CN104100282A - 打注锚索维护巷道三角区的方法 - Google Patents

打注锚索维护巷道三角区的方法 Download PDF

Info

Publication number
CN104100282A
CN104100282A CN201410268995.XA CN201410268995A CN104100282A CN 104100282 A CN104100282 A CN 104100282A CN 201410268995 A CN201410268995 A CN 201410268995A CN 104100282 A CN104100282 A CN 104100282A
Authority
CN
China
Prior art keywords
anchor cable
tunnel
anchor
eye
anchor cables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410268995.XA
Other languages
English (en)
Inventor
宋小平
张向阳
王静
包长明
李建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201410268995.XA priority Critical patent/CN104100282A/zh
Publication of CN104100282A publication Critical patent/CN104100282A/zh
Pending legal-status Critical Current

Links

Abstract

本发明属于巷道三角区维护技术领域,具体涉及一种打注锚索维护巷道三角区的方法。本发明为解决锚杆失效、断单体柱造成的维护效果不明显及不易操作的技术问题,提供了一种打注锚索维护巷道三角区的方法,其步骤为:首先根据设计要求确定帮锚索眼的位置,然后在需要施工帮锚索眼的位置依次施工帮锚索眼,锚索眼必须与对帮贯透,施工完成后将锚索穿入施工完成的锚索眼中,并伸入至对帮,先将一侧帮的锚索上好托板、锁具,然后再去对帮将伸出去的锚索上托板、锁具并涨紧,将涨紧后锚索露出锁具的部分用截割器截掉。本发明采用的方法不仅操作省力,而且能更好的维护巷道三角区。

Description

打注锚索维护巷道三角区的方法
 
技术领域
本发明属于巷道三角区维护技术领域,具体涉及一种打注锚索维护巷道三角区的方法。
背景技术
煤矿在巷道掘进过程中,常出现两三条巷道交叉的情况,交叉处压力很大,不好维护,目前,一般采用打注锚杆及单体柱护帮的方法来维护,但是往往出现锚杆失效、断单体柱的情况,维护效果不明显,且此方法不易操作。
发明内容
本发明为解决锚杆失效、断单体柱造成的维护效果不明显及不易操作的技术问题,提供了一种打注锚索维护巷道三角区的方法。
本发明采用的技术方案如下:
一种打注锚索维护巷道三角区的方法,其步骤为:
A. 当巷道I与巷道II在掘进过程中出现了交叉的三角区时,在巷道三角区根据设计要求确定施工帮锚索眼的位置;
B. 在需施工帮锚索眼的位置施工帮锚索眼,锚索眼必须贯透到对帮;
C. 帮锚索眼施工完成后,将准备好的锚索穿入施工完成后的帮锚索眼中,并将锚索穿透至对帮;
D. 锚索穿好后,先在一侧帮的锚索上安装托板I和锁具I,然后再去对帮伸出去的锚索上安装托板II和锁具II,并将锚索涨紧;
E. 将涨紧后锚索露出锁具I和锁具II的部分截掉;
F.重复上述B到E的步骤,依次完成所有帮锚索眼的施工。
所述的帮锚索眼施工两排,每排的帮锚索眼数量不少于3个。
所述帮锚索眼的施工顺序为从离巷道交叉处最远的帮锚索眼开始依次施工至离巷道交叉处最近的帮锚索眼。
本发明采用以上技术方案不仅操作省力,而且能很好的维护巷道三角区,有效解决了锚杆失效、断单体柱造成的维护效果不明显及不易操作的技术问题。
附图说明
图1为本发明的结构示意图;
图2为本发明的结构侧视图;
图中:1-巷道I,2-巷道II,3-锚索眼,4-锚索,5-托板I,6-锁具I,7-巷道交叉处,8-托板II,9-锁具II。
具体实施方式
如图1所示,巷道I1与巷道II2在掘进过程中出现了交叉的三角区,该三角区压力很大,为了更好的维护该三角区,本发明提供了一种打注锚索维护巷道三角区的方法,其具体步骤为:A、在巷道I1和巷道II2交叉的三角区根据设计要求确定施工帮锚索眼3的位置;如图1,图2所示,在该三角区的如图所示的位置准备施工两排帮锚索眼3,每排施工五组帮锚索眼3;B、确定好施工帮锚索眼3的位置后,用液压锚杆钻车或MQT—85J2、MQT-130/2.8煤矿用气动锚杆钻机在巷道I1开始施工离巷道交叉处7最远的帮锚索眼3,锚索眼3必须贯透到对帮,如图1所示;C、帮锚索眼3施工完成后将事先准备好的锚索4从巷道I1穿入施工完成的帮锚索眼3中,并将锚索4穿透至对帮的巷道II2中;D、锚索4穿好后,先在巷道I1帮上的锚索4上安装托板I5和锁具I6,然后到巷道II2,在从巷道I1穿出来的锚索4上安装托板II8和锁具II9,并将锚索4涨紧;E、将涨紧后锚索4露出锁具I6和锁具II9的部分用截割器截掉;F、重复上述B到E的步骤,依次完成所有帮锚索眼的施工,施工的顺序为先施工上排的离巷道交叉处7最远的帮锚索眼3,再施工下排的离巷道交叉处7最远的帮锚索眼3,从离巷道交叉处7最远的帮锚索眼3开始依次施工至离巷道交叉处7最近的帮锚索眼3。
本发明采用的方法不仅操作省力,而且能更好的维护巷道三角区。

Claims (3)

1.一种打注锚索维护巷道三角区的方法,其特征在于步骤为:
A. 当巷道I(1)与巷道II(2)在掘进过程中出现了交叉的三角区时,在巷道三角区根据设计要求确定施工帮锚索眼(3)的位置;
B. 在需施工帮锚索眼(3)的位置施工帮锚索眼(3),锚索眼(3)必须贯透到对帮;
C. 锚索眼(3)施工完成后,将准备好的锚索(4)穿入施工完成后的锚索眼(3)中,并将锚索(4)穿透至对帮;
D. 锚索(4)穿好后,先在一侧帮的锚索(4)上安装托板I(5)和锁具I(6),然后再去对帮伸出去的锚索(4)上安装托板II(8)和锁具II(9),并将锚索(4)涨紧;
E. 将涨紧后锚索(4)露出锁具I(6)和锁具II(9)的部分截掉;
F.重复上述B到E的步骤,依次完成所有帮锚索眼(3)的施工。
2.根据权利要求1所述的一种打注锚索维护巷道三角区的方法,其特征在于:所述的帮锚索眼(3)施工两排,每排的帮锚索眼(3)数量不少于3个。
3.根据权利要求1或2所述的一种打注锚索维护巷道三角区的方法,其特征在于:所述帮锚索眼(3)的施工顺序为从离巷道交叉处(7)最远的帮锚索眼(3)开始依次施工至离巷道交叉处(7)最近的帮锚索眼(3)。
CN201410268995.XA 2014-06-17 2014-06-17 打注锚索维护巷道三角区的方法 Pending CN104100282A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410268995.XA CN104100282A (zh) 2014-06-17 2014-06-17 打注锚索维护巷道三角区的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410268995.XA CN104100282A (zh) 2014-06-17 2014-06-17 打注锚索维护巷道三角区的方法

Publications (1)

Publication Number Publication Date
CN104100282A true CN104100282A (zh) 2014-10-15

Family

ID=51668786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410268995.XA Pending CN104100282A (zh) 2014-06-17 2014-06-17 打注锚索维护巷道三角区的方法

Country Status (1)

Country Link
CN (1) CN104100282A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005031117A1 (en) * 2003-09-30 2005-04-07 Roll Form Group, A Division Of Samuel Manu-Tech Inc. Friction stabilizer with tabs
CN201236718Y (zh) * 2008-08-08 2009-05-13 中国矿业大学 一种内注浆锚索
CN102425422A (zh) * 2011-11-17 2012-04-25 大同煤矿集团有限责任公司 主巷不间断运输条件下全煤特大断面交岔硐室施工方法
CN202360116U (zh) * 2011-12-09 2012-08-01 鹤壁煤电股份有限公司第八煤矿 一种u型棚巷道交叉点支护装置
CN102704967A (zh) * 2012-05-21 2012-10-03 严红 一种防止交叉大断面硐室顶板垮冒结构及方法
CN103615258A (zh) * 2013-12-06 2014-03-05 中国矿业大学(北京) 巷道交叉点的中间岩柱的支护结构和支护方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005031117A1 (en) * 2003-09-30 2005-04-07 Roll Form Group, A Division Of Samuel Manu-Tech Inc. Friction stabilizer with tabs
CN201236718Y (zh) * 2008-08-08 2009-05-13 中国矿业大学 一种内注浆锚索
CN102425422A (zh) * 2011-11-17 2012-04-25 大同煤矿集团有限责任公司 主巷不间断运输条件下全煤特大断面交岔硐室施工方法
CN202360116U (zh) * 2011-12-09 2012-08-01 鹤壁煤电股份有限公司第八煤矿 一种u型棚巷道交叉点支护装置
CN102704967A (zh) * 2012-05-21 2012-10-03 严红 一种防止交叉大断面硐室顶板垮冒结构及方法
CN103615258A (zh) * 2013-12-06 2014-03-05 中国矿业大学(北京) 巷道交叉点的中间岩柱的支护结构和支护方法

Similar Documents

Publication Publication Date Title
AU2015377025B2 (en) Thick coal seam large seam height gob-side retained passageway method
CN106545351B (zh) 一种隧道工作面塌方应急处理方法
CN103233748A (zh) 超大跨度切眼刷扩成巷和锚网索柱组合支护设计方法
CN102121390B (zh) 伸缩式掘进及时支护装置
CN109763861B (zh) 一种切眼内断层破碎带冒顶处理方法
CN102704965B (zh) 一种防止剧烈采动影响巷道顶板垮冒方法
CN103758529A (zh) 一种煤矿沿空留巷巷旁支护方法
CN108104821B (zh) 大断面切眼施工及其支护方法
CN109356592B (zh) 小净距叠层隧道的施工方法
CN103061771A (zh) 复采矿井综采面切眼掘进及其支护方法
CN110529144A (zh) 一种小断面回采巷道混合式超前支护方法
CN105863639A (zh) 松散煤层的采煤方法
CN201953390U (zh) 液压迈步式超前支护装备
CN104100282A (zh) 打注锚索维护巷道三角区的方法
CN104389605A (zh) 一种采煤工作面密集钢丝绳掩护回撤方法
CN102182469B (zh) 一种大跨隧道中洞二次衬砌防开裂的施工方法
CN201982128U (zh) 伸缩式掘进及时支护装置
CN106150535A (zh) 一种条带式旺格维利采煤技术支巷支护方法
CN104695991A (zh) 煤矿复合煤层锚注工艺
CN206111215U (zh) 一种用于大断面软弱围岩隧道施工支护结构
CN104453966B (zh) 大采高末采综掘机做撤架通道过陷落柱架无腿棚施工方法
CN105587324B (zh) 扩挖隧道洞口段钢格栅支护断面的施工方法
CN105133664B (zh) 一种组合框架式隔离保护体系及其施工方法
CN103967009B (zh) 一种用于锚索接长张拉的方法
CN202017505U (zh) 一种管棚支护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141015