局海威工程建设有限公司 Tunnel pipe for escaping
CN110067593B (en) * 2019-06-05 2024-03-22 中交一公局海威工程建设有限公司 Tunnel escape pipeline

Also Published As

Publication number Publication date
CN104213933B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN104213933B (en) Prearranged retractable mine lifesaving pipeline
CN201092866Y (en) Sap emergency lifesaving pipe
CN204060778U (en) The scalable mine life saving pipeline of presetting system
CN203444885U (en) Cable protection pipe
CN204512728U (en) The on-the-spot groove pipe link connected fast of a kind of energy
CN104405327A (en) Variable diameter ram monomer
CN203571247U (en) Corrosion-resistant anti-explosion plastic pipeline
CN202417588U (en) Integrated life support system for coal mine catastrophe
CN202140696U (en) Polyester fiber tubular product and pipe fitting both with lighting and light-reflecting identification
CN205036407U (en) Quick drainage system of shaft
CN205173763U (en) Compressor mouth of pipe quick change coupler
CN202001753U (en) Rotatable folding guide pipe
CN207660637U (en) Mine disaster lifesaving appliance and mine disaster lifesaving system
CN204271567U (en) Fast sealing type terminal box
CN202302418U (en) Connecting structure for sealing strip and collar clamp in spiral pipe
CN202856266U (en) Rotary-type waterproof joint for electric cable protection pipe
CN209976549U (en) Assembling system of shield tunnel segment structure
CN204941390U (en) A kind of Large Copacity coiled tubing work vehicle
CN204167831U (en) A kind of can rapid alignment sealing termination
CN208078257U (en) A kind of ox formula well logging quick connector
CN207485374U (en) A kind of underground construction device stainless steel cylinder
CN215108998U (en) Bendable assembled roadway full-section spraying device
CN203685277U (en) Coal mine emergency rescue system
CN214498931U (en) Directional connecting nipple for air-tight oil pipe hanger
CN202503222U (en) Rubber sheath for cable bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170826