CN104134165A - Integrated province, region and county electric energy synthetic data management system - Google Patents

Integrated province, region and county electric energy synthetic data management system Download PDF

Info

Publication number
CN104134165A
CN104134165A CN201410367726.9A CN201410367726A CN104134165A CN 104134165 A CN104134165 A CN 104134165A CN 201410367726 A CN201410367726 A CN 201410367726A CN 104134165 A CN104134165 A CN 104134165A
Authority
CN
China
Prior art keywords
electric energy
province
county
company
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410367726.9A
Other languages
Chinese (zh)
Inventor
杜贵和
王松
陈实
黄太贵
李端超
马金辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201410367726.9A priority Critical patent/CN104134165A/en
Publication of CN104134165A publication Critical patent/CN104134165A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/16Energy services, e.g. dispersed generation or demand or load or energy savings aggregation

Abstract

An integrated province, region and county electric energy synthetic data management system comprises a province company electric energy data platform and a region and county company electric energy data platform, wherein the province company electric energy data platform and the region and county company electric energy data platform are connected with each other and respectively connected with a front function module, a database access interface module and an SCADA system, the SCADA systems correspond to the province company electric energy data platform and the region and county company electric energy data platform respectively, and each front function module is connected with an electric energy collecting terminal of a substation and an electric energy collecting terminal of a non-uniform scheduling power plant. According to the integrated province, region and county electric energy synthetic data management system, the three-layer structure design idea is adopted, the data platforms formed by processing directly-collected data and system interconnection data are arranged on the bottom layer, standard data interfaces are arranged on the middle layer, application modules which carry out data exchange through the standard data interfaces are arranged on the high layer, and new application modules can be added to the system conveniently so that extension of the functions of the system can be achieved.

Description

Province's integrated electric flux integrated date managment system in ground county
Technical field
The present invention relates to electrical energy metering field, be specially a kind of province integrated electric flux integrated date managment system in ground county.
Background technology
The backwardness of existing electric flux system communication technology, makes electric flux system cannot realize real time data statistics.Along with developing rapidly of the communication technology, electric flux system can provide the communication capacity identical with real-time system in part now, therefore just needs electric flux system can have the ability of real-time calculating.In most of existing electric flux systems, be all that non real-time system realizes electric flux system, make a lot of upper layer application be difficult to carry out.
Existing Electric Energy Acquisition System is mainly realized collection and the management of substation data, iES-E200 electric flux long-distance metering and integrated application environment have been expanded the generated energy acquisition of the aspect such as interconnection switch, low-voltage client of distribution transforming, high pressure client, distribution transforming circuit, and realize relevant application function (as distribution transformer monitoring, load management, the whole network loss calculating, line loss are calculated, the loss of platform district is calculated, electric energy quality monitoring and examination etc.), comprehensively realize generating, transmission of electricity, distribution, electricity consumption each side generated energy acquisition and the application of electric system.
Summary of the invention
Technical matters solved by the invention is to provide a kind of province integrated electric flux integrated date managment system in ground county, to solve the problem proposing in above-mentioned background technology.
Technical matters solved by the invention realizes by the following technical solutions:
Province's integrated electric flux integrated date managment system in ground county, comprise company of electric energy data platform He Di county of company of interconnective province electric energy data platform, between company of electric energy data platform He Di county of company of province electric energy data platform, realize data retransmission by communication module, on company of electric energy data platform He Di county of company of described province electric energy data platform, be all connected with preposition functional module, database access interface module and with its corresponding data acquisition of above-mentioned platform with monitor control (SCADA) system, described SCADA system is connected and realizes correcting data error with above-mentioned platform respectively by communication module, in described preposition functional module, be connected with the electric energy acquisition terminal of transformer station and the electric energy acquisition terminal of non-tracking power plant.
Further, in described database access interface module, be connected with electric weight statistical module, line loss analyzing module, index evaluation module and Report Server Management module.
Beneficial effect of the present invention is as follows:
1, simple in structure, simple operation, has realized province and district, the centralized management of the three grades of electric energy metering systems in county, distributed browsing.
2, adopt iES-E200 electric flux long-distance metering and the integrated application environment of unique flexible bus technology, realize the application architecture of B/S/S, C/S/S, cross operating system and database platform, communications platform, stipulations Platform Designing; Application software module can be concentrated and operate on a computing machine, also can distribute and operate on a large computer network, and module is supported major-minor stand-by heat, and guarantee system is moved reliable and stablely.
3, adopt the design philosophy of three-decker, bottom is the data platform forming after processing by the processing to direct image data and system interconnect data, middle layer is the data-interface of standard, the high-rise application module that carries out exchanges data with standard data interface, new application module can add in system easily, realizes the expansion of systemic-function.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Embodiment
In order to make of the present inventionly to realize technological means, creation characteristic, reach object and effect is easy to understand, below in conjunction with specific embodiment, further set forth the present invention.
As shown in Figure 1, province's integrated electric flux integrated date managment system in ground county, comprise company of electric energy data platform He Di county of company of interconnective province electric energy data platform, between company of electric energy data platform He Di county of company of province electric energy data platform, realize data retransmission by communication module, on company of electric energy data platform He Di county of company of described province electric energy data platform, be all connected with preposition functional module, database access interface module and with its corresponding data acquisition of above-mentioned platform with monitor control (SCADA) system, described SCADA system is connected and realizes correcting data error with above-mentioned platform respectively by communication module, in described preposition functional module, be connected with the electric energy acquisition terminal of transformer station and the electric energy acquisition terminal of non-tracking power plant.In described database access interface module, be connected with electric weight statistical module, line loss analyzing module, index evaluation module and Report Server Management module.
The present invention can realize collection and the management of province's ground county integrated synthesis electric flux, adopts Cross Platform Technology, by different level implementation platform functions.Platform adopts standard C ++, the cross-platform language development such as Java, facilitate the present invention move on different operating system and portability.On the data base management system (DBMS) basis of each platform, realize Universal Database access interface simultaneously, the database application of developing in this interface basis and each platform data base management system are irrelevant, adapt to new data base management system (DBMS) only needs upgrade database interface subprogram, and do not need to revise application program.Also set up communications platform simultaneously, shield different communication modes, make the exploitation of paying close attention to application layer that signal procedure can be wholwe-hearted, and needn't be concerned about all kinds of Protean communication modes.In the superiors of platform, three extendible application display modules are provided.
More than show and described ultimate principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and instructions, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (2)

1. province's integrated electric flux integrated date managment system in ground county, comprise company of electric energy data platform He Di county of company of interconnective province electric energy data platform, it is characterized in that: between company of electric energy data platform He Di county of company of province electric energy data platform, realize data retransmission by communication module, on company of electric energy data platform He Di county of company of described province electric energy data platform, be all connected with preposition functional module, database access interface module and with its corresponding data acquisition of above-mentioned platform with monitor control (SCADA) system, described SCADA system is connected and realizes correcting data error with above-mentioned platform respectively by communication module, in described preposition functional module, be connected with the electric energy acquisition terminal of transformer station and the electric energy acquisition terminal of non-tracking power plant.
2. the province according to claim 1 integrated electric flux integrated date managment system in ground county, is characterized in that: in described database access interface module, be connected with electric weight statistical module, line loss analyzing module, index evaluation module and Report Server Management module.
CN201410367726.9A 2014-07-30 2014-07-30 Integrated province, region and county electric energy synthetic data management system Pending CN104134165A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410367726.9A CN104134165A (en) 2014-07-30 2014-07-30 Integrated province, region and county electric energy synthetic data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410367726.9A CN104134165A (en) 2014-07-30 2014-07-30 Integrated province, region and county electric energy synthetic data management system

Publications (1)

Publication Number Publication Date
CN104134165A true CN104134165A (en) 2014-11-05

Family

ID=51806837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410367726.9A Pending CN104134165A (en) 2014-07-30 2014-07-30 Integrated province, region and county electric energy synthetic data management system

Country Status (1)

Country Link
CN (1) CN104134165A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108320126A (en) * 2016-12-16 2018-07-24 山东电力调度控制中心 A kind of grid company province ground county's Integrated management system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216984A (en) * 2008-01-02 2008-07-09 江苏省电力公司 An electricity energy information acquisition integrated platform
CN103390932A (en) * 2013-07-09 2013-11-13 国家电网公司 Distribution self-governed disaster tolerant standby type prefecture and county integrated system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216984A (en) * 2008-01-02 2008-07-09 江苏省电力公司 An electricity energy information acquisition integrated platform
CN103390932A (en) * 2013-07-09 2013-11-13 国家电网公司 Distribution self-governed disaster tolerant standby type prefecture and county integrated system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李年赞 等: ""地区电网地县一体化电能量系统的设计与实现"", 《安徽电力》 *
熊政 等: ""江苏电网省地县一体化电量智能采集系统研究"", 《江苏电机工程》 *
王周虹 等: ""地县一体化电能量采集应用系统的研究与实现"", 《电网与清洁能源》 *
缪建国 等: ""地县一体化调度自动化系统在南通电网的应用"", 《江苏电机工程》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108320126A (en) * 2016-12-16 2018-07-24 山东电力调度控制中心 A kind of grid company province ground county's Integrated management system

Similar Documents

Publication Publication Date Title
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
WO2017036244A1 (en) Digital simulation system of power distribution network
CN106021684B (en) A kind of modular power source standardized designs system and its design method, application
CN105117532B (en) A kind of modeling method of secondary equipment of intelligent converting station interval information model
CN104504485A (en) Integrative power system relay protection setting calculation method
CN103559160B (en) The construction method of semantic information interactive interface based on the intelligent distribution system of SG-CIM standard
CN104537573A (en) Power grid operation information panoramic visualized display system
CN103699973A (en) Power grid typhoon prevention and disaster relief aid decision making support system based on GIS (Geographic Information System)
CN101901492A (en) Automatic generating method of electric network station wiring diagram
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN103679545A (en) Power distribution network reliability theoretical evaluation system
CN104156230A (en) Automatic red and black figure implementation method based on debug system data objectification
CN203466628U (en) Intelligent electric power monitoring system having three-dimensional view
CN109543156A (en) A kind of Substation switching automatic invoice issuance system based on IEC61850
CN105184508A (en) Harmonic measuring point optimal allocation method for distribution network
CN104134165A (en) Integrated province, region and county electric energy synthetic data management system
CN104200306A (en) Management method and system for boundary switch constant value of 10kV distribution circuit
CN105024454A (en) Transformer substation secondary equipment monitoring system
CN110649712A (en) Urban power grid operation visual monitoring system based on electricity consumption information acquisition system
CN202997354U (en) Power distribution automatic ring network cabinet
CN103617141A (en) Method for electrical equipment field test and characteristic evaluation management
CN102663159B (en) Layered automatic configuration and optimization method of single line diagram outside power distribution network
CN104463699A (en) Intelligent substation control layer information extraction method and device
CN104376614A (en) One-key ticket outlet method for substation operation tickets
CN201576963U (en) IEC61850-based intelligent data set of transformer substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141105

WD01 Invention patent application deemed withdrawn after publication