CN104121023B - Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin - Google Patents
Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin Download PDFInfo
- Publication number
- CN104121023B CN104121023B CN201410312273.XA CN201410312273A CN104121023B CN 104121023 B CN104121023 B CN 104121023B CN 201410312273 A CN201410312273 A CN 201410312273A CN 104121023 B CN104121023 B CN 104121023B
- Authority
- CN
- China
- Prior art keywords
- mud
- testing
- breath
- holding
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 128
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000009412 basement excavation Methods 0.000 title claims abstract description 23
- 239000002002 slurry Substances 0.000 title claims abstract description 21
- 238000007599 discharging Methods 0.000 claims description 24
- 239000007788 liquid Substances 0.000 claims description 17
- 238000012856 packing Methods 0.000 claims description 11
- 239000002245 particle Substances 0.000 claims description 9
- 230000015572 biosynthetic process Effects 0.000 claims description 7
- 229920006395 saturated elastomer Polymers 0.000 claims description 7
- 230000008859 change Effects 0.000 claims description 4
- 230000008595 infiltration Effects 0.000 claims description 4
- 238000001764 infiltration Methods 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 230000002123 temporal effect Effects 0.000 claims description 3
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims description 2
- 238000010998 test method Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 230000035699 permeability Effects 0.000 description 3
- GNFTZDOKVXKIBK-UHFFFAOYSA-N 3-(2-methoxyethoxy)benzohydrazide Chemical compound COCCOC1=CC=CC(C(=O)NN)=C1 GNFTZDOKVXKIBK-UHFFFAOYSA-N 0.000 description 2
- 230000001914 calming effect Effects 0.000 description 2
- 238000012407 engineering method Methods 0.000 description 2
- 239000012466 permeate Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000010453 quartz Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Landscapes
- Sampling And Sample Adjustment (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410312273.XA CN104121023B (en) | 2014-07-02 | 2014-07-02 | Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410312273.XA CN104121023B (en) | 2014-07-02 | 2014-07-02 | Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104121023A CN104121023A (en) | 2014-10-29 |
CN104121023B true CN104121023B (en) | 2016-05-25 |
Family
ID=51766628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410312273.XA Expired - Fee Related CN104121023B (en) | 2014-07-02 | 2014-07-02 | Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104121023B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695969B (en) * | 2015-02-28 | 2017-01-04 | 广东华隧建设股份有限公司 | The method that shield machine is switched to soil pressure boring mode by muddy water boring mode |
CN105738255A (en) * | 2016-02-04 | 2016-07-06 | 上海隧道工程有限公司 | Testing device and method for permeation of slurry in soil layer |
CN105891084B (en) * | 2016-04-06 | 2019-06-14 | 河海大学 | Dismountable mud film forming and mud film tightness test device and method |
CN105866337A (en) * | 2016-04-21 | 2016-08-17 | 河海大学 | Device and method for testing slurry shield excavation surface mud film formation and mud film air tightness under high pressure |
CN108007827A (en) * | 2017-12-29 | 2018-05-08 | 上海三瑞高分子材料股份有限公司 | Slurry balance shield slurry penetration film forming experimental provision and method |
CN108086987A (en) * | 2018-01-11 | 2018-05-29 | 河海大学 | EPB shield tunneling driving keeps the control method that excavation face is stablized in upper-soft lower-hard ground |
CN108918390B (en) * | 2018-08-10 | 2023-11-07 | 河海大学 | Device and method for forming mud film and measuring consolidation amount and air inflow of mud film |
CN109307628B (en) * | 2018-09-29 | 2024-04-26 | 中铁隧道局集团有限公司 | Mud film shear strength test instrument and mud film shear strength measurement method thereof |
CN110044712A (en) * | 2019-04-17 | 2019-07-23 | 河海大学 | A kind of the calm the anger shield mud film of consolidation process of consideration is held one's breath the measurement method of value and amounts of consolidation |
CN110439577B (en) * | 2019-08-21 | 2021-02-12 | 河海大学 | SCAP type under-pressure cabin opening method based on earth pressure balance shield machine |
CN112683746B (en) * | 2020-12-04 | 2022-08-02 | 山东大学 | Device and method for measuring effective stress conversion rate of slurry film forming |
CN115372206B (en) * | 2022-07-12 | 2024-10-01 | 北京交通大学 | Prediction method for air-closing time of excavation face mud film during pressurized cabin opening of slurry balance shield |
CN118130330A (en) * | 2024-03-07 | 2024-06-04 | 四川省地质矿产勘查开发局区域地质调查队 | Inter-stratum ground water turbidity and mud film observation device and method and application thereof |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4607889A (en) * | 1984-11-29 | 1986-08-26 | Daiho Construction Co., Ltd. | Shield tunnel boring machine |
CN100504030C (en) * | 2004-04-02 | 2009-06-24 | 上海第二市政工程有限公司 | PMS sludge preparation method and its application in construction of sludge balance shield and pipe-jacking |
CN101191417A (en) * | 2007-12-21 | 2008-06-04 | 沈阳重型机械集团有限责任公司 | Bentonite mud water pressurization equilibration shield machine |
CN102191939A (en) * | 2010-03-05 | 2011-09-21 | 上海盾构设计试验研究中心有限公司 | Test method for forming mud membrane by using slurry shield under high pressure |
-
2014
- 2014-07-02 CN CN201410312273.XA patent/CN104121023B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104121023A (en) | 2014-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104121023B (en) | Testing arrangement and the method for excavation face mud film value of holding one's breath that slurry shield is with pressure while opening the cabin | |
CN109612907B (en) | Testing device and method for permeability test of fractured coal rock mass | |
CN105823717B (en) | A kind of simple pressure chamber model of slurry shield and its application method | |
CN101603913B (en) | Device and method for testing permeability coefficient of cement soil | |
CN106768840B (en) | Device and method for simulating sand carrying of running water under seepage-vibration effect | |
CN105334142B (en) | A kind of experimental provision formed for simulating shield mud film | |
CN102175585B (en) | Method for testing permeability stability of sand gravel material | |
CN106769747B (en) | The experimental rig and its test method that soil body inflation resistance is seeped | |
CN106706416A (en) | Test device capable of simulating basement bottom plate stress under effect of pressure water and use method thereof | |
CN104677803A (en) | Constant and variable head composite penetration testing device | |
CN106645582B (en) | For simulating the experimental rig and its method of testing that stratum is swelled during slip casting | |
CN105863624A (en) | Visual testing method for simulating permeation of slurry into stratum during slurry shielding | |
CN206470116U (en) | A kind of experimental rig for simulating the lower basement bottom board stress of artesian water effect | |
CN101982747B (en) | Method for calibrating synchronous grouting quantity and grouting pressure of shield | |
CN206020233U (en) | A kind of soil body osmotic coefficient measurement apparatus for being contemplated that sticking grain silting | |
CN104790338A (en) | Contact scour hydraulic model | |
CN111239370A (en) | Experimental method for simulating karst collapse caused by underground water | |
CN203821294U (en) | Model test device for simulating reservoir earth dam seepage damage developing process | |
CN106768153B (en) | A kind of slurry consolidation cubical contraction test device and method of testing | |
Bezuijen et al. | Pressure gradients and muck properties at the face of an EPB | |
CN106124380B (en) | The device and method of coal column gas permeability is measured in a kind of similarity simulation experiment | |
CN104831674B (en) | Contact scour testing apparatus for earth-rock joint part | |
CN115876590A (en) | Early-stage degradation, permeation and damage test device and method for water-intercepting curtain | |
CN106353224B (en) | Slurry shield mud permeation film-forming simulation test device | |
Toledo et al. | Structural failure of the clay core or the upstream face of rockfill dams in overtopping scenario |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HEHAI UNIV. Free format text: FORMER OWNER: CCCC(CHINA COMMUNICATIONS CONSTRUCTION COMPANY) TUNNEL ENGINEERING CO., LTD. Effective date: 20150106 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Wei Inventor after: Min Fanlu Inventor after: Zhang Ning Inventor after: Jiang Teng Inventor after: Zhang Boyang Inventor after: Yao Zhanhu Inventor after: Xia Pengju Inventor before: Zhang Boyang Inventor before: Yao Zhanhu Inventor before: Min Fanlu Inventor before: Zhang Yingming Inventor before: Xia Pengju Inventor before: Zhao Xiaopeng Inventor before: Jiang Teng |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHANG BOYANG YAO ZHANHU MIN FANLU ZHANG YINGMING XIA PENGJU ZHAO XIAOPENG JIANG TENG TO: ZHU WEI MIN FANLU ZHANG NING JIANG TENG ZHANG BOYANG YAO ZHANHU XIA PENGJU Free format text: CORRECT: ADDRESS; FROM: 211860 NANJING, JIANGSU PROVINCE TO: 210098 NANJING, JIANGSU PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150106 Address after: Xikang Road, Gulou District of Nanjing city of Jiangsu Province, No. 1 210098 Applicant after: HOHAI University Address before: 211860, Jiangsu, Pukou province Nanjing Town, the top of the cross Bureau of the central tunnel crossing three river channel project manager Applicant before: CCCC TUNNEL ENGINEERING Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 |