CN104110040A - 新建顶管井与老管井连接施工方法 - Google Patents

新建顶管井与老管井连接施工方法 Download PDF

Info

Publication number
CN104110040A
CN104110040A CN201310131151.6A CN201310131151A CN104110040A CN 104110040 A CN104110040 A CN 104110040A CN 201310131151 A CN201310131151 A CN 201310131151A CN 104110040 A CN104110040 A CN 104110040A
Authority
CN
China
Prior art keywords
well
pipe
old
steel pipe
newly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310131151.6A
Other languages
English (en)
Other versions
CN104110040B (zh
Inventor
郝鑫
赵建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310131151.6A priority Critical patent/CN104110040B/zh
Publication of CN104110040A publication Critical patent/CN104110040A/zh
Application granted granted Critical
Publication of CN104110040B publication Critical patent/CN104110040B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及地下管道施工领域,一种新建顶管井与老管井连接施工方法;它包括连接钢管,其特征是:还包括下述步骤:新建顶管井结构施工,并按设计要求预留连接钢管安装口;在老管井、新管井与连接管道连接的接口区域两侧、管井与连接钢管的接口四周加固、待新顶管及顶管井结构全部施工完成后,根据新建顶管井预留洞尺寸凿除围护结构至老井外壁70%,连接钢管按设计要求与新老管井连接;连接钢管外层混凝土浇筑作业;连进入老井内,在连接洞口标记处进行水下切割井壁作业,直至将连接钢管与新、老井完全联通。本发明采用上述设计,施工进度快、对周围地层扰动少、节省投资、节约劳动力。

Description

新建顶管井与老管井连接施工方法
技术领域
本发明涉及地下管道施工领域,尤其涉及现浇钢筋混凝土沉井结构的对接领域。
背景技术
    一般新建顶管井与老井连接施工时,采用开槽埋管施工,开槽埋管需要先打围护桩,然后进行土方开挖。此工艺开挖土量大,工期较长、人力物力消耗多、对周围的管线及构筑物有较大的影响。
发明内容
本发明的目的在于,提供一种施工进度快、对周围地层扰动少、减少地面开挖面积的新建顶管井与老管井连接施工方法。
为了达到上述目的,本发明是这样实现的:
一种新建顶管井与老管井连接施工方法;它包括连接钢管,还包括下述步骤:
步骤1、新建顶管井结构施工,并按设计要求预留连接钢管安装口;
步骤2、在老管井、新管井与连接管道连接的接口区域两侧用高压旋喷桩和压密注浆加固;管井与连接钢管的接口四周采用普通硅酸盐水泥和水玻璃混合浆液通过注浆管对土体进行分层注浆加固;
步骤3、待新顶管及顶管井结构全部施工完成后,根据新建顶管井预留洞尺寸凿除围护结构至老井外壁70%,其中,洞口围护结构采用风镐凿除,沉井井壁采用钻孔机打排孔方式凿除,钻孔机钻孔直径为Φ150,钻孔取芯深度为400~700mm。首先沿直径洞口圆边线进行打孔取芯,再对洞口直径十字交叉线进行打孔取芯,将取孔分成四个区;最后各区分别进行打孔取芯;
步骤4、采用履带式吊车配合手拉葫芦将连接钢管按设计要求与新老管井连接;
步骤5、连接钢管管壁与新沉井井壁钢筋进行焊接,焊接点间距不大于25cm;
步骤6、连接钢管外层依据管道设计内径尺寸以及管节配筋进行钢筋绑扎和混凝土浇筑作业;
步骤7、连接钢管管壁外侧浇筑完混凝土后的空隙采用压密注浆进行填充;连接钢管的洞口用砖块及添加了快速及的防水砂浆封堵;
步骤8、待连接钢管外层混凝土壁强度达到100%后,选择老井内水位最低时刻,从老井内将于连接钢管的连接洞口位置进行标记;
步骤9、向新建管井内注水,水位与老井内水位一致;
步骤10、进入老井内,在连接洞口标记处进行水下切割井壁作业,直至将连接钢管与新、老井完全联通。
本发明采用上述设计,施工进度快、对周围地层扰动少、减少地面施工中建筑物以及各种管线的搬迁、地面交通影响小、占地面积小、工期短、节省投资、节约劳动力。
具体实施方式
以下通过具体实施例进一步说明本发明。
一种新建顶管井与老管井连接施工方法;它包括连接钢管,还包括下述步骤:
步骤1、新建顶管井结构施工,并按设计要求预留连接钢管安装口;
步骤2、在老管井、新管井与连接管道连接的接口区域两侧用高压旋喷桩和压密注浆加固;管井与连接钢管的接口四周采用普通硅酸盐水泥和水玻璃混合浆液通过注浆管对土体进行分层注浆加固;
步骤3、待新顶管及顶管井结构全部施工完成后,根据新建顶管井预留洞尺寸凿除围护结构至老井外壁70%,其中,洞口围护结构采用风镐凿除,沉井井壁采用钻孔机打排孔方式凿除,钻孔机钻孔直径为Φ150,钻孔取芯深度为400~700mm。首先沿直径洞口圆边线进行打孔取芯,再对洞口直径十字交叉线进行打孔取芯,将取孔分成四个区;最后各区分别进行打孔取芯;
步骤4、采用履带式吊车配合手拉葫芦将连接钢管按设计要求与新老管井连接;
步骤5、连接钢管管壁与新沉井井壁钢筋进行焊接,焊接点间距不大于25cm;
步骤6、连接钢管外层依据管道设计内径尺寸以及管节配筋进行钢筋绑扎和混凝土浇筑作业;
步骤7、连接钢管管壁外侧浇筑完混凝土后的空隙采用压密注浆进行填充;连接钢管的洞口用砖块及添加了快速及的防水砂浆封堵;
步骤8、待连接钢管外层混凝土壁强度达到100%后,选择老井内水位最低时刻,从老井内将于连接钢管的连接洞口位置进行标记;
步骤9、向新建管井内注水,水位与老井内水位一致;
步骤10、进入老井内,在连接洞口标记处进行水下切割井壁作业,直至将连接钢管与新、老井完全联通。
本发明采用上述设计,施工进度快、对周围地层扰动少、减少地面施工中建筑物以及各种管线的搬迁、地面交通影响小、占地面积小、工期短、节省投资、节约劳动力。

Claims (1)

1.一种新建顶管井与老管井连接施工方法;它包括连接钢管,其特征是:还包括下述步骤:
步骤1、新建顶管井结构施工,并按设计要求预留连接钢管安装口;
步骤2、在老管井、新管井与连接管道连接的接口区域两侧用高压旋喷桩和压密注浆加固;管井与连接钢管的接口四周采用普通硅酸盐水泥和水玻璃混合浆液通过注浆管对土体进行分层注浆加固;
步骤3、待新顶管及顶管井结构全部施工完成后,根据新建顶管井预留洞尺寸凿除围护结构至老井外壁70%,其中,洞口围护结构采用风镐凿除,沉井井壁采用钻孔机打排孔方式凿除,钻孔机钻孔直径为Φ150,钻孔取芯深度为400~700mm;首先沿直径洞口圆边线进行打孔取芯,再对洞口直径十字交叉线进行打孔取芯,将取孔分成四个区;最后各区分别进行打孔取芯;
步骤4、采用履带式吊车配合手拉葫芦将连接钢管按设计要求与新老管井连接;
步骤5、连接钢管管壁与新沉井井壁钢筋进行焊接,焊接点间距不大于25cm;
步骤6、连接钢管外层依据管道设计内径尺寸以及管节配筋进行钢筋绑扎和混凝土浇筑作业;
步骤7、连接钢管管壁外侧浇筑完混凝土后的空隙采用压密注浆进行填充;连接钢管的洞口用砖块及添加了快速及的防水砂浆封堵;
步骤8、待连接钢管外层混凝土壁强度达到100%后,选择老井内水位最低时刻,从老井内将于连接钢管的连接洞口位置进行标记;
步骤9、向新建管井内注水,水位与老井内水位一致;
步骤10、进入老井内,在连接洞口标记处进行水下切割井壁作业,直至将连接钢管与新、老井完全联通。
CN201310131151.6A 2013-04-16 2013-04-16 新建顶管井与老管井连接施工方法 Active CN104110040B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310131151.6A CN104110040B (zh) 2013-04-16 2013-04-16 新建顶管井与老管井连接施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310131151.6A CN104110040B (zh) 2013-04-16 2013-04-16 新建顶管井与老管井连接施工方法

Publications (2)

Publication Number Publication Date
CN104110040A true CN104110040A (zh) 2014-10-22
CN104110040B CN104110040B (zh) 2017-03-29

Family

ID=51707018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310131151.6A Active CN104110040B (zh) 2013-04-16 2013-04-16 新建顶管井与老管井连接施工方法

Country Status (1)

Country Link
CN (1) CN104110040B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0489992A (ja) * 1990-07-31 1992-03-24 Hazama Gumi Ltd 既設管渠の拡大工法及びその工法に使用するトンネル掘削装置
JPH08170758A (ja) * 1994-12-16 1996-07-02 Osaka Gas Co Ltd 管推進架台
CN1391053A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 土压平衡矩形顶管施工工艺
CN1916362A (zh) * 2006-09-04 2007-02-21 上海隧道工程股份有限公司 地铁盾构区间隧道联络通道的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0489992A (ja) * 1990-07-31 1992-03-24 Hazama Gumi Ltd 既設管渠の拡大工法及びその工法に使用するトンネル掘削装置
JPH08170758A (ja) * 1994-12-16 1996-07-02 Osaka Gas Co Ltd 管推進架台
CN1391053A (zh) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 土压平衡矩形顶管施工工艺
CN1916362A (zh) * 2006-09-04 2007-02-21 上海隧道工程股份有限公司 地铁盾构区间隧道联络通道的施工方法

Also Published As

Publication number Publication date
CN104110040B (zh) 2017-03-29

Similar Documents

Publication Publication Date Title
KR101051965B1 (ko) 지하연속벽 시공용 패널 조인트 및 이를 이용한 지하연속벽 시공방법
CN106120801B (zh) 富水砂层中管线横穿基坑处的施工方法
CN103821219A (zh) 顶管施工改型检查井施工方法
CN204080789U (zh) 地下连续墙墙幅缺口的修补结构
CN105525619B (zh) 一种富水地层暗挖隧道咬合管幕
CN103321244A (zh) 砂土地基既有建筑增设地下室的施工方法
CN104675405B (zh) 一种矩形顶管机进洞的辅助结构及施工方法
CN104404983A (zh) 一种用于顶管施工的骑马井装置及其施工方法
CN103437348A (zh) 一种桩周水泥土现浇劲芯桩的施工装置及施工方法
CN111810198A (zh) 隧道地表定向大口径深孔注浆装置及注浆方法
CN107740427A (zh) 一种内插混凝土预制方桩基坑围护结构的施工方法
CN101538832B (zh) 大型箱体二维顶进控制施工方法
CN106050239B (zh) 强富水上软下硬地层的深大竖井围护结构施工方法
CN203462463U (zh) 一种桩周水泥土现浇劲芯桩的施工装置
CN105065040B (zh) 一种顶板预制的地下空间暗挖构筑方法
CN104453915B (zh) 大断面竖井预注浆加固快速开挖方法
CN104153347B (zh) 地下连续墙墙幅缺口的修补结构及其施工方法
CN101769157B (zh) 隧道开挖中掌子面反压处置的施工方法
CN210658340U (zh) 一种预制护壁
CN104863183A (zh) 大断面隧道近接建筑物施工隔离减震桩结构及施工方法
CN107326932A (zh) 一种地下车库的准半逆作施工方法
CN208472716U (zh) 裂隙地质防漏浆钻孔灌注桩结构
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN205296194U (zh) 一种富水地层暗挖隧道咬合管幕
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right