CN104192270B - Buried using water surface lever ship performance dragon and tiger cliff - Google Patents
Buried using water surface lever ship performance dragon and tiger cliff Download PDFInfo
- Publication number
- CN104192270B CN104192270B CN201410411934.4A CN201410411934A CN104192270B CN 104192270 B CN104192270 B CN 104192270B CN 201410411934 A CN201410411934 A CN 201410411934A CN 104192270 B CN104192270 B CN 104192270B
- Authority
- CN
- China
- Prior art keywords
- lever
- ship
- precipice
- bamboo ladder
- ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 19
- 241000282376 Panthera tigris Species 0.000 title claims abstract description 7
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 51
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 51
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 51
- 241001330002 Bambuseae Species 0.000 claims abstract description 50
- 239000011425 bamboo Substances 0.000 claims abstract description 50
- 239000004575 stone Substances 0.000 claims abstract description 26
- 239000002023 wood Substances 0.000 claims abstract description 21
- 230000006835 compression Effects 0.000 description 12
- 238000007906 compression Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 11
- 239000000203 mixture Substances 0.000 description 6
- 239000011435 rock Substances 0.000 description 5
- 240000006053 Garcinia mangostana Species 0.000 description 2
- 235000017048 Garcinia mangostana Nutrition 0.000 description 2
- 230000002153 concerted effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 241000209128 Bambusa Species 0.000 description 1
- 241000345998 Calamus manan Species 0.000 description 1
- 244000025254 Cannabis sativa Species 0.000 description 1
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 1
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 1
- 244000274883 Urtica dioica Species 0.000 description 1
- 235000009108 Urtica dioica Nutrition 0.000 description 1
- 230000003796 beauty Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 235000009120 camo Nutrition 0.000 description 1
- 235000005607 chanvre indien Nutrition 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 239000011487 hemp Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 235000012950 rattan cane Nutrition 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
Buried using water surface lever ship performance dragon and tiger cliff, it includes a raft ship, the rotatable wood spool of an accumbency aboard ship is set in raft amidships, the preceding bamboo ladder as lever resistance arm and the rear bamboo ladder as lever weight arm are inserted with the middle of wood spool, raft ship is unobstructed object space on the terraced position of rear bamboo, outstanding coffin is accepted on the top pole of preceding bamboo ladder and bier is dragged, the foot piece part system of rear bamboo ladder, which holds, can place stone in stone net, net.Bury the lever mode for using the weight arm using hull as fulcrum to go deep into water in precipice, when weight arm end is when holding Shi Wangzhong and being put into stone heavy enough, the weight arm of lever is sunk under water by unobstructed object space, so that rise to precipice hole as the preceding bamboo ladder rotation of lever resistance arm, and by with preceding bamboo ladder links drags bier to send into coffin in hole.The present invention buries the outstanding wisdom that mode more makes people experience Chinese nation ancients without pulley, winch with this precipice suited measures to local conditions of lever waterborne.
Description
Technical field
The present invention relates to tour field, specifically buried using water surface lever ship performance dragon and tiger cliff.
Background technology
It is well known that outstanding coffin group is buried on the precipice of Jiangxi Longhushan, there is the history in more than 2600 years away from the present, be that ancient more people is buried.Dragon
Face abyss under Tiger Mountain rock-tombs, be located in precipice, Gu gets over people is how to be put into coffin in hole 20 to 50 meters high from the water surfaceTo this sea
Inside and outside personage proposes many guesses, be summed up " suspension method ", " bamboo and wood built method ", " aerial ladder frame rock dust ", " frame high ladder method ",
" nettle built method ", " plank road method ", " tunnel method is dug on rear mountain ", " towered ship placement method " etc..But so far also without a compellent
Answer.1989, Shanghai Tongji University antique mechanism researcher Lu Jingyan professors developed lift-on/lift-off system modelled after an antique, weighing 200
Kilogram coffin be promoted to hole, by lift people draw in hole lay.Also Hong Kong Mr. Xiao is also to use lift-on/lift-off system.Lu Jing is sternly taught
This lift-on/lift-off system liter modelled after an antique awarded puts the process of coffin, nowadays shows in Longhushan, and as the fixed table of Longhushan one
Program is drilled, this program is just arranged on celestial water rock and hangs the scud pavilion that coffin compares concentration.Performing artist gently soars from summit and takeoff, edge
Vertical hanging to the rope of river surface and under, when they are slipped down to close to grotto in the middle of cliff, they need to tempestuously rock
Rope, by inertia, is leapt up in hole with gesture with lightning speed.Followed by the nanmu on ground hangs coffin and slowly gone up to the air, and rises
During to close to hole, the people in grotto is drawn with tackline, and the people on ground then significantly rocks rope, by outstanding coffin in the air
The inertia rocked, finds accurately opportunity, makes a concerted effort outstanding coffin to send into hole up and down.Due to being presently believed that the feasible lift-on/lift-off system of comparison is still difficult to
The mystery that ancient times precipice is buried is untied, such as pulley, winch be not in locality discovery.If there can be a kind of method, outstanding coffin can be reached
The purpose buried, does not need pulley, winch etc. again, and only uses ancients' instrument used in everyday, the performance section with regard to that can carry out hanging-coffin burial
Mesh, this will see traveller to convince, more admire Chinese nation ancients wisdom, also improve scenic spot performance taste and
International influence, will also attract further exploitation of more personages in various fields nationwide and overseas to this tour itineraries.
The content of the invention
The purpose of the present invention is:A kind of innovation imitation ancient times get over the new method that people precipice is buried, and make the precipice of the tourist districts such as Longhushan
Bury performance program and more meet the precipice that ancients suit measures to local conditions and bury mode, so that people more admire the wisdom of Chinese nation ancients.
The object of the present invention is achieved like this:It includes raft ship, and an accumbency is set aboard ship in raft amidships
Rotatable wood spool, the side of wood spool two has to be inserted with as lever resistance arm in the middle of the wood spool limited post being fixed on raft ship, wood spool
Preceding bamboo ladder and the rear bamboo ladder as lever weight arm, raft ship is unobstructed object space on the terraced position of rear bamboo, the top pole of preceding bamboo ladder
Upper to accept outstanding coffin and drag bier, the foot piece part system of rear bamboo ladder, which holds, can place stone in stone net, net, it is characterized in that:Precipice, which is buried, adopts
The lever mode goed deep into hull for the weight arm of fulcrum in water, when the Shi Wangzhong that holds at weight arm end is put into stone heavy enough
When, the weight arm of lever is sunk under water by unobstructed object space, so that rising to precipice as the preceding bamboo ladder rotation of lever resistance arm
Hole, and by with preceding bamboo ladder link drag bier by coffin send into hole in.
So, because raft ship is on the water surface for having abyss, raft ship is the space of without hindrance block material again on the terraced position of rear bamboo,
Therefore the rear ladder bars of lever weight arm can freely extend, and this is to make use of created under local special topography condition a kind of waterborne
Lever, according to lever principle, as the front ladder pole of resistance arm also with regard to very high precipice hole can be risen to.For by Show Time institute
Limit, also just first can place sufficient added with the compression leg being fixed on raft ship, therefore before performance at raft ship rear portion in stone net is held
The stone of enough outstanding coffins of lifting, and held the control cord being fixed on rear terraced shelves using compression leg, rear bamboo ladder is not sunk and (refer to attached
Figure, but ancients should funeral outstanding coffin is first put on resistance arm when starting, then put stone on weight arm, be thus not required to compression leg),
But outstanding coffin is put into jail and reaches precipice side on front ladder pole, then by funeral raft ship, as long as the control cord that at this moment will be coiled on compression leg
Slowly loosen, rear bamboo ladder sinks down under water and hangs coffin and be raised above gradually, until reaching precipice buries height, and it is terraced because hanging the bamboo under coffin
Above fixed to drag bier, outstanding coffin can draw in Ya Dong from dragging on bier.And performing artist can also lean on this lever ladder waterborne, turnover
Hole is buried on precipice, and (because the stone for holding Shi Wangzhong is divided into multiple stones that can be lifted with netting, such people can be one by one by stone
Block lifts, then pushes down front ladder pole by personal gravity, so that it may so that lever is replied).Dragon and tiger cliff buries hole minimum about 20 meters, most
High also 50 meters or so, most long mangosteen also has more than 10 meters, even 20 meters, therefore is tied up with 1-2 root mangosteens and make front ladder pole, with regard to energy
Precipice height of holes is reached, and mao bamboon there can be larger bearing capacity in mountain, hang about 300 jin of the general weight of coffin, we are usually two people
It can stand on bamboo ladder, its weight and outstanding coffin almost, moreover can make further reinforcing after the preceding strapped bamboo pole of bamboo pole rattan.Therefore
This lever precipice, which is buried, to be not only performance precipice and buries, can also be after precipice coffin enters precipice hole, and using high bamboo ladder pole, acrobat can
Play the part of ancient times Yue State beauty to leap from Ya Dongli, her is climbed for a moment on front ladder pole, climb low for a moment, hindered with high high adjustment
The length of the arm of force, when she climbs to highest, though resistance arm is long, the heavy stone of weight arm, which has, determines power effect, and it is free-and-easy that she can shake ease;And
When she climbs to it is minimum when, resistance arm is most short, at this moment she can under to being given one's autograph as a momento with visitor on ship.Then she can lightly climb up bamboo again
Ladder, into precipice hole.Believe that the performance that this people's ghost is not surveyed will be very fascinating, can also make visitor vivid first to ancient times for meeting
Culture is buried on the wisdom of the people and precipice.《Bury performance ship in Longhushan lever precipice》Manufacture need material locality have, be nothing but a little bamboos and
The rope made of hemp, the characteristics of Longhushan faces abyss under having, people claims at the depth of water " two liang of silk threads are beaten not on earth, ", and this just enables weight arm to go deep into water
In, the effect of ship upper lever is also just substantially embodied.
Brief description of the drawings
Fig. 1 is the schematic diagram that performance ship is buried on lever precipice.
Fig. 2 is Fig. 1 A-A sectional views.
Fig. 3 is the lever rotation liter figure that performance ship is buried on lever precipice.
1 in Fig. 1 is bamboo ladder top pole, and 2 be the outstanding coffin tacked with lifting rope, and 3 be to drag bier, and 4,5,6 be bamboo before composition respectively
Ladder fore stay, front ladder shelves and front ladder pole, 7 be raft ship, and 8 be drag-line post, and 9 be wood spool, and 10 be a grade bar, and 11 be as unobstructed
The groove of object space, 12,13,14 be rear terraced pole, backstay and the rear terraced shelves of bamboo ladder after composition respectively, and 15 be compression leg, and 16 be pressure
Column base, 17 be control cord, and 18 be to hold stone net, and 19 be that (it is made up of stone hundred jin of heavy stones of the polylith with drawstring, and drawstring can
Gone out with reaching non-table in wood spool, figure along rear bamboo ladder.) 20 it is foot piece.The terraced and rear bamboo ladder of preceding bamboo, two front ladder poles 6 are inserted with wood spool 9
Between there are many front ladders shelves 5 to be connected, there are terraced shelves 14 after many to be connected between ladder bars 12 after two, the side of wood spool two has many
Root blend stop 10, makes wood spool 9 to be rotated between two side bumper bars, is hung on the top pole 1 of the terraced foremost of preceding bamboo with hanging that rope is tacked
Link on bamboo ladder under coffin 2, outstanding coffin and drag bier 3 (linking method can use rope bondage, all connected with rope, in figure not
Table rope), the terraced afterbody of rear bamboo is connected foot piece 20, and (foot piece 20, the rear terraced afterbody of pole 12 and rear terraced shelves can form a four directions
Shape frame, the four edges of square frame are held and hold stone net 18) hold placement stone 19 in stone net, the right-hand component of raft ship 7 have one it is recessed
Groove 11, groove leads directly to after being placed in river bed, therefore groove 11 bamboo ladder, and rear bamboo ladder top has one perpendicular to be fixed on pressure
Compression leg 15 in column base 14, compression leg seat is fixed on raft ship, the affixed rear terraced shelves close with it in control cord one end, other end winding
On compression leg, such precipice makes the rear bamboo ladder of weight arm not decline before burying, ease away control cord 17, makes under weight arm when precipice is buried
Drop and resistance arm rising.Drag-line post 8 is inserted firmly on wood spool 9, and above it each end of fixed fore stay 4 and backstay 13
Head, another two terminations of two drag-lines, a top pole, terraced shelves after another connection, this two drag-lines enable forward and backward bamboo ladder to add
Gu.If tourism department is buried with the ship of un-grooved to perform precipice, unobstructed object space will be space outside ship side, at this moment after
Rear terraced shelves on bamboo ladder can remove several, be sunk with without prejudice to weight arm.
Fig. 2 is Fig. 1 A-A section views.In figure 2,1,3,6,4,7,21,10,8,9,12,13,17,15,16,18,19,20 with
Sequence is:Outstanding coffin, push up pole, drag bier, preceding ladder bars, fore stay, raft ship, river surface, blend stop, drag-line post, wood spool, rear terraced pole, backstay,
Control cord, compression leg, compression leg seat, hold stone net, stone and tail pole.Its mutual structure chart 1 has been described, and repeats no more here.From
In figure it can be seen that river surface position, and《Bury performance ship in Longhushan lever precipice》Side situation.
Fig. 3 is the lever rotation liter figure that performance ship is buried on lever precipice.2 in figure, 3,6,10,21,12,18,19,20,13,16,
15th, 7,8,9,4,1 using sequence as:Outstanding coffin, drag bier, front ladder pole, blend stop, river surface, rear terraced pole, hold stone net, stone, tail pole, post-tensioning
Rope, compression leg seat, compression leg, raft ship, drag-line post, wood spool, fore stay, top pole.Its structure is identical with Fig. 1, Fig. 2, can from figure
Arrive《Bury performance ship in Longhushan lever precipice》Lever rise when under water, above-water situation, at this moment the gravity of lever pass through
Wood spool is fully fallen on ship, and when Gu Baiyue before more than 2600 years, perhaps so-called ship is bamboo raft, and we are performance ships now,
Bamboo valve in-convenience in use, therefore available wooden boat, in order to not make wooden boat be turned upside down to two sides, therefore hull should be wider.The height in precipice hole
Degree is measured before being buried on precipice with rope, therefore when precipice being buried into ship will reach precipice hole forward, before regulation control cord 16 makes on bamboo ladder
Rise, and make to drag bier 3 to be directed at precipice hole, and drawing rests on Ya Dongshang, at this moment people can calmly be climbed up and drag bier, and coffin rope is untied,
Coffin is dragged in the hole of precipice and buried.During such as shipboard body close to precipice hole, then bier is dragged also to need to be strapped in side in advance, and due to wood
Axle has the leeway moved left and right in the middle of blend stop, thus people can pull after bamboo ladder, before making on bamboo ladder drag bier to the right or
Stopped over after moving left at precipice hole.
In summary, the lever precipice that this patent is created is buried, and is not only eliminated the Gu Yueren such as pulley, winch and is difficult to what is made
Some instruments, and avoid present precipice and bury in performance, soared and takeoff from summit by performing artist, river surface is arrived along vertical hanging
Rope and under, when they are slipped down to close to grotto in the middle of cliff, also need tempestuously to rock rope, by inertia, with a sudden peal of thunder
The too late gesture for covering ear leaps up in hole.When outstanding coffin rises towards hole, the people in grotto must be drawn with tackline again, and the people on ground is then
Rope is significantly rocked, the inertia rocked by outstanding coffin in the air is found accurately opportunity, make a concerted effort outstanding coffin to send into hole up and down.
After this law, in performance, these dangerous actions just completely need not from now on.
Claims (1)
1. being buried using water surface lever ship performance dragon and tiger cliff, it includes a raft ship, and an accumbency is set aboard ship in raft amidships
Rotatable wood spool, the side of wood spool two has to be inserted with as lever resistance arm in the middle of the wood spool limited post being fixed on raft ship, wood spool
Preceding bamboo ladder and the rear bamboo ladder as lever weight arm, raft ship is unobstructed object space on the terraced position of rear bamboo, the top of preceding bamboo ladder
Outstanding coffin is accepted on pole and bier is dragged, the foot piece part system of rear bamboo ladder, which holds, can place stone in stone net, net, it is characterized in that:Bury on precipice
The lever mode for using the weight arm using hull as fulcrum to go deep into water, when the Shi Wangzhong that holds at weight arm end is put into stone heavy enough
During block, the weight arm of lever is sunk under water by unobstructed object space, so that being risen to as the preceding bamboo ladder rotation of lever resistance arm
Precipice hole, and by with preceding bamboo ladder link drag bier by coffin send into hole in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410411934.4A CN104192270B (en) | 2014-08-15 | 2014-08-15 | Buried using water surface lever ship performance dragon and tiger cliff |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410411934.4A CN104192270B (en) | 2014-08-15 | 2014-08-15 | Buried using water surface lever ship performance dragon and tiger cliff |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104192270A CN104192270A (en) | 2014-12-10 |
CN104192270B true CN104192270B (en) | 2017-08-25 |
Family
ID=52077702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410411934.4A Active CN104192270B (en) | 2014-08-15 | 2014-08-15 | Buried using water surface lever ship performance dragon and tiger cliff |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104192270B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109625208B (en) * | 2018-11-21 | 2020-04-10 | 浙江国际海运职业技术学院 | Anti-side-tipping lifeboat and anti-side-tipping method |
CN109625207B (en) * | 2018-11-21 | 2020-04-10 | 浙江国际海运职业技术学院 | Lifeboat structure and anti-side-tipping method |
CN109846662A (en) * | 2019-03-21 | 2019-06-07 | 朱根茂 | A kind of suspended coffin on cliff hanging apparatus and its application method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2473599A1 (en) * | 1980-01-11 | 1981-07-17 | Augias Francis | Manual tomb slab lifting hoist - has mobile lifting chassis running on removable rails |
CN1274676A (en) * | 1999-05-19 | 2000-11-29 | 马金祥 | Antique suspended coffin hoisting method |
CN1699138A (en) * | 2005-06-16 | 2005-11-23 | 徐慧文 | Lifting device and method for suspended coffin on cliff |
CN2769243Y (en) * | 2005-02-28 | 2006-04-05 | 李寅龙 | Placing device for simulating ancient cave suspension coffin |
CN1769632A (en) * | 2005-09-29 | 2006-05-10 | 朱立斌 | Lever-type archaized suspension coffin laying device and method |
CN101224158A (en) * | 2008-02-01 | 2008-07-23 | 苏迪 | Method for hanging archaized coffin |
CN101863439A (en) * | 2010-06-13 | 2010-10-20 | 李正才 | Ancient cliff-burying device |
CN101993019A (en) * | 2009-08-12 | 2011-03-30 | 朱国祥 | Ancient hoisting method |
CN102101627A (en) * | 2009-12-16 | 2011-06-22 | 孙慧燕 | Handling tool for cliff coffin and operating method thereof |
CN102579219A (en) * | 2012-03-19 | 2012-07-18 | 倪贵林 | Roller-vehicle type suspending-coffin lifting device |
-
2014
- 2014-08-15 CN CN201410411934.4A patent/CN104192270B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2473599A1 (en) * | 1980-01-11 | 1981-07-17 | Augias Francis | Manual tomb slab lifting hoist - has mobile lifting chassis running on removable rails |
CN1274676A (en) * | 1999-05-19 | 2000-11-29 | 马金祥 | Antique suspended coffin hoisting method |
CN2769243Y (en) * | 2005-02-28 | 2006-04-05 | 李寅龙 | Placing device for simulating ancient cave suspension coffin |
CN1699138A (en) * | 2005-06-16 | 2005-11-23 | 徐慧文 | Lifting device and method for suspended coffin on cliff |
CN1769632A (en) * | 2005-09-29 | 2006-05-10 | 朱立斌 | Lever-type archaized suspension coffin laying device and method |
CN101224158A (en) * | 2008-02-01 | 2008-07-23 | 苏迪 | Method for hanging archaized coffin |
CN101993019A (en) * | 2009-08-12 | 2011-03-30 | 朱国祥 | Ancient hoisting method |
CN102101627A (en) * | 2009-12-16 | 2011-06-22 | 孙慧燕 | Handling tool for cliff coffin and operating method thereof |
CN101863439A (en) * | 2010-06-13 | 2010-10-20 | 李正才 | Ancient cliff-burying device |
CN102579219A (en) * | 2012-03-19 | 2012-07-18 | 倪贵林 | Roller-vehicle type suspending-coffin lifting device |
Also Published As
Publication number | Publication date |
---|---|
CN104192270A (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104192270B (en) | Buried using water surface lever ship performance dragon and tiger cliff | |
CN203852797U (en) | Treadmill with pull ropes | |
Edgeworth | Harry and Lucy, Concluded: Being the Last Part of Early Lessons | |
CN203860273U (en) | Sinking and floating type fishing tool | |
CN203457651U (en) | Multi-layer three-dimensional suspended sea cucumber settlement substratum | |
JP5431883B2 (en) | Fried rice cake | |
CN206385521U (en) | A kind of theme park pool with fountain fishing device | |
CN202504064U (en) | Anti-scratch group hook | |
EP2477591B1 (en) | Urn lowering device | |
CN207466900U (en) | A kind of New-type pleasure-boat with multi-functional lookout terrace | |
US20150050852A1 (en) | Water rescue device | |
CN205855414U (en) | A kind of sandy beach filter sand picks up shellfish car | |
RU87873U1 (en) | ABOUT THE RIVER RIVER MALKOVY SEVET | |
CN208165224U (en) | A kind of recreational fishing device | |
JP7540736B2 (en) | Pond slide prevention device | |
CN206764692U (en) | A kind of spoon hook for being used for equipment gesture stability in water | |
JP2009100727A (en) | Semiautomatic water-drawing bucket | |
CN205993391U (en) | The fishpond structure of convenient fishing | |
JP2005110611A (en) | Longline type tangle reef to which wood ash ceramic is attached | |
Long et al. | Making a Megalodon:: The evolving science behind estimating the size of the largest killer shark | |
JP3155607U (en) | High altitude fishing fish catch net | |
Daly | Caves for the uninitiated | |
JP3168601U (en) | Fly fishing line | |
JP5967412B2 (en) | Feathered carp streamer | |
Baker | One Man's Island |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201021 Address after: Room a1309, No. 109, Shazhou West Road, yangshe Town, Zhangjiagang City, Suzhou City, Jiangsu Province Patentee after: Suzhou yifanghua Intellectual Property Operation Co., Ltd Address before: Jiaxing City, Zhejiang province 314000 Hexing Road, West Building 47 room 505 Ma zitengyuan Patentee before: Chen Yizhong |
|
TR01 | Transfer of patent right |