CN103195046A - 一种一孔多孔隙水压力计埋设方法 - Google Patents

一种一孔多孔隙水压力计埋设方法 Download PDF

Info

Publication number
CN103195046A
CN103195046A CN2013101160164A CN201310116016A CN103195046A CN 103195046 A CN103195046 A CN 103195046A CN 2013101160164 A CN2013101160164 A CN 2013101160164A CN 201310116016 A CN201310116016 A CN 201310116016A CN 103195046 A CN103195046 A CN 103195046A
Authority
CN
China
Prior art keywords
pressure gauge
pore pressure
hole
water pressure
woven bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101160164A
Other languages
English (en)
Other versions
CN103195046B (zh
Inventor
张军辉
郑健龙
周宇
麦灿强
何俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201310116016.4A priority Critical patent/CN103195046B/zh
Publication of CN103195046A publication Critical patent/CN103195046A/zh
Application granted granted Critical
Publication of CN103195046B publication Critical patent/CN103195046B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种一孔多孔隙水压力计埋设方法,先根据埋设深度裁剪一段长度的袋装砂井的编织袋;再将15cm左右的中砂或者细砂填充到编织袋底部作为滤层,并将孔隙水压力计安放在滤层中;然后在滤层上面填充粘土颗粒作为支撑分隔层;待粘土颗粒填充到一定厚度后用膨润土或重粘土封孔;重复以上步骤,可在一个编织袋安置多个孔隙水压力计,本发明施工工艺简单,成本低廉,易于推广,可避免因塌孔导致的孔隙水压力计埋设困难,孔隙水压力计的读数能真实反映同一个竖直平面内不同深度的孔隙水压力变化规律。

Description

一种一孔多孔隙水压力计埋设方法
技术领域
本发明属于土木工程技术领域,涉及一种一孔多孔隙水压力计埋设方法。
背景技术
目前,测试软基内孔隙水压力时需要进行孔隙水压力计埋设。我国现行规范推荐一孔埋设一个孔隙水压力计。此法有一定的缺点,即测出的孔隙水压力不是同一个点沿不同深度位置的孔隙水压力,也就是说测试数据缺乏可比性。另外,采用钻杆将孔隙水压力计压入淤泥中会导致孔隙水压力计产生超静孔隙水压力,需等其消散一定的时间才能测出准确数据。
第二种做法:最深的孔隙水压力计按第一种做法进行;接着用膨润土做成的泥球进行封孔至第二个孔隙水压力计的设计标高,依次类推直至所有孔隙水压力计埋设完毕。其主要缺点是:(1)最深的一个孔隙水压力计会产生第一种做法中的缺点;(2)封孔泥球要沉入到指定位置较难控制,很难保证质量,甚至会出现泥球将孔隙水压力计包住的情况,导致测试结果规律性较差;(3)泥球下沉速度非常慢,在工程上因工期要求往往不允许等待这么长时间。
第三种做法:用铁丝网或者塑料网做成的笼体制作封孔装置,封孔装置采用膨润土做成的泥球作为核心封孔材料,再结合淤泥、粘土或粗砂作分隔材料填充于笼体中,再将笼体放入钻孔中。其主要缺点是:(1)笼体制作工艺复杂,若批量生产需专用设备,势必增加成本;(2)一个笼体长度有限,埋设间距不等的多个孔隙水压力计时需分别制作长度不等的多个笼体,势必增加工程量;(3)埋设过程中孔隙水压力计的信号电缆线易破坏。
因此,设计一种合理的孔隙水压力计埋设方法,对于保护孔隙水压力计及保证观测数据的准确性,具有重要的工程实践意义。
发明内容
本发明的目的在于提供一种一孔多孔隙水压力计埋设方法,可在一孔中埋设多个孔隙水压力计,从而获得软基土体内孔隙水压力沿深度变化规律的可靠数据。
一种一孔多孔隙水压力计埋设方法,其特征在于:包括以下步骤:
步骤1:根据埋设深度,裁剪一定长度的袋装砂井所用的编织袋(4),系紧袋底,根据预埋设孔隙水压力计(5)的深度在编织袋(4)上作出孔隙水压力计(5)位置的标记,所述孔隙水压力计(5)和孔隙水压力计信号电缆线(6)相连,所述孔隙水压力计信号电缆线(6)的长度可穿过地表(7);
步骤2:制作埋设有不同深度孔隙水压力计的编织袋;
步骤3:将袋装砂井钻机的导管通过地表(7)在预埋设位置钻入到最下层孔隙水压力计预埋深度,将埋设有不同深度孔隙水压力计的编织袋导入导管中,并安放到位,拔出导管,理清孔隙水压力计信号电缆线,一孔多孔隙水压力计埋设工作完成。
所述的步骤2包括以下步骤:
第一步:向编织袋(4)底灌入高度为约15cm左右的中细砂作为滤层(1),然后将孔隙水压力计(5)插入滤层中央,压实;
第二步:将颗粒状粘土灌入袋中作为分隔支撑层(2),并分层压实;
第三步:在分隔支撑层(2)顶面继续灌入膨润土或重粘土并压实作为封孔层(3);
重复第一至第三步,所述每个分隔层的顶面应低于上方孔隙水压力计约25cm。
有益技术效果:
1.一孔多孔隙水压力计埋设方法有效防止可能因土质条件在平面上距离发生变化,而导致孔隙水压力计读数并非同一个竖直平面内不同深度的孔隙水压力,保证了观测数据的连续性。
2.本发明能将孔隙水压力计准确地埋设在预定位置,且有效保护了孔隙水压力计信号电缆线;孔隙水压力计埋设的主体编织袋为常用的袋装砂井编织袋,易于购买,且价格低廉;钻埋工艺和袋装砂井施工工艺一致,埋设效率高,简单可靠,可与袋装砂井施工同期进行,显著减少了埋设成本。
附图说明:
图1本发明的结构示意图。
1-滤层,2-分隔支撑层,3-封孔层,4-编织袋,5-孔隙水压力计,6-孔隙水压力计信号电缆线,7-地表。
具体实施方式
下面结合具体的实例对本发明做了进一步的描述。
一种一孔多孔隙水压力计埋设方法,其特征在于:包括以下步骤:
步骤1:根据埋设深度,裁剪一定长度的袋装砂井所用的编织袋(4),系紧袋底,根据预埋设孔隙水压力计(5)的深度在编织袋(4)上作出孔隙水压力计(5)位置的标记,所述孔隙水压力计(5)和孔隙水压力计信号电缆线(6)相连,所述孔隙水压力计信号电缆线(6)的长度可穿过地表(7);
步骤2:制作埋设有不同深度孔隙水压力计的编织袋;
步骤3:将袋装砂井钻机的导管通过地表(7)在预埋设位置钻入到最下层孔隙水压力计预埋深度,将埋设有不同深度孔隙水压力计的编织袋导入导管中,并安放到位,拔出导管,理清孔隙水压力计信号电缆线,一孔多孔隙水压力计埋设工作完成。
所述的步骤2包括以下步骤:
第一步:向编织袋(4)底灌入高度为约15cm左右的中细砂作为滤层(1),然后将孔隙水压力计(5)插入滤层中央,压实;
第二步:将颗粒状粘土灌入袋中作为分隔支撑层(2),并分层压实;
第三步:在分隔支撑层(2)顶面继续灌入膨润土或重粘土并压实作为封孔层(3);
重复第一至第三步,所述每个分隔层的顶面应低于上方孔隙水压力计约25cm。
当然,以上所述仅是本发明的一种实施方式而已,应当指出对本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰均属于本发明权利要求的保护范围之内。

Claims (2)

1.一种一孔多孔隙水压力计埋设方法,其特征在于:包括以下步骤:
步骤1:根据埋设深度,裁剪一定长度的袋装砂井所用的编织袋(4),系紧袋底,根据预埋设孔隙水压力计(5)的深度在编织袋(4)上作出孔隙水压力计(5)位置的标记,所述孔隙水压力计(5)和孔隙水压力计信号电缆线(6)相连,所述孔隙水压力计信号电缆线(6)的长度可穿过地表(7);
步骤2:制作埋设有不同深度孔隙水压力计的编织袋;
步骤3:将袋装砂井钻机的导管通过地表(7)在预埋设位置钻入到最下层孔隙水压力计预埋深度,将埋设有不同深度孔隙水压力计的编织袋导入导管中,并安放到位,拔出导管,理清孔隙水压力计信号电缆线(6),一孔多孔隙水压力计埋设工作完成。
2.根据权利要求1所述的一种一孔多孔隙水压力计埋设方法,其特征在于,所述的步骤2包括以下步骤:
第一步:向编织袋(4)底灌入高度为约15cm左右的中细砂作为滤层(1),然后将孔隙水压力计(5)插入滤层中央,压实;
第二步:将颗粒状粘土灌入袋中作为分隔支撑层(2),并分层压实;
第三步:在分隔支撑层(2)顶面继续灌入膨润土或重粘土并压实作为封孔层(3);
重复第一至第三步,所述每个分隔层的顶面应低于上方孔隙水压力计约25cm。
CN201310116016.4A 2013-03-25 2013-03-25 一种一孔多孔隙水压力计埋设方法 Active CN103195046B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310116016.4A CN103195046B (zh) 2013-03-25 2013-03-25 一种一孔多孔隙水压力计埋设方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310116016.4A CN103195046B (zh) 2013-03-25 2013-03-25 一种一孔多孔隙水压力计埋设方法

Publications (2)

Publication Number Publication Date
CN103195046A true CN103195046A (zh) 2013-07-10
CN103195046B CN103195046B (zh) 2015-08-26

Family

ID=48717849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310116016.4A Active CN103195046B (zh) 2013-03-25 2013-03-25 一种一孔多孔隙水压力计埋设方法

Country Status (1)

Country Link
CN (1) CN103195046B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410136A (zh) * 2013-08-29 2013-11-27 机械工业勘察设计研究院 一种土壤水分计的钻孔埋设方法
CN105256785A (zh) * 2015-10-30 2016-01-20 湖南科技大学 一种可重复利用孔隙水压力计的装置及其制作方法
CN105421324A (zh) * 2015-11-09 2016-03-23 上海达华测绘有限公司 孔隙水压力计埋设方法
CN107503387A (zh) * 2017-08-21 2017-12-22 水利部农村电气化研究所 一种海堤爆破挤淤软基处理施工质量检测装置的使用方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348847A (ja) * 2001-05-24 2002-12-04 Fujikura Ltd 海底底質調査方法
CN2777042Y (zh) * 2005-03-31 2006-05-03 广州四航工程技术研究院 用于一孔多孔压计埋设的封孔装置
CN201933477U (zh) * 2010-12-29 2011-08-17 上海广联建设发展有限公司 孔隙水压力计深层埋设装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348847A (ja) * 2001-05-24 2002-12-04 Fujikura Ltd 海底底質調査方法
CN2777042Y (zh) * 2005-03-31 2006-05-03 广州四航工程技术研究院 用于一孔多孔压计埋设的封孔装置
CN201933477U (zh) * 2010-12-29 2011-08-17 上海广联建设发展有限公司 孔隙水压力计深层埋设装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
付贵海等: "深厚软土地区孔隙水压力计埋设技术研究", 《铁道建筑》 *
赵秀绍等: "孔隙水压力计埋设过程中的问题研究", 《金属矿山》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410136A (zh) * 2013-08-29 2013-11-27 机械工业勘察设计研究院 一种土壤水分计的钻孔埋设方法
CN103410136B (zh) * 2013-08-29 2015-08-26 机械工业勘察设计研究院有限公司 一种土壤水分计的钻孔埋设方法
CN105256785A (zh) * 2015-10-30 2016-01-20 湖南科技大学 一种可重复利用孔隙水压力计的装置及其制作方法
CN105256785B (zh) * 2015-10-30 2017-02-01 湖南科技大学 一种可重复利用孔隙水压力计的装置及其制作方法
CN105421324A (zh) * 2015-11-09 2016-03-23 上海达华测绘有限公司 孔隙水压力计埋设方法
CN107503387A (zh) * 2017-08-21 2017-12-22 水利部农村电气化研究所 一种海堤爆破挤淤软基处理施工质量检测装置的使用方法

Also Published As

Publication number Publication date
CN103195046B (zh) 2015-08-26

Similar Documents

Publication Publication Date Title
CN104329076B (zh) 一种测斜孔渗压计装置及安装方法
CN106400782B (zh) 一种利用旋挖钻机施工基坑围护钻孔咬合桩的施工方法
WO2019056410A1 (zh) 一种既有路基、边坡稳定性的监测结构及其施工方法
CN105806418A (zh) 一种水库滑坡多场信息现场监测系统及其施工方法
CN103195046B (zh) 一种一孔多孔隙水压力计埋设方法
CN105547967A (zh) 裂隙介质系统渗透张量室内测定装置
CN103645061A (zh) 一种格构锚固技术大型物理模型试验方法
CN102619206A (zh) 一种深水裸岩、岩溶桩的基础平台结构
CN105586865A (zh) 土压力盒钻孔埋设方法与装置
CN108951595A (zh) 一种一孔多孔隙水压力计埋设结构及埋设方法
CN103410136B (zh) 一种土壤水分计的钻孔埋设方法
CN103091471A (zh) 一种加速冲填土固结的模型及其试验方法
CN202492854U (zh) 深水裸岩、岩溶桩的基础平台结构
CN106707364B (zh) 一种雷达测井用标准井的施工方法
CN205384014U (zh) 一种钻孔灌注桩水下混凝土浇筑面高程测量系统
Wan et al. Field measurement by fully grouted vibrating wire piezometers
CN103114561B (zh) 一种在粘土心墙内埋设光纤传感器的方法
CN103195045B (zh) 一种一孔多孔隙水压力计埋设装置
CN105257318B (zh) 一种衬砌局部渗漏引起隧道结构变形的安全保护方法
CN105421324B (zh) 孔隙水压力计埋设方法
CN204252103U (zh) 一种测斜孔渗压计装置
KR101769352B1 (ko) 충진식 싱크홀 측정방법
CN203256721U (zh) 一种一孔多孔隙水压力计埋设装置
CN104196488A (zh) 水下勘探孔封孔工艺
CN204043825U (zh) 一种水平布置土压力盒的固定装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Zhang Junhui

Document name: Notification of qualified procedures

DD01 Delivery of document by public notice