CN104196488A - 水下勘探孔封孔工艺 - Google Patents

水下勘探孔封孔工艺 Download PDF

Info

Publication number
CN104196488A
CN104196488A CN201410391580.1A CN201410391580A CN104196488A CN 104196488 A CN104196488 A CN 104196488A CN 201410391580 A CN201410391580 A CN 201410391580A CN 104196488 A CN104196488 A CN 104196488A
Authority
CN
China
Prior art keywords
hole
underwater
underwater exploration
cement paste
cement slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410391580.1A
Other languages
English (en)
Other versions
CN104196488B (zh
Inventor
姚燕明
刘敏
胡立明
丁国洪
张春进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Rail Transit Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410391580.1A priority Critical patent/CN104196488B/zh
Publication of CN104196488A publication Critical patent/CN104196488A/zh
Application granted granted Critical
Publication of CN104196488B publication Critical patent/CN104196488B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

一种水下勘探孔封孔工艺,首先调配比重为1.18至1.25克每立方厘米的速凝水泥浆,速凝水泥浆初凝时间小于40分钟、终凝时间小于80分钟;将内部中空的钻杆伸入水下勘探孔的底部,将速凝水泥浆用泥浆泵通过钻杆灌入水下勘探孔,并挤出水下勘探孔内的水,在灌入速凝水泥浆的同时钻杆上移,直至孔口出现速凝水泥浆,完成灌浆;事先制作好比重大于水、小于上述速凝水泥浆的桩塞,在速凝水泥浆初凝后,通过钻杆将桩塞完全压入水下勘探孔,压入后的桩塞底部离地下的盾构顶板高度差为1.5至3米;待速凝水泥浆终凝后,完成封孔。本发明通过速凝水泥浆和桩塞配合封堵水下勘探孔,防止水体通过水下勘探孔向下渗流,避免地表水注入区间隧道,造成安全事故。

Description

水下勘探孔封孔工艺
技术领域
本发明涉及一种用于封堵勘探孔的技术,具体的说是一种封堵水下勘探孔的封孔工艺。
背景技术
地铁在开挖前,都需要对地铁沿线的地质进行勘探,进行地质勘探后,钻孔处会形成一柱形空洞,目前多采用“粘土段采用粘土回填、砂土层采用砂土回填”的方法,但效果往往不好。特别是在江底、湖底的勘探孔,不仅封孔难度大,封孔后还容易造成渗流。如后期线路发生调整,盾构机需经过钻孔位置时,地下水会从钻孔填筑材料的空隙中流入盾构区间,水淹隧道酿成重大安全事故。另外,盾构推进会对钻孔内的封孔材料产生向上的挤压力,当挤压力较大,封孔材料被挤出,从而形成下水通道,江水、河水、湖水等沿通道流向盾构区间,造成重大安全事故。回填的材料也不能有太大的硬度,如采用混凝土等回填,会对盾构机造成阻碍,甚至可能损坏盾构机。为此有此水下勘探孔选择在远离地铁开挖路线处,这样会造成勘探不准确。
中国专利局于2013年4月17日公开的,申请号为“201210563813.2”的“可溶岩溶洞上方勘探孔封堵方法”,它包括如下步骤 :柔性杯型桩塞的制作,放置桩塞,水泥砂浆制备,灌注水泥砂浆,通过导浆管将配制好的水泥砂浆注入钻孔 内,至基岩面为止,边注浆边提升导浆管;注浆完成后,提升出导浆管,并使水泥砂浆凝固 30min ;采用重型动力触探对砂浆封孔质量进行检查,将圆锥型动力触探头改为平底探头,5 次连续锤击,记录贯入度;封孔检测合格后,上覆土层按“以土还土,以砂还砂”的原则进行封孔。这种方法解决了可溶岩溶洞上方勘探孔的封堵,但无法解决水下勘探孔的封堵。
发明内容
本发明的目的在于针对上述现有技术的缺陷和不足,为人们提供一种封堵水下勘探孔的封孔工艺。
为实现上述目的,本发明所采取的技术方案是:该水下勘探孔封孔工艺包括如下步骤:
首先调配比重为1.18至1.25克每立方厘米的速凝水泥浆,速凝水泥浆初凝时间小于40分钟、终凝时间小于80分钟;
将内部中空的钻杆伸入水下勘探孔的底部,将速凝水泥浆用泥浆泵通过钻杆灌入水下勘探孔,并挤出水下勘探孔内的水,在灌入速凝水泥浆的同时钻杆上移,直至孔口出现速凝水泥浆,完成灌浆;
事先制作好比重大于水、小于上述速凝水泥浆的桩塞,在速凝水泥浆初凝后,通过钻杆将桩塞完全压入水下勘探孔,压入后的桩塞底部离地下的盾构顶板高度差为1.5至3米;
待速凝水泥浆终凝后,完成封孔。
所述速凝水泥浆采用H型地质勘探水泥,浆液水灰比(水与水泥质量比)为1:0.3至1:0.4,在每100千克浆液中加入15至25毫升水玻璃调配而成。
所述的桩塞包括相互套装的外筒和内筒,外筒和内筒之间为填充物,内筒的内腔中空。
所述的填充物为混凝土或水泥砂浆。
所述桩塞的底部设有圆锥头,圆锥头的角度为100至150度。
所述桩塞的顶部设有悬挂钩。
所述桩塞的长度为1米至3米。
所述桩塞的外壁设有多个凸环。
本发明通过速凝水泥浆和桩塞配合封堵水下勘探孔,防止水体通过水下勘探孔向下渗流。由于速凝水泥浆凝固后的硬度比较低,盾构机在通过水下勘探孔时,不会对盾构机造成过大的阻碍。桩塞侧壁的凸环加大了桩塞与周围土体的摩擦力,克服了盾构机对封孔材料产生向上的挤压力。本发明能安全有效地回填水下勘探孔,解决了水下勘探孔的安全隐患,为我国的地铁发展作出了巨大贡献。
附图说明
图1为本发明的结构示意图。
图2为本发明桩塞的结构示意图。
具体实施方式
如图1所示,本发明为一种水下勘探孔封孔工艺,它包括如下步骤:
首先调配比重为1.18至1.25克每立方厘米的速凝水泥浆3,速凝水泥浆3初凝时间小于40分钟、终凝时间小于80分钟。所述速凝水泥浆3采用H型地质勘探水泥,浆液水灰比(水与水泥质量比)为1:0.3至1:0.4,在每100千克浆液中加入15至25毫升水玻璃调配而成。
浆液的水灰比优选为1:0.35,在每100千克浆液中加入20毫升水玻璃,可以将初凝时间控制在30分钟,终凝时间控制在60分钟,如果水泥加的过多,会使速凝水泥浆3凝固后的硬度过高,如果水泥加的过少,凝结时间会延长。本发明的速凝水泥浆3凝固后的硬度比较低,盾构机在通过水下勘探孔1时,不会对盾构机造成过大的阻碍。
然后,将内部中空的钻杆伸入水下勘探孔1的底部,将速凝水泥浆3用泥浆泵通过钻杆灌入水下勘探孔1,并挤出水下勘探孔1内的水。在灌入速凝水泥浆3的同时钻杆上移,直至孔口出现速凝水泥浆3,完成灌浆。
如图2所示,事先制作好比重大于水、小于上述速凝水泥浆3的桩塞2,在速凝水泥浆3初凝后,通过钻杆将桩塞2完全压入水下勘探孔1。所述的桩塞2包括相互套装的外筒23和内筒22,外筒23和内筒22之间为填充物24,内筒22的内腔中空,所述的填充物24为混凝土或水泥砂浆。由于水下勘探孔1的直径一般都是120CM,因此本发明选择外筒23直径为110CM,内筒22直径80CM,外筒23和内筒22之间注入混凝土浆液,整体密度为1.12克每立方厘米,达到初期强度后即可使用。所述桩塞2的长度为1米至3米,以2米为宜。所述桩塞2的顶部设有悬挂钩21,悬挂钩21可以使桩塞2悬挂在钻杆下方。所述桩塞2的底部设有圆锥头26,可以方便将桩塞2塞入初凝的速凝水泥浆3内。圆锥头26的角度为100至150度,最佳为120度,如角度太大,桩塞2不容易塞入,如角度太小,桩塞2容易下沉,起不了封堵效果。
由于开挖地铁时的盾构顶板4距离水底的高度差需大于5米,才能保证安全性,因此压入后的桩塞2底部离地下的盾构顶板4高度差为1.5至3米,一般以2米为宜。桩塞2的压入高度可以通过钻杆长度计算。
待速凝水泥浆3终凝后,完成封孔。所述桩塞2的外壁设有多个凸环25,加大了桩塞2与周围土体的摩擦力,能克服盾构机对封孔材料产生向上的挤压力。
本发明通过速凝水泥浆3和桩塞2配合封堵水下勘探孔1,防止水体通过水下勘探孔1向下渗流。由于速凝水泥浆3凝固后的硬度比较低,盾构机在通过水下勘探孔时,不会对盾构机造成过大的阻碍。桩塞2侧壁的凸环25加大了桩塞2与周围土体的摩擦力,克服了盾构机对封孔材料产生向上的挤压力。本发明能安全有效地回填水下勘探孔1,解决了水下勘探孔1的安全隐患,为我国的地铁发展作出了巨大贡献。

Claims (8)

1.一种水下勘探孔封孔工艺,其特征在于它包括如下步骤:
首先调配比重为1.18至1.25克每立方厘米的速凝水泥浆(3),速凝水泥浆(3)初凝时间小于40分钟、终凝时间小于80分钟;
将内部中空的钻杆伸入水下勘探孔(1)的底部,将速凝水泥浆(3)用泥浆泵通过钻杆灌入水下勘探孔(1),并挤出水下勘探孔(1)内的水,在灌入速凝水泥浆(3)的同时钻杆上移,直至孔口出现速凝水泥浆(3),完成灌浆;
事先制作好比重大于水、小于上述速凝水泥浆(3)的桩塞(2),在速凝水泥浆(3)初凝后,通过钻杆将桩塞(2)完全压入水下勘探孔(1),压入后的桩塞(2)底部离地下的盾构顶板(4)高度差为1.5至3米;
待速凝水泥浆终凝后,完成封孔。
2.根据权利要求1所述的水下勘探孔封孔工艺,其特征在于所述速凝水泥浆(3)采用H型地质勘探水泥,浆液水灰比(水与水泥质量比)为1:0.3至1:0.4,在每100千克浆液中加入15至25毫升水玻璃调配而成。
3.根据权利要求1或2所述的水下勘探孔封孔工艺,其特征在于所述的桩塞(2)包括相互套装的外筒(23)和内筒(22),外筒(23)和内筒(22)之间为填充物(24),内筒(22)的内腔中空。
4.根据权利要求3所述的水下勘探孔封孔工艺,其特征在于所述的填充物(24)为混凝土、水泥砂浆。
5.根据权利要求1或2所述的水下勘探孔封孔工艺,其特征在于所述桩塞(2)的底部设有圆锥头(26),圆锥头(26)的角度为100至150度。
6.根据权利要求1或2所述的水下勘探孔封孔工艺,其特征在于所述桩塞(2)的顶部设有悬挂钩(21)。
7.根据权利要求1或2所述的水下勘探孔封孔工艺,其特征在于所述桩塞(2)的长度为1米至3米。
8.根据权利要求1或2所述的水下勘探孔封孔工艺,其特征在于所述桩塞(2)的外壁设有多个凸环(25)。
CN201410391580.1A 2014-08-11 2014-08-11 水下勘探孔封孔工艺 Active CN104196488B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410391580.1A CN104196488B (zh) 2014-08-11 2014-08-11 水下勘探孔封孔工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410391580.1A CN104196488B (zh) 2014-08-11 2014-08-11 水下勘探孔封孔工艺

Publications (2)

Publication Number Publication Date
CN104196488A true CN104196488A (zh) 2014-12-10
CN104196488B CN104196488B (zh) 2016-09-14

Family

ID=52081837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410391580.1A Active CN104196488B (zh) 2014-08-11 2014-08-11 水下勘探孔封孔工艺

Country Status (1)

Country Link
CN (1) CN104196488B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893675A (zh) * 2017-12-01 2018-04-10 姚燕明 用于盾构隧道的抢险支撑设备
CN108756809A (zh) * 2018-07-23 2018-11-06 中南大学 一种盾构隧道地质勘探钻孔的封孔方法
CN109869117A (zh) * 2019-03-21 2019-06-11 中国核电工程有限公司 用于钻孔的封孔塞及对钻孔进行封孔的方法
WO2020147310A1 (zh) * 2019-01-17 2020-07-23 中山荣思东数码科技有限公司 一种含有微胶囊的水性多次可移压敏胶及其制备方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2411918A (en) * 2004-03-12 2005-09-14 Schlumberger Holdings Sealing system
CN201891124U (zh) * 2010-09-16 2011-07-06 中建八局第一建设有限公司 一种钻孔时封堵泉眼的装置
CN103046537A (zh) * 2012-12-21 2013-04-17 长江勘测规划设计研究有限责任公司 可溶岩溶洞上方勘探孔封堵方法
CN203022679U (zh) * 2012-12-13 2013-06-26 北京东方新星石化工程股份有限公司 钻孔抽压水多塞封孔器
CN103221631A (zh) * 2010-09-15 2013-07-24 莱斯矿业发展控股有限公司 钻孔塞
CN103437790A (zh) * 2013-08-23 2013-12-11 西安建筑科技大学 一种地下水封堵方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2411918A (en) * 2004-03-12 2005-09-14 Schlumberger Holdings Sealing system
CN103221631A (zh) * 2010-09-15 2013-07-24 莱斯矿业发展控股有限公司 钻孔塞
CN201891124U (zh) * 2010-09-16 2011-07-06 中建八局第一建设有限公司 一种钻孔时封堵泉眼的装置
CN203022679U (zh) * 2012-12-13 2013-06-26 北京东方新星石化工程股份有限公司 钻孔抽压水多塞封孔器
CN103046537A (zh) * 2012-12-21 2013-04-17 长江勘测规划设计研究有限责任公司 可溶岩溶洞上方勘探孔封堵方法
CN103437790A (zh) * 2013-08-23 2013-12-11 西安建筑科技大学 一种地下水封堵方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893675A (zh) * 2017-12-01 2018-04-10 姚燕明 用于盾构隧道的抢险支撑设备
CN108756809A (zh) * 2018-07-23 2018-11-06 中南大学 一种盾构隧道地质勘探钻孔的封孔方法
WO2020147310A1 (zh) * 2019-01-17 2020-07-23 中山荣思东数码科技有限公司 一种含有微胶囊的水性多次可移压敏胶及其制备方法
CN109869117A (zh) * 2019-03-21 2019-06-11 中国核电工程有限公司 用于钻孔的封孔塞及对钻孔进行封孔的方法

Also Published As

Publication number Publication date
CN104196488B (zh) 2016-09-14

Similar Documents

Publication Publication Date Title
CN104153352B (zh) 一种岩溶地质旋挖灌注桩成孔工艺
CN104453913B (zh) 一种竖井工作面超前预注浆方法
CN108560541B (zh) 一种旋挖钻全护筒跟进岩面钻进施工方法
CN201665871U (zh) 长螺旋钻孔灌注桩后压浆技术装置
CN110230309A (zh) 岩溶区桥梁溶洞桩基施工方法
CN105275381B (zh) 富水卵石地层中冲击钻成孔施工方法
CN103899351B (zh) 一种处理复杂采空区的充填加固方法
CN102720186B (zh) 变截面钻孔灌注桩水下一次成型浇筑法
CN102877865A (zh) 一种治理地下采空区或空洞的施工方法
CN104196488B (zh) 水下勘探孔封孔工艺
CN103452100A (zh) 后压浆挤扩组合钻孔灌注桩施工方法
CN206308569U (zh) 一种加固处治下伏溶洞的路基结构
CN109518677A (zh) 冲孔灌注桩溶洞处理方法
CN107299650B (zh) 一种远距离沉井排土纠偏方法
CN108756809B (zh) 一种盾构隧道地质勘探钻孔的封孔方法
CN103806433A (zh) 一种地基回填土的加固方法
CN103556551B (zh) 加固路堤软基的哑铃形钻孔桩复合地基结构的施工方法
CN103556554A (zh) 加固路堤软基的钻孔桩复合地基结构及其施工方法
CN105525605A (zh) 一种地下室回填区域加固的方法
JP3807658B2 (ja) 地下空洞の充填工法
CN102979087B (zh) 一种旋挖桩施工方法
CN204282329U (zh) 水下勘探孔封孔桩塞
CN109322315A (zh) 一种用于高陡坡路堤地段的支挡结构及其施工方法
CN203514140U (zh) 加固路堤软基的哑铃形钻孔桩复合地基结构
CN103195046A (zh) 一种一孔多孔隙水压力计埋设方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210225

Address after: Ningbo Rail Transit building, 3399 Ningchuan Road, Yinzhou District, Ningbo City, Zhejiang Province, 315010

Patentee after: NINGBO RAIL TRANSIT GROUP Co.,Ltd.

Address before: Ningbo Rail Transit Project Construction Headquarters, no.668, Liyuan North Road, Haishu District, Ningbo City, Zhejiang Province, 315010

Patentee before: Yao Yanming

TR01 Transfer of patent right