CN103452100A - 后压浆挤扩组合钻孔灌注桩施工方法 - Google Patents
后压浆挤扩组合钻孔灌注桩施工方法 Download PDFInfo
- Publication number
- CN103452100A CN103452100A CN2013103625575A CN201310362557A CN103452100A CN 103452100 A CN103452100 A CN 103452100A CN 2013103625575 A CN2013103625575 A CN 2013103625575A CN 201310362557 A CN201310362557 A CN 201310362557A CN 103452100 A CN103452100 A CN 103452100A
- Authority
- CN
- China
- Prior art keywords
- pile
- squeezed
- construction
- grouting
- force bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
本发明公开了一种适合在“软硬互层”地质条件下采用的后压浆挤扩组合钻孔灌注桩施工方法。包括以下步骤:(1)钻孔施工(2)挤扩承力盘施工(3)清孔(4)后压浆装置设置及钢筋笼下设(5)混凝土灌注(6)桩端、桩侧后压浆施工。本发明将桩基后压浆技术和挤扩桩施工技术有机地结合在一起,解决了“软硬互层”地质条件下提高单桩承载力,降低基桩工后沉降和不均匀沉降的难题。适用于“软硬互层”地质条件下要求高单桩承载力、低工后沉降和低差异沉降时采用,可降低工程造价。
Description
技术领域
本发明涉及一种“软硬互层”地质条件下的钻孔灌注桩施工方法,特别是
一种后压浆挤扩组合钻孔灌注桩施工方法,属于土木建筑工程技术领域。
背景技术
在“软硬互层”状沉积的地层上建设超大型构筑物,基础多采用钻孔灌注桩,要获得较大的单桩承载力,并有效控制基桩沉降和建筑物的不均匀沉降,通常都是增加桩长,在地层深部寻找合适的桩端持力层。这种做法很不经济。
为充分发挥“软硬互层”地层中硬地层对桩基承载力的贡献,可在硬土层部位挤扩出一层或多层近似圆锥盘状的扩大头腔(即承力盘),形成由桩身、承力盘和桩端共同承担上部荷载的基桩。但挤扩施工在扩大头腔附近孔壁形成的局部疏松和散落到孔底的泥渣碎块不易清除干净,在一定程度上降低了扩大头腔的作用。钻孔灌注桩后压浆技术通过预埋在桩身内的注浆管向桩侧和桩端注入高压水泥浆,水泥浆具有挤密孔壁土层、置换桩侧泥皮、固化桩端沉渣的作用,从而提高桩端和桩侧摩阻力,降低不均匀沉降。但后压浆对提高软地层的侧摩阻力的作用较小。为此,寻找一种既充分发挥桩长范围内地层的桩端阻力和桩侧阻力,又能很好地解决桩侧局部疏松和桩端沉渣对基桩承载力的影响的施工方法,对于解决桩基施工中的实际问题具有现实意义。
发明内容
本发明的目的在于提供一种适合在“软硬互层”地质条件下采用的后压浆挤扩组合钻孔灌注桩施工方法,解决了“软硬互层”地质条件下提高单桩承载力,降低基桩工后沉降和不均匀沉降的难题。
本发明是基于以下构思完成的。为充分发挥挤扩桩施工技术和钻孔灌注桩后压浆技术的优点,克服各自存在的不足,将桩基后压浆技术和挤扩桩施工技术有机地结合在一起,同时应用在同一根桩上,既可以充分发挥桩长范围内地层的桩端阻力和桩侧阻力,又能很好地解决施工过程中形成的桩侧局部疏松、孔壁泥皮和桩端沉渣对基桩承载力的不利影响,使基桩的承载能力大幅度提高,又能有效降低工程造价。
本发明将桩基后压浆技术和挤扩桩施工技术进行有机结合,在“软硬互层”地质条件下选择“硬地层”处进行挤扩,在地层中挤扩出一层或多层近似圆锥盘状的扩大头腔;在钢筋笼上预设注浆管路,成桩后向桩端、桩侧注入高压水泥浆,水泥浆加固扩大头腔附近的孔壁局部疏松,置换桩侧泥皮,固化桩端沉渣;最终形成一根由桩身、承力盘和桩端共同承担上部荷载的基桩。本发明通过在“硬地层”部位挤扩出一个或多个承力盘,使桩长范围内硬地层的端阻力得到充分发挥,通过后压浆固化桩端沉渣、加固孔壁局部疏松、置换桩侧泥皮,降低和消除桩端沉渣和桩侧泥皮对基桩承载力的不利影响,从而有效提高单桩承载力,降低基桩的工后沉降和不均匀沉降。
具体的,本发明的后压浆挤扩组合钻孔灌注桩施工方法,包括以下步骤:
(1)钻孔施工
钻孔施工可采用回转钻机、旋挖钻机、潜水电钻等设备,一般情况下应采用泥浆护壁。为保证孔壁稳定,施工时采用间隔跳打的施工顺序,跳打间距不宜小于6D(D为挤扩承力盘直径),相临桩混凝土初凝后方可开始钻孔作业。钻进至设计孔底标高以上0.3-0.5m时停止钻进,进行第一次清孔,此时不要换浆,保持泥浆比重不小于1.2,胶体率大于98%,粘度不小于22s。符合要求后进行挤扩承力盘施工。
(2)挤扩承力盘施工
挤扩机入孔前应检查油路、液压装置和弓压臂分合情况,一切正常后开始挤扩作业。当每桩设置多层挤扩承力盘时应自下而上实施挤扩,每桩三个挤扩承力盘或多个挤扩承力盘。使用三个挤扩承力盘时,三个挤扩承力盘自上而下分别称为上、中、下挤扩承力盘。施工时,先将挤扩机下放至下挤扩承力盘的设计位置,开启液压泵进行挤扩,挤扩时应认真观察和记录挤扩压力值。达到设计压力后收起弓压臂,按孔口角度盘控制弓压臂转动角度,符合要求后再次挤扩,每盘挤扩次数和每次转动角度应根据盘径和弓压臂宽度确定。
完成下挤扩承力盘的挤扩后上提挤扩机至中挤扩承力盘的位置,中挤扩承力盘的挤扩后再上提挤扩机至上挤扩承力盘的位置进行挤扩,依次按上述步骤,从而完成一根桩的挤扩施工。
挤扩设备出孔后,用盘径检测器对承力盘的成型效果进行检测。
在挤扩施工时,不应降低泥浆比重,挤扩过程中应认真观察泥浆面高度,当泥浆面下降时应及时补浆,保持孔内水头,防止坍孔。
(3)清孔
盘径检测合格后,重新下入钻具,继续钻进,将挤扩掉落孔底的泥渣清出孔外,钻进至设计孔底标高后进行第二次清孔。二次清孔可采用正循环或反循环清孔工艺。
(4)后压浆装置设置及钢筋笼下设
后压浆可采用桩端压浆或桩端、桩侧联合压浆。后压浆装置由竖向设置的桩端注浆导管1、桩侧注浆导管2,以及环形的桩侧注浆环管3、桩端注浆头7组成。桩端注浆导管1、桩侧注浆导管2由普通钢管制作,注浆导管1、2顶端伸出地面。桩端注浆头7采用具有逆止功能的压浆头,桩侧注浆环管3由环状PVC软管和保护装置组成。
后压浆装置预先安装在钢筋笼上,桩端注浆头7伸出钢筋笼底不少于20cm,数量一般不少于2根。桩侧注浆环管3根据桩周地层和挤扩承力盘4、5、6的设置位置确定,一般情况下,每隔6~12m设置一道,最上端的注浆装置距桩顶应不少于15m,靠近挤扩承力盘4、5、6的桩侧注浆头一般设置在挤扩承力盘4、5、6上方1m处(防止桩侧注浆头进入承力盘4、5、6的混凝土内,使桩侧注浆环管3无法打开)。桩端注浆导管1、桩侧注浆导管2竖向绑扎在钢筋笼内侧,桩侧注浆环管3平行绑扎在钢筋笼外侧。
后压浆装置随钢筋笼下放至钻孔内,分段制作的钢筋笼在孔口连接和下放时应仔细检查竖向设置的桩端注浆导管1、2和注浆环管3、桩端注浆头7的连接质量,防止连接处漏浆,堵塞注浆导管和注浆头。
(5)混凝土灌注
钢筋笼及后压浆装置固定安放完成后,及时下设导管、浇注水下砼。水下砼的浇注程序、检验标准、控制措施等应符合相关规范规定。
(6)后压浆施工
桩身混凝土灌注完成12~24小时内进行后压浆装置开环工作,开环通过向压浆导管内压注清水完成,压注清水的时间不小于5分钟。
桩身混凝土灌注完成48~72小时内应完成后压浆工作。压浆时应按先桩顶压浆装置,后桩端压浆装置,最后桩中间压浆装置的顺序进行。
浆液所用水泥宜选用强度等级为42.5Mpa的普通硅酸盐水泥,水灰比宜采用0.5~0.7。压浆时注浆压力应控制在1.5-3.0Mpa,防止浆液随意扩散。
压浆终止标准以压浆量控制为主,压力控制为辅。即首先要保证各压浆装置分配的压浆量全部压注完毕,完成成桩施工。
注浆完成后水泥浆对桩端沉渣9进行固化,对孔壁局部疏松处进行加固,把钻孔形成的泥皮进行置换,在桩端和桩侧分别形成桩端注浆加固体10和桩侧注浆加固体8。
本发明取得以下有益效果:
本发明将桩基后压浆技术和挤扩桩施工技术有机地结合在一起,解决了“软硬互层”地质条件下提高单桩承载力,降低基桩工后沉降和不均匀沉降的难题。采用挤扩桩技术,通过合理设置挤扩承力盘位置,充分发挥“软硬互层”地质条件下“硬地层”对基桩承载力的贡献,大幅提高了基桩承载力。有效提高了桩侧摩阻和桩端摩阻,消除和降低了桩端沉渣和桩侧泥皮对基桩承载力的影响。
附图说明
图1是挤扩承力盘和后压浆装置设置位置示意图。
图中标号代表的含义如下:
1、桩端注浆导管 2、桩侧注浆导管 3、桩侧注浆环管 4、下挤扩承力盘 5、中挤扩承力盘 6、上挤扩承力盘 7、桩端注浆头 8、桩侧注浆形成的注浆加固体 9、固化后的桩端沉渣 10、桩端注浆形成的注浆加固体。
具体实施方式
以下实施例用于说明本发明。
实施例
某项目位于我国东部沿海,桩基施工范围内的地层如下: 层吹填砂,饱和,松散;①层粉砂,饱和,稍密~中密;②层粉砂夹粉质粘土、粉质粘土夹粉砂,饱和,稍密~中密;③层粉砂:饱和,稍密~中密;④层粉质粘土夹粉砂、局部呈互层状:⑤层粉砂;⑥层粉质粘土:软塑,局部可塑;⑦层粉砂,饱和,中密~密实;为获得较大的单桩承载力(极限值16000KN),并有效控制不允匀沉降,设计采用后压浆挤扩灌注桩,桩径1.4m,每桩三个承力盘,盘径2.4m,桩长58.8m,三个承力盘设置在③层粉砂、⑤层粉砂、⑦层粉砂中。
利用本发明的施工方法具体施工步骤如下:
(1)钻孔施工
钻孔施工采用旋挖钻机成孔,泥浆护壁。施工时采用跳打方式,临近桩混凝土初凝后方开始钻孔作业。钻进至58m左右时停止钻进,进行第一次清孔。
(2)承力盘施工
挤扩机入孔前应检查油路、液压装置和弓压臂分合情况,一切正常后开始挤扩作业,挤扩时自下而上实施挤扩。
见图1,本实施例使用三个挤扩承力盘。将挤扩机下至下挤扩承力盘4位置后,开启液压泵进行挤扩,根据试桩取得的数据,挤扩承力盘首次挤扩压力值分别为上盘19 MPa、中盘19 MPa、下盘20MPa,达到设计压力后收起弓压臂,按孔口角度盘控制弓压臂转动角度,每盘挤扩11次,每次转动约11°,依次挤扩完成盘腔。第一次挤扩后,每次参照孔口角度盘转角约11°再进行挤扩,每盘共完成10次转角,11次挤扩,最后形成承力盘腔。
完成下挤扩承力盘4挤扩后顺序上提挤扩机至中挤扩承力盘5、上挤扩承力盘6的位置,依次按上述步骤完成一根桩的挤扩施工。
挤扩设备出孔后,用盘径检测器对承力盘成型效果进行检测。
(3)清孔
盘径检测合格后,重新下入钻具,钻进至58.8m后进行第二次清孔。二次清孔采用正循环清孔工艺。
(4)后压浆装置设置及钢筋笼下设
参见图1,本项目后压浆采用桩端压浆,随钢筋笼设置设置两根竖向的桩端注浆导管1,桩端注浆导管1底端连接桩端注浆头7。竖向的桩端注浆导管1绑扎在钢筋笼内侧,桩端注浆头7伸出钢筋笼底端30cm。
钢筋笼分5段制作,竖向的桩端注浆导管1和桩端注浆头7随钢筋笼下放至钻孔内,在孔口连接和下放时应仔细检查竖向的桩端注浆导管1和桩端注浆头7的连接质量,防止连接处漏浆,堵塞注浆导管1和注浆头7。
(5)混凝土灌注
钢筋笼及后压浆装置固定安放完成后,及时下设导管、浇注水下砼。水下砼的浇注程序、检验标准、控制措施等应符合相关规范规定。
(6)后压浆施工
桩身混凝土灌注完成12~24小时内进行后压浆装置开环工作,开环通过向压浆导管1内压注清水完成,压注清水的时间不小于5分钟。
桩身混凝土灌注完成48~72小时内应完成后压浆工作。浆液所用水泥选用强度等级为42.5Mpa的普通硅酸盐水泥,水灰比宜采用0.5~0.7。压浆时注浆压力应控制在1.5-3.0MPa,防止浆液随意扩散。
压浆终止标准以压浆量控制为主,压力控制为辅。单桩注浆量按4吨控制。
桩基检测结果表明:单桩承载力不小于16000KN,最终沉降量为19.18-27.21mm,效果良好。
Claims (1)
1.一种后压浆挤扩组合钻孔灌注桩施工方法,其特征在于包括以下步骤:
(1)钻孔施工
钻孔采用泥浆护壁,施工时采用间隔跳打的顺序进行施工,跳打间距不小于挤扩承力盘直径的6倍,相临桩混凝土初凝后开始钻孔作业,钻进至设计孔底标高以上0.3-0.5m时停止钻进,进行第一次清孔,符合要求后进行挤扩承力盘施工;
(2)挤扩承力盘施工
挤扩机入孔前检查油路、液压装置和弓压臂分合情况,一切正常后开始挤扩作业,当每桩设置多层挤扩承力盘时,自下而上实施挤扩,先将挤扩机下至下挤扩承力盘设计位置后,开启液压泵进行挤扩,挤扩时观察和记录挤扩压力值,达到设计压力后收起弓压臂,按孔口角度盘控制弓压臂转动角度,符合要求后再次挤扩,每盘挤扩次数和每次转动角度根据盘径和弓压臂宽度确定,完成下挤扩承力盘挤扩后顺序上提挤扩机至中挤扩承力盘、上挤扩承力盘位置,按上述步骤依次完成一根桩的挤扩施工,挤扩设备出孔后,用盘径检测器对挤扩承力盘的成型效果进行检测;
(3)清孔
盘径检测合格后,重新下入钻具,钻进至设计孔底标高后进行第二次清孔;
(4)后压浆装置设置及钢筋笼下设
后压浆采用桩端压浆或桩端、桩侧联合压浆方式,后压浆装置由桩端注浆导管、桩侧注浆环管和桩侧注浆环管、桩端注浆头组成,桩端注浆导管、桩侧注浆环管由普通钢管制作,注浆导管顶端伸出地面,桩侧注浆环管由环状PVC软管和保护装置组成;
后压浆装置预先安装在钢筋笼上,桩端注浆头伸出钢筋笼底不少于20cm,数量不少于2根,桩侧注浆环管根据桩周地层和挤扩承力盘设置位置确定,每隔6~12m设置一道,最上端的注浆装置距桩顶应不少于15m,靠近挤扩承力盘的桩侧注浆环管设置在挤扩承力盘上方1m处,桩端注浆导管、桩侧注浆导管竖向绑扎在钢筋笼内侧,桩侧注浆环管平行绑扎在钢筋笼外侧;
(5)混凝土灌注
钢筋笼及后压浆装置固定安放完成后,及时下设导管、浇注水下砼;
(6)后压浆施工
桩身混凝土灌注完成12~24小时内进行后压浆装置开环工作,开环通过向压浆导管内压注清水完成,压注清水的时间不小于5分钟;
桩身混凝土灌注完成48~72小时内完成后压浆工作,压浆时按先桩顶压浆装置,后桩端压浆装置,最后桩中间压浆装置的顺序进行,完成成桩施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103625575A CN103452100A (zh) | 2013-08-20 | 2013-08-20 | 后压浆挤扩组合钻孔灌注桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103625575A CN103452100A (zh) | 2013-08-20 | 2013-08-20 | 后压浆挤扩组合钻孔灌注桩施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103452100A true CN103452100A (zh) | 2013-12-18 |
Family
ID=49734907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103625575A Pending CN103452100A (zh) | 2013-08-20 | 2013-08-20 | 后压浆挤扩组合钻孔灌注桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103452100A (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103924586A (zh) * | 2014-03-18 | 2014-07-16 | 沈保汉 | 多节钻扩灌注桩施工方法 |
CN105804052A (zh) * | 2016-05-06 | 2016-07-27 | 同济大学 | 注浆管路结构、预制注浆管路的x型异型桩及其注浆方法 |
CN105926690A (zh) * | 2016-05-23 | 2016-09-07 | 浙江工业大学 | 应用硼中子寿命测井技术检测桩基后压浆质量的新方法 |
CN108035340A (zh) * | 2017-12-19 | 2018-05-15 | 中冶成都勘察研究总院有限公司 | 一种低温高含水率的粉砂地层灌注桩施工工艺 |
CN108221965A (zh) * | 2018-01-18 | 2018-06-29 | 樊军让 | 混凝土反压旋冲式多支盘灌注桩施工法 |
CN108797577A (zh) * | 2018-07-12 | 2018-11-13 | 上海市城市建设设计研究总院(集团)有限公司 | 带挤扩支盘的碎石注浆桩及其施工方法 |
CN109267567A (zh) * | 2018-11-12 | 2019-01-25 | 同济大学浙江学院 | 一种桩端和桩侧可转换注浆的钢管桩及其浇筑工艺 |
CN110295591A (zh) * | 2019-06-27 | 2019-10-01 | 深圳市工勘岩土集团有限公司 | 大直径超深灌注桩分层后注浆施工方法 |
CN111074882A (zh) * | 2019-12-16 | 2020-04-28 | 温州中领建设有限公司 | 多重立体灌注桩构造以及灌注桩体的方法 |
CN112281816A (zh) * | 2020-10-30 | 2021-01-29 | 南京长江都市建筑设计股份有限公司 | 一种多节拼接管桩及其埋设方法 |
CN112900440A (zh) * | 2021-01-21 | 2021-06-04 | 中国三峡新能源(集团)股份有限公司 | 一种加强海上风电桩基础承载力的注浆系统及施工方法 |
CN113529684A (zh) * | 2021-06-28 | 2021-10-22 | 中铁南方投资集团有限公司 | 用于填海软弱地层的支盘桩及其施工方法 |
CN114164852A (zh) * | 2021-12-28 | 2022-03-11 | 中交第二航务工程局有限公司 | 一种用于磨蚀环境的钢管复合桩及施工方法 |
WO2023193387A1 (zh) * | 2022-04-08 | 2023-10-12 | 中铁四局集团第五工程有限公司 | 一种钢管-混凝土支盘桩复合桩基结构及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1341795A (zh) * | 2001-10-18 | 2002-03-27 | 赵书平 | 可变式支盘扩底植入桩及成型方法 |
CN1355354A (zh) * | 2001-12-30 | 2002-06-26 | 赵书平 | 可变式扩底支盘注浆桩及成型方法 |
CN1609347A (zh) * | 2004-11-25 | 2005-04-27 | 河北建设勘察研究院有限公司 | 后压浆旋挖钻孔灌注桩技术 |
KR20070109436A (ko) * | 2006-05-11 | 2007-11-15 | 주식회사 쏘일텍 | 소구경 말뚝의 시공방법 |
CN101936004A (zh) * | 2010-08-25 | 2011-01-05 | 张继红 | 一种预制挤扩桩及其施工方法与施工机械设备 |
CN102926384A (zh) * | 2010-03-01 | 2013-02-13 | 张继红 | 一种后注浆的预制扩孔桩及其施工方法 |
-
2013
- 2013-08-20 CN CN2013103625575A patent/CN103452100A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1341795A (zh) * | 2001-10-18 | 2002-03-27 | 赵书平 | 可变式支盘扩底植入桩及成型方法 |
CN1355354A (zh) * | 2001-12-30 | 2002-06-26 | 赵书平 | 可变式扩底支盘注浆桩及成型方法 |
CN1609347A (zh) * | 2004-11-25 | 2005-04-27 | 河北建设勘察研究院有限公司 | 后压浆旋挖钻孔灌注桩技术 |
KR20070109436A (ko) * | 2006-05-11 | 2007-11-15 | 주식회사 쏘일텍 | 소구경 말뚝의 시공방법 |
CN102926384A (zh) * | 2010-03-01 | 2013-02-13 | 张继红 | 一种后注浆的预制扩孔桩及其施工方法 |
CN101936004A (zh) * | 2010-08-25 | 2011-01-05 | 张继红 | 一种预制挤扩桩及其施工方法与施工机械设备 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103924586A (zh) * | 2014-03-18 | 2014-07-16 | 沈保汉 | 多节钻扩灌注桩施工方法 |
CN105804052A (zh) * | 2016-05-06 | 2016-07-27 | 同济大学 | 注浆管路结构、预制注浆管路的x型异型桩及其注浆方法 |
CN105926690A (zh) * | 2016-05-23 | 2016-09-07 | 浙江工业大学 | 应用硼中子寿命测井技术检测桩基后压浆质量的新方法 |
CN105926690B (zh) * | 2016-05-23 | 2018-11-13 | 浙江工业大学 | 应用硼中子寿命测井技术检测桩基后压浆质量的方法 |
CN108035340A (zh) * | 2017-12-19 | 2018-05-15 | 中冶成都勘察研究总院有限公司 | 一种低温高含水率的粉砂地层灌注桩施工工艺 |
CN108221965A (zh) * | 2018-01-18 | 2018-06-29 | 樊军让 | 混凝土反压旋冲式多支盘灌注桩施工法 |
CN108797577A (zh) * | 2018-07-12 | 2018-11-13 | 上海市城市建设设计研究总院(集团)有限公司 | 带挤扩支盘的碎石注浆桩及其施工方法 |
CN109267567B (zh) * | 2018-11-12 | 2024-02-06 | 同济大学浙江学院 | 一种桩端和桩侧可转换注浆的钢管桩及其浇筑工艺 |
CN109267567A (zh) * | 2018-11-12 | 2019-01-25 | 同济大学浙江学院 | 一种桩端和桩侧可转换注浆的钢管桩及其浇筑工艺 |
CN110295591A (zh) * | 2019-06-27 | 2019-10-01 | 深圳市工勘岩土集团有限公司 | 大直径超深灌注桩分层后注浆施工方法 |
CN111074882A (zh) * | 2019-12-16 | 2020-04-28 | 温州中领建设有限公司 | 多重立体灌注桩构造以及灌注桩体的方法 |
CN112281816A (zh) * | 2020-10-30 | 2021-01-29 | 南京长江都市建筑设计股份有限公司 | 一种多节拼接管桩及其埋设方法 |
CN112900440A (zh) * | 2021-01-21 | 2021-06-04 | 中国三峡新能源(集团)股份有限公司 | 一种加强海上风电桩基础承载力的注浆系统及施工方法 |
CN113529684A (zh) * | 2021-06-28 | 2021-10-22 | 中铁南方投资集团有限公司 | 用于填海软弱地层的支盘桩及其施工方法 |
CN114164852A (zh) * | 2021-12-28 | 2022-03-11 | 中交第二航务工程局有限公司 | 一种用于磨蚀环境的钢管复合桩及施工方法 |
WO2023193387A1 (zh) * | 2022-04-08 | 2023-10-12 | 中铁四局集团第五工程有限公司 | 一种钢管-混凝土支盘桩复合桩基结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452100A (zh) | 后压浆挤扩组合钻孔灌注桩施工方法 | |
CN102587358B (zh) | 一种高聚物材料后注浆挤扩灌注桩施工方法 | |
CN104131575B (zh) | 一种岩溶高度发育地层坝基的堵漏排水方法 | |
CN103184734B (zh) | 一种植入注浆组合桩的施工方法 | |
CN107503257B (zh) | 一种傍山高填路堤稳定与变形控制结构及施工方法 | |
CN101812976B (zh) | 可调式多级螺旋挤扩钻具 | |
CN100501011C (zh) | 钻孔压浆桩施工方法 | |
CN101962949A (zh) | 长螺旋二重管高压搅喷桩施工方法及其装置 | |
CN110144908A (zh) | 一种深层注浆加固滑坡构造及其构筑方法 | |
CN104499479A (zh) | 一种穿越砂砾石回填层的挖孔桩施工方法 | |
CN107740434B (zh) | 一种用于砂卵石、白云岩破碎带水坝基坑防水帷幕的施工方法 | |
CN203684242U (zh) | 滩涂区土工袋泥浆复合围堰式水中施工平台 | |
CN107513995A (zh) | 一种桥梁灌注桩后压浆施工方法 | |
CN108708743A (zh) | 一种采用灌浆处理隧洞塌方的方法 | |
CN103806433A (zh) | 一种地基回填土的加固方法 | |
CN103556554B (zh) | 加固路堤软基的钻孔桩复合地基结构的施工方法 | |
CN110306586A (zh) | 一种用于传统建筑的地基加固方法 | |
CN104264653A (zh) | 超高能级强夯与置换兼容施工工艺 | |
CN103556551B (zh) | 加固路堤软基的哑铃形钻孔桩复合地基结构的施工方法 | |
CN208201874U (zh) | 一种开孔式布袋注浆结构 | |
CN105525605A (zh) | 一种地下室回填区域加固的方法 | |
CN104213554A (zh) | 注浆成型变截面钢管桩施工方法及其扩挤装置 | |
CN103114576A (zh) | 一种用于混凝土灌注桩的后压浆施工方法 | |
CN102979087B (zh) | 一种旋挖桩施工方法 | |
CN102425179B (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131218 |