CN104153368B - 振动锤装置 - Google Patents

振动锤装置 Download PDF

Info

Publication number
CN104153368B
CN104153368B CN201410319276.6A CN201410319276A CN104153368B CN 104153368 B CN104153368 B CN 104153368B CN 201410319276 A CN201410319276 A CN 201410319276A CN 104153368 B CN104153368 B CN 104153368B
Authority
CN
China
Prior art keywords
pile body
plate
damping block
bindiny mechanism
vibrating hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410319276.6A
Other languages
English (en)
Other versions
CN104153368A (zh
Inventor
张建忠
林志鹏
池秀如
朱利勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Kechuang Jiasi Technology Co Ltd
Original Assignee
Chengdu Kechuang Jiasi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kechuang Jiasi Technology Co Ltd filed Critical Chengdu Kechuang Jiasi Technology Co Ltd
Priority to CN201410319276.6A priority Critical patent/CN104153368B/zh
Publication of CN104153368A publication Critical patent/CN104153368A/zh
Application granted granted Critical
Publication of CN104153368B publication Critical patent/CN104153368B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明公开了一种振动锤装置,包括激振装置,激振装置与一减振板连接,减振板与激振装置之间设有连接板,减振板下表面靠近两端处竖向设有桩体,两桩体之间通过一加荷板连接,加荷板两端穿过桩体延伸在桩体外,两桩体顶部与减振板连接,其底部连接在一液压板上表面,且桩体与液压板之间固定连接,加荷板中部竖向设有连接机构,连接机构与加荷板之间活动连接,连接机构底部设置在一辅助受力板上表面,激振装置为两个,其中一个设置在减振板上表面,其另一个位于液压板及辅助受力板之间。本振动锤装置稳定性好,输出效率高,激振装置产生的周期性激振力使桩体产生振动,从而使桩体周边的土壤液化,降低了土壤对桩体的摩擦力,使用效果良好。

Description

振动锤装置
技术领域
本发明涉及一种土建设施,特别涉及一种振动锤装置。
背景技术
振动锤是桩基础施工中的重要设备之一,其广泛应用于土建施工中,其用途为建筑物的打桩。在振动锤工作时,设置在振动锤上的弹簧会呈上下运动状态,有时会造成弹簧的水平位移,会破坏桩体,导致需重新更换桩体,然后继续进行打桩,且在粘土中,对预制桩和管进行振动沉桩可大大节约施工成本,从作业上来讲,通常只需冲击沉桩锤的百分之十,但是在一些特殊情况下,振动桩锤可能失效,而不能使桩下沉,另外如果桩体与土壤之间的摩擦力过大,普通振动桩锤无法贯入土体,从而影响打桩效率,影响施工进度。
发明内容
本发明要解决的技术问题是:克服上述问题,提供一种稳定性好,输出效率高,激振装置产生的周期性激振力使桩体产生振动的振动锤装置。
为了实现上述目的,本发明采用的技术方案是这样的:本发明的振动锤装置,包括激振装置,激振装置与一减振板连接,减振板与激振装置之间设有连接板,减振板下表面靠近两端处竖向设有桩体,两桩体之间通过一加荷板连接,加荷板两端穿过桩体延伸在桩体外,两桩体顶部与减振板连接,其底部连接在一液压板上表面,且桩体与液压板之间固定连接,加荷板中部竖向设有连接机构,连接机构与加荷板之间活动连接,连接机构底部设置在一辅助受力板上表面,激振装置为两个,其中一个设置在减振板上表面,其另一个位于液压板及辅助受力板之间,且两激振装置之间通过皮带轮连接,且辅助受力板下表面设有振动锤,连接机构底部穿过辅助受力板与振动锤连接。
进一步的,作为一种具体的结构形式,本发明所述振动锤与连接机构之间设有弹性装置。
进一步的,作为一种具体的结构形式,本发明所述激振装置内设有偏心装置。
进一步的,作为一种具体的结构形式,本发明所述偏心装置为两个偏心质量块。
进一步的,作为一种具体的结构形式,本发明所述加荷板与桩体连接处通过可调节螺栓连接。
与现有技术相比,本发明的优点在于:本振动锤装置稳定性好,输出效率高,激振装置产生的周期性激振力使桩体产生振动,从而使桩体周边的土壤液化,降低了土壤对桩体的摩擦力,使用效果良好。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明的结构示意图;
图中:1.激振装置;2.减振板;3.皮带轮;4.加荷板;5.桩体;6.液压板;7.辅助受力板;8.连接机构;9.振动锤。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示的本发明振动锤装置的优选实施例,包括激振装置1,激振装置1与一减振板2连接,减振板2与激振装置1之间设有连接板,减振板2下表面靠近两端处竖向设有桩体5,两桩体5之间通过一加荷板4连接,加荷板4两端穿过桩体5延伸在桩体5外,两桩体5顶部与减振板2连接,其底部连接在一液压板6上表面,且桩体5与液压板6之间固定连接,加荷板4中部竖向设有连接机构8,连接机构8与加荷板4之间活动连接,连接机构8底部设置在一辅助受力板7上表面,激振装置1为两个,其中一个设置在减振板2上表面,其另一个位于液压板6及辅助受力板7之间,且两激振装置1之间通过皮带轮3连接,且辅助受力板7下表面设有振动锤9,连接机构8底部穿过辅助受力板7与振动锤9连接,所述振动锤9与连接机构8之间设有弹性装置,所述激振装置1内设有偏心装置,所述偏心装置为两个偏心质量块,所述加荷板4与桩体5连接处通过可调节螺栓连接。
本发明的振动锤装置稳定性好,输出效率高,激振装置1产生的周期性激振力使桩体产生振动,从而使桩体周边的土壤液化,降低了土壤对桩体的摩擦力,使用效果良好。所述振动锤9与连接机构8之间设有弹性装置,进一步提高了减振效果,使用更加灵活;所述激振装置1内设有偏心装置,增强了激振装置的使用性能;所述偏心装置为两个偏心质量块,配置合理;所述加荷板4与桩体5连接处通过可调节螺栓连接,便于加荷板4与桩体5之间的调节。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (2)

1.一种振动锤装置,包括激振装置,其特征在于:激振装置与一减振板连接,减振板与激振装置之间设有连接板,减振板下表面靠近两端处竖向设有桩体,两桩体之间通过一加荷板连接,加荷板两端穿过桩体延伸在桩体外,两桩体顶部与减振板连接,其底部连接在一液压板上表面,且桩体与液压板之间固定连接,加荷板中部竖向设有连接机构,连接机构与加荷板之间活动连接,连接机构底部设置在一辅助受力板上表面,激振装置为两个,其中一个设置在减振板上表面,其另一个位于液压板及辅助受力板之间,且两激振装置之间通过皮带轮连接,且辅助受力板下表面设有振动锤,连接机构底部穿过辅助受力板与振动锤连接;所述振动锤与连接机构之间设有弹性装置;所述激振装置内设有偏心装置。
2.根据权利要求1所述的振动锤装置,其特征在于:所述加荷板与桩体连接处通过可调节螺栓连接。
CN201410319276.6A 2014-07-07 2014-07-07 振动锤装置 Expired - Fee Related CN104153368B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410319276.6A CN104153368B (zh) 2014-07-07 2014-07-07 振动锤装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410319276.6A CN104153368B (zh) 2014-07-07 2014-07-07 振动锤装置

Publications (2)

Publication Number Publication Date
CN104153368A CN104153368A (zh) 2014-11-19
CN104153368B true CN104153368B (zh) 2016-04-06

Family

ID=51878982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410319276.6A Expired - Fee Related CN104153368B (zh) 2014-07-07 2014-07-07 振动锤装置

Country Status (1)

Country Link
CN (1) CN104153368B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1419017A (zh) * 2002-12-09 2003-05-21 夏良站 一种振动打桩锤
CN201686988U (zh) * 2010-08-20 2010-12-29 浙江振中工程机械有限公司 防噪音振动桩锤
CN202899137U (zh) * 2012-04-28 2013-04-24 罗海军 一种振动桩锤
CN202925912U (zh) * 2012-11-01 2013-05-08 梁毅 非同轴二级隔振电动振动锤
CN204080808U (zh) * 2014-07-07 2015-01-07 成都科创佳思科技有限公司 振动锤装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5483739B2 (ja) * 2011-02-07 2014-05-07 調和工業株式会社 杭打機及びそれを用いた杭打工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1419017A (zh) * 2002-12-09 2003-05-21 夏良站 一种振动打桩锤
CN201686988U (zh) * 2010-08-20 2010-12-29 浙江振中工程机械有限公司 防噪音振动桩锤
CN202899137U (zh) * 2012-04-28 2013-04-24 罗海军 一种振动桩锤
CN202925912U (zh) * 2012-11-01 2013-05-08 梁毅 非同轴二级隔振电动振动锤
CN204080808U (zh) * 2014-07-07 2015-01-07 成都科创佳思科技有限公司 振动锤装置

Also Published As

Publication number Publication date
CN104153368A (zh) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104790372B (zh) 一种振动‑压气‑真空联合地基加固系统和方法
CN102733377A (zh) 混凝土桩的施工方法
CN101787690A (zh) 共振法加固液化地基的操作方法
CN204080808U (zh) 振动锤装置
CN104153368B (zh) 振动锤装置
CN102605758A (zh) 一种桩承式加筋体系
CN205875154U (zh) 一种自动冲孔打桩机的桩锤
Minaev Russian methods and equipment for spatial vibrocompaction foundations and structures
CN106120790A (zh) 高频挤密压灌桩的专用设备及方法
JP2018178641A5 (zh)
CN204645040U (zh) 冲击振动式打桩锤
CN203373746U (zh) 履带式振动沉管打桩机
Novoseltseva et al. Prospects for Further Rock Cutting Mechanisms Development
CN107829428A (zh) 一种变直径竹节式砂浆桩
CN107905225A (zh) 适合基岩起伏地区的桩基施工方法
JP6253926B2 (ja) 地盤環境における振動低減方法
CN208023594U (zh) 一种边坡防护装置
CN105019424A (zh) 一种扶手减震的夯实机
CN202430704U (zh) 振动锤的多功能联接装置
CN209114467U (zh) 防止启停时受损的液压振动锤
RU156644U1 (ru) Фундамент сейсмостойкого здания
CN203270601U (zh) 用于钢结构的设备基础地基系统
CN104153359B (zh) 预应力混凝土疏筋桩的施工方法
CN104929122B (zh) 一种连续式静力压桩机
CN204059372U (zh) 一种垂直岩体永久性支护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Jianzhong

Inventor after: Lin Zhipeng

Inventor after: Chi Xiuru

Inventor after: Zhu Liyong

Inventor before: Jiu Jiaxu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160303

Address after: Jiangbei 325100 Zhejiang County of Yongjia Province Jin Jiang Street Road No. 26

Applicant after: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Address before: 610000 Sichuan city of Chengdu province Jinjiang District East Street No. 139 Building 1 3 floor No. 4

Applicant before: Chengdu Kechuang Jiasi Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20170707