CN104097042A - Bridge assembly jig for aluminum electrolysis multifunctional unit - Google Patents

Bridge assembly jig for aluminum electrolysis multifunctional unit Download PDF

Info

Publication number
CN104097042A
CN104097042A CN201310125876.4A CN201310125876A CN104097042A CN 104097042 A CN104097042 A CN 104097042A CN 201310125876 A CN201310125876 A CN 201310125876A CN 104097042 A CN104097042 A CN 104097042A
Authority
CN
China
Prior art keywords
span structure
crane span
plate
hole
assembly fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310125876.4A
Other languages
Chinese (zh)
Other versions
CN104097042B (en
Inventor
刘红枫
张世军
李家森
满涵
黄浩
杨立业
隋显常
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NFC Shenyang Metallurgy Machinery Co Ltd
Original Assignee
NFC Shenyang Metallurgy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NFC Shenyang Metallurgy Machinery Co Ltd filed Critical NFC Shenyang Metallurgy Machinery Co Ltd
Priority to CN201310125876.4A priority Critical patent/CN104097042B/en
Publication of CN104097042A publication Critical patent/CN104097042A/en
Application granted granted Critical
Publication of CN104097042B publication Critical patent/CN104097042B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes

Abstract

The invention relates to a bridge assembly jig for an aluminum electrolysis multifunctional unit, and belongs to the technical field of assembly jigs. The bridge assembly jig for the aluminum electrolysis multifunctional unit has the advantages of convenience in adjusting the assembly straightness of an end beam, high accuracy and high assembly efficiency. The bridge assembly jig comprises a bottom support device, and is structurally characterized in that the bottom support device is provided with a combined beam; the combined beam is provided with an end beam wheel positioning guide rail.

Description

A kind of pot tending machine crane span structure assembly fixture
Technical field
the invention belongs to assembly fixture technical field, relate in particular to a kind of pot tending machine crane span structure assembly fixture.
Background technology
pot tending machine is one of key equipment of the large-scale pre-baked burning anode electrolysis of aluminium industry processed factory both at home and abroad, pot tending machine is also by original two single beam bicycle structures, be improved to large span three beam two bassinet structures, span can reach 33 meters, met domestic and international large-scale aluminium electrolysis factory high-temperature molten salt, working condition requirement and the technique of large electric current, high-intensity magnetic field, many dust and HF flue gas need.
three girder construction multifunctional electrolytic machine groups, mainly by cart, tool cart, go out aluminium dolly, hydraulic system, the part such as pneumatic system and electric-control system composition, cart is aluminum electrolysis multifunctional overhead crane tool cart, go out the crane span structure part of aluminium trolley travelling, cart is mainly by girder, end carriage, the parts such as wheel form, its design feature is that cart is provided with three girders, girder is a kind of portable metal structure, it is the main load bearing component structure of overhead traveling crane, the girder quality of large span overhead traveling crane accounts for 50%~60% of complete machine deadweight, so reasonably determine structural parameters and the assembling form of girder, it is the deadweight that alleviates girder, prevent that main beam deformation from causing tool cart, go out the key point of the inclined to one side rail of aluminium dolly, between two girders, be provided with tool cart, go out aluminium dolly, tool cart, go out aluminium dolly respectively with four wheel supportings on the track of girder, the core component of multifunctional electrolytic machine group as: crust breaker, cutting agency, more anode changing device, hydraulic means and control cabinl pulpit are all arranged on tool cart, and tool cart moves and realize the actions such as crust breaking, blanking, anode change on cart.
as can be seen here, the crudy of overhead traveling crane crane span structure and assembly quality directly affect tool cart, go out the work operation conditions of aluminium dolly, particularly for the overhead traveling crane of large span, the flatness that perpendicularity, the linearity between two end carriages, high-altitude frame structure between the depth of parallelism, girder and end carriage between linearity, three girders of every girder how guaranteeing overhead traveling crane in more than 30 meters of length are four jiaos and the linearity of wheel are the key issues of the current fast pace high efficiency overhead traveling crane assembling of restriction.
although adopted a lot of measures in overhead traveling crane crane span structure assembling process in the past, for ensureing and realize the high-quality and high-efficiency of overhead traveling crane assembling, but owing to lacking special fixture, overhead traveling crane crane span structure is assembled to omnibearing control guarantee, the form and position tolerance of crane span structure assembling is difficult to ensure, its assembly quality and efficiency of assembling never significantly take on a new look, and there is potential safety hazard, as: 1, the early stage crane span structure assembling base for supporting adopting is two conjoined cast steel part rectangle bases, because understructure heaviness is difficult to carrying, flexibility is very poor, simultaneously because the casting time is long, and in cast structure, there is casting trachoma, the drawbacks such as pore, after above the very heavy crane span structure of deadweight is put, very easily crack at the inhomogeneous place of casting, cause base to support cracking, potential safety hazard is serious, simultaneously, because linearity between two end carriages is difficult to ensure card, cause the perpendicularity of the depth of parallelism between girder, girder and end carriage seriously overproof, when assembling the adjustment time long, inefficiency.
2, afterwards steel-casting base is improved to several groups of special contour pads that are designed to Welding Structure form, after locate with fixed block one end, contour pad surface, above end carriage is placed in; The contour pad of this version is due to highly consistent, the frame structure of end carriage and girder has been equipped with to obvious improvement, simultaneously because there is locating piece restriction contour pad one end, the linearity adjustment time of two end carriages obviously shortens, but the flatness of this structure to several groups of contour pads and the linearity of putting require high, after end carriage assembling, the linearity of nearly 30 meters of length requires to ensure at ± 0.03mm, adjust still quite difficult, assembly quality and efficiency of assembling are still very undesirable, to such an extent as to very large on the girder assembling impact in later stage, adjustment assembly efficiency is very low repeatedly.
Summary of the invention
the present invention is exactly for the problems referred to above, and the pot tending machine crane span structure assembly fixture that a kind of end carriage assembling linearity is easy to adjust, precision is high and efficiency of assembling is high is provided.
for achieving the above object, the present invention adopts following technical scheme, the present invention includes base support means, in its structural feature base support means, is provided with combination beam, is provided with end carriage wheel alignment guide rail on combination beam.
as a kind of preferred version, on combination beam of the present invention, be provided with end carriage positioning and locking device.
as another kind of preferred version, on end carriage wheel alignment guide rail of the present invention, be provided with wheel alignment locking device.
as another kind of preferred version, base support means of the present invention comprises rectangular case, and housing top and bottom are provided with upper cover plate and lower cover, is provided with gripper shoe anyhow in housing, and housing width is installed with steel pipe.
as another kind of preferred version, upper cover plate length direction of the present invention two ends are provided with fixed block, are installed with combination beam location jackscrew on fixed block; Upper cover plate width both sides are provided with waist-shaped hole along its length.
as another kind of preferred version, combination beam of the present invention comprises I-beam, between I-beam upper and lower plates, be provided with gripper shoe, I-beam two ends are provided with the combination beam connecting plate with the first through hole, on combination beam connecting plate, be provided with positioning key, I-beam lower plate both sides are provided with the second through hole corresponding to described waist-shaped hole.
as another kind of preferred version, end carriage positioning and locking device of the present invention comprises both sides support plate, upper supporting piece and lower support element, upper supporting piece and lower support element are all arranged between support plate middle part, both sides and lower end by securing member, support plate bottom is provided with directive wheel corresponding to described I-beam lower plate upper surface, and support plate top is provided with horizontal holding device.
as another kind of preferred version, horizontal holding device of the present invention comprises and holds out against connecting plate, holds out against connecting plate two ends and is provided with connecting hole, hold out against connecting plate middle part and be provided with screwed hole, in screwed hole, be installed with screw rod, screw front end is withstanding tight block, and spiro rod rear end is for screwing force side; Support plate top is provided with bar hole corresponding to connecting hole and screw rod, and support plate arranged outside has vertical strengthening ribs plate.
secondly, wheel alignment locking device of the present invention comprises that longitudinal section is the base of H shape, and the left and right sides, base bottom is provided with tracks positioned piece, and before and after base top, both sides are provided with stop parallels, and the left and right sides, base top is provided with wheel holding device.
in addition, wheel holding device of the present invention comprises both sides wheel alignment jackscrew, on the jackscrew of single wheel location, is provided with the adjusting pad with unthreaded hole and the adjusting pad with screwed hole.
beneficial effect of the present invention.
in base support means of the present invention, be provided with combination beam, on combination beam, be provided with end carriage wheel alignment guide rail; End carriage wheel alignment guide rail is the position-limiting action in length to end carriage wheel, end carriage is assemblied in 12m length, realize ± the linearity requirement of 0.03mm.In addition, the present invention has changed the equipment adjustment mode of original backwardness, has shortened crane span structure installation time, improves assembly quality and security, increases work efficiency and reaches 50% simultaneously.
Brief description of the drawings
below in conjunction with the drawings and specific embodiments, the present invention will be further described.Protection domain of the present invention is not only confined to the statement of following content.
fig. 1 is structural representation of the present invention.
fig. 2 is base support means structural representation of the present invention.
fig. 3 is the support plate structural representation of end carriage positioning and locking device of the present invention.
fig. 4 is support plate, upper supporting piece, lower support element, the directive wheel position relationship schematic diagram of end carriage positioning and locking device of the present invention.
fig. 5 is the horizontal holding device structural representation of end carriage positioning and locking device of the present invention.
fig. 6 is wheel alignment locking device structure schematic diagram of the present invention.
fig. 7 is that the present invention uses state diagram.
in figure, 1 is gripper shoe, 2 is end carriage wheel alignment guide rail, 3 is base support means, 4 is combination beam connecting plate, 5 is wheel alignment locking device, 6 is end carriage positioning and locking device, 7 is combination beam, 8 is the second through hole, 9 is I-beam, 10 is waist-shaped hole, 11 is steel pipe, 12 is lower cover, 13 is upper cover plate, 14 is housing, 15 is fixed block, 16 is combination beam location jackscrew, 17 is bar hole, 18 for strengthening gusset, 19 is support plate, 20 is upper supporting piece, 21 is directive wheel, 22 is lower support element, 23 is withstanding tight block, 24 is screw rod, 25 is connecting hole, 26 for holding out against connecting plate, 27 for screwing force side, 28 is stop parallels, 29 is adjusting pad, 30 is base, 31 is tracks positioned piece, 32 is end carriage, 33 is wheel.
Detailed description of the invention
as shown in the figure, the present invention includes base support means 3, in base support means 3, be provided with combination beam 7, on combination beam 7, be provided with end carriage wheel alignment guide rail 2.
on described combination beam 7, be provided with end carriage positioning and locking device 6.
on described end carriage wheel alignment guide rail 2, be provided with wheel alignment locking device 5.
described base support means 3 comprises rectangular case 14, and housing 14 top and bottom are provided with upper cover plate 13 and lower cover 12, is provided with gripper shoe 1 anyhow in housing 14, and housing 14 widths are installed with steel pipe 11.This dead load is light, and bearing load is large, and node stress is uniformly dispersed, and not yielding, manufacturing process is simple.3 four of locker format frame structure base support means after having welded are one group, determine and put interval according to end carriage 32 length, be positioned in grade level, adjust that four base support means 3 make it linearity, the depth of parallelism meets tolerance, by pressing plate, base support means 3 use high-strength bolts are fixed.
described upper cover plate 13 length direction two ends are provided with fixed block 15, are installed with combination beam location jackscrew 16 on fixed block 15; Upper cover plate 13 width both sides are provided with waist-shaped hole 10 along its length.By regulating combination beam location jackscrew 16, by accurate combination beam 7 positioning and locking, avoid combination beam 7 planar movements; Again by waist-shaped hole 10 and high-strength bolt by combination beam 7 and upper cover plate 13 firmly closing, form Unified Global.
described combination beam 7 comprises I-beam 9, between I-beam 9 upper and lower plates, be provided with gripper shoe 1, I-beam 9 two ends are provided with the combination beam connecting plate 4 with the first through hole, on combination beam connecting plate 4, are provided with positioning key, and I-beam 9 lower plate both sides are provided with the second through hole 8 corresponding to described waist-shaped hole 10.This structure is applicable to the occasion that load is large, appearance and size is relatively large, and manufacturing process is simple; Simultaneously because gripper shoe 1 is disperseed the weight of carrying, make whole combination beam 7 stress concentrate less, fatigue resistance is higher.Positioning key can make two combination beam 7 accurate positionings, by combination beam connecting plate 4 closing bolt, by two combination beams 7 synthetic Unified Global.
described end carriage positioning and locking device 6 comprises both sides support plate 19, upper supporting piece 20 and lower support element 22, upper supporting piece 20 and lower support element 22 are all arranged between both sides support plate 19 middle parts and lower end by securing member, support plate 19 bottoms are provided with directive wheel 21 corresponding to described I-beam 9 lower plate upper surfaces, and support plate 19 tops are provided with horizontal holding device.By horizontal holding device positioning and locking overhead traveling crane end carriage 32.By securing member, lower support element 22, both sides support plate 19, the directive wheel 21 at lower support element 22 two ends, end carriage positioning and locking device 6 is installed on combination beam 7, directive wheel 21 is pressed on I-beam 9 lower plate upper surfaces.By the walking function of directive wheel 21, realize the horizontal walking positioning and locking of end carriage positioning and locking device 6 in different end carriage 32 length.Described upper supporting piece 20, for ensureing the clamping force of horizontal holding device, is offset and is held out against the outside tension force of both sides support plate 19 in process.
described horizontal holding device comprises and holds out against connecting plate 26, holds out against connecting plate 26 two ends and is provided with connecting hole 25, holds out against connecting plate 26 middle parts and is provided with screwed hole, is installed with screw rod 24 in screwed hole, and screw rod 24 front ends are withstanding tight block 23, and screw rod 24 rear ends are for screwing force side 27; Support plate 19 tops are provided with bar hole 17 corresponding to connecting hole 25 and screw rod 24, and support plate 19 arranged outside have vertical strengthening ribs plate 18.
described wheel alignment locking device 5 comprises that longitudinal section is the base 30 of H shape, and base 30 left and right sides, bottom are provided with tracks positioned piece 31, and before and after base 30 tops, both sides are provided with stop parallels 28, and base 30 left and right sides, top are provided with wheel 33 holding devices.In overhead traveling crane crane span structure assembling process, two end carriage 32 linearity tolerance guarantees are key points of guaranteeing the depth of parallelism, girder and end carriage 32 perpendicularity between girder when assembling three beams.Wherein H shape base 30 is placed on end carriage wheel alignment guide rail 2 by tracks positioned piece 31, and precise positioning is realized the unification of the linearity positioning datum of four wheel alignment locking devices 5 in end carriage wheel alignment guide rail 2 length.End carriage 32 wheels 33 are placed in base 30 tops, by wheel 33 holding device positioning and locking wheels 33, prevent wheel 33 horizontal looseness in assembling process; Stop parallels 28 has solved the rotational problems of wheel 33.
described wheel 33 holding devices comprise that both sides wheel 33 locates jackscrew, and single wheel 33 is located and on jackscrew, is provided with the adjusting pad 29 with unthreaded hole and the adjusting pad 29 with screwed hole.
the whole tool height of the present invention can be limited in 1600mm, reduces high-altitude and assembles the potential safety hazard of bringing, easy to use.The present invention, because structure is assembly, is easy to assembling and dismounting, and flexibility is strong; The overhead traveling crane crane span structure assembling of suitable various dissimilar (electrolysis car, roasting car, carrier-and-stacker, European crane) and specification needs.
be understandable that, above about specific descriptions of the present invention, only for being described, the present invention is not limited to the described technical scheme of the embodiment of the present invention, those of ordinary skill in the art is to be understood that, still can modify or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as meet, all within protection scope of the present invention.

Claims (10)

1. a pot tending machine crane span structure assembly fixture, comprises base support means (3), it is characterized in that being provided with combination beam (7) in base support means (3), is provided with end carriage wheel alignment guide rail (2) on combination beam (7).
2. a kind of pot tending machine crane span structure assembly fixture according to claim 1, is characterized in that being provided with on described combination beam (7) end carriage positioning and locking device (6).
3. a kind of pot tending machine crane span structure assembly fixture according to claim 1, is characterized in that being provided with on described end carriage wheel alignment guide rail (2) wheel alignment locking device (5).
4. a kind of pot tending machine crane span structure assembly fixture according to claim 2, it is characterized in that described base support means (3) comprises rectangular case (14), housing (14) top and bottom are provided with upper cover plate (13) and lower cover (12), in housing (14), be provided with gripper shoe (1) anyhow, housing (14) width is installed with steel pipe (11).
5. a kind of pot tending machine crane span structure assembly fixture according to claim 4, is characterized in that described upper cover plate (13) length direction two ends are provided with fixed block (15), is installed with combination beam location jackscrew (16) on fixed block (15); Upper cover plate (13) width both sides are provided with waist-shaped hole (10) along its length.
6. a kind of pot tending machine crane span structure assembly fixture according to claim 5, it is characterized in that described combination beam (7) comprises I-beam (9), between I-beam (9) upper and lower plates, be provided with gripper shoe (1), I-beam (9) two ends are provided with the combination beam connecting plate (4) with the first through hole, combination beam connecting plate is provided with positioning key on (4), and I-beam (9) lower plate both sides are provided with the second through hole (8) corresponding to described waist-shaped hole (10).
7. a kind of pot tending machine crane span structure assembly fixture according to claim 6, it is characterized in that described end carriage positioning and locking device (6) comprises both sides support plate (19), upper supporting piece (20) and lower support element (22), upper supporting piece (20) and lower support element (22) are all arranged between both sides support plate (19) middle part and lower end by securing member, support plate (19) bottom is provided with directive wheel (21) corresponding to described I-beam (9) lower plate upper surface, and support plate (19) top is provided with horizontal holding device.
8. a kind of pot tending machine crane span structure assembly fixture according to claim 7, it is characterized in that described horizontal holding device comprises holds out against connecting plate (26), hold out against connecting plate (26) two ends and be provided with connecting hole (25), hold out against connecting plate (26) middle part and be provided with screwed hole, in screwed hole, be installed with screw rod (24), screw rod (24) front end is withstanding tight block (23), and screw rod (24) rear end is for screwing force side (27); Support plate (19) top is provided with bar hole (17) corresponding to connecting hole (25) and screw rod (24), and support plate (19) arranged outside has vertical strengthening ribs plate (18).
9. a kind of pot tending machine crane span structure assembly fixture according to claim 3, it is characterized in that described wheel alignment locking device (5) comprises that longitudinal section is the base (30) of H shape, base (30) left and right sides, bottom is provided with tracks positioned piece (31), before and after base (30) top, both sides are provided with stop parallels (28), and base (30) left and right sides, top is provided with wheel (33) holding device.
10. a kind of pot tending machine crane span structure assembly fixture according to claim 9, it is characterized in that described wheel (33) holding device comprises both sides wheel (33) location jackscrew, is provided with the adjusting pad (29) with unthreaded hole and the adjusting pad (29) with screwed hole on the jackscrew of single wheel (33) location.
CN201310125876.4A 2013-04-12 2013-04-12 A kind of pot tending machine crane span structure assembly fixture Expired - Fee Related CN104097042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310125876.4A CN104097042B (en) 2013-04-12 2013-04-12 A kind of pot tending machine crane span structure assembly fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310125876.4A CN104097042B (en) 2013-04-12 2013-04-12 A kind of pot tending machine crane span structure assembly fixture

Publications (2)

Publication Number Publication Date
CN104097042A true CN104097042A (en) 2014-10-15
CN104097042B CN104097042B (en) 2016-08-03

Family

ID=51665792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310125876.4A Expired - Fee Related CN104097042B (en) 2013-04-12 2013-04-12 A kind of pot tending machine crane span structure assembly fixture

Country Status (1)

Country Link
CN (1) CN104097042B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106078580A (en) * 2016-08-16 2016-11-09 山起重型机械股份公司 A kind of crane span structure assembling device
CN108480984A (en) * 2018-06-05 2018-09-04 法兰泰克重工股份有限公司 A kind of assembled device of semi-automatic positioning suitable for European single-beam crane crane span structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201249340Y (en) * 2008-09-24 2009-06-03 唐山轨道客车有限责任公司 Assembly welding tooling of long bar components
CN101628368A (en) * 2009-08-10 2010-01-20 李登平 Clamping apparatus for vertical welding of single main beam group of crane
CN202572219U (en) * 2012-05-04 2012-12-05 辽宁石油机械制造有限公司 Base installing and positioning device
CN202780934U (en) * 2012-07-18 2013-03-13 苏州神峰起重机械有限公司 Assembling clamping fixture for same-side four-wheel hinging end beams
CN202780349U (en) * 2012-09-26 2013-03-13 河南卫华重型机械股份有限公司 End beam grouping forming device
DE102011114463A1 (en) * 2011-09-28 2013-03-28 Manfred Böttcher Crane e.g. bridge crane has two mutually parallel rails whose track is contacted with wheels of trolley
CN203156634U (en) * 2013-03-14 2013-08-28 中国有色(沈阳)冶金机械有限公司 Special tooling fixture of crane span assembly
CN203212228U (en) * 2013-04-12 2013-09-25 中国有色(沈阳)冶金机械有限公司 Jig for assembling bridge frame of multifunctional aluminum electrolysis unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201249340Y (en) * 2008-09-24 2009-06-03 唐山轨道客车有限责任公司 Assembly welding tooling of long bar components
CN101628368A (en) * 2009-08-10 2010-01-20 李登平 Clamping apparatus for vertical welding of single main beam group of crane
DE102011114463A1 (en) * 2011-09-28 2013-03-28 Manfred Böttcher Crane e.g. bridge crane has two mutually parallel rails whose track is contacted with wheels of trolley
CN202572219U (en) * 2012-05-04 2012-12-05 辽宁石油机械制造有限公司 Base installing and positioning device
CN202780934U (en) * 2012-07-18 2013-03-13 苏州神峰起重机械有限公司 Assembling clamping fixture for same-side four-wheel hinging end beams
CN202780349U (en) * 2012-09-26 2013-03-13 河南卫华重型机械股份有限公司 End beam grouping forming device
CN203156634U (en) * 2013-03-14 2013-08-28 中国有色(沈阳)冶金机械有限公司 Special tooling fixture of crane span assembly
CN203212228U (en) * 2013-04-12 2013-09-25 中国有色(沈阳)冶金机械有限公司 Jig for assembling bridge frame of multifunctional aluminum electrolysis unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106078580A (en) * 2016-08-16 2016-11-09 山起重型机械股份公司 A kind of crane span structure assembling device
CN108480984A (en) * 2018-06-05 2018-09-04 法兰泰克重工股份有限公司 A kind of assembled device of semi-automatic positioning suitable for European single-beam crane crane span structure
CN108480984B (en) * 2018-06-05 2024-01-26 法兰泰克重工股份有限公司 Semi-automatic positioning and assembling device suitable for European single-beam crane bridge

Also Published As

Publication number Publication date
CN104097042B (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN203212228U (en) Jig for assembling bridge frame of multifunctional aluminum electrolysis unit
CN102626841B (en) Automatic welding fixture of subway train obverse-reverse side roofs
CN204843382U (en) Crane end beam fastened by welding board hydraulic pressure clamping position frock
CN201493639U (en) Trinity full-weld clamping tool of subway
CN104476242A (en) Auxiliary tool used for positioning electric multiple unit framework on computer numerical control planer type milling machine
CN201769017U (en) Rail-mounted welding falsework
CN201486156U (en) Accurate adjustment device for adjusting gap between large-sized steel members
CN104097042B (en) A kind of pot tending machine crane span structure assembly fixture
CN204711437U (en) LH gourd double-beam elements analysis of trolley frame of bridge crane assembly welding positioner
CN204917675U (en) Electronic dolly end beam structure of bridge crane
CN204867925U (en) Bridge crane end beam processing frock
CN205096783U (en) H -beam location frock
CN112355539A (en) Assembling tool and assembling and welding system for bogie frame
CN209647928U (en) A kind of underground railway track vehicle sleeper beam general welding fixture
CN204530480U (en) Faulting of slab ends adjusting device
CN204530347U (en) Double-block type ballastless track sleeper adjuster
CN103056581A (en) Hydraulic cylinder welding device of electric platform truck
CN110682259A (en) Multi-position rotatable pantograph bottom frame overhauling device
CN203159053U (en) Cart structure of multifunctional aluminum electrolytic crane
CN109332978B (en) Bridge crane end beam positioning method
CN201907930U (en) Combined trolley frame
CN201722045U (en) Three-dimensional forming device of sidewalk upper part driving assembly of escalator
CN204847834U (en) Cross and stride single -beam crane
CN107214666B (en) Railway vehicle is with frame car frock
CN204381313U (en) A kind of metal die installing mechanism in place

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Hongfeng

Inventor after: Zhang Shijun

Inventor after: Li Jiasen

Inventor after: Man Han

Inventor after: Huang Hao

Inventor after: Yang Liye

Inventor after: Sui Xianchang

Inventor after: Sun Jie

Inventor before: Liu Hongfeng

Inventor before: Zhang Shijun

Inventor before: Li Jiasen

Inventor before: Man Han

Inventor before: Huang Hao

Inventor before: Yang Liye

Inventor before: Sui Xianchang

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

CF01 Termination of patent right due to non-payment of annual fee