CN104141497B - A kind of shield machine translation tune reaction frame installation method that starts - Google Patents

A kind of shield machine translation tune reaction frame installation method that starts Download PDF

Info

Publication number
CN104141497B
CN104141497B CN201410349311.9A CN201410349311A CN104141497B CN 104141497 B CN104141497 B CN 104141497B CN 201410349311 A CN201410349311 A CN 201410349311A CN 104141497 B CN104141497 B CN 104141497B
Authority
CN
China
Prior art keywords
reaction frame
shield machine
frame
reaction
starts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410349311.9A
Other languages
Chinese (zh)
Other versions
CN104141497A (en
Inventor
向云桃
熊志强
陈招伟
李涛
王振坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cggc Foundation Engineering Co Ltd
Original Assignee
Cggc Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cggc Foundation Engineering Co Ltd filed Critical Cggc Foundation Engineering Co Ltd
Priority to CN201410349311.9A priority Critical patent/CN104141497B/en
Publication of CN104141497A publication Critical patent/CN104141497A/en
Application granted granted Critical
Publication of CN104141497B publication Critical patent/CN104141497B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of shield machine translation tune start reaction frame installation method comprise remove that reaction frame, reaction frame entirety location, reaction frame turn to, reaction frame fractionation, reaction frame are reorientated, reaction frame is installed. Reaction frame and shield machine are connected and fixed as a whole, make reaction frame along with shield machine main frame together translation, in the time that shield machine main frame moves to originating location, reaction frame also arrives corresponding installation site, then reaction frame is separated from entirety, arrived accurate installation site through adjusting. The trouble that while having avoided half lid to dig station reaction frame installation, suspension-center pre-embedded or middle plate opening set up hoist engine, has also reduced the operation that reaction frame is installed. Both simplified working procedure, shortened the construction period, also saved labour's material resources, also can avoid carrying out the potential safety hazard that reaction frame split lifting exists simultaneously in sealing narrow space.

Description

A kind of shield machine translation tune reaction frame installation method that starts
Technical field
The present invention is applicable to the shield machine translation tune convenient installation of reaction frame of starting, the closed station shield machine translation tune that the is specially adapted to narrow space installation of reaction frame of starting.
Background technology
Most shield structures are all the constructions of starting AT STATION, and in order to avoid being originally positioned at the interference to traffic of shield-tunneling construction on the turnpike road of bustling location, city, station is generally and adopts the half closed station that lid digs or subsurface excavation method is constructed. In closed station directly over shield structure circuit without ground hoisting port, be generally at middle plate opening or suspension-center pre-embedded for meeting the lifting of reaction frame while starting, then adopt hoist engine or chain block to lift. Generally, the installation of reaction frame is to have carried out having completed after shield machine main frame translation tune and rear supporting chassis translation are reversed end for end. When shield machine main frame translation tune arrive originating location and after supporting chassis also after translation tune, just seem very narrow and small of the remaining space to reaction frame lifting, and reaction frame is transported to Hoisting Position is also not easy. So in the time of reaction frame lifting practice of construction, not only need to drop into larger manpower and materials, and the lifting duration of reaction frame is not short yet, and has larger potential safety hazard.
Summary of the invention
How fast and convenient in space-closed and narrow and small closed station patent of the present invention problem to be solved be reaction frame parts to be transported to shield machine afterbody, and the rapid and convenient of carrying out reaction frame not without ground hoisting port in the situation that is installed.
For solving the problems of the technologies described above, the technical solution used in the present invention is, a kind of shield machine translation tune reaction frame installation method that starts comprises and removes that reaction frame, reaction frame entirety location, reaction frame turn to, reaction frame is reorientated, reaction frame splits, reaction frame is installed;
1), remove reaction frame, reaction frame is removed from original installation site;
2), reaction frame entirety location, on shield machine, indicate position line, indicate position reference line at reaction frame, reaction frame position reference line is overlapped with shield machine position line, and is fixedly connected with shield machine overall reaction frame;
3), reaction frame turns to, and makes shield machine oppositely reverse end for end translation by hydraulic jack, when shield machine is oppositely reversed end for end, reaction frame also and then turns to;
4), reaction frame splits, shield machine moves to after the originating location of real-time measurement, by being fixed on reaction frame on shield machine, from shield machine, overall separation is out;
5), reaction frame reorientates, and carries out trickle adjustment by the position of jack and jack pair reaction frame, make it to overlap with the installation site of real-time measurement;
6) reaction frame is installed, and by welding, reaction frame bottom is fixed to weld horizontal support simultaneously and diagonal brace with floor;
Completing the shield machine translation tune reaction frame that starts by above step installs.
Further, the position reference line of reaction frame is the outer edge line of reaction frame one side.
All right, on the position line of shield machine, be uniformly distributed multiple connectors, connect reaction frame by connector.
Its beneficial effect of the present invention is as follows: in the process of shield machine main frame translation tune, reaction frame and shield machine main frame acceptance frame, shield machine main frame are welded and fixed as a whole, make reaction frame along with shield machine main frame together translation, in the time that shield machine main frame moves to originating location, reaction frame also arrives corresponding installation site, then reaction frame is separated from entirety, arrive accurate installation site through adjusting, in having completed shield machine translation tune, also completed like this installation of reaction frame. Its method is simple to operate, quick, has effectively improved the installation effectiveness of reaction frame; Shield machine translation tune, reaction frame are installed to two procedures and unite two into one, succinct working procedure; Shorten the construction period, produced economic benefit; Reduce the potential safety hazard that closed station adopts conventional method lifting reaction frame.
Brief description of the drawings
Fig. 1 is reaction frame front view of the present invention.
Fig. 2 is reaction frame side view of the present invention.
As figure, main frame 1, back support frame 2, horizontal partition line 3, longitudinal cut-off rule 4.
Detailed description of the invention
This example is domestic certain subway shield construction station shield machine translation tune reaction frame Installation Example that starts. As shown in Figure 1, Figure 2, reaction frame comprises main frame 1 and is supported on main frame 1 back support frame 2 behind, when reaction frame is arranged in the closed station of half digging method construction, directly over shield structure circuit without ground hoisting port, and middle plate aperture position is not suitable for reaction frame lifting, suspension-center pre-embedded lazy weight on middle plate, the serious narrow and small deficiency of reaction frame installing space. By the fast and simple installation that has completed reaction frame of the present invention, larger shortening the construction period.
The invention process step is as follows:
Preparation, complete the slab plate laying of shield structure bottom, shield machine receives rear and implements before shield machine translation tune, 1), remove reaction frame, horizontal partition line 3 by reaction frame in as shown in Figure 1, Figure 2, longitudinally cut-off rule 4 is removed into parts successively from original installation site, and carries out interim affixed one-tenth reaction frame entirety.
2), reaction frame entirety location, on shield machine, indicate position line, indicate position reference line at reaction frame, preferred position reference line is the outer edge line of reaction frame one side, in shield structure bottom, plate carries out shield machine translation, provide the power of translation shield machine for two pairs of 100t hydraulic jack with a 100t hydraulic power unit and the pipeline that matches, in the time that shield machine reaches reaction frame position reference line and overlaps position with shield machine position line, winch to shield structure shaft bottom and by being placed on shield machine by whole interim affixed reaction frame with the truck crane of a 100t, whole reaction frame is separately fixed to shield machine with the long 18# I-steel of 5 1.5m and receives bracket both sides, on shield machine afterbody, left, the right side is fixed by welding in shield machine and receives on bracket and shield machine, when connection, ensure that position reference line overlaps with position line.
3) reaction frame turns to, and shield machine and reaction frame are moved to the originating location through real-time measurement together, with crane gear, shield machine is oppositely reversed end for end to translation, and when shield machine is oppositely reversed end for end, reaction frame also and then turns to.
4), reaction frame splits, shield machine moves to after the originating location of real-time measurement, by being fixed on interim affixed reaction frame on shield machine, whole from shield machine, overall separation is out;
5), reaction frame is reorientated, be divided into reaction frame parts by whole interim affixed reaction frame according to the horizontal partition line 3 in Fig. 1, Fig. 2, longitudinal cut-off rule 4 foldings, and successively reaction frame component locations is carried out to trickle adjustment by jack and jack pair, make it to overlap with the installation site of real-time measurement;
6) reaction frame is installed, and by welding, reaction frame bottom is fixed to weld horizontal support simultaneously and diagonal brace with floor.
Completing the shield machine translation tune reaction frame that starts by above step installs.
Preferred scheme is uniformly distributed multiple connectors on the position line of shield machine, connects reaction frame by connector, can further increase work efficiency.

Claims (2)

1. the shield machine translation tune reaction frame installation method that starts, is characterized in that: described method comprise remove that reaction frame, reaction frame entirety location, reaction frame turn to, reaction frame fractionation, reaction frame are reorientated, reaction frame is installed;
1), remove reaction frame, reaction frame is removed from original installation site;
2), reaction frame entirety location, on shield machine, indicate position line, indicate position reference line at reaction frame, the position reference line of described reaction frame is the outer edge line of reaction frame one side, reaction frame position reference line is overlapped with shield machine position line, and reaction frame entirety is fixedly connected with shield machine;
3), reaction frame turns to, and makes shield machine oppositely reverse end for end translation by hydraulic jack, when shield machine is oppositely reversed end for end, reaction frame also and then turns to;
4), reaction frame splits, shield machine moves to after the originating location of real-time measurement, by being fixed on reaction frame on shield machine, from shield machine, overall separation is out;
5), reaction frame reorientates, and carries out trickle adjustment by the position of jack and jack pair reaction frame, make it to overlap with the installation site of real-time measurement;
6) reaction frame is installed, and by welding, reaction frame bottom is fixed to weld horizontal support simultaneously and diagonal brace with floor;
Completing the shield machine translation tune reaction frame that starts by above step installs.
2. a kind of shield machine translation tune according to claim 1 reaction frame installation method that starts, is characterized in that: on the position line of shield machine, be uniformly distributed multiple connectors, connect reaction frame by connector.
CN201410349311.9A 2014-07-22 2014-07-22 A kind of shield machine translation tune reaction frame installation method that starts Active CN104141497B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410349311.9A CN104141497B (en) 2014-07-22 2014-07-22 A kind of shield machine translation tune reaction frame installation method that starts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410349311.9A CN104141497B (en) 2014-07-22 2014-07-22 A kind of shield machine translation tune reaction frame installation method that starts

Publications (2)

Publication Number Publication Date
CN104141497A CN104141497A (en) 2014-11-12
CN104141497B true CN104141497B (en) 2016-05-11

Family

ID=51850809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410349311.9A Active CN104141497B (en) 2014-07-22 2014-07-22 A kind of shield machine translation tune reaction frame installation method that starts

Country Status (1)

Country Link
CN (1) CN104141497B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105626088B (en) * 2016-02-02 2018-02-06 中铁十九局集团轨道交通工程有限公司 T-shaped bored tunnel shield machine is gone into the well shift method
CN109083647A (en) * 2018-08-17 2018-12-25 北京市政建设集团有限责任公司 A kind of shield machine translating station-crossing construction method
CN109356598B (en) * 2018-12-08 2021-01-12 成都鑫都建设工程有限公司 Shield machine reaction frame for tunnel construction

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3412066B2 (en) * 1996-06-20 2003-06-03 不動建設株式会社 Initial excavation method of shield machine
CN102400690B (en) * 2011-12-26 2013-08-28 中铁四局集团有限公司 Shield machine pushing turn-around method in construction subway tunnel by using shield method
CN102758634A (en) * 2012-08-01 2012-10-31 上海隧道工程股份有限公司 Assembling type reaction frame device for shield launching and propulsion
CN203201562U (en) * 2013-03-14 2013-09-18 中铁十一局集团城市轨道工程有限公司 Shield tunneling machine initial counter-force frame convenient to detach, install and transport

Also Published As

Publication number Publication date
CN104141497A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN104141497B (en) A kind of shield machine translation tune reaction frame installation method that starts
CN204151692U (en) A kind of modular assembly formula connection system for guide rail
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
JP7030243B2 (en) Piping system that does not require attachment / detachment work used for pipe propulsion machines and construction method using this
US20200095747A1 (en) Foundation Construction Device and Its Construction Method
CN204716257U (en) Guarantee that shield whole starts and the variable door opening cribbing of station main body synchronous construction
CN104314009B (en) Big sections hoisting mechanism and using method
CN105714829A (en) Construction device for deep foundation pit excavation and underground station construction and construction method adopting same
CN202560321U (en) Shield fission starting pipe line synchronous move device
KR20110088326A (en) Construction method for underground structure using pressed pipe
CN104314577A (en) Disassembling and assembling method for shield tunneling machine in tunnel
CN109723453B (en) Method for reforming pipe jacking machine in tunnel
CN107724425B (en) Mechanized construction equipment and construction method for prefabricated comprehensive pipe gallery
CN103953358A (en) Clearing construction method for underground obstacle
CN108018882B (en) Shallow comprehensive pipe rack engineering integrated construction device
CN203801239U (en) Chain ditcher
CN102839671A (en) Concrete supporting reinforced cage prefabricated assembling technology and construction method
KR101217189B1 (en) The soil excavation device for pipe type tunnel
CN204819907U (en) Prefabricated vibrations drawing of patterns platform of railway roadbed cable duct
CN103899312A (en) Right angle turn construction method of underwell T-shaped roadway
CN108483284B (en) A kind of derrick crane base steel plinth suspension installation method
CN208056079U (en) A kind of annular weir builds mechanism
CN203846552U (en) Hydraulic grab bucket electric transmission tool
CN102691507B (en) Integrated fast construction method for shield machine
CN103088829B (en) The construction method that in a kind of foundation ditch, concrete supports

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 443000 Hubei city of Yichang Province, Jianshe Road No. 40

Applicant after: CGGC FOUNDATION ENGINEERING CO., LTD.

Address before: 443000 Hubei city of Yichang Province, Jianshe Road No. 40

Applicant before: Gezhouba Group Foundation Engineering Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant