CN104067188B - Working real result collection system and job-oriented terminal - Google Patents

Working real result collection system and job-oriented terminal Download PDF

Info

Publication number
CN104067188B
CN104067188B CN201280067867.8A CN201280067867A CN104067188B CN 104067188 B CN104067188 B CN 104067188B CN 201280067867 A CN201280067867 A CN 201280067867A CN 104067188 B CN104067188 B CN 104067188B
Authority
CN
China
Prior art keywords
information
data
tag
determined
real result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201280067867.8A
Other languages
Chinese (zh)
Other versions
CN104067188A (en
Inventor
大石聪
新村米满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN104067188A publication Critical patent/CN104067188A/en
Application granted granted Critical
Publication of CN104067188B publication Critical patent/CN104067188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The control device of cell assignments terminal is when the data (D340) operation sent are sent to working real result managing device, being set up with the information of identification in moment associates as data (D341), the information being determined Work places being set up with identification information associates as data (D342), the information being determined operator being set up with identification information associates as data (D343), the information being determined job content being set up with identification information associates as data (D344), would indicate that operation starts or the information of the end of job associates as data (D345) with the foundation of identification information, split after operation sends data with this and be transmitted, working real result managing device resumes operation and sends data and store to storage part.

Description

Working real result collection system and job-oriented terminal
Technical field
The present invention relates to possess and collect the data of working real result the data to working real result from job-oriented terminal The working real result collection system of the working real result managing device being managed and job-oriented terminal, though be about Data also cannot be collected easily with the working real result of its data by the improper taker that obtains when improper acquisition System and job-oriented terminal.
Background technology
As determining the information i.e. method of activity duration of working real result, such as, read by IC tag reading device Operator entrained by operator determines with IC (Integrated Circuit) label, IC tag reading device read in use Determine in the operation object determining manipulating object article and use IC tag.The information read is additionally implemented for determining operation area Information after be sent to real result CPU management, and the information duration of runs being arranged at the implement of each operation area is passed through The implement of implement controls device and is sent to real result CPU management to determine that activity duration such method is invented It is disclosed (for example, referring to patent documentation 1).
Additionally, disclose a kind of following working real result collection system, possess: operation determines with IC tag, is written with The information that the job content of manipulating object article is determined;Task management case, has the input operation when operation and determines use The input port of IC tag;With IC tag reading device, being attached to the side of task management case, reading operation determines uses IC tag, And the information read is sent to working real result managing device (for example, referring to patent documentation 2).
Citation
Patent documentation
Patent documentation 1: Japanese Unexamined Patent Publication 2005-182656 publication
Patent documentation 2: Japanese Unexamined Patent Publication 2007-328665 publication
Summary of the invention
The problem that invention is to be solved
IC tag reading device described in patent documentation 1 is additionally implemented for determining the letter of operation area in the information read Real result CPU management it is sent to after breath.
Additionally, IC tag reading device described in patent documentation 2 also from the communication equipment of WLAN to operation actual become Achievement managing device sends and determines with operation with the start information and enter the job content of manipulating object article of communicating of IC tag The information that row determines.In communication start information, there is the ID (IDentification) of task management case, operation start time. In the information that the job content of manipulating object article is determined, it is assumed that such as there is workpiece order number (workpiece order No), the name of an article of manufactured finished product/semi-finished product or model, make number.
In a networked society, the most wireless or wired, data all can be increased by the misgivings of improper acquisition.Aforementioned In the method for data capture of patent documentation 1 and patent documentation 2, each data sent be when have, wherein, What for Deng the data of the meaning.Thus, there is the improper taker that obtains in effectively utilizing of data or asking of being used in terms of analysis Topic.
The present invention is the invention for solving above-mentioned problem, even if its object is to provide a kind of data by improper acquisition And the improper taker that obtains also cannot easily utilize working real result collection system and the job-oriented terminal of these data.
For solving the means of problem
In order to reach above-mentioned purpose, the working real result collection system of the present invention is to possess job-oriented terminal (such as, community Job-oriented terminal 10) and collect from the working real result of this job-oriented terminal work that working real result is managed The working real result collection system of industry real result managing device, job-oriented terminal is arranged on the attached of operation post or operation area Closely, and have: IC tag reading device (such as, IC tag read write line 15) is attached to determine operation with IC tag and work Dealer determines and carries out, with IC tag, the IC tag place to place placed, and reads the IC mark being placed on this IC tag place to place The information signed, wherein, operation determines and is written with, with IC tag, the information that the job content to manipulating object article is determined, and makees Dealer determines and is written with, with IC tag, the information being determined operator;And control device, by IC tag reading device institute The information read is sent to working real result managing device.
In the case of apposition has operation to determine and be placed on IC tag place to place with the instruction sheet of IC tag, IC tag The information that job content is determined that IC tag reading device is read by reading device and the information that expression operation starts Send to controlling device;In the case of operator determines and is placed on IC tag place to place with IC tag, IC tag reads The information being determined operator that IC tag reading device is read by device sends to controlling device.
In the information that job content is determined, represent the information that operation starts and the information that operator is determined In the case of coupling, control device by the information being respectively determined, coupling time moment, control device kept to operation field The information and the identification information when working real result managing device that is sent to that are determined set up association, as work Industry sends data and edits.And, control device and operation sent when data are sent to working real result managing device, Set up to associate with the information of identification using moment during coupling and send data (such as data D341) as the 1st, Work places will be entered The information that row determines is set up to associate with identification information and is sent data (such as data D342) as the 2nd, will carry out operator really Fixed information is set up to associate with the information of identification and is sent data (such as data D343) as the 3rd, will be determined job content Information set up associate with the information of identification and send data (such as data D344) as the 4th, would indicate that information that operation starts with Identification information is set up association and is sent data (such as data D345) as the 5th, splits operation with this and sends data, and will segmentation After data be sent to working real result managing device.
In the case of working real result managing device data after receiving segmentation, according to the information of identification, based on work For the data after divided the 1st transmission data, the 2nd send data, the 3rd send data, the 4th send data and the 5th and send number According to, the transmission data that resume operation also store to storage part 23.
Invention effect
According to the present invention, even if data are by improper acquisition, the improper taker that obtains also cannot easily utilize this data.
Accompanying drawing explanation
Fig. 1 is the pie graph representing working real result collection system based on present embodiment.
Fig. 2 is to represent the explanatory diagram that data edition based on present embodiment/segmentation/recovery processes, and Fig. 2 (a) represents IC tag place to place placed the situation of instruction sheet, and Fig. 2 (b) is the feelings representing and placed employee's card in IC tag place to place Condition, Fig. 2 (c) represents the situation pressing switch.
Fig. 3 is the explanatory diagram representing the relation between cell assignments terminal and working real result managing device, Fig. 3 (a) Be represent factory in and working real result managing device between the figure of relation, Fig. 3 (b) be represent multinational between international conjunction The figure made.
Fig. 4 is the stereoscopic figure of the example of the operation post representing operation area.
Fig. 5 is the flow chart of the processing sequence representing working real result collection system.
Fig. 6 is the explanatory diagram of the example representing that working real result collects data.
Fig. 7 is the explanatory diagram of the example representing the data recovered by working real result managing device.
Fig. 8 is the explanatory diagram of the example representing task management data.
Fig. 9 is the explanatory diagram representing the job status corresponding with Fig. 8.
Figure 10 is the pie graph of other examples representing working real result collection system based on present embodiment.
Figure 11 is the explanatory diagram of an example of the display picture representing the display device in operation.
Figure 12 is the explanatory diagram representing the method for informing the parts supply assembled.
Detailed description of the invention
Hereinafter, embodiments of the present invention are described in detail with reference to the attached drawings.
" the 1st embodiment "
Fig. 1 is the pie graph representing working real result collection system based on present embodiment.Working real result is received Collecting system S possesses: cell assignments terminal 10, is arranged on operation post or operation area nearby;And working real result management dress Put 20, collect working real result from cell assignments terminal 10 and working real result is managed.
Cell assignments terminal 10 has: the communication equipment 11 of WLAN, make the flow diagram being shown in display device 14 The instruction that switches over of picture switch 13, be attached to IC tag place to place 15a and to being placed on this IC tag park The IC tag read write line 15 (IC tag reading device) that is read out of the information of IC tag and by IC tag read write line 15 The information read is sent to the control device 12 of working real result managing device 20 via communication equipment 11.
Can place at IC tag place to place 15a and be written with the letter that the job content to manipulating object article is determined The operation of breath determines with IC tag 30, is written with the operator of the information being determined operator and determines with IC tag 40 etc. Various IC tags.
Here, as job content, using the assembling procedure at workpiece 60 upper mounting component 61 as electronic circuit board It is that an example illustrates.
Operation determines the noncontact using RFID (Radio Frequency IDentification) etc. with IC tag 30 Radio frequency IC tag, and be attached on the file of the instruction sheet 31 of the record having flow chart.Determine in operation and mark with IC Sign the information that storage has the job content to manipulating object article to be determined in 30, this information such as refer to workpiece order No, The name of an article of manufactured finished product/semi-finished product or model, making number.Additionally, as the job content to manipulating object article The details of the information being determined, record instruction information when parts 61 are installed on workpiece 60 by operator, concrete and Speech is the classification of parts 61, number and the erection sequence of parts.Instruction sheet 31 is to record the assembling work that operator is consistent The file of sequence.Specifically, the parts being installed on workpiece 60 have the parts 61 of various installation, record for being made one The flow process (route) of the operation of workpiece 60.Such as, there is CPU operation, CPU circumferential component operation, power supply operation, I/O interface work Sequence.Operator can judge the flow process of flow chart according to instruction sheet 31.
IC tag place to place 15a is that operator's placement is attached on the workpiece 60 that assembling is predetermined when operation starts The place of instruction sheet 31.If the end of job of the assembling procedure of workpiece 60, then operator removes from IC tag place to place 15a Instruction sheet 31, comes to be distributed at next assembling procedure by instruction sheet 31 apposition taken out on the work piece 60.
When being placed with instruction sheet 31 at IC tag place to place 15a, if it have been confirmed that determine with operation and use IC tag The communication of 30, then the operation that IC tag read write line 15 reading is attached on instruction sheet 31 determines the information using IC tag 30, to Control device 12 to send and determine with operation with the start information and the job content of manipulating object article is entered of communicating of IC tag 30 The information that row determines.So-called communication start information, refers to that the operation start information of instruction sheet 31 (represents that operation starts this meaning Information).In the information that the job content of manipulating object article is determined, such as have instruction sheet ID, workpiece order No, The name of an article of manufactured finished product/semi-finished product or model, making number.
Additionally, when when IC tag place to place 15a eliminates instruction sheet 31, if it have been confirmed that break off determining with operation With the communication of IC tag 30, then IC tag read write line 15 determines with the communication knot of IC tag 30 with operation to controlling device 12 transmission The information that bundle information and the job content to manipulating object article are determined.So-called communication end information, refers to instruction sheet 31 The end-of-job message information of this meaning of the end of job (represent).The job content of manipulating object article is determined In information, such as, there is workpiece order No, the name of an article of manufactured finished product/semi-finished product or model, make number.
Control device 12 to be determined by the job content to manipulating object article received from IC tag read write line 15 Information be shown in display device 14.In the information be determined the job content of manipulating object article, record operator The summary of instruction information when parts 61 are installed on workpiece 60, the specifically classification of finger 61, number and parts Erection sequence.
Additionally, control device 12 operation start information is sent to the working real result managing device 20 (step with reference to Fig. 5 Rapid S203), receive detailed instruction sheet information (with reference to step S302 of Fig. 5) from working real result managing device 20.About Detailed process content will describe below.It addition, instruction sheet information comprises based on instruction sheet 31 what operator was carried out Multiple pages of pictures.
Control device 12 and show page picture based on instruction sheet information in display device 14.Operator confirm shown by interior Hold, from spare parts kit 72 (with reference to Fig. 4), take out corresponding parts 61, and parts 61 are installed on workpiece 60.End is being installed After, operator pressing is arranged at the switch 13 controlling device 12.Then, control device 12 and page end-of-job message (is represented page Represent the information of this meaning of the end of job) send to controlling device 12.If additionally, controlling device 12 to receive switch 13 Signal, then then show page picture in display device 14.And then, control device 12 by page end-of-job message via communication equipment 11 And send to working real result managing device 20.
It addition, here, after according to page picture, the installation of each parts terminates, the ending message of page picture is sent extremely Working real result managing device 20, but can also be after the assembling procedure in an operation area all terminate, with reference to Fig. 2 And send to working real result managing device 20 with the method described below.
In the present embodiment, there is in controlling device 12 data edition portion 16 and data cutting part 17, control device 12 are sending operation start information, end-of-job message, the feelings of page end-of-job message to working real result managing device 20 Under condition, in data edition portion 16 as comprising " when " (When), " wherein " (Where), " who " (Who), " What for " (What), the information of " how " (How) such 4W1H send data in interior operation and edit, then data Cutting part 17 becomes multiple partition data operation being sent when data are sent to working real result managing device, and via Communication equipment 11 sends.
Additionally, have data recovery section 22 in working real result managing device 20.Data recovery section 22 is based on being connect The multiple partition datas received resume operation transmission data, and store to storage part 23.Working real result managing device 20 energy Enough manage the activity duration according to job content classification according to the information of storage part 23.
Fig. 2 is to represent the explanatory diagram that data edition based on present embodiment/segmentation/recovery processes.Take the circumstances into consideration to come with reference to Fig. 1 Illustrate.Fig. 2 (a) represents the situation that placed instruction sheet 31 at IC tag place to place 15a, and Fig. 2 (b) represents at IC tag Place to place 15a placed employee and demonstrate,proves the situation of 41, and Fig. 2 (c) represents the situation pressing switch 13.
In the case of Fig. 2 (a), IC tag read write line 15 reads in operation and determines the information using IC tag 30, and sends extremely Control device 12.Control device 12 data edition portion 16 will " when ", " wherein ", " who ", " What for ", " with what side Formula " data set up association, and be saved in storage part 18 (with reference to Fig. 1).Specifically, data D301 are IC tag read write lines (the page ID of flow diagram is " 000 " for 15 moment read in (timestamp), place ID, instruction sheet ID.), as represent job content Start this meaning information.It addition, the information of " who " not quite clear (?).Additionally, place ID is stored in advance in storage part for determining The information in the place of the cell assignments terminal 10 in 18.
In the case of Fig. 2 (b), IC tag read write line 15 reads in operator and determines the information using IC tag 40, and sends To controlling device 12.Control device 12 data edition portion 16 will " when ", " wherein ", " who ", " What for ", " with what Mode " data set up association, and be saved in storage part 18.Specifically, data D401 are that IC tag read write line 15 is read Moment (timestamp) of entering, place ID, the information of operator ID.Here, the information of " What for ", " how " is not quite clear (?).
In the case of Fig. 2 (c), control device 12 data edition portion 16 will " when ", " wherein ", " who ", " do assorted ", the data of " how " set up association, and are saved in storage part 18 (with reference to Fig. 1).Specifically, data D131 Be moment of being pressed of switch 13 or control device 12 accepted press the moment of signal, place ID, instruction sheet ID (comprise work The page ID of the flow diagram that industry terminates.), be denoted as job content terminate this meaning information.It addition, the information of " who " is not In detail (?).
The operation of the data edition portion 16 of control device 12 information to comprising 4W1H sends data and carries out Editorial Services Reason.Operation transmission data are carried out editing and processing refer to, in the case of data D301 and data D401 are mated, to data D301 Additional not enough operator ID, and moment in the case of additional matches and the encryption ID (identification information) as unique ID, It is made data D340, and stores to storage part 18.
Or such as, in the case of formerly storage has data D401 and receives data D301, when data D301 and data When D401 coupling, to data D401 additional not enough instruction sheet ID and the information of job content, and the situation of additional matches Under moment and as the encryption ID (identification information) of unique ID, be made data D340, and store to storage part 18.
It addition, in the case of data D131, both association can be set up to be made operation in data D401 and data 131 Send data, it is also possible to set up in data D340 with data D131 and associate the data being made as operation transmission data D341P (not shown).
Situation in order to mate data D301 and data D401 judges, both can be using place ID as key (key) Set up association, it is also possible to using moment of being in the scope in the stipulated time as key to set up association.
The data cutting part 17 controlling device 12 carrys out partition data D340 according to sending timetable.In the present embodiment, Even if the segmentation of so-called data refers to that the data of a part also can be integrally formed upper insignificant data mode by improper acquisition It is transmitted.
Specifically, as in figure 2 it is shown, data D340 sending data as operation are being sent to work by data cutting part 17 When industry real result managing device 20, the moment is set up with encryption ID with IP (Internet Protocol) header and associates work For data D341 (the 1st send data (when)), place ID and encryption ID with IP header foundation are associated as data D342 (the 2 send data (wherein)), operator ID is set up with encryption ID with IP header and associates as data D343 (the 3rd transmission data (who)), instruction sheet ID is set up with encryption ID with IP header and associates as data D344 (the 4th sends data (What for)), will Job content is set up with encryption ID with IP header and associate as data D345 (the 5th send data (how)), with this Segmentation operation sends data, and the data after segmentation are sent to working real result managing device 20.It addition, so-called IP header Comprise sending destination IP address and send source IP address etc..
The data recovery section 22 of working real result managing device 20 receive divided after data in the case of, deposit Storage is in storage part 23, and according to encryption ID (identification information), based on as data D341 of data after divided, data D342, data D343, data D344 and data D345, recover send data D340 of data as operation and store to storage Portion 23.
In the present embodiment, it is divided into the data of the most minimal content such by operation sends data Data send, thus become the working real result collection system that safety for improper acquisition is high.Additionally, When being transmitted, send each data if the most random, then become the higher work of safety for improper acquisition Industry real result collection system.
It addition, it is known that, conventionally, send carry out data segmentation on the internet as data packet communications after.At order wire Road determines MTU (Maximum Transmission Unit).MTU is max-forwards unit, is to turn in the maximum that can forward Data after splitting in bill position are long.Because determining MTU according to every communication line, so passing through in the midway in path In the case of MTU is less than the communication path of packet length, the data fragmentation (segmentationization process) of packet to be carried out.
Present embodiment is different from considering the data packet communications forwarding unit, for for leading to by communication path Normal MTU and only send minimal information.And, at above-mentioned shown data D341, D342, D343, D344, D345, On transmission frequency in each data etc. meaningful, it is also possible to regard as carrying out continually the information of operation in certain IP address.Thus, From the viewpoint of manager, become significant data become one of to be characterized.
Fig. 3 is the explanatory diagram representing the relation between cell assignments terminal and working real result managing device.Fig. 3 (a) Be represent factory 200 in and working real result managing device 20 between the figure of relation, Fig. 3 (b) represent multinational between The figure of international cooperation.
In Fig. 3 (a), the production scene in the factory 200 being distributed in certain state is configured with cell assignments terminal 10, operation The operation that real result managing device 20 is collected via network 90 (the Internet) from cell assignments terminal 10 sends data i.e. Working real result.Such as, if enumerated as a example by India, then can also in Calcutta, Delhi, Chen Nai, the 4 of Bombay Individual city configuration factory 200, a city disposes working real result managing device 20 wherein.
In Fig. 3 (b), in multiple national 210A, 210B, 210C, it is configured with the factory 200 as production base, is returning Holding together configuration working real result managing device 20 in state 210X together, working real result managing device 20 is via network 90 And collect the operation from cell assignments terminal 10 and send data i.e. working real result.For example, it is also possible to Germany, India, The multiple domestic configuration factory 200 of Brazil etc., disposes working real result managing device 20 in Japan.
In the present embodiment, the communication line even with the Internet also only can communicate on communication path divided after Data, so becoming the working real result collection system that safety for improper acquisition is high.
Fig. 4 is the stereoscopic figure of the example of the operation post representing operation area.Cell assignments platform 71 top (above) It is provided with the IC tag read write line 15 as IC tag place to place 15a and display device 14.The top of cell assignments platform 71 For the assembling work district of workpiece 60, the front of this external operator is provided with multiple spare parts kit 72.When assembling work, operator According to the information (operation instruction picture) being shown in display device 14, workpiece 60 is carried out the assembling work of parts 61.
Additionally, cell assignments platform 71 top (above), be configured with switch 13 as illustrated by FIG, If operator presses switch 13, then allow hand over the instruction picture of the sequence of operation being shown in display device 14.
It addition, in FIG, illustrate that cell assignments terminal 10 is by communication equipment 11, control device 12, display device 14, switch The situation that 13 grades are constituted, but can also be using the display device 14 shown in Fig. 4 as flat board PC (Personal Computer) Comprise communication equipment 11, control device 12, display device 14, the function of switch 13.
Secondly, the process of working real result collection system S is described with reference to Fig. 5.
Fig. 5 is the flow chart of the process representing working real result collection system.Take the circumstances into consideration to illustrate with reference to Fig. 1.Make By initial apposition, operator determines that demonstrate,proving 41 with the employee of IC tag 40 (operator's label) is placed on community to the operator in industry district IC tag place to place 15a set by the top of operation post 71.Then, IC tag read write line 15 determines whether to detect work The mounting (step S201) of dealer's label, in the case of the mounting detecting operator's label, (step S201: yes) enters into Step S202, in the case of the mounting not detecting operator's label, (step S201: no) returns to step S201.It addition, Such as operator when be responsible for this operation area in the morning on the same day, it is also possible to load in advance during the morning on the same day.
If having accepted apposition have the workpiece 60 of instruction sheet 31, then instruction sheet 31 is placed on cell assignments platform 71 by operator The IC tag place to place 15a set by top.Then, IC tag read write line 15 determines whether to detect with operation true Surely by the mounting (step S202) of the instruction sheet 31 of IC tag 30 (instruction sheet label), the mounting of instruction sheet label is being detected In the case of (step S202: yes) enter step S203, in the case of not detecting the mounting of instruction sheet, (step S202: no) is returned Return to step S202.It addition, about step S201, the judgement of step S202, it is also possible to reversed order.
IC tag read write line 15 determines reading instruction sheet identification information among with IC tag 30 from operation, also true from operator Surely identify information with reading operation person among IC tag 40, in controlling device 12, generate operation start information (such as, data D340), partition data send (step S203) to working real result managing device 20 when being transmitted.
Working real result managing device 20 based on received divided after data and by operation start information record To storage part 23 (step S301).
Assembling instruction information (every as page identification information that working real result managing device 20 will comprise instruction sheet 31 Operation instruction picture corresponding to individual page ID) send to cell assignments terminal 10 (step S302) in interior instruction sheet information.
If receiving instruction sheet information, then the device 12 that controls of cell assignments terminal 10 shows the operation instruction of page 1 Picture (page picture) (step S204).
Then, cell assignments terminal 10 control device 12 determine whether there is switch 13 press (step S205).If Detect pressing (step S205: yes) of switch 13, then control device 12 and the information of the page end of job is sent to operation actual Score management device 20 (step S206), the operation picture at lower one page is updated (step S207), returns to step S204.
Working real result managing device 20 based on received divided after data and by page end-of-job message remember Record is to storage part 23 (step S303).
Cannot be in the case of the pressing of search switch 13 (step S205: no) when controlling device 12 in step S205, IC Tag read-write equipment 15 determines whether to detect and eliminates instruction sheet 31 (step S208) from IC tag place to place 15a, is visiting Measure instruction sheet remove in the case of (step S208: yes), control device 12 to working real result managing device 20 send with Operation determines with the communication end information (end-of-job message) (step S209) of IC tag 30, end process.On the other hand, exist In the case of not detecting the removal of instruction sheet (step S208: no), return to step S205.
Working real result managing device 20 based on received divided after data and by end-of-job message record To storage part 23 (step S304).
It addition, operation start information, the page that working real result managing device 20 recorded is described with reference to Fig. 6 to Fig. 8 End-of-job message, end-of-job message.
Fig. 6 is the explanatory diagram of the example representing that working real result collects data.Working real result managing device 20 with Time the data that receive be stored as tables of data 24.Tables of data 24 be configured to comprise encryption ID, the moment, place ID, operator ID, The project of instruction sheet ID, page ID, job content etc..If specifically illustrated, then it is expert in 241 in addition to encryption ID also There are the data in only moment, be expert in 242 and there are the data in only place.
Fig. 7 is the explanatory diagram of the example representing the data after being recovered by working real result managing device.Number shown in Fig. 7 According to table 25 be working real result managing device 20 data recovery section 22 tables of data based on Fig. 6 24 and data have been carried out extensive Multiple example.Tables of data 25 is configured to comprise encryption ID, moment, place ID, operator ID, instruction sheet ID, page ID, job content Deng project.If specifically illustrated, then row 251 is the row 241 with Fig. 6, row 242, row 243, row 244, the number of row 245 On the basis of according to, operation is sent the row that recovered of data, row 252 be the row 247 with Fig. 6, row 248, row 24A, row 24D, On the basis of row 24F, operation being sent the row that recovered of data, row 253 is the row 246 with Fig. 6, row 249, row 24B, OK On the basis of 24C, row 24E, operation is sent the row that data are recovered.
If with reference to row 251, then understand: 00 point (201112200900) when December in 2011 20 days 9, place ID is In the case of L00001, operator ID are MM0001, instruction sheet ID is A00001, page ID is B000, operation starts.Similarly, If with reference to row 252, then understand: when December in 2011 20 days 9 05 point, place ID is L00001, operator ID is MM0001, In the case of instruction sheet ID is A00001, page ID is B001, the end of job.
And then, if with reference to row 257, then understanding: when December in 2011 20 days 9 35 points, place ID is L00001, operation In the case of person ID is MM0001, instruction sheet ID is A00001, page ID is B099, the end of job.
It addition, page ID is the end that B099 is not meant as the operation of page 99, but instruction sheet 31 is from IC tag park In institute 15a removed in the case of end-of-job message when page ID, refer to that finishing instruction sheet ID is A00001's In the case of a series of operations.
Fig. 8 is the explanatory diagram of the example representing task management data.According to each instruction sheet ID in the tables of data 26 of Fig. 8 Summarize the activity duration.Tables of data 26 is configured to comprise encryption ID, instruction sheet ID, operation start time, end of job moment, work The project of industry time, place ID, operator ID etc..It addition, the encryption ID that encryption ID is when starting the operation of instruction sheet ID as With reference to carrying out record.
Fig. 9 is the explanatory diagram representing the job status corresponding with Fig. 8.In the case of instruction sheet ID is A00001, referring to The moment 9:00 that order single 31 is placed in IC tag place to place 15a starts operation, at instruction sheet 31 from IC tag place to place 15a Removed moment 9:35 terminates operation.Additionally, in the case of instruction sheet ID is A00002, load at other instruction sheets 31a Operation is started, at instruction sheet 31 when IC tag place to place 15a is removed in the moment 9:50 of IC tag place to place 15a Carve 10:40 and terminate operation.
It is the details in the case of A00001 about instruction sheet ID, according to each parts installation procedure as shown in Figure 7 The moment 9:05 that is arranged on carrying out record, such as part B 001 like that terminates, and the moment 9:12 that is arranged on of part B 002 terminates, portion The moment 9:15 that is arranged on of part B003 terminates, and the moment 9:22 that is arranged on of part B 004 terminates, and being arranged on of part B 005 Moment, 9:32 terminated.The period of moment 9:32~moment 9:35 is considered the inspection of job content or the fixture of job content Time of removal operation etc..It addition, about the management of activity duration, although in the example of figure 9 by minute in units of carry out Explanation, but can also be managed in seconds according to job content.
According to present embodiment, cell assignments terminal 10 is arranged on the vicinity of cell assignments platform 71 or operation area, and Have: IC tag reading device (such as, IC tag read write line 15), be attached to place the work being written with manipulating object article Hold in the industry the operation of the information being determined to determine with IC tag 30 and the operation that is written with the information that operator is determined Person determines use IC tag 40, IC tag place to place 15a, and reads the IC mark being placed on this IC tag place to place 15a The information signed;And control device 12, the information that IC tag reading device is read is sent to working real result management dress Put.
IC tag reading device, when apposition has operation to determine, being placed on IC tag with the instruction sheet 31 of IC tag 30 places In the case of the 15a of place, the information being determined job content read by IC tag read write line 15 and expression operation are opened The information begun sends to controlling device 12, is placed on the feelings of IC tag place to place 15a with IC tag 40 when operator determines Under condition, the information being determined operator read by IC tag read write line 15 sends to controlling device 12.
Control device 12, when the information that job content is determined, represent the information that starts of operation and operator is entered In the case of the information matches that determines of row, by the moment when information being respectively determined, coupling, control that device kept to work The information that industry place is determined is set up with identification information when being sent to working real result managing device 20 and is associated, as Operation sends data and edits.
Control device 12, operation is being sent when data are sent to working real result managing device, by during coupling Moment sets up with the information of identification and associate as the 1st transmission data (when), by the information being determined Work places and identification Information is set up association and is sent data (wherein) as the 2nd, the information being determined operator and identification information is set up and closes Join and send data (who) as the 3rd, the information being determined job content is set up with identification information and associates as the 4th transmission Data (What for), would indicate that the information that operation starts is set up with identification information to associate and send data (with what side as the 5th Formula) split operation send data, and will segmentation after data be sent to working real result managing device.
In the case of the working real result managing device 20 data after receiving segmentation, it is possible to according to the information of identification also Based on as the data after divided the 1st transmission data, the 2nd send data, the 3rd send data, the 4th send data and the 5th Send data to resume operation transmission data, and store to storage part 23.
" the 2nd embodiment "
Figure 10 is the pie graph of the 2nd embodiment representing working real result collection system based on present embodiment. Composition shown in Figure 10 is to have added at IC tag place to place 15a be written with operation pair relative to the composition shown in Fig. 1 The operation of the information being determined as the flow chart of article determines by composition IC tag 50.The side that Figure 10 is shown below Method, i.e. the most also use the operation being written with the information that the flow chart to manipulating object article is determined to determine and use IC Label 50, dual-purpose operation determines and determines with IC tag 30, operator and determine with IC tag 50 with IC tag 40 and operation, passes through Make them carry out loading, removing relative to IC tag place to place 15a, thus collect working real result.It addition, and Fig. 1 The explanation of same section will be omitted.
Determine have for the work described in the instruction sheet 31 shown in the 1st embodiment with storage in IC tag 50 in operation The data that the flow process of sequence is determined.Specifically, it is installed on the parts 61 in the parts of workpiece 60 with various installation, tool There is the flow process of operation for being made a workpiece 60.In the flow process of operation, such as, there is CPU operation, CPU circumferential component work Sequence, power supply operation, I/O interface operation.
Determine with when IC tag 50 being placed with operation, if it have been confirmed that determine with the communication of IC tag 50 with operation, Then IC tag read write line 15 reads operation and determines the information with IC tag 50, and sends and determine with operation to controlling device 12 and use IC The communication start information of label 50 and information that operation is determined.In communication start information, such as, there is the work of operation Industry start information (representing that operation starts the information of this meaning), operation start time.Additionally, from IC tag place to place 15a eliminates operation and determines with when IC tag 50, if it have been confirmed that break off determining with the communication of IC tag 50, then IC with operation Tag read-write equipment 15 determines the communication end information with IC tag 50 with operation to controlling device 12 transmission and carries out operation The information determined.In communication end information, the end-of-job message such as with operation (represents the letter of this meaning of the end of job Breath), the end of job moment.
And then, if be described in detail, the most in case of fig. 10, IC tag read write line 15 reads in operation and determines use The information of IC tag 30, and send to controlling device 12.Control the data edition portion 16 of device 12 as operation transmission data " when ", " wherein ", " who ", " What for ", the data of " how " are set up association, and are saved in storage part 18 In (with reference to Fig. 1).Specifically, be IC tag read write line 15 read in moment (timestamp), place ID, operation ID, conduct The information of the purport of the beginning of job content.It addition, the information of " who " not quite clear (?).Additionally, place ID is stored in advance in for determining The information in the place of the cell assignments terminal 10 in storage part 18.
The operation of the data edition portion 16 of control device 12 information to comprising 4W1H sends data and carries out Editorial Services Reason.Operation is sent data and carries out editing and processing, refer to send data and additional not enough operator ID as operation, and attached Add the encryption ID (identification information) as unique ID, be made operation and send data, and store to storage part 18.
The data cutting part 17 controlling device 12 splits operation transmission data according to sending timetable.Specifically, number Operation is being sent when data are sent to working real result managing device 20, by moment and encryption ID and IP according to cutting part 17 Header is set up association and is sent data (when) as the 1st, place ID and encryption ID with IP header is set up and associates as the 2nd transmission Data (wherein), using operator ID with encryption ID with IP header set up associate as the 3rd send data (who), by operation ID with Encryption ID with IP header is set up to associate and is sent data (What for) as the 4th, job content and encryption ID and IP header is set up Associate and send data (how) as the 5th, split operation and send data, and the data after segmentation are sent to operation Real result managing device 20.It addition, so-called IP header comprises sending destination IP address and sends source IP address etc..
The data recovery section 22 of working real result managing device 20 receive divided after data in the case of, deposit Storage is in storage part 23, and according to encryption ID (identification information), based on as the data after divided, the 1st send data, 2nd send data, the 3rd send data, the 4th send data and the 5th send data resume operation transmission data and store to Storage part 23.Working real result managing device 20 can manage according to job content classification according to the information of storage part 23 Activity duration.
Figure 11 is the explanatory diagram of an example of the display picture representing the display device in operation.Display in display device 14 Demonstrate on picture instruction sheet ID141, instruction sheet content 142 (comprise the manufactured model of finished product/semi-finished product, the name of an article and Number.), assembling instruction information 143, operation ID144, operator ID146, complete number 147, date-time/work is set about in operation Time industry Close Date 145 and in detail operation moment 148.Refer in instruction sheet ID141, instruction sheet content 142 and assembling Show information 143 demonstrates operation is determined the information being determined with the job content of the manipulating object article of IC tag 30 and Its details.Operation ID144 demonstrates operation is determined the information being determined by the operation of IC tag 50.In operation Person ID146 demonstrates operator is determined the information being determined with the operator of IC tag 40.
In date-time/end of job date-time 145 is set about in operation, demonstrate that operation determines with IC tag 30, operation Person determine with IC tag 40 be placed on IC tag place to place 15a and all consistent time moment.Show in completing number 147 Illustrate making number one among complete several, assembling instruction information 143 order all terminate when control device 12 Show number.In the detailed operation moment 148, demonstrate the finish time of each order, control device 12 display switch 13 The moment that (with reference to Fig. 1) is pressed.So, operator can be according to the finger of the job content of the display picture of display device 14 Show, confirm to carry out operation.
" the 3rd embodiment "
Figure 12 is the explanatory diagram representing the method for informing the parts supply assembled.It is being in operator by parts 61 It is installed in the operation of workpiece 60, it is sometimes desirable to supply part 61.In the case, operator can will be placed in spare parts kit 72 Parts determine that putting into task management case 70 with IC tag 80 replaces the IC tag place to place 15a shown in Fig. 4, thus to Working real result managing device 20 is informed.
Task management case 70 is set in the bottom of cell assignments platform 71, and tilts towards accompanying drawing front, in order to operator exists It is readily put into instruction sheet 31 when operation starts, easily takes out instruction sheet 31 when the end of job.Thus, operator is about working pipe The presence or absence of the instruction sheet 31 in reason case 70, also can be confirmed with eye observation, thus be become easy.It addition, task management case The input port 70a of 70 is the most substantially vertical and upward.Thereby, it is possible to make the setting area of task management case 70 minimize. Even if being applied it addition, task management case 70 also can replace IC tag place to place 15a in Fig. 1, Fig. 4.
Compared with Figure 12 with Fig. 4, the composition of change parts case 72, and double well-bucket is used as the compensation process of parts 61 Method.That is, spare parts kit 72 is made up of spare parts kit 72a and spare parts kit 72b, puts into same parts 61.
When the spare parts kit 72a of front is emptying, if the parts being placed in spare parts kit 72a are determined by operator uses IC tag 80 put into task management case 70, then IC tag read write line 15 starts letter by determining with input parts with the communication of IC tag 80 Cease and for parts being determined the component information being determined with the parts 61 of IC tag 80 sends to controlling device 12.Communication In start information, such as, there is expression parts supply and entrust the supply of the information (parts supply entrusted information) of this meaning, parts Entrust the moment.In component information, such as, there is the piece number (parts ID) of parts, name of parts, number.
In case of fig .12, control the data edition portion 16 of device 12 send data as operation and will " when ", " Where ", " who ", " What for ", the data of " how " set up association, and are saved in storage part 18 (with reference to Fig. 1).Tool For body, be IC tag read write line 15 read in moment (timestamp), place ID, component information, expression parts supply entrust The information of this meaning.It addition, the information of " who " not quite clear (?).It is stored in advance in storage part 18 additionally, place ID determines that The information in the place of cell assignments terminal 10.
The operation of the data edition portion 16 of control device 12 information to comprising 4W1H sends data and carries out Editorial Services Reason.So-called operation sent data carry out editing and processing, refer to send data as operation and additional not enough operator ID, And the additional encryption ID as unique ID (identification information), it is made operation and sends data, and store to storage part 18.
The data cutting part 17 controlling device 12 splits operation transmission data according to sending timetable.Specifically, number Operation is being sent when data are sent to working real result managing device 20, by moment and encryption ID and IP according to cutting part 17 Header is set up association and is sent data (when) as the 6th, place ID and encryption ID with IP header is set up and associates as the 7th transmission Data (wherein), set up operator ID with encryption ID with IP header and associate as the 8th transmission data (who), by component information Set up to associate with encryption ID with IP header and send data (What for) as the 9th, job content and encryption ID and IP header are built Vertical association sends data (how) as the 10th, splits operation and sends data, and the data after segmentation is sent to Working real result managing device 20.It addition, so-called IP header comprises sending destination IP address and sends source IP address etc..
The data recovery section 22 of working real result managing device 20 receive divided after data in the case of, deposit Storage is in storage part 23, and according to encryption ID (identification information), based on as the data after divided, the 6th send data, 7th sends data, the 8th transmission data, the 9th transmission data and the 10th transmission data resumes operation and sends data and store To storage part 23.Working real result managing device 20 can manage parts supply according to the information of storage part 23 and entrust letter Breath.
Working real result managing device 20 judges whether consume corresponding component in corresponding cell assignments platform 71, excellent The augmentation requests of corresponding component is informed in choosing to component placement person.As the informing method informed to component placement person, it is also possible to will The parts comprising place ID supply place, the piece number of parts, name of parts, number transmission to taking that component placement person is had Tape terminal.
According to present embodiment, when operator needs the parts installed, as long as parts being determined with IC tag 80 Put in task management case 70, the burden of the certificate of entrustment etc. wanting creation section to supply will not be brought to operator.
In embodiment described above, the controlling device 12 and operation can sent of cell assignments terminal 10 When data D340 are sent to working real result managing device 20, the moment are set up with the information of identification and associates as data D341, sets up the information being determined Work places with identification information and associates as data D342, will carry out operator The information determined is set up with identification information and is associated as data D343, by the information being determined job content and identification information Set up and associate as data D344, would indicate that operation starts or the information of the end of job associates as number with the foundation of identification information According to D345, splitting after operation sends data and be transmitted, working real result managing device 20 resumes operation transmission data also Store to storage part 23.
Additionally, in embodiment described above, although data D340 are carried out 5 be divided into data D341, D342, D343, D344, D345, but it is not limited to this.For example, it is also possible to by the information that Work places is determined with to operation The information that content is determined is set up with identification information and is associated as data, by the information being determined operator and table It is shown as industry to start or the information of the end of job is as data, the moment is set up with the information of identification and associate as data, Carry out 3 segmentations.
Additionally, in embodiment described above, although control the data edition portion 16 of device 12 to comprising 4W1H's Information sends data in interior operation and carries out editing and processing, but is not limited to this.Such as, the data edition of device 12 is controlled Portion 16 can also send data to the operation of the information comprising 5W1H and carry out editing and processing.
Specifically, in the case of the rework process that there occurs finishing finished product in the manufacturing process of finished product, by referring to The information being determined reprocessing write is determined by order list distribution device to reprocessing to be used in IC tag, and issues reprocessing Instruction sheet.In the case, the information of " why " (Why) is determined with IC tag is written with in reprocessing.In the case, Control device 12 data edition portion 16 can also " when ", " wherein ", " who ", " What for ", " why ", " with assorted Mode " data set up association, and be saved in storage part 18 (with reference to Fig. 1).Then, cell assignments terminal 20 splits operation Being transmitted after sending data, working real result managing device 20 can resume operation and sends data and store to storage part 23.It addition, reprocessing determine with IC tag, there is as the information of " why " (Why) reprocessing will be because of, be written with IC and pacify Welding equipment stannum is bad, IC installation form is bad, IC pin fractures, connector pin fractures, parts are bad, the letter of wiring error etc. Breath.
Similarly, the most also can produce the finished product because being sent to client bad and return requirement place under repair trust or inspection Look into the reparing process in the case of trust.In the case, instruction sheet distribution device the information being determined reparation is write Enter to reparation to determine and use in IC tag, and issue the instruction sheet of reparation.It addition, determine with in IC tag in reparation, as " for assorted " information of (Why) and be written with and repair entrusted information or accept the information that inspection information is suitable.
Symbol description
10 cell assignments terminals
11 communication equipments
12 control device
13 switches
14 display devices
15 IC tag read write lines
15a IC tag place to place
16 data edition portions
17 data cutting parts
18 storage parts
20 working real result managing devices
21 communication equipments
22 data recovery section
23 storage parts
24,25,26 tables of data
30 operations determine uses IC tag
31 instruction sheets
40 operators determine and use IC tag
41 employee's cards
50 operations determine uses IC tag
60 workpiece
61 parts
70 task management casees
70a input port
80 parts determine uses IC tag
90 networks
S working real result collection system

Claims (7)

1. a working real result collection system, possesses job-oriented terminal and collects the operation reality from this job-oriented terminal Achievement the working real result managing device that described working real result is managed,
Described job-oriented terminal is arranged on the vicinity of operation post or operation area, and described job-oriented terminal has: IC tag reads Device, is attached to determine operation and determines, with IC tag and operator, the IC tag park placed with IC tag Institute, and read the information of the described IC tag being placed on this IC tag place to place, wherein, described operation determines uses IC tag Being written with the information that the job content to manipulating object article is determined, described operator determines and is written with work with IC tag The information that dealer is determined;And control device, the information that described IC tag reading device is read is sent to described work Industry real result managing device, described working real result collection system is characterised by,
In the case of apposition has described operation to determine and be placed on described IC tag place to place with the instruction sheet of IC tag, institute State the information that described job content is determined and table that described IC tag reading device is read by IC tag reading device It is shown as the information transmission extremely described control device that industry starts;
In the case of described operator determines and is placed on described IC tag place to place with IC tag, described IC tag reads The information being determined described operator that described IC tag reading device is read by device sends to described control device,
The information that starts in the information that described job content is determined, described expression operation and described operator is carried out really In the case of fixed information matches, described control device is by moment when the information being determined described in each, described coupling, described Control the information that Work places is determined that kept of device and be sent to described working real result managing device it The identification information on border sets up association, sends data as operation and edits;
Described control device is when being sent to described working real result managing device by described operation transmission data, by described Moment during coupling sets up to associate with described identification information and sends data as the 1st, by be determined described Work places Information and described identification information are set up and associates as the 2nd transmission data, by the information being determined described operator and described Identification information is set up association and is sent data as the 3rd, by the information being determined described job content and described identification information Set up association to set up associate as the 5th as the 4th transmission data, the information described expression operation started and described identification information Send data, split described operation with this and send data, and the described data after segmentation are sent to the actual one-tenth of described operation Achievement managing device,
In the case of the described working real result managing device described data after receiving segmentation, identify letter according to described Breath, based on as the described 1st of the described data after divided send data, the described 2nd send data, the 3rd send data, the 4 send data and the 5th sends data, recovers described operation and sends data, and stores to storage part.
Working real result collection system the most according to claim 1, it is characterised in that
Described operation is had to determine with the instruction sheet of IC tag in the case of described IC tag place to place is removed in apposition, institute State the information that described job content is determined and table that described IC tag reading device is read by IC tag reading device Show that the information of the end of job sends to described control device,
In the information that described job content is determined, the information of the described expression end of job and described operator is carried out really In the case of fixed information matches, described control device is by moment when the information being determined described in each, described coupling, described Control the information that Work places is determined that kept of device and be sent to described working real result managing device it The identification information on border sets up association, sends data as operation and edits;
Described control device is when being sent to described working real result managing device by described operation transmission data, by described Moment during coupling sets up to associate with described identification information and sends data as the 1st, by be determined described Work places Information and described identification information are set up and associates as the 2nd transmission data, by the information being determined described operator and described Identification information is set up association and is sent data as the 3rd, by the information being determined described job content and described identification information Set up association and send data as the 4th, the information of the described expression end of job is set up with described identification information and associates as the 5th Send data, split described operation with this and send data, and the described data after segmentation are sent to the actual one-tenth of described operation Achievement managing device.
Working real result collection system the most according to claim 1, it is characterised in that
Multiple described job-oriented terminal it is provided with in multiple production regions,
Described working real result managing device is connected with the plurality of production region via network.
Working real result collection system the most according to claim 1, it is characterised in that
The information being determined described job content is the instruction sheet ID of described instruction sheet or sets up with this instruction sheet ID The operation page ID of association.
Working real result collection system the most according to claim 1, it is characterised in that
Spare parts kit on operation post is equipped with and is written with the portion to the information that the parts being installed on manipulating object article are determined Part determines uses IC tag,
When described parts being determined and is placed on described IC tag place to place owing to requiring supplementation with described parts with IC tag In the case of, described IC tag reading device is when confirming to determine the communication with IC tag with described parts, to described control device The information that described parts are determined by notice,
Described control device will receive described notice when moment, kept Work places is carried out of described control device The information determined, the information that described operator is determined, the information that described parts are determined, represent described parts Information and the identification information when described working real result managing device that is sent to of augmentation requests set up association, as The transmission data of parts augmentation requests are edited;
The transmission data of described parts augmentation requests are being sent to described working real result managing device by described control device When, the moment when receiving described notice sets up to associate with described identification information and sends data as the 6th, will be to described The information that Work places is determined is set up to associate with described identification information and is sent data as the 7th, will enter described operator The information that row determines is set up to associate with described identification information and is sent data, the information being determined described parts as the 8th Set up to associate with described identification information and send data as the 9th, would indicate that the information of described parts augmentation requests and described identification Information is set up association and is sent data as the 10th, splits the transmission data of described parts augmentation requests with this, and by after segmentation Described data be sent to described working real result managing device,
In the case of the described working real result managing device described data after receiving segmentation, identify letter according to described Breath, sends data based on as the described 6th of the described data after divided, the described 7th sends data, the described 8th sends number According to, the described 9th send data and the described 10th and send data, recover the transmission data of described parts augmentation requests and store to Described storage part, and would indicate that this information notification of augmentation requests that there are described parts is to component placement person.
6. a job-oriented terminal, sends operation to the working real result managing device being managed working real result actual Achievement, described job-oriented terminal is characterised by,
Described job-oriented terminal is arranged on the vicinity of operation post or operation area, and described job-oriented terminal has: IC tag reads Device, is attached to determine operation and determines, with IC tag and operator, the IC tag park placed with IC tag Institute, and read the information of the described IC tag being placed on this IC tag place to place, wherein, described operation determines uses IC tag Being written with the information that the job content to manipulating object article is determined, described operator determines and is written with work with IC tag The information that dealer is determined;And control device, the information that described IC tag reading device is read is sent to described work Industry real result managing device,
In the case of apposition has described operation to determine and be placed on described IC tag place to place with the instruction sheet of IC tag, institute State the information that described job content is determined and table that described IC tag reading device is read by IC tag reading device It is shown as the information transmission extremely described control device that industry starts;
In the case of described operator determines and is placed on described IC tag place to place with IC tag, described IC tag reads Device sends the information being determined described operator that described IC tag reading device is read,
The information that starts in the information that described job content is determined, described expression operation and described operator is carried out really In the case of fixed information matches, described control device is by moment when the information being determined described in each, described coupling, described Control the information that Work places is determined that kept of device and be sent to described working real result managing device it The identification information on border sets up association, sends data as operation and edits;
Described control device is when being sent to described working real result managing device by described operation transmission data, by described Moment during coupling sets up to associate with described identification information and sends data as the 1st, by be determined described Work places Information and described identification information are set up and associates as the 2nd transmission data, by the information being determined described operator and described Identification information is set up association and is sent data as the 3rd, by the information being determined described job content and described identification information Set up association to set up associate as the 5th as the 4th transmission data, the information described expression operation started and described identification information Send data, split described operation with this and send data, and the described data after segmentation are sent to the actual one-tenth of described operation Achievement managing device.
Job-oriented terminal the most according to claim 6, it is characterised in that
Described operation is had to determine with the instruction sheet of IC tag in the case of described IC tag place to place is removed in apposition, institute State the information that described job content is determined and table that described IC tag reading device is read by IC tag reading device Show that the information of the end of job sends to described control device,
In the information that described job content is determined, the information of the described expression end of job and described operator is carried out really In the case of fixed information matches, described control device is by moment when the information being determined described in each, described coupling, described Control the information that Work places is determined that kept of device and be sent to described working real result managing device it The identification information on border sets up association, sends data as operation and edits;
Described control device is when being sent to described working real result managing device by described operation transmission data, by described Moment during coupling sets up to associate with described identification information and sends data as the 1st, by be determined described Work places Information and described identification information are set up and associates as the 2nd transmission data, by the information being determined described operator and described Identification information is set up association and is sent data as the 3rd, by the information being determined described job content and described identification information Set up association and send data as the 4th, the information of the described expression end of job is set up with described identification information and associates as the 5th Send data, split described operation with this and send data, and the described data after segmentation are sent to the actual one-tenth of described operation Achievement managing device.
CN201280067867.8A 2012-01-27 2012-01-27 Working real result collection system and job-oriented terminal Active CN104067188B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/051820 WO2013111324A1 (en) 2012-01-27 2012-01-27 Job result gathering system and job terminal

Publications (2)

Publication Number Publication Date
CN104067188A CN104067188A (en) 2014-09-24
CN104067188B true CN104067188B (en) 2016-09-28

Family

ID=48873088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280067867.8A Active CN104067188B (en) 2012-01-27 2012-01-27 Working real result collection system and job-oriented terminal

Country Status (3)

Country Link
JP (1) JP5764676B2 (en)
CN (1) CN104067188B (en)
WO (1) WO2013111324A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015041173A (en) * 2013-08-21 2015-03-02 株式会社日立製作所 Work result collection device
JP6096872B1 (en) 2015-11-30 2017-03-15 ファナック株式会社 Production management device and production system for managing production performance information on a production line
JP6782963B2 (en) * 2016-07-29 2020-11-11 小林クリエイト株式会社 Transportation material management program and transportation material management equipment
US11392110B2 (en) * 2016-10-26 2022-07-19 Kabushiki Kaisha Toshiba Information management system
JP6858053B2 (en) * 2017-03-29 2021-04-14 株式会社富士通アドバンストエンジニアリング Work record management device and program
KR102253360B1 (en) 2020-08-06 2021-05-20 쿠팡 주식회사 Electronic apparatus and information providing method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1503468A (en) * 2002-11-25 2004-06-09 格鲁博-工厂布克哈特格鲁博E.K. Station with operation area
CN101140455A (en) * 2007-10-22 2008-03-12 广东工业大学 Real time monitoring system for production processes and monitoring method
EP1918865A1 (en) * 2006-10-31 2008-05-07 Fujitsu Limited System, device, method, program for controlling communication between radio frequency identification tag and network, and manufacturing method for manufacturing products using the control method
CN201134030Y (en) * 2007-12-07 2008-10-15 上海盛锐软件技术有限公司 RFID control system in industrial production line

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3797828B2 (en) * 1999-09-02 2006-07-19 株式会社日立製作所 Commodity trading system
JP4626937B2 (en) * 2003-11-07 2011-02-09 富士通株式会社 Achievement time collection system, RFID reader / writer, and achievement time collection method
JP2005182656A (en) * 2003-12-22 2005-07-07 Nippon Steel Corp Method and system for collecting working result
JP4851855B2 (en) * 2006-06-09 2012-01-11 株式会社日立製作所 Work results collection system
JP4871853B2 (en) * 2007-12-14 2012-02-08 株式会社日立製作所 Parts lot management system and parts lot management method
JP2011003120A (en) * 2009-06-22 2011-01-06 Asai Kosan Kk Management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1503468A (en) * 2002-11-25 2004-06-09 格鲁博-工厂布克哈特格鲁博E.K. Station with operation area
EP1918865A1 (en) * 2006-10-31 2008-05-07 Fujitsu Limited System, device, method, program for controlling communication between radio frequency identification tag and network, and manufacturing method for manufacturing products using the control method
CN101140455A (en) * 2007-10-22 2008-03-12 广东工业大学 Real time monitoring system for production processes and monitoring method
CN201134030Y (en) * 2007-12-07 2008-10-15 上海盛锐软件技术有限公司 RFID control system in industrial production line

Also Published As

Publication number Publication date
CN104067188A (en) 2014-09-24
WO2013111324A1 (en) 2013-08-01
JP5764676B2 (en) 2015-08-19
JPWO2013111324A1 (en) 2015-05-11

Similar Documents

Publication Publication Date Title
CN104067188B (en) Working real result collection system and job-oriented terminal
JP4851855B2 (en) Work results collection system
CN100468246C (en) Real time monitoring system for production processes and monitoring method
CN101644930B (en) Process control device, process control method, and process control system
JP5324418B2 (en) Assembly work support system and program
JP2008146502A5 (en)
JP2007108880A (en) Production management device, production management method, production management program, recording medium recording production management program, and production system
JP4170000B2 (en) Device connection management system
JP2006139793A (en) Machining work management support system and machining work management support method
JP5139650B2 (en) Work results collection system and work results collection method
JP4922837B2 (en) Work management system and work management method
JP3929038B2 (en) Machining work management support system and machining work management support method
CN101198100A (en) Communication device and communication management system
JP5068684B2 (en) Work management system and work management method
JP2006107161A (en) Tool management apparatus, tool management method, tool management program and tool management program storage medium
JP2012003721A (en) Operation instruction display and result collection system and its method
WO2020250928A1 (en) Cable connection work assistance system, cable connection work assistance method, and cable connection work assistance program
JPH0799522B2 (en) Equipment used for production control
CN101887610A (en) Automatic vending system based on electronic money payment, vending machine and communication method
JP2008158648A (en) System and method for managing cable network
CN113407117A (en) Method, device and system for demagnetizing magnetic disk
CN110910048B (en) Railway work site operation monitoring command method and system
CN111222591B (en) Method and system for manufacturing personalized certificate card
JP3876158B2 (en) Display setting system, display setting method and display setting program
CN105740695A (en) Diversified engineering equipment monitoring system and monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant