CN104213893A - Perforating and fracturing integrated pipe column for selective re-transformation of old well of oil field and working method thereof - Google Patents

Perforating and fracturing integrated pipe column for selective re-transformation of old well of oil field and working method thereof Download PDF

Info

Publication number
CN104213893A
CN104213893A CN201310220039.XA CN201310220039A CN104213893A CN 104213893 A CN104213893 A CN 104213893A CN 201310220039 A CN201310220039 A CN 201310220039A CN 104213893 A CN104213893 A CN 104213893A
Authority
CN
China
Prior art keywords
fracturing
interval
packer
perforating
transformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310220039.XA
Other languages
Chinese (zh)
Other versions
CN104213893B (en
Inventor
冯飞
任勇
王在强
何华
刘明
邵媛
刘汉斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310220039.XA priority Critical patent/CN104213893B/en
Publication of CN104213893A publication Critical patent/CN104213893A/en
Application granted granted Critical
Publication of CN104213893B publication Critical patent/CN104213893B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a perforating and fracturing integrated pipe column for selective re-transformation of an old well of an oil field and the working method of the pipe column. The perforating and fracturing integrated pipe column for selective re-transformation of the old well of the oil field and the working method of the pipe column are designed to achieve re-fracturing of a transformed interval and re-perforating and fracturing of a new interval. The pipe column is connected with a safety releasing device, an upper controllable packer, an intermediate controllable packer, a hydraulic ejector, a lower packer, a ball seat, a check valve, an eye pipe and a plug in sequence through an oil pipe, and transformation of all intervals is achieved by conducting perforation on the new interval, operating the controllable packers to conduct packing and unpacking and other processes. According to the pipe column, the advantages of hydraulic jet fracturing and the advantages of dual-packing and single-clamping fracturing are combined, re-fracturing and re-transformation of the old well of the oil field can be achieved effectively, the pipe column is simple in structure, easy to operate, high in efficiency, and capable of achieving re-fracturing of the transformed interval and re-perforating and fracturing of the new interval, and perforating and fracturing can be achieved integrally through one pipe column.

Description

Oilfield old well selectively repeats to transform perforating and fracturing integrated pipe column and method of work thereof
Technical field
The present invention relates to a kind of oilfield old well and selectively repeat to transform perforating and fracturing integrated pipe column and method of work thereof, belong to oil-gas field fracturing technical field.
Background technology
At present, conventional hydraulic sand blasting pressure break is that it can only ensure the packing to lower floor construction section by dragging with the hydraulic sand blasting fracturing string of underseal construct multilayer or the multistage pressure break of well.For the old well of oil gas, newly-designed transformation interval may be distributed in the middle of the interval of having transformed, the requirement that cannot meet packing top and transformed interval with conventional tubing string.Conventional two envelope single deck tape-recorder pressure breaks need first carry out perforation to all construction intervals of construction well, and the easy like this compacting infringement producing while causing nearly well band pore-forming, affects oil well productivity.
Summary of the invention
The object of the present invention is to provide a kind of oilfield old well selectively to repeat to transform perforating and fracturing integrated pipe column and method of work thereof, it can complete the refracturing of having transformed interval, also can increase perforations adding and the pressure break of interval newly.
It is as follows that oilfield old well selectively repeats to transform the technology contents of perforating and fracturing integrated pipe column:
This tubing string oil pipe lower end connects safety and gives up, the safety lower end of giving up connects the upper packer of controllable type by oil pipe, upper packer lower end connects the middle packer of controllable type by oil pipe, middle packer lower end connects hydraulic ejector, hydraulic ejector lower end connects lower packet, and lower packet lower end connects ball seat, and ball seat lower end connects ball-and-seat, ball-and-seat lower end connects eye pipe, and eye pipe lower end connects plug.
The method of work that oilfield old well selectively repeats to transform perforating and fracturing integrated pipe column is as follows:
1, according to repeating the needs of transformation and the interval of design, be lowered to this tubing string, hydraulic ejector is aimed at the position of the first new interval specking, carries out perforation;
2, repeatedly drag this tubing string, complete all perforating jobs that need transformation interval;
3, after all perforating jobs that need transform interval complete, transfer tubing string to initial position, safety is given up and is positioned at the straight well section of this well, upper packer is positioned at this well needs the top of transformation interval topmost, middle packer is positioned at this well needs to transform the top of interval bottom, hydraulic ejector is aimed at the position of the first new interval specking, and lower packet is positioned at the below that needs bottom to transform interval;
4, deliver steel ball from well head, open the sliding sleeve in upper packer, start upper packer and set, and then steel ball continues to move down, and opens the sliding sleeve in middle packer, and in also starting, packer 4 sets, and last steel ball falls in ball seat 7;
5, after upper packer, middle packer and lower packet set, this tubing string has just formed the structure of similar two envelope single deck tape-recorder fracturing technology tubing strings, can directly carry out the pressing crack construction of orlop section;
6, after the pressing crack construction of orlop section completes, fracturing unit truck stops pumping, allows three removing seal for packers;
7, the like, drag the newly position of interval specking of tubing string to the second, repeat above-mentioned steps, complete the transformation of all intervals.
The present invention combines the advantage of hydraulic jetting fracturing and two envelope single deck tape-recorder pressure breaks, can effectively solve the problem of the old well refracturing transformation of oil gas.Be hampered cannot pull out of hole time at tubing string, give up and be convenient to trip out upper end tubing string in tubing string safety topmost.Tubular column structure and simple to operate, efficiency is high, both can complete the refracturing of having transformed interval, also can complete perforations adding and the pressure break of newly-increased interval, only needs one-trip string can complete the institutional operation of perforation and pressure break.
Brief description of the drawings
Fig. 1 is that oilfield old well selectively repeats to transform perforating and fracturing integrated pipe column schematic diagram.
Detailed description of the invention
Embodiment:
With reference to Fig. 1, embodiments of the invention are further illustrated:
Oil pipe 1 lower end of this tubing string connects safety and gives up 2, safety 2 lower ends of giving up connect the upper packer 3 of controllable type by oil pipe 1, upper packer 3 lower ends connect the middle packer 4 of controllable type by oil pipe 1, middle packer 4 lower ends connect hydraulic ejector 5, hydraulic ejector 5 lower ends connect lower packet 6, and lower packet 6 lower ends connect ball seat 7, and ball seat 7 lower ends connect ball-and-seat 8, ball-and-seat 8 lower ends connect eye pipe 9, and eye pipe 9 lower ends connect plug 10.
The method of work of this tubing string is as follows:
Taking the old well of a bite oilfield horizontal well as example, there are two sections to transform interval, perforations adding is transformed two sections of intervals with increasing newly again now:
1, according to repeating the needs of transformation and the interval of design, be lowered to this tubing string, hydraulic ejector 5 is aimed at the position A of the first new interval specking, carries out perforation;
2, repeatedly drag this tubing string, complete all perforating jobs that need transformation interval;
3, after all perforating jobs that need transform interval complete, transfer tubing string to initial position, the i.e. safety 2 straight well sections that are positioned at this well of giving up, upper packer 3 is positioned at this well needs the top of transformation interval topmost, middle packer 4 is positioned at this well needs to transform the top of interval bottom, hydraulic ejector 5 A that aims the place, lower packet 6 is positioned at the below that needs bottom to transform interval;
4, deliver steel ball from well head, open the sliding sleeve in upper packer 3, start upper packer 3 and set, and then steel ball continues to move down, and opens the sliding sleeve in middle packer 4, and in also starting, packer 4 sets, and last steel ball falls in ball seat 7;
5, after upper packer 3, middle packer 4 and lower packet 6 set, this tubing string has just formed the structure of similar two envelope single deck tape-recorder fracturing technology tubing strings, can directly carry out the pressing crack construction of orlop section;
6, after the pressing crack construction of orlop section completes, fracturing unit truck stops pumping, allows three removing seal for packers;
7, analogize in proper order, drag the position B of the new interval specking of tubing string to the second, repeat above-mentioned steps, complete the transformation of all intervals.

Claims (2)

1. oilfield old well selectively repeats to transform a perforating and fracturing integrated pipe column, it is characterized in that:
This tubing string oil pipe (1) lower end connects give up safely (2), safety is given up (2) lower end by the upper packer (3) of oil pipe (1) connection controllable type, upper packer (3) lower end connects the middle packer (4) of controllable type by oil pipe (1), middle packer (4) lower end connects hydraulic ejector (5), hydraulic ejector (5) lower end connects lower packet (6), lower packet (6) lower end connects ball seat (7), ball seat (7) lower end connects ball-and-seat (8), ball-and-seat (8) lower end connects eye pipe (9), eye pipe (9) lower end connects plug (10),
2. oilfield old well selectively repeats to transform a method of work for perforating and fracturing integrated pipe column, it is characterized in that its job step is as follows:
1) according to repeating the needs of transformation and the interval of design, be lowered to this tubing string, hydraulic ejector (5) is aimed at the position (A) of the first new interval specking, carries out perforation;
2) repeatedly drag this tubing string, complete all perforating jobs that need transformation interval;
3) after all perforating jobs that need transform interval complete, transfer tubing string to initial position, safe give up (2) are positioned at the straight well section of this well, upper packer (3) is positioned at this well needs the top of transformation interval topmost, middle packer (4) is positioned at this well needs to transform the top of interval bottom, hydraulic ejector (5) is aimed at the position (A) of the first new interval specking, and lower packet (6) is positioned at the below that needs bottom to transform interval;
4) deliver steel ball from well head, open the sliding sleeve in upper packer (3), starting upper packer (3) sets, and then steel ball continues to move down, open the sliding sleeve in middle packer (4), also in starting, packer (4) sets, and last steel ball falls in ball seat (7);
5) after upper packer (3), middle packer (4) and lower packet (6) set, this tubing string has just formed the structure of similar two envelope single deck tape-recorder fracturing technology tubing strings, can directly carry out the pressing crack construction of orlop section;
6) after the pressing crack construction of orlop section completes, fracturing unit truck stops pumping, allows three removing seal for packers;
7) the like, drag the newly position (B) of interval specking of tubing string to the second, repeat above-mentioned steps, complete the transformation of all intervals.
CN201310220039.XA 2013-06-05 2013-06-05 Oilfield old well selectivity repeats to transform perforating and fracturing integrated pipe column and method of work thereof Active CN104213893B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310220039.XA CN104213893B (en) 2013-06-05 2013-06-05 Oilfield old well selectivity repeats to transform perforating and fracturing integrated pipe column and method of work thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310220039.XA CN104213893B (en) 2013-06-05 2013-06-05 Oilfield old well selectivity repeats to transform perforating and fracturing integrated pipe column and method of work thereof

Publications (2)

Publication Number Publication Date
CN104213893A true CN104213893A (en) 2014-12-17
CN104213893B CN104213893B (en) 2016-08-10

Family

ID=52095762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310220039.XA Active CN104213893B (en) 2013-06-05 2013-06-05 Oilfield old well selectivity repeats to transform perforating and fracturing integrated pipe column and method of work thereof

Country Status (1)

Country Link
CN (1) CN104213893B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275442A (en) * 2015-10-29 2016-01-27 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Old well re-transformation volume fracturing technology
CN107965305A (en) * 2016-10-20 2018-04-27 中国石油化工股份有限公司 One kind layering refracturing method
CN110359893A (en) * 2018-04-09 2019-10-22 中国石油天然气股份有限公司 Mine sprays fracturing device and operational method
CN110671058A (en) * 2019-09-10 2020-01-10 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Double-sealing single-clamping process pipe column of old horizontal well and method for realizing large-discharge transformation
CN112177581A (en) * 2019-07-02 2021-01-05 中国石油天然气股份有限公司 Repeated fracturing method for old well
CN113586017A (en) * 2021-08-31 2021-11-02 中国石油天然气股份有限公司 Perforating and sand-preventing integrated pipe column suitable for volcanic reservoir and using method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201144682Y (en) * 2008-01-16 2008-11-05 中国石油化工股份有限公司西南油气分公司工程技术研究院 Multiple fracturing pipe column for petroleum and gas well
US20110139456A1 (en) * 2009-07-20 2011-06-16 Conocophillips Company Controlled Fracture Initiation Stress Packer
CN201902202U (en) * 2010-11-25 2011-07-20 中国石油化工股份有限公司 Staged fracturing string of oil-gas horizontal well
CN202250014U (en) * 2011-10-08 2012-05-30 华鼎鸿基石油工程技术(北京)有限公司 Dual-packing single-clamping staged fracturing tool
CN102691495A (en) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 High-broken-pressure stratum horizontal well sectional-fracturing method for well cementation and completion of casing
US20120247775A1 (en) * 2011-04-01 2012-10-04 Daniel Keith Moeller Downhole tool with pumpable section

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201144682Y (en) * 2008-01-16 2008-11-05 中国石油化工股份有限公司西南油气分公司工程技术研究院 Multiple fracturing pipe column for petroleum and gas well
US20110139456A1 (en) * 2009-07-20 2011-06-16 Conocophillips Company Controlled Fracture Initiation Stress Packer
CN201902202U (en) * 2010-11-25 2011-07-20 中国石油化工股份有限公司 Staged fracturing string of oil-gas horizontal well
US20120247775A1 (en) * 2011-04-01 2012-10-04 Daniel Keith Moeller Downhole tool with pumpable section
CN202250014U (en) * 2011-10-08 2012-05-30 华鼎鸿基石油工程技术(北京)有限公司 Dual-packing single-clamping staged fracturing tool
CN102691495A (en) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 High-broken-pressure stratum horizontal well sectional-fracturing method for well cementation and completion of casing

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275442A (en) * 2015-10-29 2016-01-27 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Old well re-transformation volume fracturing technology
CN107965305A (en) * 2016-10-20 2018-04-27 中国石油化工股份有限公司 One kind layering refracturing method
CN107965305B (en) * 2016-10-20 2019-12-24 中国石油化工股份有限公司 Layered repeated fracturing method
CN110359893A (en) * 2018-04-09 2019-10-22 中国石油天然气股份有限公司 Mine sprays fracturing device and operational method
CN110359893B (en) * 2018-04-09 2021-11-30 中国石油天然气股份有限公司 Mine jet fracturing device and operation method
CN112177581A (en) * 2019-07-02 2021-01-05 中国石油天然气股份有限公司 Repeated fracturing method for old well
CN112177581B (en) * 2019-07-02 2022-06-03 中国石油天然气股份有限公司 Repeated fracturing method for old well
CN110671058A (en) * 2019-09-10 2020-01-10 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Double-sealing single-clamping process pipe column of old horizontal well and method for realizing large-discharge transformation
CN113586017A (en) * 2021-08-31 2021-11-02 中国石油天然气股份有限公司 Perforating and sand-preventing integrated pipe column suitable for volcanic reservoir and using method

Also Published As

Publication number Publication date
CN104213893B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN104213893A (en) Perforating and fracturing integrated pipe column for selective re-transformation of old well of oil field and working method thereof
CN104213894B (en) Oilfield old well selectivity refracturing technique
CN104213891A (en) Coiled tubing controllable packer process tubular column for repeated oil well transformation
CN203321476U (en) Coiled tubing controllable packer technique pipe for repeated reconstruction of old wells
CN103032060A (en) Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
CN201412133Y (en) Pipe string for multi-stage drag fracturing of horizontal well
CN103573241A (en) Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well
CN103821489B (en) Horizontal well machinery layering is acidified combination process tubing string with hydraulic jetting fracturing
CN203961938U (en) Packer staged fracturing technology tube pillar in a kind of horizontal well tube
CN2856407Y (en) Perforating and fracturing string of horizontal well
CN203626787U (en) Pipe string capable of realizing perforating and fracturing integration through hydraulic jetting fracturing technique and double-packer single-chuck fracturing technique
CN203394491U (en) Integrated perforating and fracturing tubing string for selective and repetitive reconstruction of old well in oil field
CN104563997A (en) Water-jet and bridge plug combined process tubing string and work thereof
CN104632167A (en) Hydraulic jet double-seal single-blockage perforation and fracturing integrated process pipe string
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN203188991U (en) Sliding sleeve type layered eight-level fracturing pipe column
CN105221094A (en) Horizontal well two envelope single deck tape-recorder Technics of Prevention of Well Blowout
CN104847324A (en) Injection recovery auxiliary device and injection recovery system and method thereof
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN102182439B (en) Balanced-pressure perforation/negative-pressure backflow process
CN201057037Y (en) One-time lifted fracturing string of horizontal well
CN202900204U (en) Downhole throttle device for coiled tubing
CN105089598A (en) Rupture starting sliding sleeve
CN202152661U (en) Anchoring type graded deblocking packer for oil well
CN104074487A (en) Packer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant