CN104158103A - 一种城市配电房快速抢修方法 - Google Patents

一种城市配电房快速抢修方法 Download PDF

Info

Publication number
CN104158103A
CN104158103A CN201410448593.8A CN201410448593A CN104158103A CN 104158103 A CN104158103 A CN 104158103A CN 201410448593 A CN201410448593 A CN 201410448593A CN 104158103 A CN104158103 A CN 104158103A
Authority
CN
China
Prior art keywords
switch
transformer
car
disconnect
closed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410448593.8A
Other languages
English (en)
Other versions
CN104158103B (zh
Inventor
吴敏秀
高晓宁
胡德敏
殷俊
孔伯骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Xuzhou Handler Special Vehicle Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Xuzhou Handler Special Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Yangzhou Power Supply Co of Jiangsu Electric Power Co, Xuzhou Handler Special Vehicle Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410448593.8A priority Critical patent/CN104158103B/zh
Publication of CN104158103A publication Critical patent/CN104158103A/zh
Application granted granted Critical
Publication of CN104158103B publication Critical patent/CN104158103B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种城市配电房快速抢修方法。提供了一种能够解决配电房抢修停电时间长、成本高、效率低的问题,保证居民正常供电的城市配电房快速抢修方法。包括以下步骤:1)在配电房的10kV进线端二增加一组高压预留接口;在配电房的0.4kVⅠ段母线和0.4kVⅡ段母线上分别增加低压预留接口一和低压预留接口二;2)箱变车抵达现场,展放箱变车旁路电缆;3)断开10kV进线端二的上级开关,断开高压开关二的进线电缆和环网柜的连接,并防护;4)针对环网柜突发故障、环网柜例行检修或任一变压器故障进行工作;本发明的适用于配电房,同时适用于配网箱式变、柱上变、开闭所等配网设备的快速抢修。

Description

一种城市配电房快速抢修方法
技术领域
本发明涉及城市配电网中配电房、箱式变电站等配网终端设备的快速抢修作业领域,尤其涉及城区配电房快速抢修、不停电例行检修等作业。
背景技术
随着城市的建设发展,高层建筑愈来愈多,楼房消防、高压水泵等应急和生活必须设备对电力供电可靠性的要求越来要高,基本不允许停电,城市发达地区的网架建设基本做到双电源,但针对配电房内部设备,仍为单一设备,如环网柜。虽环网柜进线为双电源,但环网柜自身出现故障或需要例行检修时,仍需对用户停电,而且高层建筑的配电房均建设在楼层地下室或1层,如何在配电房出现故障时,抢修车辆快速抵达现场并修复或对配电房进行不停电检修,已经成为配网作业的迫切需要。
目前配电房的抢修或例行检修主要有两种方式,一种是采用应急发电车,临时对高层建筑进行供电,从而实现配电房的停电检修。该方法可以实现高层建筑重要用电设备的用电需求,但发电车抵达现场后,需要较长时间进行敷设电缆、机组启动等工作,时效性差,受道路条件限制,车辆外形尺寸不能过大,导致发电机组的功率不能配置较高,供电功率有限,同时发电机组需消耗大量燃油,经济性差,且存在噪音污染。另一种方法是采用旁路作业设备,通过旁路作业车转供负荷,实现对高层建筑的供电。该种方法克服第一种经济性差、噪音污染的缺点,正在被推广,但旁路作业车辆准备时间长、敷设电缆数量多导致其时效性差,仅适用于计划检修,不能满足配电房的快速抢修要求。
发明内容
本发明针对以上问题,提供了一种能够解决配电房抢修停电时间长、成本高、效率低的问题,保证居民正常供电的城市配电房快速抢修方法。
本发明的技术方案是:所述配电房内设有高压室、变压器室和低压室,所述高压室包括10kV母线和环网柜,所述环网柜内设有高压开关一~四,所述变压器室内设有变压器一和变压器二,所述低压室包括0.4kVⅠ段母线、0.4kVⅡ段母线和低压开关一~三,
所述高压开关一~四并列设置、且一端分别连接10kV母线,所述高压开关一的另一端连接10kV进线端一,所述高压开关二的另一端连接10kV进线端二,所述10kV进线端一和10kV进线端二上分别设有上级开关;
所述高压开关三的另一端连接所述变压器一,所述高压开关四的另一端连接所述变压器二,
所述低压开关一连接在所述高压开关三和0.4kVⅠ段母线之间,
所述低压开关二连接在所述高压开关四和0.4kVⅡ段母线之间,
所述低压开关三连接在所述0.4kVⅠ段母线和0.4kVⅡ段母线之间;
包括以下步骤:
1)、在配电房的10kV进线端二增加一组高压预留接口,所述高压预留接口位于10kV进线端二的上级开关和高压开关二之间;在配电房的0.4kVⅠ段母线和0.4kVⅡ段母线上分别增加低压预留接口一和低压预留接口二;
2)、箱变车抵达现场,展放箱变车旁路电缆;箱变车具有10kV高压引入线、10kV输出线、10kV进线开关、10kV开关、10kV输出开关、0.4kV输出线、0.4kV输出开关和变压器;
10kV进线开关控制10kV高压引入线,10kV输出开关控制10kV输出线,10kV开关控制变压器内高压侧断送电,变压器高压侧通过10kV连接线与10kV开关连接,低压侧通过低压线与0.4kV输出开关连接,0.4kV输出开关控制0.4kV输出线;
3)、断开10kV进线端二的上级开关,断开高压开关二的进线电缆和环网柜的连接,并防护;
4)、针对环网柜突发故障、环网柜例行检修或任一变压器故障进行工作;
4.1)、环网柜突发故障,箱变车的10kV高压引入线接入高压预留口;
4.1.1)、变压器一、二的负荷均小于40%;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,分步闭合低压开关一、三,负载通过变压器一运行,恢复供电;
     断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.2)、变压器一、二的负荷均在40%-60%;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,箱变车的0.4kV输出线与低压预留接口二连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合低压开关一,闭合箱变车内的0.4kV输出开关,负载通过变压器一和箱变车内的变压器分别运行,低压开关三此时处于断开位置,
     断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一;
     判断箱变车内的变压器是否满足与变压器二并联运行;
     若满足,按以下顺序依次进行,分步闭合高压开关四,低压开关二,断开箱变车内的0.4kV输出开关,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一,带电断开箱变车的0.4kV输出线与低压预留接口二的连接,收回旁路电缆,箱变车撤离现场,检修完毕;
     若不满足,按以下顺序依次进行,断开箱变车内的0.4kV输出开关,断开箱变车内的10kV输出开关,断开箱变车内的0.4kV输出线与低压预留接口二的连接,闭合高压开关四,闭合低压开关二,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.3)、变压器一、二的负荷均满载;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一;同时,发电车驶入施工现场,展放发电车输出线缆,发电车的输出线缆接入低压预留接口二,启动发电车,并送电;使得负载通过变压器一运行和发电车分别运行,恢复供电,断开10kV进线端一的上级开关;检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一,然后,分两路操作:
      一路按以下顺序依次进行为:分步恢复变压器一与环网柜的连接,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一;
      二路按以下顺序依次进行为:分步恢复变压器二与环网柜的连接,发电车停止送电,熄灭发电机组,拆除发电车的输出电缆与低压预留接口二的连接,闭合高压开关四,闭合低压开关二;
      最后,负载通过变压器一、二运行,收回旁路电缆,箱变车、发电车撤离现场,检修完毕;
4.2)、环网柜例行检修,变压器一、二的负荷均小于40%;
     按以下顺序依次进行:将配电房负荷调整至由变压器二带全负荷运行,箱变车的10kV高压引入线接入高压预留接口,断开低压开关一,断开高压开关三,变压器一的高压进线与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一,断开低压开关二,断开环网柜高压开关四,负载通过变压器一运行,断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车的10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态下重新接入高压开关的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.3)、任一变压器故障,变压器一发生故障且变压器一、二的负载均大于60%:
     按以下顺序依次进行:箱变车的10kV高压引入线接入高压预留口,断开低压开关一,断开高压开关三,变压器二的负载正常运行,变压器一的负载故障停电,箱变车的0.4kV输出线与低压预留口一连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合箱变车内的0.4kV输出开关,负载通过变压器二和箱变车分别运行恢复供电,变压器一、高压开关三和低压开关一分别断开,变压器一处于不带电状态,检修、更换变压器一,检修更换完毕;
      判断箱变车内的变压器与变压器一是否满足并列运行:
      若满足,按以下顺序依次进行,分步闭合高压开关三和低压开关一,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开10kV进线端二的上级开关,带电断开箱变车的0.4kV输出线与低压预留口一的连接,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
      若不满足,按以下顺序依次进行,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开箱变车的0.4kV输出线与低压预留口一的连接,闭合高压开关三,闭合低压开关一,断开10kV进线端二的上级开关,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕。
所述环网柜的10kV进线端二上设有T型接头,所述高压预留接口连接在所述T型接头上。
本发明在配电房高压侧增加一组高压预留接口,高压预留接口设置在环网柜进线端二的上端口,在环网柜进线端加装T型接头,采用旁路柔性电缆将环网柜进线转接,旁路柔性电缆终端扣压快速终端接头,实际应用中,终端接头安装在接头箱体内,接头箱体安装在配电房外或便于接入的位置。
设置高压预留接口的有益效果是:当配电房内环网柜出现故障或需例行检修时,预留接口位于配电房外部,移动箱变车抵达现场可快速接入预留接口,同时减少旁路电缆敷设数量,提高抢修的时效性和经济性。
在配电房低压开关的上、下端口增加两组低压预留接口,低压预留接口引出位置分别位于低压开关的上、下端口,通过低压柔性电缆从配电房的低压室内引出,引出的低压柔性电缆端头扣压快速接头,实际应用中,快速接头固定安装在接头箱内,接头箱安装在配电房进户门位置,快速接头可以实现带电快速拔插。
设置低压预留接口的有益效果是:当配电房内环网柜出现故障,移动箱变车抵达现场,可根据配电房负荷、箱变车变压器容量、发电车功率等情况,选择是否分段带负荷,或通过电源车和箱变车同时各自带负荷运行。
本发明在环网柜突发故障中,在变压器一、二的负荷均满载时,增加发电车驶入现场配合工作,提高了发电车的利用率。
环网柜例行检修时,10kV电源通过箱变车转供至配电房内变压器,由变压器一先带全负荷运行,环网柜例行检修完毕恢复送电后,将负荷转切至变压器二运行,实现负荷在变压器一、二之间切换时,完全不停电,增加售电量。
用电高峰时,配电房任一变压器故障,箱变车取10kV电源后,箱变车内变压器与配电房内未故障变压器配合增容使用,代替故障变压器带负荷运行,故障变压器检修完毕恢复运行时,采用与箱变车并列运行手段,从而减少检修停电次数,提高供电可靠性。
本发明通过设置高压预留接口、低压预留接口一和低压预留接口二,在工作中,能够针对环网柜突发故障、环网柜例行检修或任一变压器故障形成具有针对性、实践性和可操作性强的工作方法;这样,在工作中,才能完成快速抢修工作,提高了工作效率,保证了用电的可靠性。本发明的适用于配电房,同时适用于配网箱式变、柱上变、开闭所等配网设备的快速抢修。
附图说明
图1是本发明的结构示意图,
图2是图1中A处的局部放大图,
图3是本发明的流程框图,
图4是本发明中环网柜突发故障中实施例一的流程框图,
图5是本发明中环网柜突发故障中实施例二的流程框图,
图5a是图5中a的流程框图,
图5b是图5中b的流程框图,
图6是本发明中环网柜突发故障中实施例三的流程框图,
图6a1是图6中a1的流程框图,
图6a2是图6中a2的流程框图,
图7是本发明中环网柜例行检修的流程框图,
图8是本发明中任一变压器故障的流程框图,
图8a是图8中a的流程框图,
图8b是图8中b的流程框图;
    图中101是高压开关一,102是高压开关二,113是高压开关三,114是高压开关四,111是高压开关五,
11是10kV母线,12是10kV进线端一,13是10kV进线端二,
2是箱变车,21是10kV高压引入线,22是10kV输出线,23是10kV进线开关,24是10kV输出开关,25是10kV连接线,26是10kV开关,27是0.4kV输出开关,28是变压器,29是0.4kV输出线;
31是变压器一,32是变压器二,
401是低压开关一,402是低压开关二,430是低压开关三,
41是0.4kVⅠ段母线,42是0.4kVⅡ段母线,
5是高压预留接口,
61是低压预留接口一,62是低压预留接口二,
7是T型接头,8是转接接头。
具体实施方式
本发明如图1-8b所示,所述配电房内设有高压室、变压器室和低压室,所述高压室包括10kV母线11和环网柜,所述环网柜内设有高压开关一~四(即高压开关一101、高压开关二102、高压开关三113和高压开关四114),所述变压器室内设有变压器一31和变压器二32,所述低压室包括0.4kVⅠ段母线41、0.4kVⅡ段母线42和低压开关一~三(即低压开关401、低压开关二402和低压开关三430),应用中,还设有高压开关五111,作备用开关;
所述高压开关一~四并列设置、且一端分别连接10kV母线11,所述高压开关一101的另一端连接10kV进线端一12,所述高压开关二102的另一端连接10kV进线端二13,所述10kV进线端一12和10kV进线端二13上分别设有上级开关;
所述高压开关三113的另一端连接所述变压器一31,所述高压开关四114的另一端连接所述变压器二32,
所述低压开关一401连接在所述高压开关三113和0.4kVⅠ段母线41之间,
所述低压开关二402连接在所述高压开关四114和0.4kVⅡ段母线42之间,
所述低压开关三430连接在所述0.4kVⅠ段母线41和0.4kVⅡ段母线42之间;
    包括以下步骤:
  1)、在配电房的10kV进线端二13增加一组高压预留接口5,所述高压预留接口5位于10kV进线端二的上级开关和高压开关二之间;在配电房的0.4kVⅠ段母线41和0.4kVⅡ段母线42上分别增加低压预留接口一61和低压预留接口二62;
基于高、低压预留接口的设置,减少了敷设旁路电缆的数量,降低了敷设电缆时间,提高了工作效率。
  2)、箱变车2抵达现场,展放箱变车旁路电缆;箱变车具有10kV高压引入线21、10kV输出线22、10kV进线开关23、10kV开关26、10kV输出开关24、0.4kV输出线29、0.4kV输出开关27和变压器28;
10kV进线开关23控制10kV高压引入线21,10kV输出开关24控制10kV输出线22,10kV开关26控制变压器28内高压侧断送电,变压器28高压侧通过10kV连接线25与10kV开关26连接,低压侧通过低压线与0.4kV输出开关27连接,0.4kV输出开关27控制0.4kV输出线29;
3)、断开10kV进线端二的上级开关,断开高压开关二的进线电缆和环网柜的连接,并防护;
4)、针对环网柜突发故障、环网柜例行检修或任一变压器故障进行工作;
4.1)、环网柜突发故障,箱变车的10kV高压引入线接入高压预留口;
4.1.1)、变压器一、二的负荷均小于40%(低负荷),如图4所示;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,分步闭合低压开关一、三,负载通过变压器一运行,恢复供电;
     断开10kV进线端一的上级开关(环网柜处于不带电状态),检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.2)、变压器一、二的负荷均在40%-60%(中等负荷),如图5-5b所示;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头8与箱变车的10kV输出线连接,箱变车的0.4kV输出线与低压预留接口二连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合低压开关一,闭合箱变车内的0.4kV输出开关,负载通过变压器一和箱变车内的变压器分别运行,低压开关三此时处于断开位置,
     断开10kV进线端一的上级开关(环网柜处于不带电状态),检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一;
     判断箱变车内的变压器是否满足与变压器二并联运行;
     a:若满足,按以下顺序依次进行,分步闭合高压开关四,低压开关二,断开箱变车内的0.4kV输出开关,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一,带电断开箱变车的0.4kV输出线与低压预留接口二的连接,收回旁路电缆,箱变车撤离现场,检修完毕;
     b:若不满足,按以下顺序依次进行,断开箱变车内的0.4kV输出开关,断开箱变车内的10kV输出开关,断开箱变车内的0.4kV输出线与低压预留接口二的连接,闭合高压开关四,闭合低压开关二,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.3)、变压器一、二的负荷均满载(满负荷),如图6-6a2所示;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一;同时,发电车驶入施工现场,展放发电车输出线缆,发电车的输出线缆接入低压预留接口二,启动发电车,并送电;使得负载通过变压器一运行和发电车分别运行,恢复供电,断开10kV进线端一的上级开关(环网柜处于不带电状态);检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一,然后,分两路操作:
      a1:一路按以下顺序依次进行为:分步恢复变压器一与环网柜的连接,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一;
      a2:二路按以下顺序依次进行为:分步恢复变压器二与环网柜的连接,发电车停止送电,熄灭发电机组,拆除发电车的输出电缆与低压预留接口二的连接,闭合高压开关四,闭合低压开关二;
      最后,负载通过变压器一、二运行,收回旁路电缆,箱变车、发电车撤离现场,检修完毕;
4.2)、环网柜例行检修,变压器一、二的负荷均小于40%(低负荷),如图7所示;
     按以下顺序依次进行:将配电房负荷调整至由变压器二带全负荷运行,箱变车的10kV高压引入线接入高压预留接口,断开低压开关一,断开高压开关三,变压器一的高压进线与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一,断开低压开关二,断开环网柜高压开关四,负载通过变压器一运行,断开10kV进线端一的上级开关(环网柜处于不带电状态),检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车的10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态下重新接入高压开关的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.3)、任一变压器故障,变压器一发生故障且变压器一、二的负载均大于60%,如图8-8b所示:
     按以下顺序依次进行:箱变车的10kV高压引入线接入高压预留口,断开低压开关一(此时,低压开关三断开,低压开关二合闸),断开高压开关三,变压器二的负载正常运行,变压器一的负载故障停电,箱变车的0.4kV输出线与低压预留口一连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合箱变车内的0.4kV输出开关,负载通过变压器二和箱变车分别运行恢复供电,变压器一、高压开关三和低压开关一分别断开,变压器一处于不带电状态,检修、更换变压器一,检修更换完毕;
      判断箱变车内的变压器与变压器一是否满足并列运行:
      a:若满足,按以下顺序依次进行,分步闭合高压开关三和低压开关一,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开10kV进线端二的上级开关,带电断开箱变车的0.4kV输出线与低压预留口一的连接,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
      b:若不满足,按以下顺序依次进行,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开箱变车的0.4kV输出线与低压预留口一的连接,闭合高压开关三,闭合低压开关一,断开10kV进线端二的上级开关,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕。
所述环网柜的10kV进线端二上设有T型接头7,所述高压预留接口连接在所述T型接头上。
本发明在工作中根据环网柜故障形式分为:环网柜突发故障抢修和环网柜例行检修两种,这两种形式又根据负荷状况分为:低负荷(配电房两台变压器负荷小于40%)、中等负荷(配电房变压器负荷在40%-60%),满负荷(配电房变压器接近满载)
环网柜例行检修时,一般选在在低负荷时间进行维护、测试工作,因此本发明按照低负荷情况下实施。
根据变压器故障形式分为:变压器突发故障停电,或检修、更换新变压器
且负荷大于60%。因配电房内一般设置两台变压器,在负荷小于60%时,可采用1台变压器带载全部负荷的运行方式,两台变压器同时出现故障的情况属于小概率事件,本发明仅考虑负荷大于60%,单台出现故障的工况。
实际应用中:环网柜突发故障,此时用户已停电。箱变车抵达现场后,进行操作,恢复用户供电;恢复用电后,检修人员可以在环网柜完全停电的状态下进行检修、更换工作,从而保证检修期间的作业安全而用户不停电。
   环网柜例行检修,此时用户正常用电。箱变车抵达现场后,进行操作,检修人员可以在环网柜完全停电的状态下进行检修、更换工作,从而保证检修期间的作业安全而用户不停电。
    任一变压器出现突发故障或需更换(以变压器一故障为例),此时变压器二用户正常用电,变压器一用户停电。箱变车抵达现场后,进行操作,恢复用户用电。恢复用电后,检修人员可以在变压器一完全停电的状态下进行检修、更换工作,从而保证检修期间的作业安全而用户不停电。检修完毕的变压器一若能满足与车载变压器并列运行的条件,恢复变压器一时可选择变压器并列运行的方式,减少变压器一用户的停电次数。若不满足并列运行条件,则恢复时,需先使箱变车退出运行,然后恢复变压器一运行,中间有短暂的停电。

Claims (2)

1.一种城市配电房快速抢修方法,所述配电房内设有高压室、变压器室和低压室,所述高压室包括10kV母线和环网柜,所述环网柜内设有高压开关一~四,所述变压器室内设有变压器一和变压器二,所述低压室包括0.4kVⅠ段母线、0.4kVⅡ段母线和低压开关一~三,
所述高压开关一~四并列设置、且一端分别连接10kV母线,所述高压开关一的另一端连接10kV进线端一,所述高压开关二的另一端连接10kV进线端二,所述10kV进线端一和10kV进线端二上分别设有上级开关;
所述高压开关三的另一端连接所述变压器一,所述高压开关四的另一端连接所述变压器二,
所述低压开关一连接在所述高压开关三和0.4kVⅠ段母线之间,
所述低压开关二连接在所述高压开关四和0.4kVⅡ段母线之间,
所述低压开关三连接在所述0.4kVⅠ段母线和0.4kVⅡ段母线之间;
其特征在于,包括以下步骤:
1)、在配电房的10kV进线端二增加一组高压预留接口,所述高压预留接口位于10kV进线端二的上级开关和高压开关二之间;在配电房的0.4kVⅠ段母线和0.4kVⅡ段母线上分别增加低压预留接口一和低压预留接口二;
2)、箱变车抵达现场,展放箱变车旁路电缆;箱变车具有10kV高压引入线、10kV输出线、10kV进线开关、10kV开关、10kV输出开关、0.4kV输出线、0.4kV输出开关和变压器;
10kV进线开关控制10kV高压引入线,10kV输出开关控制10kV输出线,10kV开关控制变压器内高压侧断送电,变压器高压侧通过10kV连接线与10kV开关连接,低压侧通过低压线与0.4kV输出开关连接,0.4kV输出开关控制0.4kV输出线;
3)、断开10kV进线端二的上级开关,断开高压开关二的进线电缆和环网柜的连接,并防护;
4)、针对环网柜突发故障、环网柜例行检修或任一变压器故障进行工作;
4.1)、环网柜突发故障,箱变车的10kV高压引入线接入高压预留口;
4.1.1)、变压器一、二的负荷均小于40%;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,分步闭合低压开关一、三,负载通过变压器一运行,恢复供电;
     断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.2)、变压器一、二的负荷均在40%-60%;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,箱变车的0.4kV输出线与低压预留接口二连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合低压开关一,闭合箱变车内的0.4kV输出开关,负载通过变压器一和箱变车内的变压器分别运行,低压开关三此时处于断开位置,
     断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一;
     判断箱变车内的变压器是否满足与变压器二并联运行;
     若满足,按以下顺序依次进行,分步闭合高压开关四,低压开关二,断开箱变车内的0.4kV输出开关,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一,带电断开箱变车的0.4kV输出线与低压预留接口二的连接,收回旁路电缆,箱变车撤离现场,检修完毕;
     若不满足,按以下顺序依次进行,断开箱变车内的0.4kV输出开关,断开箱变车内的10kV输出开关,断开箱变车内的0.4kV输出线与低压预留接口二的连接,闭合高压开关四,闭合低压开关二,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.1.3)、变压器一、二的负荷均满载;
     按以下顺序依次进行:断开低压开关一、三、二,断开环网柜高压开关三、四,变压器一的高压进线通过转接接头与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一;同时,发电车驶入施工现场,展放发电车输出线缆,发电车的输出线缆接入低压预留接口二,启动发电车,并送电;使得负载通过变压器一运行和发电车分别运行,恢复供电,断开10kV进线端一的上级开关;检修、更换环网柜,检修、更换完毕,闭合10KV进线端一的上级开关,闭合高压开关一,然后,分两路操作:
      一路按以下顺序依次进行为:分步恢复变压器一与环网柜的连接,断开低压开关一,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态重新接入高压开关三的下端口,恢复高压开关二的电缆连接,闭合高压开关三,闭合低压开关一;
      二路按以下顺序依次进行为:分步恢复变压器二与环网柜的连接,发电车停止送电,熄灭发电机组,拆除发电车的输出电缆与低压预留接口二的连接,闭合高压开关四,闭合低压开关二;
      最后,负载通过变压器一、二运行,收回旁路电缆,箱变车、发电车撤离现场,检修完毕;
4.2)、环网柜例行检修,变压器一、二的负荷均小于40%;
     按以下顺序依次进行:将配电房负荷调整至由变压器二带全负荷运行,箱变车的10kV高压引入线接入高压预留接口,断开低压开关一,断开高压开关三,变压器一的高压进线与箱变车的10kV输出线连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV输出开关,闭合低压开关一,断开低压开关二,断开环网柜高压开关四,负载通过变压器一运行,断开10kV进线端一的上级开关,检修、更换环网柜,检修、更换完毕,闭合10kV进线端一的上级开关,闭合高压开关一,闭合高压开关四,闭合低压开关二,断开低压开关一,负载通过变压器二运行,断开箱变车内的10kV输出开关,断开10kV进线端二的上级开关,断开箱变车的10kV输出线与变压器一的高压进线的连接,变压器一的高压进线在断电状态下重新接入高压开关的下端口,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
4.3)、任一变压器故障,变压器一发生故障且变压器一、二的负载均大于60%:
     按以下顺序依次进行:箱变车的10kV高压引入线接入高压预留口,断开低压开关一,断开高压开关三,变压器二的负载正常运行,变压器一的负载故障停电,箱变车的0.4kV输出线与低压预留口一连接,闭合10kV进线端二的上级开关,闭合箱变车内的10kV开关,闭合箱变车内的0.4kV输出开关,负载通过变压器二和箱变车分别运行恢复供电,变压器一、高压开关三和低压开关一分别断开,变压器一处于不带电状态,检修、更换变压器一,检修更换完毕;
      判断箱变车内的变压器与变压器一是否满足并列运行:
      若满足,按以下顺序依次进行,分步闭合高压开关三和低压开关一,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开10kV进线端二的上级开关,带电断开箱变车的0.4kV输出线与低压预留口一的连接,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕;
      若不满足,按以下顺序依次进行,断开箱变车内0.4kV输出开关,断开箱变车内10kV开关,断开箱变车的0.4kV输出线与低压预留口一的连接,闭合高压开关三,闭合低压开关一,断开10kV进线端二的上级开关,恢复高压开关二的电缆连接,收回旁路电缆,箱变车撤离现场,检修完毕。
2.根据权利要求1所述的一种城市配电房快速抢修方法,其特征在于,所述环网柜的10kV进线端二上设有T型接头,所述高压预留接口连接在所述T型接头上。
CN201410448593.8A 2014-09-04 2014-09-04 一种城市配电房快速抢修方法 Active CN104158103B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410448593.8A CN104158103B (zh) 2014-09-04 2014-09-04 一种城市配电房快速抢修方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410448593.8A CN104158103B (zh) 2014-09-04 2014-09-04 一种城市配电房快速抢修方法

Publications (2)

Publication Number Publication Date
CN104158103A true CN104158103A (zh) 2014-11-19
CN104158103B CN104158103B (zh) 2016-03-02

Family

ID=51883547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410448593.8A Active CN104158103B (zh) 2014-09-04 2014-09-04 一种城市配电房快速抢修方法

Country Status (1)

Country Link
CN (1) CN104158103B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2988383A3 (de) * 2014-08-15 2016-03-30 EnBW Energie Baden-Württemberg AG Verfahren zur spannungsfreien wartung einer ortsfesten transformatorstation und mobile transformatorstation
CN108806925A (zh) * 2018-07-02 2018-11-13 国网浙江慈溪市供电有限公司 模块化箱式变压器
CN109462276A (zh) * 2018-08-07 2019-03-12 国网浙江省电力有限公司衢州供电公司 无缝接电方法
CN111711194A (zh) * 2020-07-20 2020-09-25 西南石油大学 基于旁路作业一体化的供电保障装置
CN112332281A (zh) * 2020-11-16 2021-02-05 国网江苏省电力有限公司南通供电分公司 基于移动储能的不停电更换低压台区配电箱的控制方法
CN113851990A (zh) * 2021-08-11 2021-12-28 浙江大有实业有限公司带电作业分公司 一种低压侧完全不停电的箱式变压器更换方法
CN114583821A (zh) * 2022-03-04 2022-06-03 国网浙江省电力有限公司金华供电公司 一种不停电投运开闭所的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08205334A (ja) * 1995-01-27 1996-08-09 Nissin Electric Co Ltd 試験装置
CN101794973A (zh) * 2010-04-07 2010-08-04 绵阳电业局 更换配电变压器的带电作业法
CN201601404U (zh) * 2010-01-22 2010-10-06 武汉雷泰电力科技发展有限公司 旁路式移动箱变抢修车
CN102122801A (zh) * 2010-12-28 2011-07-13 徐州海伦哲专用车辆股份有限公司 配变旁路供电车
CN102684087A (zh) * 2012-05-30 2012-09-19 广州供电局有限公司 不停电更换配电变压器的旁路作业车

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08205334A (ja) * 1995-01-27 1996-08-09 Nissin Electric Co Ltd 試験装置
CN201601404U (zh) * 2010-01-22 2010-10-06 武汉雷泰电力科技发展有限公司 旁路式移动箱变抢修车
CN101794973A (zh) * 2010-04-07 2010-08-04 绵阳电业局 更换配电变压器的带电作业法
CN102122801A (zh) * 2010-12-28 2011-07-13 徐州海伦哲专用车辆股份有限公司 配变旁路供电车
CN102684087A (zh) * 2012-05-30 2012-09-19 广州供电局有限公司 不停电更换配电变压器的旁路作业车

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2988383A3 (de) * 2014-08-15 2016-03-30 EnBW Energie Baden-Württemberg AG Verfahren zur spannungsfreien wartung einer ortsfesten transformatorstation und mobile transformatorstation
CN108806925A (zh) * 2018-07-02 2018-11-13 国网浙江慈溪市供电有限公司 模块化箱式变压器
CN109462276A (zh) * 2018-08-07 2019-03-12 国网浙江省电力有限公司衢州供电公司 无缝接电方法
CN111711194A (zh) * 2020-07-20 2020-09-25 西南石油大学 基于旁路作业一体化的供电保障装置
CN111711194B (zh) * 2020-07-20 2023-09-12 西南石油大学 基于旁路作业一体化的供电保障装置
CN112332281A (zh) * 2020-11-16 2021-02-05 国网江苏省电力有限公司南通供电分公司 基于移动储能的不停电更换低压台区配电箱的控制方法
CN113851990A (zh) * 2021-08-11 2021-12-28 浙江大有实业有限公司带电作业分公司 一种低压侧完全不停电的箱式变压器更换方法
CN114583821A (zh) * 2022-03-04 2022-06-03 国网浙江省电力有限公司金华供电公司 一种不停电投运开闭所的方法

Also Published As

Publication number Publication date
CN104158103B (zh) 2016-03-02

Similar Documents

Publication Publication Date Title
CN104158103A (zh) 一种城市配电房快速抢修方法
CN205231835U (zh) 一种大型火力发电厂机组高压厂用电源互为备用的结构
CN103855713A (zh) 配电网架接线结构
CN107039965B (zh) 一种社区配网供电系统
CN104009452A (zh) 一种用于直流配电系统短路故障的保护方案
CN204928156U (zh) 一种配电网架接线结构
CN103872682A (zh) 开关站馈线自动保护方法
CN210404841U (zh) 一种新型的水电站黑启动电源系统
CN106953377B (zh) 适用于多接入场景的移动储能供电系统控制方法
CN103427479B (zh) 基于dcs的发电厂保安电源切换方法
CN102931587B (zh) 保供电配电车
CN104333126A (zh) 一种大型水电工程的供电系统
CN203983755U (zh) 发电厂黑启动转保安降压配电装置
CN104218457A (zh) 一种配电装置及其电气主系统
CN202906202U (zh) 保供电配电车
CN205319698U (zh) 一种运用于火电厂脱硫改造的脱硫电气主接线
CN104092284A (zh) 带电采用备自投技术替代10kV变压器作业法
CN204905673U (zh) 一种用于火力发电厂的厂用电接线系统
CN209948370U (zh) 旁路节点型pt柜
CN112049728A (zh) 基于车载燃气轮机发电机组不停电作业的系统和方法
CN203813438U (zh) 配电网架接线结构
CN202997690U (zh) Ups装置
CN106611994B (zh) 海上风场风机的备用电源系统
CN112311012A (zh) 一种220kV电压等级内外桥接线无高厂变水电站黑启动系统及方法
CN102938580B (zh) 便携式多功能应急抢修电源

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 225009 Weiyang Road, Jiangsu, China, No. 179, No.

Applicant after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Applicant after: Jiangsu Electric Power Company

Applicant after: Xuzhou Handler Special Vehicle Co., Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Jiangsu Electric Power Company

Applicant before: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Applicant before: Xuzhou Handler Special Vehicle Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: STATE GRID CORPORATION OF CHINA TO: YANGZHOU POWER SUPPLY CO., JIANGSU PROV ELECTRIC POWER CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant