JP2008146502A5 - - Google Patents

Download PDF

Info

Publication number
JP2008146502A5
JP2008146502A5 JP2006335128A JP2006335128A JP2008146502A5 JP 2008146502 A5 JP2008146502 A5 JP 2008146502A5 JP 2006335128 A JP2006335128 A JP 2006335128A JP 2006335128 A JP2006335128 A JP 2006335128A JP 2008146502 A5 JP2008146502 A5 JP 2008146502A5
Authority
JP
Japan
Prior art keywords
work safety
work
safety
management
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006335128A
Other languages
Japanese (ja)
Other versions
JP2008146502A (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2006335128A priority Critical patent/JP2008146502A/en
Priority claimed from JP2006335128A external-priority patent/JP2008146502A/en
Publication of JP2008146502A publication Critical patent/JP2008146502A/en
Publication of JP2008146502A5 publication Critical patent/JP2008146502A5/ja
Pending legal-status Critical Current

Links

Claims (6)

作業者の安全を確保するための安全手段と、作業場、前記作業場の機械・工具、前記作業場に出入りする前記作業者の少なくとも一つとを作業安全管理対象体とし、前記作業安全管理対象体の各々を識別するために前記作業安全管理対象体に付設するID―TAGと、前記ID―TAGに付与した認識符号を含むデータを読み取るTAGリーダ/ライタと、コンピュータを有するホスト管理装置又は/及び現場管理端末と、を有していて、前記ホスト管理装置は、予めセットされた第1のプログラムにより、作業安全の計画を作成することに使用され、前記現場管理端末と前記現場管理端末及び前記ホスト管理装置に付設した通信手段を経由して前記TAGリーダ/ライタが読み取った前記認識符号を含む前記データを授受し、第1の作業安全判断出力を出すものであり、前記現場管理端末は、前記作業場、前記作業場の機械・工具、前記作業場に出入りする前記作業者に付設又は携帯され、マイクロコンピュータを組み込んだ端末であり、予めセットされた第2のプログラムにより、前記TAGリーダ/ライタに前記認識符号を含む前記データの読み取りを行わせ、読み取った前記認識符号を含む前記データを用いて、前記マイクロコンピュータのメモリに予め設定した前記作業安全管理対象体の第2の関連付けに照合して、第2の作業安全判断出力を出力するか、又は、読み取った前記認識符号を含む前記データを前記通信手段を経由して前記ホスト管理装置に送信し、前記ホスト管理装置で前記コンピュータのメモリに予め設定した前記作業安全管理対象体の第1の関連付けに照合して、第1の作業安全判断出力を出力することを助け、前記の第1の作業安全判断出力を前記通信手段を介して受け取ることで、前記第1の作業安全判断出力又は第2の作業安全判断出力を表示又は/及び音声出力、又は/及び電気接点出力を出す出力手段を有し、前記第2のプログラムの設定、又は/及び、前記認識符号を含む前記データ又は及び前記作業安全管理対象体の識別名の入力、又は/及び、予め設定された前記第1のプログラム又は/及び第2のプログラムの動作に絡むモードの選択のための入力手段を有するものであり、前記作業者が行う作業と前記安全手段を含む前記作業安全管理対象体について、前記ホスト管理装置又は/及び前記現場管理端末を用いた前記作業安全の計画段階で前記の第1の関連付け又は/及び第2の関連付けを行い、実施内容と予定を含めた作業安全の手順を作成し、前記作業安全の手順に基づいて、前記安全手段を含む前記作業安全管理対象体を付設し、前記RFID―TAGを取り付け、又は、逆に、前記安全手段を含む前記作業安全管理対象体を付設し、前記RFID―TAGを取り付けた後に、前記現場管理端末を用いて、前記作業安全の前記第1の関連付け又は第2の関連付けを行い、作業段階では、前記TAGリーダ/ライタで前記認識符号を含む前記データを読み取ることにより、前記ホスト管理装置又は/及び前記現場管理端末が、前記作業安全の計画又は前記作業安全の手順に定めたことに照合して、前記第1の関連付け又は/及び第2の関連付けされたことと前記認識符号を含む前記データの読み取り結果が一致するかどうかで前記安全手段が確保されているか否かを確認し、前記第1の作業安全判断出力又は/及び前記第2の作業安全判断出力として、対応する事実の報知又は/及び警報を出すか、又は/及び作業中止指令を出すことを特徴とする作業安全計画管理システム。 Each of the work safety management objects is a safety means for ensuring the safety of the worker, a work place, a machine / tool of the work place, and at least one of the workers entering and leaving the work place. ID-TAG attached to the work safety management object in order to identify the data, a TAG reader / writer that reads data including an identification code assigned to the ID-TAG, a host management device having a computer, and / or field management The host management device is used to create a work safety plan according to a preset first program, and the site management terminal, the site management terminal, and the host management The data including the recognition code read by the TAG reader / writer is transmitted / received via a communication means attached to the apparatus, and a first work safety is received. The field management terminal is a terminal that is attached to or carried by the worker who enters or exits the workplace, the machine / tool of the workplace, and incorporates a microcomputer, and is set in advance. The second program causes the TAG reader / writer to read the data including the recognition code, and uses the data including the read recognition code to preset the operation in the memory of the microcomputer. A second work safety judgment output is output by collating with the second association of the safety management object, or the read data including the recognition code is sent to the host management device via the communication means. A first association of the work safety management object transmitted and preset in the memory of the computer by the host management device Collating and assisting in outputting the first work safety judgment output, and receiving the first work safety judgment output via the communication means, so that the first work safety judgment output or the second work safety judgment output is received. Output means for displaying work safety judgment output or / and voice output, and / or electrical contact output, and setting the second program or / and the data including the recognition code or the work safety The operator has an input means for inputting the identification name of the management object and / or selecting a mode related to the operation of the first program and / or the second program set in advance. For the work safety management object including the work to be performed and the safety means, the first association or / and in the planning stage of the work safety using the host management device or / and the site management terminal The second association is performed to create a work safety procedure including an implementation content and a schedule, and the work safety management object including the safety means is attached based on the work safety procedure, and the RFID-TAG Or, conversely, after attaching the work safety management object including the safety means and attaching the RFID-TAG, using the site management terminal, the first association of the work safety or The second association is performed, and in the work stage, the host management apparatus or / and the site management terminal read the data including the recognition code by the TAG reader / writer, so that the work safety plan or the work The result of reading the data including the first association or / and the second association and the data including the recognition code is compared with that determined in the safety procedure. Whether or not the safety means is secured, and a corresponding fact notification or / and warning is output as the first work safety judgment output or / and the second work safety judgment output. A work safety plan management system characterized by issuing a work stop command. 前記現場管理端末が、前記認識符号を含む前記データを前記TAGリーダ/ライタから受け取って、前記ホスト管理装置との通信無しに、自ら、前記第2の作業安全判断出力を出すことが可能なスタンドアロンの構成において、前記ホスト管理装置の設置を省略したことを特徴とする請求項1記載の作業安全計画管理システム。 The field management terminal can receive the data including the recognition code from the TAG reader / writer and can output the second work safety judgment output by itself without communication with the host management device. The work safety plan management system according to claim 1, wherein the host management apparatus is omitted from the configuration. 前記ホスト管理装置又は/及び、前記現場管理端末の作業安全計画の記述欄に記述した項目が、前記手順又は/及びチェックリストの記述欄と関連づけられ、自動的に前記手順又は/及びチェックリストの記述欄に取り込まれ、前記手順又は/及びチェックリストが生成することを特徴とする請求項1又は請求項2に記載の作業安全計画管理システム。 The items described in the description column of the work safety plan of the host management device or / and the field management terminal are associated with the description column of the procedure or / and checklist, and automatically the procedure or / and checklist. The work safety plan management system according to claim 1 or 2, wherein the procedure or / and checklist is generated by being taken into a description column. 前記ホスト管理装置又は/及び、前記現場管理端末の表示画面の前記作業安全計画の計画画面は、ボタンのクリックにより、より詳細な記述の対応する計画画面を表示することを特徴とする請求項1から請求項3のいずれか一つに記載の作業安全計画管理システム。 The plan screen of the work safety plan on the display screen of the host management device and / or the site management terminal displays a corresponding plan screen with a more detailed description by clicking a button. The work safety plan management system according to claim 1. 前記ホスト管理装置又は/及び、前記現場管理端末の表示画面の前記作業安全計画の作業内容と安全手段の確認ための記述欄には、予め決められた記述項目リストが存在し、そのリストから選ぶことで記述を容易ならしめたことを特徴とする請求項1から請求項4のいずれか一つに記載の作業安全計画管理システム。 In the description column for confirming the work contents and safety means of the work safety plan on the display screen of the host management device and / or the site management terminal, there is a list of predetermined description items, and a list is selected from the list. The work safety plan management system according to any one of claims 1 to 4, wherein the description is made easy. 前記作業安全の計画において記述した前記安全手段がリストの形でまとめて見えるようにしたことを特徴とする請求項1から請求項5のいずれか一つに記載の作業安全計画管理システム。
The work safety plan management system according to any one of claims 1 to 5, wherein the safety means described in the work safety plan can be viewed together in a list form.
JP2006335128A 2006-12-12 2006-12-12 Work safety plan management system Pending JP2008146502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006335128A JP2008146502A (en) 2006-12-12 2006-12-12 Work safety plan management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006335128A JP2008146502A (en) 2006-12-12 2006-12-12 Work safety plan management system

Publications (2)

Publication Number Publication Date
JP2008146502A JP2008146502A (en) 2008-06-26
JP2008146502A5 true JP2008146502A5 (en) 2010-04-02

Family

ID=39606587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006335128A Pending JP2008146502A (en) 2006-12-12 2006-12-12 Work safety plan management system

Country Status (1)

Country Link
JP (1) JP2008146502A (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101117613B1 (en) 2010-07-19 2012-03-08 주식회사 파인시스 Safety management system for worker in culvert
US20150112769A1 (en) * 2013-10-18 2015-04-23 Caterpillar Inc. System and method for managing a worksite
JP2017045321A (en) * 2015-08-27 2017-03-02 前田建設工業株式会社 Information management system, information management method, and information management program
KR101622891B1 (en) * 2015-12-11 2016-05-19 정용호 Safety Management System for alarming a early warn and Drive Method of the Same
JP6264392B2 (en) * 2016-03-31 2018-01-24 積水ハウス株式会社 Form creation system and form creation method
JP6703456B2 (en) * 2016-08-02 2020-06-03 日本電信電話株式会社 Method of operating determination device, determination device, and wearable sensor system
JP6994707B2 (en) * 2016-09-02 2022-01-14 株式会社汎建大阪製作所 Work management system
JP7044530B2 (en) * 2017-02-17 2022-03-30 倉敷紡績株式会社 Heat stroke risk management system
WO2019064454A1 (en) * 2017-09-28 2019-04-04 株式会社オプティム Augmented reality output system, augmented reality output method, and program
KR102562723B1 (en) * 2018-07-20 2023-08-03 재단법인 포항산업과학연구원 Safety work system and method applying blockchain in a closed space
JP7368171B2 (en) * 2019-10-08 2023-10-24 清水建設株式会社 Safety information provision system, safety information provision method
CN115223345A (en) * 2022-07-19 2022-10-21 中建八局发展建设有限公司 Scaffold construction monitoring and management system and method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06259443A (en) * 1991-07-02 1994-09-16 Shimizu Corp Work safety confirming information management system
JP2001323695A (en) * 2000-05-17 2001-11-22 Dainippon Printing Co Ltd Entering/leaving control system
JP2005078222A (en) * 2003-08-28 2005-03-24 Seiko Precision Inc Passage management system, safety management system and management passage method
JP2006154934A (en) * 2004-11-25 2006-06-15 Toshiba Plant Systems & Services Corp Plant construction work information management system

Similar Documents

Publication Publication Date Title
JP2008146502A5 (en)
JP6057607B2 (en) Production management system and method
JP2008146502A (en) Work safety plan management system
JP2008052480A (en) Maintenance and inspection support system, and maintenance and inspection support device, maintenance and inspection support program used for the same
WO2012053293A1 (en) Cable construction assistance/management system
CN105334798A (en) Automatic piece counting method and system for machining workshop of numerically-controlled machine tool
CN104950793B (en) Control system is matched and is overhauled in the makeup of locomotive magnitude
WO2019062254A1 (en) Device management system and method
WO2017141794A1 (en) Maintenance work management system
CN104950702A (en) Robot system for determining operator by biometric authentication
CN109784767B (en) Standardized intelligent overhaul management control system for parts
JP2006139793A (en) Machining work management support system and machining work management support method
JP2005326965A (en) Construction site management system
KR20150012762A (en) Apparatus for managing production work and method thereof
CN112014071A (en) Method, system, equipment and storage medium for identifying fault bad points of LED display screen
JP2012174158A (en) Operational instruction management method and operational instruction management system
KR102151996B1 (en) Tool management system
JP4707689B2 (en) Valve check support system
JP3929038B2 (en) Machining work management support system and machining work management support method
JP2006107161A (en) Tool management apparatus, tool management method, tool management program and tool management program storage medium
JP2003330375A (en) Method and program for manufacturing rating plate
CN206058261U (en) It is a kind of to examine safety management system for fixing equipment maintenance point
KR101215597B1 (en) Method for production of spool
JP2006221507A (en) Progress management device in batch line type repairing process and its method
JP2010006595A (en) Picking assisting system and picking assisting method