CN104192469A - Electric tower sliding and conveying device and application method thereof - Google Patents
Electric tower sliding and conveying device and application method thereof Download PDFInfo
- Publication number
- CN104192469A CN104192469A CN201410434095.8A CN201410434095A CN104192469A CN 104192469 A CN104192469 A CN 104192469A CN 201410434095 A CN201410434095 A CN 201410434095A CN 104192469 A CN104192469 A CN 104192469A
- Authority
- CN
- China
- Prior art keywords
- electric tower
- slip rope
- cross
- cylinder
- conveying arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to an electric tower sliding and conveying device and an application method of the electric tower sliding and conveying device. A transverse supporting plate is arranged in the middle of an electric tower body. A lifting device is arranged on the transverse supporting plate. A slip rope fixing plate which is arranged longitudinally is fixedly connected to the lifting device. Winding rollers for winding slip ropes are arranged on the slip rope fixing plate. The slip ropes are wound around the winding rollers. Each winding roller is provided with a driving device for driving the winding roller to rotate. According to the electric tower sliding and conveying device, since the lifting device, the slip ropes, movable pulleys and other devices are arranged on an electric tower, assembly parts of the electric tower can be conveyed through the slip ropes of a slip rope device arranged on the established electric tower in a complex terrain, the conveying difficulty and the installation difficulty of the assembly parts of the electric tower can be greatly relieved, and the installation speed is effectively increased.
Description
Technical field
The present invention relates to a kind of electric power conveyer, be specifically related to a kind of electric tower sliding conveying arrangement and using method thereof.
Background technology
Electricity tower is a kind of for the fixing device of power transmission line, in the situation that the complex-terrain vehicles such as some mountain regions, marsh cannot transport, electricity tower need to manually carry build electric tower frame parts part through mountain forest or marsh, install after arriving appointed place, this method extremely wastes time and energy.
Summary of the invention
The present invention improves the problems referred to above, and the technical problem to be solved in the present invention is that existing electric tower is installed while running into situation with a varied topography and adopted and manually transport installation frame, wastes time and energy.
The first specific embodiments of the present invention is: a kind of electric tower sliding conveying arrangement, it is characterized in that, comprise electric tower body, described electric tower body middle part is provided with cross-tie plate, described cross-tie plate is provided with jacking system, is fixedly connected with the slip rope adapter plate of longitudinal setting on described jacking system, is provided with for being wound around the take-up cylinder of slip rope on described slip rope adapter plate, on described take-up cylinder, be wound with slip rope, described take-up cylinder is provided with the actuating device of head roll rotation.
Further, described slip rope adapter plate upper end is fixed with a cross bar, described cross bar be provided with a pair of can be along the pulley fixed link of cross bar slippage, described pulley fixed link one end is provided with movable pulley.
Further, described cross bar is that cross section is rectangle, and described pulley fixed link is towards the rectangular through-hole matching with cross bar cross section that is provided with of cross bar one end.
Further, described jacking system is hydraulic actuating cylinder, and the upper end of hydraulic actuating cylinder is fixedly connected with slip rope adapter plate lower end.
Further, described actuating device is motor.
Further, described take-up cylinder top is provided with the shank being fixed on slip rope adapter plate.
Further, described electric tower body is provided with cross-tie plate, and cross-tie plate both sides are provided with the side shield being fixed on electric tower, and described side shield is provided with control box.
The second specific embodiments of the present invention is: a kind of electric tower sliding conveying arrangement using method, comprise a kind of electric tower sliding conveying arrangement as claimed in claim 6, and it is characterized in that, comprise the following steps:
(1) on electric tower, be fixedly installed cross-tie plate, jacking system is installed on stay bearing plate, slip rope adapter plate is set on jacking system, take-up cylinder is installed on slip rope adapter plate, on take-up cylinder, be wound around slip rope, take-up outer surface of cylinder is fixed in one end of slip rope, and the other end is provided with hook;
(2) slip rope adapter plate upper end dead sheave fixed link, pulley fixed link one end is provided with movable pulley, operating personal stands on cross-tie plate, slip rope is walked around to movable pulley from cylinder extraction slip rope lower end is transferred to ground, and terrestrial operation personnel are fixed on electric tower installing component on slip rope;
(3) by actuating device, electric tower installing component is pulled on cross-tie plate by slip rope, unloads electric tower installing component and be placed on cross-tie platform;
(4) other end of slip rope is transferred to ground and to the next one, the predeterminated position point of electric tower need to be installed by ground staff's tractive, and fix, by jacking system, improve the height of take-up cylinder, at predeterminated position point, buffering pneumatic cushion is set;
(5) the electric tower installing component on cross-tie platform is placed on slip rope, by slip rope sliding to predeterminated position point.
Further, the take-up cylinder in described step (1) has two at least.
Further, after the electric tower of step (5) predeterminated position point completes and builds, electric tower sliding conveying arrangement is set equally on the electric tower of predeterminated position point, by the jacking system of two electric towers, realizes the change at the angle of inclination of slip rope, thereby realize the conveying back and forth of follow-up material or instrument.
Compared with prior art, the present invention has following beneficial effect: the present invention is simple in structure, utilizes lowering rope device can be adapted at Di He slope, mountain and carries electric tower mounting parts by high-altitude, does not need to install by manually bearing part mountain-climbing, thereby saved manpower, improved installation effectiveness.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present invention.
Fig. 2 is the present invention's electricity tower sliding conveying arrangement structure enlarged diagram.
Fig. 3 is cross bar of the present invention and pulley fixed link fit structure schematic diagram.
Fig. 4 is that the present invention uses view.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
As shown in Fig. 1~2, a kind of electric tower sliding conveying arrangement, comprise electric tower body 10, described electric tower body 10 middle parts are provided with cross-tie plate 110, described cross-tie plate 110 is provided with hydraulic actuating cylinder 20, on described hydraulic actuating cylinder 20, be fixedly connected with the slip rope adapter plate 30 of longitudinal setting, on described slip rope adapter plate 30, be provided with for being wound around the take-up cylinder 40 of slip rope, on described take-up cylinder 40, be wound with slip rope, described take-up cylinder 40 is provided with the actuating device of head roll rotation, and actuating device is generally motor.
Described slip rope adapter plate 30 upper ends are fixed with a cross bar 50, described cross bar 50 be provided with a pair of can be along the pulley fixed link 510 of cross bar slippage, described pulley fixed link one end is provided with movable pulley 520.Cross bar 50 for cross section be rectangle, described pulley fixed link 510 is towards the rectangular through-hole matching with cross bar cross section that is provided with of cross bar 50 one end.
Take-up cylinder 40 tops are provided with the shank 60 being fixed on slip rope adapter plate, and described electric tower body is provided with cross-tie plate 110, and cross-tie plate 110 both sides are provided with the side shield 70 being fixed on electric tower, and described side shield is provided with control box.
Cross-tie plate by bolt-locking on electric tower body 10, slip rope one end is fixed on take-up cylinder 40, the other end can be provided with the gib head that can match with shank 60, take-up cylinder 40 is generally provided with two or more, the position of pulley fixed link 510 can be adjusted along cross bar 50 left and right, pulley fixed link also can be set to Collapsible structure, when needs are sling ground object, movable pulley on pulley fixed link 510 520 is adjusted to mutually concordant with take-up cylinder 40, while not using, move to side, plural take-up cylinder 40 is in order to guarantee the steady of handling article.
During use, comprise the following steps:
(1) on electric tower, be fixedly installed cross-tie plate, jacking system is installed on stay bearing plate, slip rope adapter plate is set on jacking system, take-up cylinder is installed on slip rope adapter plate, on take-up cylinder, be wound around slip rope, take-up outer surface of cylinder is fixed in one end of slip rope, and the other end is provided with hook;
(2) slip rope adapter plate upper end dead sheave fixed link, pulley fixed link one end is provided with movable pulley, operating personal stands on cross-tie plate, slip rope is walked around to movable pulley from cylinder extraction slip rope lower end is transferred to ground, and terrestrial operation personnel are fixed on electric tower installing component on slip rope;
(3) by actuating device, electric tower installing component is pulled on cross-tie plate by slip rope, unloads electric tower installing component and be placed on cross-tie platform;
(4) other end of slip rope is transferred to ground and to the next one, the predeterminated position point of electric tower need to be installed by ground staff's tractive, and fix, by jacking system, improve the height of take-up cylinder, at predeterminated position point, buffering pneumatic cushion is set;
(5) the electric tower installing component on cross-tie platform is placed on slip rope, by slip rope sliding to predeterminated position point.
After the electric tower of step (5) predeterminated position point completes and builds, electric tower sliding conveying arrangement is set equally on the electric tower of predeterminated position point, by the jacking system of two electric towers, realize the change at the angle of inclination of slip rope, thereby realize the conveying back and forth of follow-up material or instrument.
The foregoing is only preferred embodiment of the present invention, all equalizations of doing according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.
Claims (10)
1. an electric tower sliding conveying arrangement, it is characterized in that, comprise electric tower body, described electric tower body middle part is provided with cross-tie plate, described cross-tie plate is provided with jacking system, is fixedly connected with the slip rope adapter plate of longitudinal setting on described jacking system, is provided with for being wound around the take-up cylinder of slip rope on described slip rope adapter plate, on described take-up cylinder, be wound with slip rope, described take-up cylinder is provided with the actuating device of head roll rotation.
2. a kind of electric tower sliding conveying arrangement according to claim 1, described slip rope adapter plate upper end is fixed with a cross bar, described cross bar be provided with a pair of can be along the pulley fixed link of cross bar slippage, described pulley fixed link one end is provided with movable pulley.
3. a kind of electric tower sliding conveying arrangement according to claim 1 and 2, described cross bar is that cross section is rectangle, described pulley fixed link is towards the rectangular through-hole matching with cross bar cross section that is provided with of cross bar one end.
4. a kind of electric tower sliding conveying arrangement according to claim 3, described jacking system is hydraulic actuating cylinder, the upper end of hydraulic actuating cylinder is fixedly connected with slip rope adapter plate lower end.
5. a kind of electric tower sliding conveying arrangement according to claim 4, described actuating device is motor.
6. a kind of electric tower sliding conveying arrangement according to claim 4, is provided with the shank being fixed on slip rope adapter plate above described take-up cylinder.
7. a kind of electric tower sliding conveying arrangement according to claim 1, described electric tower body is provided with cross-tie plate, and cross-tie plate both sides are provided with the side shield being fixed on electric tower, and described side shield is provided with control box.
8. an electric tower sliding conveying arrangement using method, comprises a kind of electric tower sliding conveying arrangement as claimed in claim 6, it is characterized in that, comprises the following steps:
(1) on electric tower, be fixedly installed cross-tie plate, jacking system is installed on stay bearing plate, slip rope adapter plate is set on jacking system, take-up cylinder is installed on slip rope adapter plate, on take-up cylinder, be wound around slip rope, take-up outer surface of cylinder is fixed in one end of slip rope, and the other end is provided with hook;
(2) slip rope adapter plate upper end dead sheave fixed link, pulley fixed link one end is provided with movable pulley, operating personal stands on cross-tie plate, slip rope is walked around to movable pulley from cylinder extraction slip rope lower end is transferred to ground, and terrestrial operation personnel are fixed on electric tower installing component on slip rope;
(3) by actuating device, electric tower installing component is pulled on cross-tie plate by slip rope, unloads electric tower installing component and be placed on cross-tie platform;
(4) other end of slip rope is transferred to ground and to the next one, the predeterminated position point of electric tower need to be installed by ground staff's tractive, and fix, by jacking system, improve the height of take-up cylinder, at predeterminated position point, buffering pneumatic cushion is set;
(5) the electric tower installing component on cross-tie platform is placed on slip rope, by slip rope sliding to predeterminated position point.
9. a kind of electric tower sliding conveying arrangement using method according to claim 8, the take-up cylinder in described step (1) has two at least.
10. a kind of electric tower sliding conveying arrangement using method according to claim 9, after the electric tower of step (5) predeterminated position point completes and builds, electric tower sliding conveying arrangement is set equally on the electric tower of predeterminated position point, by the jacking system of two electric towers, realize the change at the angle of inclination of slip rope, thereby realize the conveying back and forth of follow-up material or instrument.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410434095.8A CN104192469B (en) | 2014-08-29 | 2014-08-29 | A kind of electricity tower sliding conveying arrangement and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410434095.8A CN104192469B (en) | 2014-08-29 | 2014-08-29 | A kind of electricity tower sliding conveying arrangement and using method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104192469A true CN104192469A (en) | 2014-12-10 |
CN104192469B CN104192469B (en) | 2016-07-06 |
Family
ID=52077897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410434095.8A Active CN104192469B (en) | 2014-08-29 | 2014-08-29 | A kind of electricity tower sliding conveying arrangement and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104192469B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105347199A (en) * | 2015-11-30 | 2016-02-24 | 国网福建省电力有限公司 | Electric tower sliding conveying slideway positioning device and use method thereof |
CN107575044A (en) * | 2017-09-27 | 2018-01-12 | 林月仙 | It is a kind of to view and admire platform using the seashore lifting of wave-energy power generation |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190116663A (en) * | 1901-08-19 | 1901-11-09 | Victor Petit | Improvements in Deep Boring Machines. |
KR20090088998A (en) * | 2008-02-18 | 2009-08-21 | 현대로템 주식회사 | Zigzag cone telescopic chute |
CN102359302A (en) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | Extra-high voltage large-span iron tower assembling method |
CN202785449U (en) * | 2012-09-27 | 2013-03-13 | 国家电网公司 | Rope coiling-and-uncoiling all-in-one crane |
CN203545564U (en) * | 2013-10-17 | 2014-04-16 | 罗猛 | Portable crane with rotary boom positioning function |
CN203582933U (en) * | 2013-11-15 | 2014-05-07 | 国家电网公司 | Torque release machine for wire rope |
CN204137712U (en) * | 2014-08-29 | 2015-02-04 | 国家电网公司 | A kind of electric tower sliding conveying arrangement |
-
2014
- 2014-08-29 CN CN201410434095.8A patent/CN104192469B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190116663A (en) * | 1901-08-19 | 1901-11-09 | Victor Petit | Improvements in Deep Boring Machines. |
KR20090088998A (en) * | 2008-02-18 | 2009-08-21 | 현대로템 주식회사 | Zigzag cone telescopic chute |
CN102359302A (en) * | 2011-10-31 | 2012-02-22 | 湖北省输变电工程公司 | Extra-high voltage large-span iron tower assembling method |
CN202785449U (en) * | 2012-09-27 | 2013-03-13 | 国家电网公司 | Rope coiling-and-uncoiling all-in-one crane |
CN203545564U (en) * | 2013-10-17 | 2014-04-16 | 罗猛 | Portable crane with rotary boom positioning function |
CN203582933U (en) * | 2013-11-15 | 2014-05-07 | 国家电网公司 | Torque release machine for wire rope |
CN204137712U (en) * | 2014-08-29 | 2015-02-04 | 国家电网公司 | A kind of electric tower sliding conveying arrangement |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105347199A (en) * | 2015-11-30 | 2016-02-24 | 国网福建省电力有限公司 | Electric tower sliding conveying slideway positioning device and use method thereof |
CN107575044A (en) * | 2017-09-27 | 2018-01-12 | 林月仙 | It is a kind of to view and admire platform using the seashore lifting of wave-energy power generation |
Also Published As
Publication number | Publication date |
---|---|
CN104192469B (en) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107425463B (en) | Novel transmission line patrol robot wire feeding and discharging device | |
CN102942067B (en) | Belt installing method and changing method of belt conveyor and installing or changing system thereof | |
CN109955925B (en) | Pole-climbing robot | |
CN103790390B (en) | Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof | |
CN202181174U (en) | Saddle of cable crane | |
CN104192469A (en) | Electric tower sliding and conveying device and application method thereof | |
CN105152097A (en) | Sliding-plug door installation lifting device | |
CN204137712U (en) | A kind of electric tower sliding conveying arrangement | |
CN110803663B (en) | Hoisting equipment for maintenance of power equipment | |
CN207844187U (en) | A kind of chain-type conveying device | |
CN203747357U (en) | Coal mine coal machine cable machinery self moving device | |
CN100575241C (en) | Self-lifting load carrying device | |
CN103274310A (en) | Self-lifting type cableway transporting device | |
CN203856216U (en) | Complete transportation equipment for arc-shaped light-transmitting roof component | |
CN205489288U (en) | Overhead line wire barrow | |
CN204506903U (en) | Rail transport quick despatch car device | |
CN208199541U (en) | The device of belt conveyor conveyer belt is installed | |
CN105347199A (en) | Electric tower sliding conveying slideway positioning device and use method thereof | |
CN205204674U (en) | Electricity tower cunning is sent and is carried slide rail positioner | |
CN204150578U (en) | A kind of head moving type belt feeder | |
CN104876165A (en) | Mobile mounting and maintenance platform of photovoltaic component | |
CN204689566U (en) | A kind of device installed for electric power distribution cabinet fast transportation | |
CN204859074U (en) | Portable installation and maintenance platform of photovoltaic module | |
CN205365808U (en) | Female car of building block transportation | |
CN204702434U (en) | A kind of device installed for electric power distribution cabinet fast transportation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |