CN104831674B - Contact scour testing apparatus for earth-rock joint part - Google Patents

Contact scour testing apparatus for earth-rock joint part Download PDF

Info

Publication number
CN104831674B
CN104831674B CN201510108608.0A CN201510108608A CN104831674B CN 104831674 B CN104831674 B CN 104831674B CN 201510108608 A CN201510108608 A CN 201510108608A CN 104831674 B CN104831674 B CN 104831674B
Authority
CN
China
Prior art keywords
top cover
base
casing
upper limb
contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510108608.0A
Other languages
Chinese (zh)
Other versions
CN104831674A (en
Inventor
李娜
赵寿刚
刘忠
乔瑞社
郝伯瑾
鲁立三
杨小平
邓宇
李振全
岳瑜素
宋力
王少锋
高玉琴
常芳芳
余元宝
校永志
赵险峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Institute of Hydraulic Research
Original Assignee
Yellow River Institute of Hydraulic Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Institute of Hydraulic Research filed Critical Yellow River Institute of Hydraulic Research
Priority to CN201510108608.0A priority Critical patent/CN104831674B/en
Publication of CN104831674A publication Critical patent/CN104831674A/en
Application granted granted Critical
Publication of CN104831674B publication Critical patent/CN104831674B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/02Hydraulic models

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a hydraulic testing apparatus, especially relates to a contact scour testing apparatus for an earth-rock joint part, and belongs to the field of water conservancy. The contact scour testing apparatus of the invention comprises a box body, a base, an upper flange, and a top cover. A movable top cover is arranged in the middle of the top cover. The box body is made of a transparent organic glass square pipe with a rectangular cross section. A rectangular groove is arranged in the portion, disposed inside the box body, of the base, and a permeable steel plate is arranged on the upper part of the groove. The testing apparatus of the invention can be used to carry out contact scour test under different conditions, is convenient to operate and simple, significantly improves the working efficiency, needs less investment, and is simple and feasible. The box body adopts transparent organic glass, which facilitates observation of various phenomena in the process of testing.

Description

A kind of soil stone joint portion contact scour experimental rig
Technical field:
The present invention relates to a kind of hydraulic testing equipment, particularly to a kind of examination of the native stone joint portion contact scour rule of simulation Test equipment, its IPC international Patent classificating number G01M 10/00, E02B 1/00, belong to Water Resources Domain.
Background technology:
Through-dyke building and the weak link that dyke soil stone joint portion is dyke, have saying of " culverts and water gates one dangerous section ", special Be not due to reason often can the cause native stone joint portion generation crack such as backfill leakiness, differential settlement, ground be bad or its His defect and there is seepage failure, relatively hazardous seepage failure type is that building is broken with the contact scour on earth embankment contact surface Bad, for example banket and building contact surface along base soil or lateral, top, under high water level, long-time action of soaking, contacted before this Position particle is carried over from seepage exit, and then forms seepage channel, causes dike breaching.Therefore, carry out dyke culverts and water gates soil stone Contact scour seepage failure relevant issues research in joint portion has important practical significance and practical engineering application is worth.
But conventional permeability test only can measure the infiltration coefficient of soil at present, and for this seepage failure class of contact scour The test of type, currently without related experimental rig device, such as using conventional permeability apparatus, it will produce following problem:
(1) as the simulation xoncrete structure such as sluice plate or side wall and soil matrix contact scour when, need to concrete slab processed, and The each component of sluice mostly is rectangular structure, but conventional infiltration instrument is circle, Mold Making more inconvenience and cannot model engineering Actual;
(2), in contact scour test, the seepage characteristic of contact surface is except the seepage characteristic with the two media contacting with each other Have outside the Pass, be also in contact with it the contact condition in face, outside hydraulics etc. relevant.Therefore study contact surface seepage characteristic, main Solve contact surface percolating medium and the simulation of hydraulics and two key issues of simulation of contact surface physical mechanics state.And Contact scour field test between Yellow River dyke culverts and water gates soil stone joint portion is implemented more difficult, conventional infiltration instrument size is relatively Little, dimensional effect more substantially simulates real stress it is impossible to press close to;
(3) conventional infiltration instrument only can carry out seepage failure test it is impossible to the contact scour carrying out between different medium tries Test.
Content of the invention:
It is an object of the invention to overcoming existing testing equipment to carry out the larger two media of elastic modelling quantity difference special It is the deficiency existing when the soil body is tested with rigid building contact scour, provide a kind of principle simple, easily operated, can be true The experimental rig of the native stone joint portion contact scour seepage failure of reflection, provides means of testing for engineering actual demand.The present invention's Technical scheme:
A kind of soil stone joint portion contact scour experimental rig, including casing, base, upper limb and top cover, described top cover, upper limb It is rectangular steel plates with base, the middle part of described top cover is provided with movable top cover, and described movable top cover is formed around multiple spiral shells Bolt, movable top cover is fixed on described top cover;The surrounding of described upper limb and base is equipped with indent, is provided with described indent The silica gel sealing bar of thick 12mm;Described casing is made up of the transparent organic glass square tube of rectangle of cross section, and wall thickness is 8mm, institute State casing to be placed in described upper limb and the described indent of base, be provided with delivery port in a side of described casing;Described top Lid covers on described upper limb, is provided with therebetween sealing ring;The bottom of described base is provided with water inlet;Described base is located at institute State the part in casing and be provided with rectangular recess, the top of described groove is provided with permeable steel plate, the permeable aperture of described permeable steel plate ForThe upper surface of described permeable steel plate and the upper surface of described base are in approximately the same plane;Current pass through described enter The mouth of a river enters in described groove, then by the even transition of the permeable hole on described permeable steel plate, enters in casing;Multiple tops Bar passes through described top cover, upper limb and base, using fastening bolt, described top cover, upper limb, casing and base is fixed together.
The native stone joint portion contact scour experimental rig of the present invention, can carry out the contact scour test under different condition, behaviour It is convenient and simple to make, and operating efficiency significantly improves, small investment, simple.Casing is using transparent with machine glass, convenient The observation of various phenomenons in process of the test.
Brief description:
Fig. 1, the contact scour experimental rig top view of the present invention;
Fig. 2, the contact scour experimental rig longitudinal section of the present invention.
In figure, 1 is top cover, and 2 is movable top cover, and 3 is sealing ring, and 4 is fastening bolt, and 5 is delivery port, and 6 is indent, 7 For upper limb, 8 is casing, and 9 is push rod, and 10 is base, and 11 is permeable steel plate, and 12 is water inlet.
Specific embodiment:
With reference to Fig. 1-2, the present invention is elaborated.
A kind of soil stone joint portion contact scour experimental rig of the present invention, including casing 8, base 10, upper limb 7 and top cover 1, Described top cover 1, upper limb 7 and base 10 are the rectangular steel plates of thickness 200mm, and the middle part of described top cover 1 is provided with movable top cover 2, described movable top cover 2 is made up of the thick lucite of 8mm, is consolidated by being arranged on multiple bolts of movable top cover 2 surrounding It is scheduled on described top cover 1;The surrounding of described upper limb 7 and base 10 is equipped with indent 6, is provided with the silicon of thick 12mm in described indent 6 Glue sealing strip.Described casing 8 is made up of the transparent organic glass square tube of rectangle of cross section, and wall thickness is 8mm, and described casing 8 is put Put in the described indent 6 of described upper limb 7 and base 10, be provided with delivery port 5 in a side of described casing 8;Described top cover 1 Cover on described upper limb 7, be provided with therebetween sealing ring 3;The bottom of described base 10 is provided with water inlet 12, and described water tank leads to Cross rubber hose to connect with described water inlet 12;The part that described base 10 is located in described casing 8 is provided with rectangular recess, described The top of groove is provided with permeable steel plate 11, and the permeable aperture of described permeable steel plate 11 isDescribed permeable steel plate 11 upper The upper surface of surface and described base 10 is in approximately the same plane;Current enter in described groove, so by described water inlet 12 Afterwards by the even transition of the permeable hole on described permeable steel plate 11, enter in casing 8;Multiple push rods 9 pass through described top cover 1, Upper limb 7 and base 10, are fixed together using top cover 1, upper limb 7, casing 8 and base 10 described in fastening bolt 4.
When carrying out contact scour test using the experimental rig of the present invention, step is as follows:
(1) soil sample is prepared:After test is done with folk song, smashed with wooden mallet, sieving for standby, then with optimum moisture content and Maximum dry density is Con trolling index, and soil sample is laid in pallet, the amount of water being expected with atomizers spray, is layered uniform mixing After be placed into one night of wetting in closed container, so that uniform moisture is distributed in earth material.
(2) sample preparation:
(1) normal contact sample preparation:
The movable top cover 2 of described contact scour experimental rig is opened, contact scour experimental rig is vertically placed into Luggage sample;Before dress sample, one layer of bentonite of inwall uniform application in other three faces outside casing 8 inspection surface prevents side wall concentration from oozing Leakage;Each sample divides four layers of charging, compacting of vibrating after surfacing, every layer all according to needed for sample maximum dry density to hit actual arrival pre- Fixed height, during every layer of filler, makes even particle distribution and will carry out between layers cuing open hair process, cuing open mao depth is 1~2cm; Hit in real time, hammer will be evenly distributed direct attack to requiring thickness, and the periphery of sample and casing 8 contact internal walls must hit reality.
(2) sample preparation during contact surface existing defects:
There is the sample preparation in leakiness area in (a) contact surface:
The preparation of contact surface leakiness area sample (is controlled by the compactness changing soil sample by compact zone and leakiness area System) the prefabricated of every layer of soil sample highly to control.Before soil body sample modelling
First every layer of native quality and compacting height are calculated respectively according to the compactness in compact zone and leakiness area, by control The difference of the compacting height of every layer of system, produces compact zone and leakiness area;Every layer is all compacted to required height to ensure Compactness;During every layer of filler, make even particle distribution and will carry out between layers cuing open hair process, cuing open mao depth is 1~2cm; Hit in real time, hammer will be evenly distributed direct attack to requiring thickness, and the periphery of sample and casing 8 contact internal walls must hit reality.
There is the sample preparation in crack in (b) contact surface:
The setting of contact surface Fracture Width is controlled by having certain thickness thin plate, before sample preparation, needs according to test, will The inwall that casing 8 is close to by certain thickness thin plate is placed, one layer of bentonite retaining wall of inwall uniform application in its excess-three face, so Carry out the preparation of soil sample afterwards again, preparation process, with normal contact sample preparation, is extracted thin plate after the preparation of soil sample is good and can be tested.
(3) test operation
(1) debugging of testing equipment:Lucite inherently one rigid media, can be directly as a rigid contact Face, and simulate the contact scour test situation between the soil body and different roughness rigid buildings by changing its roughness.Can root According to the species of the rigid building contacting with the soil body, the roughness of casing 8 inwall is set.
When carrying out native stone contact scour test, except the native stone joint portion contact scour experimental rig using the present invention, also Need to adopt water supply installation, described water supply installation include revolution hang, electric block and water tank, described electric block is fixed on described Revolution hangs on, and described water tank is fixed on the suspension hook of described electric block.
Start electric block, according to the head of experimental simulation, by water tank hoisting to corresponding height, the height of water tank bottom surface Maximum can reach 10m, is equivalent to the head pressure of 0.1MPa, and described contact scour experimental rig is supplied water, and connects described in inspection The whether leak of the sealing position of tactile washout test device.
(2) need to choose the modes of emplacement of contact scour experimental rig according to test:Simulation culverts and water gates base plate is connect with soil matrix Touch when washing away, contact surface is laterally disposed;During the contact scour of simulation side wall and the soil body, contact surface is vertically placed;
(3) need to arrange the state of movable top cover 2 according to test:When there is laterally limiting contact scour in simulation downstream, Open delivery port 5, the bolt of movable top cover 2 surrounding is tightened, movable top cover 2 is tightly fixed to one with described top cover 1 Rise;During the simulation no laterally limiting contact scour in downstream, close delivery port 5, movable top cover 2 is removed, or by surrounding Bolt is unscrewed, and makes to maintain a certain distance between movable top cover 2 and described top cover 1;
(4) start to test:According to test requirements document, adjust test head, then open each valve and start to test;Head applies Afterwards, observe sample especially with casing 8 contact internal walls face leakiness area sample with the variation phenomenon of head application time, and record Leakiness area rushing in the process that wetting, infiltration, destruction, leakage passage are formed and every 2min after time, sample erosion damage Brush amount, and contrast the change of experimental phenomena under every kind of experimental condition;The soil body is overflowed to initial trial and washes away the soil body and be sampled Dry, weigh, point, under the conditions of contrasting different tests, various soil mass wash away the change of before and after's grain composition.
Application example:
As a example by downstream, no lateral spacing, contact surface have the contact scour test in leakiness area, concrete Con trolling index is:Not close Real area compactness 0.85, compact zone compactness 0.95, test head are 0.7m, transverse test.Concrete test situation is as follows:Sample Initial phenomenon shows as from the beginning of the bottom in sample and instrument contacts face, contact surface soil sample wetting before this, infiltration (stabilization sub stage), And then soil sample is soft, bulging for contact band, and then contact surface bottom fritter soil sample comes off (failure stage), and internal soil sample exists then Upstream head effect is lower successional loss, eventually forms piping passage (washing away the stage).
Using the experimental rig of the present invention, open delivery port 5, the bolt of movable top cover 2 surrounding is tightened, will be movable Top cover 2 is tightly secured together with described top cover 1, can carry out the seepage failure test of undisturbed soil or manipulated soil, the different soil of measurement The infiltration coefficient of body, or carry out seepage failure test.It is with the difference of contact scour test:During sample preparation, by instrument One layer of bentonite of device surrounding uniform application prevents side wall concentrative seepage, and concrete preparation is with normal contact sample preparation.
Technical scheme, the contact scour that can carry out under different condition is tested it is also possible to carry out seepage failure examination Test, measure the infiltration coefficient of the soil body.About 2000 yuan of single contact scour experimental rig manufacturing cost, in addition reusable, fall The cost of low test.Casing 8, using transparent with machine glass, facilitates the observation of various phenomenons in process of the test.

Claims (1)

1. a kind of soil stone joint portion contact scour experimental rig, including casing (8), base (10), upper limb (7) and top cover (1), institute State top cover (1), upper limb (7) and base (10) and be rectangular steel plates, the middle part of described top cover (1) is provided with movable top cover (2), institute State movable top cover (2) and be formed around multiple bolts, movable top cover (2) is fixed on described top cover (1);Described upper limb (7) and the surrounding of base (10) is equipped with indent (6), it is provided with the silica gel sealing bar of thick 12mm in described indent (6);Described casing (8) it is made up of the transparent organic glass square tube of rectangle of cross section, wall thickness is 8mm, described casing (8) is placed on described upper limb (7), and in the described indent (6) of base (10), it is provided with delivery port (5) in a side of described casing (8);Described top cover (1) Cover on described upper limb (7), be provided with therebetween sealing ring (3);The bottom of described base (10) is provided with water inlet (12);Institute State base (10) and be provided with rectangular recess positioned at the part in described casing (8), the top of described groove is provided with permeable steel plate (11), The permeable aperture of described permeable steel plate (11) isThe upper surface of described permeable steel plate (11) and described base (10) Upper surface is in approximately the same plane;Current enter in described groove by described water inlet (12), then pass through described permeable steel The even transition of the permeable hole on plate (11), enters in casing (8);Multiple push rods (9) pass through described top cover (1), upper limb (7) and Described top cover (1), upper limb (7), casing (8) and base (10) are fixed together by base (10) using fastening bolt (4).
CN201510108608.0A 2015-03-12 2015-03-12 Contact scour testing apparatus for earth-rock joint part Expired - Fee Related CN104831674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510108608.0A CN104831674B (en) 2015-03-12 2015-03-12 Contact scour testing apparatus for earth-rock joint part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510108608.0A CN104831674B (en) 2015-03-12 2015-03-12 Contact scour testing apparatus for earth-rock joint part

Publications (2)

Publication Number Publication Date
CN104831674A CN104831674A (en) 2015-08-12
CN104831674B true CN104831674B (en) 2017-02-22

Family

ID=53809845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510108608.0A Expired - Fee Related CN104831674B (en) 2015-03-12 2015-03-12 Contact scour testing apparatus for earth-rock joint part

Country Status (1)

Country Link
CN (1) CN104831674B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109781563B (en) * 2019-02-25 2023-06-02 黄河水利委员会黄河水利科学研究院 Method for simulating viscous soil starting scouring by using hydraulic model
CN109781566B (en) * 2019-02-25 2023-06-02 黄河水利委员会黄河水利科学研究院 Cohesive soil starting scouring hydraulic model
CN112666060A (en) * 2020-12-17 2021-04-16 北京航空航天大学 Penetration tester for researching soil body penetration destruction characteristics

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788451B (en) * 2010-02-09 2011-06-01 浙江树人大学 Silt anti-permeability strength measuring equipment and method
CN202748295U (en) * 2012-07-04 2013-02-20 河海大学 Intelligent test system for permeability characteristics of earth material
JP2014206007A (en) * 2013-04-12 2014-10-30 清水建設株式会社 Method for quantitatively evaluating clogging effect of grout material
CN203768857U (en) * 2014-03-05 2014-08-13 河海大学 Model device for utilizing temperature field to acquire dam foundation permeating flow velocity
CN203808987U (en) * 2014-05-08 2014-09-03 中国海洋石油总公司 Two-dimensional visual sand filling model for simulating in-layer heterogeneity and two-dimensional visual seepage test device

Also Published As

Publication number Publication date
CN104831674A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104790338B (en) Earth-rock combination part contact scour experimental method
CN108088982B (en) Simulate the Experimental Method in Laboratory of fine grained seepage inflow erosion inside deep aquifers sand
CN103954511B (en) A kind of Fracture Networks rock shearing-seepage flow coupling experiment method
CN104880396B (en) The soil body two is to flow model in porous media device and method of testing under outside charge function
CN103389249A (en) Device and method for clay core wall hydraulic fracturing experiments
CN104865371A (en) Experiment device and method for consolidation of soft foundation under vacuum condition
CN111337650A (en) Multifunctional test device for researching underground engineering soil body seepage failure mechanism
CN104831674B (en) Contact scour testing apparatus for earth-rock joint part
CN110658332B (en) Concrete lining pre-pressure measurement test device and test method thereof
CN102645395B (en) Diaphragm wall permeability tester
CN105699257B (en) A kind of experimental rig and its test method being suitable for native stone contact surface seepage failure
CN102662044B (en) Device and method for bituminous concrete hydraulic fracture testing
CN203821294U (en) Model test device for simulating reservoir earth dam seepage damage developing process
CN111239370A (en) Experimental method for simulating karst collapse caused by underground water
CN105628892B (en) For studying the model equipment that dusty gas is migrated when contaminated site pile foundation is set
CN204405502U (en) A kind of native stone joint portion contact scour test unit
CN108426779A (en) The structural cracks experiment simulator and method of underground engineering under high hydraulic condition
CN107941671B (en) Water-rich region fractured rock mass tunnel lining water pressure distribution test simulation method
CN104535424A (en) Earth and rockfill dam core wall hydraulic fracturing and self-healing test device and method
CN107389906A (en) For testing the experimental provision system of distress in concrete self-healing ability
CN210427566U (en) Three-dimensional visual infiltration slip casting model test device
CN209708465U (en) Soil body penetration crash simulation device
CN207502350U (en) A kind of crack soil two dimension infiltration flat plate model experimental rig
CN216791954U (en) Migration and diffusion test device for double-medium soil body by MICP reaction solution
CN207114545U (en) For testing the experimental provision system of distress in concrete self-healing ability

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20210312