JP2006154934A - Plant construction work information management system - Google Patents

Plant construction work information management system Download PDF

Info

Publication number
JP2006154934A
JP2006154934A JP2004340599A JP2004340599A JP2006154934A JP 2006154934 A JP2006154934 A JP 2006154934A JP 2004340599 A JP2004340599 A JP 2004340599A JP 2004340599 A JP2004340599 A JP 2004340599A JP 2006154934 A JP2006154934 A JP 2006154934A
Authority
JP
Japan
Prior art keywords
work
schedule
work schedule
plant construction
information management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004340599A
Other languages
Japanese (ja)
Inventor
Yuji Kato
裕二 加藤
Yutaka Ikeda
豊 池田
Koichi Wataji
浩一 綿路
Tsutomu Nishida
力 西田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Plant Systems and Services Corp
Original Assignee
Toshiba Corp
Toshiba Plant Systems and Services Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Plant Systems and Services Corp filed Critical Toshiba Corp
Priority to JP2004340599A priority Critical patent/JP2006154934A/en
Publication of JP2006154934A publication Critical patent/JP2006154934A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a plant construction work information management system capable of reliably penetrating safety instructions thoroughly when creating a work plan. <P>SOLUTION: This plant construction work information management system for creating a work schedule 23 for plant construction has a server 13 for storing attention-requiring work contents among the plant construction works together with an attention attracting symbol mark 41 and an attention-requiring diagnosis processing part 16 which reads out the attention attracting symbol mark 41 corresponding to the input attention-requiring work contents in response to inputting of the attention-requiring work contents into the work schedule 23 and which displays the read out attention attracting symbol mark 41 on the work schedule 23. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、プラント工事作業情報管理システムに関し、特に作業計画策定にあたり安全指示などを確実に徹底可能としたプラント工事作業情報管理システムに関する。   The present invention relates to a plant construction work information management system, and more particularly to a plant construction work information management system that can ensure safety instructions and the like when formulating a work plan.

発電所のようなプラント施設では、新設備の設置や既存設備の補修、点検などの多数の工事が日常的に行われている。このような工事においては地域社会への信頼性・安全性の確保はもとより、顧客への品質安全・工事安全並びに効率化が求められており、実現にあたっては工事関係者間での円滑な作業情報の共有、品質不適合・労働災害の撲滅に向けての措置及び作業員への適切な作業指示・伝達の仕組みは必要不可欠である。   In plant facilities such as power plants, many constructions such as installation of new equipment, repair and inspection of existing equipment are routinely performed. In such construction, in addition to ensuring reliability and safety for the local community, quality safety, construction safety, and efficiency are required for customers. , Measures to eliminate quality non-conformity and occupational accidents, and appropriate work instruction and communication mechanisms to workers are indispensable.

その手段としては、作業実施会社の作業責任者が作業実施前に作業予定内容及び品質不適合・労働災害防止に関する指示事項などの必要事項を所定用紙(以下、作業予定表という)に記載する。記載された作業予定表は、請負系列上の上位会社に提出された後、この上位会社の関連部署の担当者に回付され、作業内容の確認・検討・修正又は追記が行われ、作業予定表を作成した作業実施会社の作業責任者へ返却される。作業責任者は、この後自社の作業員へ記載内容に基づき各種指示が行われる。   As a means for doing so, the person in charge of the work execution company writes the work schedule contents and necessary items such as instructions on quality nonconformity and occupational accident prevention on the prescribed form (hereinafter referred to as work schedule table) before the work is performed. The work schedules listed are submitted to the higher-ranking company in the contracted series, then circulated to the person in charge at the relevant department of the higher-ranking company, and the work content is confirmed, reviewed, revised, or added to the work schedule. Returned to the person responsible for the work at the company that created the table. The person in charge of the work then gives various instructions to the workers in the company based on the description.

作業予定表の起草にあたっては、作業の安全性の確認、作業対象の明確化、危険作業に従事することによる立入り規制など、従事する作業員のみならず近傍作業員への周知徹底を図るため、作業予定の詳細を記載する必要がある。このため、記入漏れなどの不備のない正確な作業予定表の作成には多大な労力を要している。   In drafting the work schedule, in order to ensure not only the workers engaged, but also the nearby workers, such as confirming the safety of the work, clarifying the work target, and restricting access by engaging in dangerous work, Details of the work schedule need to be described. For this reason, it takes a great deal of labor to create an accurate work schedule without any omissions.

また、作業実施会社が作成した作業予定表の記載内容の確認を行う上位会社の担当者においては、これらの情報を的確に把握し労務管理・安全管理上の不備事項の有無の確認、修正を行い、作業実施会社へ適切な指示を行うことは大きな負担となっていた。   In addition, the person in charge of the higher-level company that confirms the contents of the work schedule created by the work execution company accurately grasps this information and confirms and corrects any deficiencies in labor management and safety management. It was a heavy burden to do and give appropriate instructions to the working company.

一方、工程表の作成に人的要素の依存度の低減を図るために、工事の手配や進捗状況のフォローを容易に行うため、コンピュータシステムを利用した電子的な工程表を用いて工程管理を行う方法も知られている(特許文献1を参照)。   On the other hand, in order to reduce the dependency of human factors on the creation of process schedules, process management is performed using electronic process schedules using a computer system in order to facilitate construction arrangements and follow-up of progress. The method of performing is also known (see Patent Document 1).

この方法では、作業項目欄、スケジュール欄に、あらかじめ標準作業項目や典型的な作業期間情報が記載されている工程表の雛形が記憶されている。この雛形を利用して追加、修正を行って個々の作業工程表が完成される。そして、施工管理者と取引先業者間でインターネットを利用して作業の依頼、進捗度の報告などに人的労力の低減を図るようにしたシステムである。   In this method, a schedule table in which standard work items and typical work period information are described in advance is stored in the work item column and the schedule column. Each work schedule is completed by making additions and corrections using this template. The system is designed to reduce human labor for work requests and progress reports using the Internet between construction managers and suppliers.

このように、特許文献1のシステムにおいては、標準作業を想定した各種項目をあらかじめ記入しておく雛形の利便性はあるが、個々の作業毎に留意すべき特殊条件、特に安全上の注意事項など記入漏れがないような配慮までには至っていない。
特開2002−149747号公報
As described above, in the system of Patent Document 1, there is the convenience of a template in which various items assuming standard work are entered in advance, but special conditions to be noted for each work, particularly safety precautions. It has not yet reached the point where there is no omission.
JP 2002-149747 A

本発明は、上記課題を解決するためになされたもので、作業計画策定にあたり、安全指示などを確実に徹底可能としたプラント工事作業情報管理システムを提供することを目的とする。   The present invention has been made in order to solve the above-described problems, and an object of the present invention is to provide a plant construction work information management system capable of ensuring thorough safety instructions and the like when formulating a work plan.

本発明の請求項1に係わるプラント工事作業情報管理システムは、プラント工事の作業予定表を作成するプラント工事作業情報管理システムにおいて、前記プラント工事作業の内、要注意作業内容に関連付けて注意喚起シンボルマークを格納するサーバと、前記作業予定表に前記要注意作業内容が入力されたことに応じて前記要注意作業内容に対応する前記注意喚起シンボルマークを前記サーバから読み出し、読み出された前記注意喚起シンボルマークを前記作業予定表に表示する要注意作業診断処理部を具備することを特徴とする。   A plant construction work information management system according to claim 1 of the present invention is a plant construction work information management system for creating a work schedule for plant construction. A server for storing a mark, and the attention symbol mark corresponding to the work content requiring attention in response to the work content requiring attention being input to the work schedule, and the read attention A cautionary work diagnosis processing unit for displaying an urging symbol mark on the work schedule is provided.

本発明の請求項2に係わるプラント工事作業情報管理システムは、前記作業予定表への記入必須項目の記入漏れの有無並びに前記作業予定表への複数の記入内容間の整合性の有無を判定し、前記記入漏れ又は不整合が判定された場合にはエラーメッセージを出す情報不整合診断処理部を具備することを特徴とする。   The plant construction work information management system according to claim 2 of the present invention determines whether there are omissions in the required items to be entered in the work schedule and whether there is consistency between a plurality of entries in the work schedule. An information inconsistency diagnosis processing unit that issues an error message when the entry omission or inconsistency is determined is provided.

本発明の請求項3に係わるプラント工事作業情報管理システムは、前記サーバには前記作業予定表に登録される作業員毎の保有資格データが格納されており、前記作業予定表に記入された作業内容が資格保有作業員によらなければならない作業である場合に、前記作業予定表に登録された作業員が前記必要とする資格を保有しているか否かを判定する有資格診断処理部を具備することを特徴とする。   In the plant construction work information management system according to claim 3 of the present invention, the qualification data for each worker registered in the work schedule is stored in the server, and the work entered in the work schedule Provided with a qualified diagnosis processing unit for determining whether or not the worker registered in the work schedule has the required qualification when the contents are work that must be performed by a qualified worker It is characterized by doing.

本発明の請求項4に係わるプラント工事作業情報管理システムは、前記作業予定表に記入された作業内容又は使用機器類に対応して、前記作業内容又は使用機器類に関連する分担作業内容を決定し、この決定された分担作業内容を前記作業予定表に表示する役割分担項目生成処理部を具備することを特徴とする。   The plant construction work information management system according to claim 4 of the present invention determines shared work contents related to the work contents or the used equipment corresponding to the work contents or the used equipment entered in the work schedule. And a role assignment item generation processing section for displaying the determined assignment work contents on the work schedule.

本発明の請求項5に係わるプラント工事作業情報管理システムは、前記注意喚起シンボルマークが、前記作業予定表の他の記載とは異なる色で着色されて表示されることを特徴とする。   The plant construction work information management system according to claim 5 of the present invention is characterized in that the alert symbol mark is displayed in a color different from other descriptions of the work schedule.

本発明の請求項6に係わるプラント工事作業情報管理システムは、前記分担作業内容の表示が、前記作業予定表の他の記載とは異なる色で着色されて表示されることを特徴とする。   The plant construction work information management system according to claim 6 of the present invention is characterized in that the display of the shared work contents is displayed in a color different from other descriptions of the work schedule.

本発明の請求項7に係わるプラント工事作業情報管理システムは、プラント工事の作業予定表を作成するプラント工事作業情報管理システムにおいて、前記プラント工事作業の内、要注意作業内容を注意喚起シンボルマークとともに格納するサーバと、前記作業予定表に要注意作業内容が表示されたことに応じてこの表示された前記要注意作業内容に対応する前記注意喚起シンボルマークを前記サーバから読み出し、読み出された前記注意喚起シンボルマークを前記作業予定表に表示する要注意作業診断処理部と、前記作業予定表への記入必須項目の記入漏れの有無並びに前記作業予定表への複数の記入内容間の整合性の有無を判定し、前記記入漏れ又は不整合が判定された場合にはエラーメッセージを出す情報不整合診断処理部と、前記サーバには前記作業予定表に登録される作業員毎の保有資格データが格納されており、前記作業予定表に記入された作業内容が資格保有作業員によらなければならない作業である場合に、前記作業予定表に登録された作業員が前記必要とする資格を保有しているか否かを判定する有資格診断処理部と、前記作業予定表に記入された作業内容又は使用機器類に対応して、前記作業内容又は使用機器類に関連する分担作業内容を決定し、この決定された分担作業内容を前記作業予定表に表示する役割分担項目生成処理部とを具備することを特徴とする。   A plant construction work information management system according to claim 7 of the present invention is a plant construction work information management system for creating a work schedule for plant construction. In response to the display of the work contents requiring attention on the work schedule table, the server stores the warning symbol mark corresponding to the displayed work contents requiring attention read from the server, and the read The warning work diagnosis processing unit that displays a warning symbol mark on the work schedule, whether there are omissions in required items to be entered in the work schedule, and consistency between multiple entries in the work schedule. An information inconsistency diagnosis processing unit which issues an error message when the presence or absence is determined and the entry omission or inconsistency is determined, and the support If the work qualification data for each worker registered in the work schedule is stored in the work schedule, and the work content entered in the work schedule is a work that must be performed by a qualified worker, Corresponding to the qualified diagnosis processing unit for determining whether or not the worker registered in the work schedule has the necessary qualification, and the work content or equipment used entered in the work schedule. And a role assignment item generation processing unit for determining the assigned work content related to the work content or the equipment used and displaying the determined assigned work content on the work schedule.

プラント工事の作業予定表を作成するにあたり、人的作成要素によるミスをなくすためコンピュータにて効率化するとともに、作業計画策定にあたり、安全指示などを確実に徹底可能とした。   In preparing the work schedule for plant construction, the computer has been streamlined to eliminate mistakes due to human factors, and safety instructions and other information can be reliably implemented when formulating work plans.

以下に本発明の実施形態を図を参照して説明する。図1は本発明に係る実施形態の概要を示す図であるが、通信回線を用いたWAN11には、システムによる処理・実行情報を表示出力するパーソナルコンピュータからなるシステム端末12、システムサーバ13並びにプリンタ14が接続されている。すなわち、この構成によるシステムによって、プラント工事の作業予定表を作成する。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram showing an outline of an embodiment according to the present invention. In a WAN 11 using a communication line, a system terminal 12 including a personal computer that displays and outputs processing / execution information by the system, a system server 13, and a printer 14 is connected. That is, a work schedule for plant construction is created by the system having this configuration.

システム端末12には、作業情報登録処理部15、要注意作業診断処理部16、有資格診断処理部17、情報不整合診断処理部18、役割分担項目生成処理部19、作業情報提供処理部20が形成されている。システムサーバ13は、当該作業の作業日、作業内容などの作業情報を格納するメインシステムファイル21並びに作業情報の入力時点での選択項目一覧を作成するための各種選択項目を格納したサブファイル22から構成されており、プリンタ14からは作成された作業予定表23が出力される。   The system terminal 12 includes a work information registration processing unit 15, a cautionary work diagnosis processing unit 16, a qualified diagnosis processing unit 17, an information inconsistency diagnosis processing unit 18, a role assignment item generation processing unit 19, and a work information provision processing unit 20. Is formed. The system server 13 includes a main system file 21 that stores work information such as a work date and work contents of the work, and a sub file 22 that stores various selection items for creating a list of selection items when the work information is input. The work schedule table 23 is output from the printer 14.

さて、作業予定表23の詳細は後述するが、図2に概要を示してある。すなわち、作業予定表23は、作業予定表・安全指示書との表題にしてあり、作業内容に加えて安全確保のための指示事項も重点項目に設定してある。作業予定表23の構成としては、図の通りであるが、大きく左右に分かれているが端末画面上では一画面に表示されるように構成されている。なお、記載内容が詳細にわたるため、通常の画面では左右同時に全ての画面を表示することは困難である場合は、左右にスクロールすることにより確認するようになる。   The details of the work schedule 23 will be described later, but an outline is shown in FIG. In other words, the work schedule table 23 is titled “work schedule table / safety instruction sheet”, and in addition to the work contents, instructions for ensuring safety are also set as priority items. The configuration of the work schedule table 23 is as shown in the figure, but is largely divided into left and right, but is configured to be displayed on one screen on the terminal screen. In addition, since the description contents are detailed, if it is difficult to display all the screens on the right and left at the same time on the normal screen, it is confirmed by scrolling left and right.

作業予定表23は、左に、承認欄24、参加会社データ欄25、工事対象・工事件名欄26、作業内容・使用機器類欄27、品質指示欄28、確認者欄29が配置されており、右に、安全指示事項欄30、作業グループ主要留意事項欄31、作業グループメンバー欄32、役割分担リスト欄33から構成されている。   In the work schedule table 23, an approval column 24, a participating company data column 25, a construction object / construction subject column 26, a work content / used equipment column 27, a quality instruction column 28, and a confirmer column 29 are arranged on the left. On the right side, a safety instruction item column 30, a work group main consideration item column 31, a work group member column 32, and a role assignment list column 33 are configured.

なお、作業内容・使用機器類欄27の内、作業内容を記入する欄は「1」と「2」の二つの欄が設けられており、これは作業予定表23に作業を二つまで記入できることを示している。この結果、図4に示した安全指示事項欄30に表示されている各安全指示事項の前に□内に表示されている「1」「2」は、作業内容を記入する欄の「1」「2」に対応しているものである。すなわち、第1の作業に対応する安全指示事項は□内に「1」の表示にレ印が付され、第2の作業に対応する安全指示事項は□内の「2」の表示にレ印が付されることになる。   Of the work contents / used equipment column 27, the work entry field has two fields, “1” and “2”, which are entered up to two in the work schedule table 23. It shows what you can do. As a result, “1” and “2” displayed in □ before each safety instruction item displayed in the safety instruction item column 30 shown in FIG. 4 are “1” in the column for entering the work content. This corresponds to “2”. That is, the safety instruction corresponding to the first work is marked with “1” in the square, and the safety instruction corresponding to the second work is marked on the “2” in the square. Will be attached.

次にこのような作業予定表23の詳細な構成と必要項目の入力方法について図3、図4を参照して説明する。図3、図4に分割して示してあるが、図2に概要を示した一画面の左右を分割したものである。また、図3、図4には作業予定表23の構成に加えて、一部の入力データも入力方法の説明のために記載してあるが、全ての必要項目の入力結果は後述する他の図面にて説明する。更に、各記入欄に表示されている諸項目の記載は、本発明の内容理解を容易にするため相互の内容に関連性が乏しい記載もある。   Next, a detailed configuration of the work schedule table 23 and a method for inputting necessary items will be described with reference to FIGS. FIG. 3 and FIG. 4 are divided, but the left and right sides of one screen whose outline is shown in FIG. 2 are divided. In addition to the configuration of the work schedule table 23, FIG. 3 and FIG. 4 also show some input data for explanation of the input method. However, input results of all necessary items will be described later. This will be described with reference to the drawings. Furthermore, the descriptions of the various items displayed in the respective entry columns include descriptions that are poorly related to each other in order to facilitate understanding of the contents of the present invention.

さて、作業予定表23への入力を指定すると、図3、図4の画面が表示される。入力にあたっては図1に示した作業情報登録処理部15により各記載項目をキーボード操作により直接文字列を生成するほかに、例えば楕円34で示した主管G・監理員の欄では、選択キー35を操作することにより、図1のサブファイル22に格納されている選択項目一覧36を表示させ、この中から本件を主管するグループとして機械補修課を選択する方式も採用している。この選択項目一覧方式を採用している項目は、図3にて選択キー35と同一の記号にて示してある。   When the input to the work schedule table 23 is designated, the screens of FIGS. 3 and 4 are displayed. In the input, the work information registration processing unit 15 shown in FIG. 1 directly generates a character string by operating the keyboard, and for example, in the section of the supervisor G / supervisor shown by an ellipse 34, the selection key 35 is set. By operating, a selection item list 36 stored in the subfile 22 of FIG. 1 is displayed, and a method of selecting a machine repair section as a group that supervises the case from this is also adopted. Items adopting this selection item list method are indicated by the same symbols as the selection key 35 in FIG.

他の入力形態としては、図3、図4の各所に設けた□を選択して内部に『レ』印を記入する方式もある。例えば、楕円37でクレーンを選択した例や、楕円39で溶接機、溶断機を選択した例などを示しておいた。また、楕円40に示した工事件名記入欄の記載方法として、図示しないがコード一覧からの選択により行うことが可能で、入力作業の省力化を図ることができる。   As another input form, there is a method of selecting “□” provided at various places in FIG. 3 and FIG. For example, the example which selected the crane with the ellipse 37, the example which selected the welding machine and the fusing machine with the ellipse 39, etc. were shown. Moreover, although it is not illustrated as a description method of the construction subject entry column shown in the ellipse 40, it can be performed by selecting from a code list, and labor saving of input work can be achieved.

また、図1に示した要注意作業診断処理部16では、工事安全面から災害発生のリスクが高い要注意作業を、図3、図4の記入項目から判断して、作業指示者及び作業員へ視覚的に注意喚起を促す注意喚起シンボルマーク41、42、43を作業予定表23の作業内容欄に表示する機能を行う。注意喚起シンボルマーク41、42、43はそれぞれ、『高』『火』『重』を太丸で囲った記号として表示され、『高』は高所作業での注意、『火』は火気注意、『重』は重量物取り扱い上の注意をそれぞれ視覚的に喚起する。更に、各注意喚起シンボルマークは視認性をよくするために赤色で表示される。   Further, the cautionary work diagnosis processing unit 16 shown in FIG. 1 judges the cautionary work with a high risk of occurrence of a disaster from the viewpoint of construction safety based on the entries shown in FIGS. The function of displaying the alert symbol marks 41, 42, 43 for visually prompting the user in the work content column of the work schedule table 23 is performed. The warning symbol marks 41, 42, and 43 are respectively displayed as symbols that enclose “high”, “fire”, and “heavy” in bold circles, “high” indicates caution when working at height, “fire” indicates fire, “Heavy” visually calls attention to handling heavy objects. Further, each attention symbol mark is displayed in red for better visibility.

これらの注意喚起シンボルマーク41、42、43は、図5に示す注意喚起シンボル判断基準44に基づき、図1の要注意作業診断処理部16にて作業予定表23への入力内容と対比して該当する場合には図3の注意喚起シンボルマーク41、42、43のように表示される。   These warning symbol marks 41, 42, and 43 are compared with the contents input to the work schedule table 23 by the cautionary work diagnosis processing unit 16 of FIG. 1 based on the warning symbol judgment standard 44 shown in FIG. 5. If applicable, the warning symbol marks 41, 42, and 43 in FIG. 3 are displayed.

すなわち、図5に示すように、注意喚起シンボルマーク『高』は要注意作業名として高所作業が該当し、判定基準として図3の作業高度欄45の高さが3m以上又は図4の安全指示欄にて「高所作業」46に記入されている場合に表記される。同様に『開』は、開口部作業に関し図4の「開口部作業」47に記入されている場合に表記される。以下同様に『有』は有機溶剤取扱い作業、『酸』は酸素欠乏等危険作業、『火』は火気作業、『充』は充電部近接作業、『重』は重量物運搬作業にそれぞれ関し、各判定基準は図5に示す通りである。また、これらの各注意喚起シンボルマーク毎の判定基準44は、図1のシステムサーバ13のサブファイル22に対応する要注意作業に関連付けて格納されている。   That is, as shown in FIG. 5, the alert symbol mark “high” corresponds to a work at a high place as a work name requiring attention, and the height of the work altitude column 45 in FIG. This is displayed when “work at height” 46 is entered in the instruction column. Similarly, “open” is written when “opening work” 47 in FIG. 4 is entered for the opening work. Similarly, “Yes” is related to organic solvent handling work, “Acid” is related to dangerous work such as oxygen deficiency, “Fire” is related to fire work, “Charge” is related to charging part work, “Heavy” is related to heavy material transport work, Each criterion is as shown in FIG. In addition, the determination criteria 44 for each of these warning symbol marks is stored in association with the work requiring attention corresponding to the subfile 22 of the system server 13 in FIG.

また、図1の有資格者確認処理部17では、当該作業に従事する作業構成員が作業に必要な資格を保有しているかどうかの確認を、作業予定表23に記載された作業班員各々の保有資格を、図6にファイル構成例を示す作業員保有資格台帳ファイル48と照合して判断する。照合の結果、有資格者が班員として構成されていない場合には、作業班の再構成を作成者へ促す機能を有する。   In addition, the qualified person confirmation processing unit 17 in FIG. 1 confirms whether or not the working members engaged in the work have the necessary qualifications for the work. Are compared with the worker qualification ledger file 48 shown in FIG. As a result of the collation, when the qualified person is not configured as a group member, it has a function of prompting the creator to reconfigure the work group.

図6(a)には、個々の作業員が保有する資格をコードで格納し、更にそれぞれの資格の取得年月日データを保有する。図6(b)のデータは、各資格コードの資格名称と有効期間データである。図6(c)は、図4の作業予定表23の安全指示項目毎に作業員が保有しなければならない必要資格をコードで示したデータである。例えば安全指示項目が「玉掛者」(図4の49)に表記されている場合には、必要資格としてT101、すなわち図6(b)にあるように「玉掛技能講習」を終了した者でなければならないことを表してある。これらの作業員保有資格台帳ファイル48は、図1のシステムサーバ13のサブファイル22に格納されている。   In FIG. 6A, qualifications held by individual workers are stored as codes, and acquisition date data of the respective qualifications is further held. The data in FIG. 6B is the qualification name and valid period data of each qualification code. FIG. 6C shows data indicating the necessary qualifications required by the worker for each safety instruction item in the work schedule table 23 of FIG. 4 by codes. For example, if the safety instruction item is written as “Takekake” (49 in FIG. 4), it must be T101 as a necessary qualification, that is, a person who has finished “Tamakake Skill Training” as shown in FIG. It shows what must be done. These worker qualification ledger files 48 are stored in the subfile 22 of the system server 13 in FIG.

図1に示す情報不整合診断処理部18では、作業を実施する上で図3、図4に示す作業予定表23の記入漏れ及び指示内容の整合性を図7に示す診断フローに従って、不整合の有無を診断し、結果を表示するとともに不整合がある場合には、記載内容の見直しを作成者へ促す機能を行う。   In the information inconsistency diagnosis processing unit 18 shown in FIG. 1, when performing the work, the incompleteness of the work schedule table 23 shown in FIG. 3 and FIG. 4 and the consistency of the instruction contents are inconsistent according to the diagnosis flow shown in FIG. The function of prompting the creator to review the description is performed if there is any inconsistency.

図7に示すように、先ず作業予定表の各項目へ入力する(Step1)。作業予定表の出力を指示し(Step2)、記入漏れ項目の有無をチェックする(Step3)。記入漏れが有りの場合にはその旨のエラーメッセージが出て(Step4)、作業予定表への入力へ戻る。記入漏れが無しの場合には記入内容の整合性がチェックされる(Step5)。チェックの結果、不整合が有りの場合にはその旨のエラーメッセージが出て(Step6)、作業予定表への入力へ戻る。不整合が無しの場合には作業予定表出力が指示され(Step7)、入力済作業予定表が出力される。   As shown in FIG. 7, input is first made to each item of the work schedule (Step 1). The output of the work schedule is instructed (Step 2), and the presence or absence of an entry missing item is checked (Step 3). If there are omissions, an error message to that effect appears (Step 4) and the process returns to the work schedule table. If there is no omission, the consistency of the contents is checked (Step 5). If there is inconsistency as a result of the check, an error message to that effect appears (Step 6), and the process returns to the work schedule table. If there is no inconsistency, the output of the work schedule is instructed (Step 7), and the input work schedule is output.

例えば、図3の作業予定表23には記入必須項目が定められており、例えば参加会社データ欄25、工事対象・工事件名欄26、作業内容・使用機器類欄27に記入がなされていない場合には、記入漏れとしてエラーメッセージがなされ、記入が促される。   For example, the work schedule table 23 in FIG. 3 has mandatory items to be filled. For example, the participation company data column 25, the construction target / construction subject column 26, and the work content / used equipment column 27 are not filled in. In this case, an error message is given as missing entry, and entry is prompted.

また、図3の作業予定表23にて、作業高度記入欄45には7mと記入したにもかかわらず、図4の安全指示欄にて「高所作業」46に記入がなされない場合には、不整合としてエラーメッセージがなされる。作成者はこの注意喚起によって、安全指示欄の「高所作業」の項目へのチェック漏れを解消することが可能となる。   Further, in the work schedule table 23 of FIG. 3, even if 7 m is entered in the work altitude entry field 45, the “work at high place” 46 is not entered in the safety instruction field of FIG. An error message is made as an inconsistency. By making this alert, the creator can eliminate the check omission in the item “work at height” in the safety instruction column.

次に図1に示した役割分担項目生成処理部19について説明する。役割分担項目生成処理部19では、当該作業における作業前・作業後に作業員へ割り付ける作業チェック項目を作業予定表23の記載内容に基づき、図8にその例を示す役割分担項目生成条件50に従い、自動生成することにより作成者の思考を支援する機能である。   Next, the role assignment item generation processing unit 19 shown in FIG. 1 will be described. In the role assignment item generation processing unit 19, the work check items to be assigned to the workers before and after the work in the work are based on the contents of the work schedule table 23, according to the role assignment item generation condition 50 shown in FIG. It is a function that supports the creator's thinking by automatically generating it.

図8(a)には役割分担項目とこれの生成条件を2項目を例に示したものである。すなわち、役割分担項目は図4の作業予定表23の最下方に設けてあるが、例として図8(b)の下端に示してある。図8(a)に役割分担項目例として「安全帯の使用状況確認」、「終了時の電源OFF」についてそれぞれ生成条件を示した。   FIG. 8 (a) shows role assignment items and conditions for generating them as an example. That is, the role assignment items are provided at the lowermost part of the work schedule table 23 in FIG. 4, but are shown at the lower end of FIG. 8B as an example. FIG. 8A shows the generation conditions for “confirmation of usage status of safety belt” and “power OFF at the end” as examples of role assignment items.

図8(b)上段の使用火器(図3参照)の欄で溶接機にレ印を付した場合には、上記生成条件に合致することから、役割分担リスト56の「H.終了時の電源OFF確認」が色付きの背景に表示が強調される。同様に図8(b)の中断の安全指示(図4参照)の欄で高所作業にレ印を付した場合には、上記生成条件に合致することから、役割分担リストの「G.安全帯の使用状況確認」が色付きの背景に表示が強調される。   When the welding machine is marked in the upper-use firearm (see FIG. 3) column in FIG. 8 (b), the above generation conditions are met, so “H. The “OFF confirmation” is highlighted on a colored background. Similarly, when the work at a high place is marked in the column of the safety instruction for interruption (see FIG. 4) in FIG. 8B, the above-mentioned generation conditions are met, so “G. The display of “Confirmation of band usage” is highlighted on a colored background.

このようにして役割分担リストに色付き強調表示された点検・確認などの実施項目は、各作業員が分担して行わなければならない。この分担指示は、図4の下方に設けられたメンバー役割分担欄51に作業員毎に記入することになる。図4では例として、山田一郎の欄にGと表記してあることは、この作業員は安全帯の使用状況の確認を役割として指示され、自覚することになる。また、山本太郎の欄にHと表記してあることは、この作業員は終了時の電源OFFを確認する役割として指示され、自覚することになる。メンバー役割分担欄51への各作業員へ命ずる役割の記入は、例えば班長が記入したうえで、各作業員への徹底を図る。   The work items such as inspection and confirmation that are highlighted in color in the role assignment list in this way must be shared by each worker. This sharing instruction is entered for each worker in the member role sharing column 51 provided in the lower part of FIG. In FIG. 4, as an example, “G” is written in the field of Ichiro Yamada, and this worker is instructed to confirm the usage status of the safety belt and becomes aware. In addition, the fact that “H” is written in the column of Taro Yamamoto is instructed and aware of the role of confirming that the power is turned off at the end of the operation. The role assigned to each worker in the member role assignment column 51 is entered by, for example, the head of the team, and is thoroughly implemented for each worker.

このようにして作業予定表の必要項目を入力することにより、図9、図10に分割して示した入力結果が得られる。実際には一体の画面に表示され、プリントアウトする場合にも一枚の用紙に印刷される。なお、図9、図10に記載されている入力内容と図8までに説明した内容とが必ずしも一致しない箇所もあるが、あくまでも例として示してある。また、図9上部に(KYシート)と記載されているが、これは危険予知シートの頭文字をとってKYと副題にしたもので、作業の第一が安全確保にあることを作業員、作業責任者ともども常時習慣的に念頭に置くことを求めているために付してある。   By inputting the necessary items of the work schedule in this way, the input results shown in FIGS. 9 and 10 are obtained. Actually, it is displayed on an integral screen, and is printed on a single sheet even when printing out. Although there are places where the input contents described in FIGS. 9 and 10 and the contents described up to FIG. 8 do not always match, they are shown as examples only. In addition, although (KY sheet) is described in the upper part of FIG. 9, this is an acronym of the danger prediction sheet and subtitled KY. This is because the person in charge of the work always needs to be habitually in mind.

このように記入漏れや注意喚起のために、本発明に係るシステムを利用して作業予定表を作成したが、図9、図10にはプリントアウトした後に作業グループの班長などによって、手書き記入する箇所もあり、これらの記入完了後に責任者の承認を受け、再度作業グループに戻り、この作業予定に基づき作業が行われる。また、図9、図10において、網掛けされている箇所は所定の色で表示されている箇所である。   As described above, the work schedule table was created by using the system according to the present invention for omission of entry and alerting. However, in FIG. 9 and FIG. There are also places, and after completing these entries, the person in charge is approved and returned to the work group. Work is performed based on this work schedule. In FIGS. 9 and 10, shaded portions are portions displayed in a predetermined color.

さて、図1に示した作業情報提供処理部20では、作業予定表23の作成者のみならず、当該工事における関連者に対し、図11にその利用例を示すように、任意の検索条件を指定することにより、条件を満足する作業情報を図1のメインシステムファイル21から抽出して、作業一覧として提供する機能が実行できる。   Now, in the work information provision processing unit 20 shown in FIG. 1, not only the creator of the work schedule table 23 but also the related persons in the construction work, an arbitrary search condition is set as shown in FIG. By designating, the function of extracting work information satisfying the conditions from the main system file 21 in FIG. 1 and providing it as a work list can be executed.

すなわち、図11の作業検索画面52上部の検索条件入力部53にて、作業日、会社名などを入力する。図の例では、本日の作業の内、元請会社、一次会社を指定し、二次会社はすべての会社として検索を行った。   That is, a work day, a company name, etc. are input in the search condition input part 53 at the top of the work search screen 52 in FIG. In the example shown in the figure, the main contractor and the primary company were specified in the work for today, and the secondary company searched for all the companies.

この検索条件に合致する作業案件は、作業情報一覧表示部54に表示される。ここでは、プラント番号GGG−01と称する共通のプラント工事の中で3件の作業を表示し、作業中分類名称Ppppppに含まれる小分類作業として10件あることが示され、Qqqqqqに含まれる小分類作業として1件あることが示され、Rrrrrrに含まれる小分類作業として3件あることが示された。   Work items that match the search conditions are displayed on the work information list display unit 54. Here, 3 works are displayed in the common plant construction called the plant number GGG-01, and it is shown that there are 10 minor classification works included in the working classification name Pppppp, and the small works included in Qqqqqq It was shown that there was one classification work, and there were three small classification work included in Rrrrrrr.

また、件数表示の数字の下には下線が表示されており、この数字をクリックすることにより、その数字の内訳である作業内容は詳細作業情報表示部55に表示される。本例では、作業中分類名称Rrrrrrの件数3をクリックして、3件の詳細な作業内容を表示させることができる。   Further, an underline is displayed under the number display number, and by clicking on this number, the work content as a breakdown of the number is displayed on the detailed work information display unit 55. In this example, it is possible to display three detailed work contents by clicking the number of cases 3 of the in-work classification name Rrrrrrr.

図12には本発明に係る作業予定表の作成から確認、修正、承認、返却などのルーチン例を示したものである。実際の作業を行う二次/三次会社にて作業予定表を作成し(Step1)、上位会社である一次会社へ提出する。一次会社の工事担当部門にて作業予定表の内容確認を行い、修正を要する場合には二次/三次会社へ差し戻すか、一次会社にて手書き修正を行い、一次会社の安全担当にて安全指示事項の確認の後、一次会社の工事責任者へ回付する(Step2)。一次会社の工事責任者から工程担当へ回付し(Step3)、工程担当では確認された作業予定表を客先へ提出(Step4)し、あわせて作業を実施する二次/三次会社へ返却する(Step5)。二次/三次会社では実施の作業員に対して確認された作業予定表に基づき、TBM(tool box meeting)と称する朝礼などでその内容の確認と徹底を図り、作業の効率化と安全確保を図る(Step6)。   FIG. 12 shows a routine example such as confirmation, correction, approval, return, etc. from creation of a work schedule according to the present invention. A work schedule is created at the secondary / tertiary company that performs the actual work (Step 1) and submitted to the primary company that is the upper company. Check the contents of the work schedule in the construction department of the primary company, and if correction is required, return it to the secondary / tertiary company, or perform handwritten corrections at the primary company, and the safety at the primary company's safety department After confirming the instructions, it is circulated to the construction manager of the primary company (Step 2). The primary company's construction manager circulates to the process manager (Step 3), and the process manager submits the confirmed work schedule to the customer (Step 4) and returns it to the secondary / tertiary company that performs the work. (Step 5). At the secondary / tertiary company, based on the work schedule confirmed for the workers in charge, the contents are confirmed and thoroughly confirmed at the morning meeting called TBM (tool box meeting) to improve work efficiency and ensure safety. Aim (Step 6).

本発明の実施形態の概要を示すシステム構成図。The system block diagram which shows the outline | summary of embodiment of this invention. 本発明の実施形態に係る作業予定表の概要構成図。1 is a schematic configuration diagram of a work schedule according to an embodiment of the present invention. 本発明の実施形態に係る作業予定表の一部を示す構成図。The block diagram which shows a part of work schedule according to the embodiment of the present invention. 本発明の実施形態に係る作業予定表の一部を示す構成図。The block diagram which shows a part of work schedule according to the embodiment of the present invention. 本発明の実施形態に係る動作を説明するためのデータ構成図。The data block diagram for demonstrating the operation | movement which concerns on embodiment of this invention. 本発明の実施形態に係る動作を説明するためのデータ構成図。The data block diagram for demonstrating the operation | movement which concerns on embodiment of this invention. 本発明の実施形態の動作を説明するためのフローチャート。The flowchart for demonstrating operation | movement of embodiment of this invention. 本発明の実施形態の動作を説明するためのデータ構成図。The data block diagram for demonstrating operation | movement of embodiment of this invention. 本発明の実施形態に係る記入済作業予定表の一部を示す図。The figure which shows a part of completed work schedule according to the embodiment of the present invention. 本発明の実施形態に係る記入済作業予定表の一部を示す図。The figure which shows a part of completed work schedule according to the embodiment of the present invention. 本発明の実施形態に係る作業予定表の利用形態を説明するための構成図。The block diagram for demonstrating the utilization form of the work schedule according to the embodiment of the present invention. 本発明の実施形態の動作を説明するためのフローチャート。The flowchart for demonstrating operation | movement of embodiment of this invention.

符号の説明Explanation of symbols

11…LAN、12…システム端末、13…システムサーバ、14…プリンタ、15…作業情報登録処理部、16…要注意作業診断処理部、17…有資格診断処理部、18…情報不整合診断処理部、19…役割分担項目生成処理部、20…作業情報提供処理部、21…メインシステムファイル、22…サブファイル、23…作業予定表、24…承認欄、25…参加会社データ欄、26…工事対象・工事件名欄、27…作業内容・使用機器類欄、28…品質指示欄、29…確認者欄、30…安全指示事項欄、31…作業グループ主要留意事項欄、32…作業グループメンバー欄、33役割分担リスト欄、41、42、43…注意喚起シンボルマーク、44…注意喚起判断基準、45…作業高度記入欄、48…作業員保有資格台帳ファイル、51…メンバー役割分担欄、52…作業検索画面、53…検索条件入力部、54…作業情報一覧表示部   DESCRIPTION OF SYMBOLS 11 ... LAN, 12 ... System terminal, 13 ... System server, 14 ... Printer, 15 ... Work information registration process part, 16 ... Careful work diagnosis process part, 17 ... Eligible diagnosis process part, 18 ... Information inconsistency diagnosis process , 19 ... Role assignment item generation processing part, 20 ... Work information provision processing part, 21 ... Main system file, 22 ... Sub file, 23 ... Work schedule, 24 ... Approval column, 25 ... Participating company data column, 26 ... Work target / work title column, 27 ... work content / equipment used column, 28 ... quality instruction column, 29 ... confirmer column, 30 ... safety instructions column, 31 ... work group main notes column, 32 ... work group members Column, 33 role assignment list column, 41, 42, 43 ... alert symbol mark, 44 ... alert call criteria, 45 ... work altitude entry column, 48 ... worker possession qualification ledger file, 51 Members roles column, 52 ... work search screen, 53 ... search condition input unit, 54 ... work information list display unit

Claims (7)

プラント工事の作業予定表を作成するプラント工事作業情報管理システムにおいて、前記プラント工事作業の内、要注意作業内容に関連付けて注意喚起シンボルマークを格納するサーバと、前記作業予定表に前記要注意作業内容が入力されたことに応じて前記要注意作業内容に対応する前記注意喚起シンボルマークを前記サーバから読み出し、読み出された前記注意喚起シンボルマークを前記作業予定表に表示する要注意作業診断処理部を具備することを特徴とするプラント工事作業情報管理システム。   In the plant construction work information management system for creating a work schedule for plant construction, a server storing a warning symbol mark in association with the work contents requiring attention among the plant work, and the work requiring attention in the work schedule A cautionary work diagnosis process that reads the caution symbol mark corresponding to the cautionary work content from the server and displays the read caution symbol mark on the work schedule according to the input of the content A plant construction work information management system characterized by comprising a section. 前記作業予定表への記入必須項目の記入漏れの有無並びに前記作業予定表への複数の記入内容間の整合性の有無を判定し、前記記入漏れ又は不整合が判定された場合にはエラーメッセージを出す情報不整合診断処理部を具備することを特徴とする請求項1記載のプラント工事作業情報管理システム。   It is determined whether there are omissions in required items to be entered in the work schedule and whether there is consistency among a plurality of entries in the work schedule, and an error message is displayed if omission or inconsistency is determined. The plant construction work information management system according to claim 1, further comprising an information inconsistency diagnosis processing unit that issues 前記サーバには前記作業予定表に登録される作業員毎の保有資格データが格納されており、前記作業予定表に記入された作業内容が資格保有作業員によらなければならない作業である場合に、前記作業予定表に登録された作業員が前記必要とする資格を保有しているか否かを判定する有資格診断処理部を具備することを特徴とする請求項1記載のプラント工事作業情報管理システム。   The server stores qualification data for each worker registered in the work schedule, and the work content entered in the work schedule is work that must be performed by a qualified worker. The plant construction work information management according to claim 1, further comprising a qualified diagnosis processing unit for judging whether or not a worker registered in the work schedule has the necessary qualification. system. 前記作業予定表に記入された作業内容又は使用機器類に対応して、前記作業内容又は使用機器類に関連する分担作業内容を決定し、この決定された分担作業内容を前記作業予定表に表示する役割分担項目生成処理部を具備することを特徴とする請求項1記載のプラント工事作業情報管理システム。   Corresponding to the work contents or equipment used entered in the work schedule, the assigned work contents related to the work contents or used equipment are determined, and the determined shared work contents are displayed on the work schedule The plant construction work information management system according to claim 1, further comprising a role assignment item generation processing unit. 前記注意喚起シンボルマークは、前記作業予定表の他の記載とは異なる色で着色されて表示されることを特徴とする請求項1記載のプラント工事作業情報管理システム。   2. The plant construction work information management system according to claim 1, wherein the alert symbol mark is displayed in a color different from other descriptions of the work schedule. 3. 前記分担作業内容の表示は、前記作業予定表の他の記載とは異なる色で着色されて表示されることを特徴とする請求項5記載のプラント工事作業情報管理システム。   6. The plant construction work information management system according to claim 5, wherein the display of the shared work content is displayed in a color different from other descriptions of the work schedule. プラント工事の作業予定表を作成するプラント工事作業情報管理システムにおいて、前記プラント工事作業の内、要注意作業内容を注意喚起シンボルマークを格納するサーバと、前記作業予定表に要注意作業内容が入力されたことに応じて前記要注意作業内容に対応する前記注意喚起シンボルマークを前記サーバから読み出し、読み出された前記注意喚起シンボルマークを前記作業予定表に表示する要注意作業診断処理部と、前記作業予定表への記入必須項目の記入漏れの有無並びに前記作業予定表への複数の記入内容間の整合性の有無を判定し、前記記入漏れ又は不整合が判定された場合にはエラーメッセージを出す情報不整合診断処理部と、前記サーバには前記作業予定表に登録される作業員毎の保有資格データが格納されており、前記作業予定表に記入された作業内容が資格保有作業員によらなければならない作業である場合に、前記作業予定表に登録された作業員が前記必要とする資格を保有しているか否かを判定する有資格診断処理部と、前記作業予定表に記入された作業内容又は使用機器類に対応して、前記作業内容又は使用機器類に関連する分担作業内容を決定し、この決定された分担作業内容を前記作業予定表に表示する役割分担項目生成処理部とを具備することを特徴とするプラント工事作業情報管理システム。   In the plant construction work information management system for creating a work schedule for plant construction, a server for storing a warning symbol mark of the work contents requiring attention among the plant construction work, and the work contents requiring attention entered in the work schedule table In response to being performed, the caution symbol mark corresponding to the caution work content is read from the server, and the caution symbol diagnosis processing unit that displays the read caution symbol mark on the work schedule table; It is determined whether there are omissions in required items to be entered in the work schedule and whether there is consistency among a plurality of entries in the work schedule, and an error message is displayed if omission or inconsistency is determined. The information inconsistency diagnosis processing unit for issuing, and the server stores possession qualification data for each worker registered in the work schedule, When the work contents entered in the work schedule are work that must be performed by qualified workers, it is determined whether or not the workers registered in the work schedule have the required qualifications. The assigned diagnosis processing unit, and the assigned work content related to the work content or the used equipment are determined in accordance with the work content or the used equipment entered in the work schedule, and the determined assigned work A plant construction work information management system comprising: a role assignment item generation processing unit for displaying contents on the work schedule.
JP2004340599A 2004-11-25 2004-11-25 Plant construction work information management system Pending JP2006154934A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004340599A JP2006154934A (en) 2004-11-25 2004-11-25 Plant construction work information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004340599A JP2006154934A (en) 2004-11-25 2004-11-25 Plant construction work information management system

Publications (1)

Publication Number Publication Date
JP2006154934A true JP2006154934A (en) 2006-06-15

Family

ID=36633208

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004340599A Pending JP2006154934A (en) 2004-11-25 2004-11-25 Plant construction work information management system

Country Status (1)

Country Link
JP (1) JP2006154934A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008146502A (en) * 2006-12-12 2008-06-26 Systec:Kk Work safety plan management system
JP4850973B1 (en) * 2010-09-14 2012-01-11 ギアヌーヴ株式会社 Construction site labor management system and server
JP2012073811A (en) * 2010-09-29 2012-04-12 Hitachi Ltd Work management system
JP2012230550A (en) * 2011-04-26 2012-11-22 Civilsite Co Ltd Construction management support device and construction management support program
JP2015114706A (en) * 2013-12-09 2015-06-22 三菱重工業株式会社 Risk calculation system and risk calculation method
JP2016118852A (en) * 2014-12-19 2016-06-30 カシオ計算機株式会社 Work management system and program
KR101957982B1 (en) * 2017-10-13 2019-03-14 주식회사 포스코 Security activity smart tool box meeting system using beacon tag
CN112488329A (en) * 2020-11-26 2021-03-12 南通市市政工程设计院有限责任公司 Municipal works supervision information management system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04322955A (en) * 1991-04-22 1992-11-12 Mitsubishi Motors Corp Display method of work indicating slip
JP2001282731A (en) * 2000-03-30 2001-10-12 Seiko Epson Corp Online data input supporting method, and recording medium with online data input support processing program recorded thereon
JP2002117097A (en) * 2000-10-10 2002-04-19 Toyota Motor Corp Method and system for managing construction information
JP2002259500A (en) * 2001-03-06 2002-09-13 Omron Corp Preparation apparatus for instruction document and support system for work
JP2003056277A (en) * 2001-08-20 2003-02-26 Enzan Kobo:Kk System for integrated control of computerized construction of tunnel
JP2003108771A (en) * 2001-09-28 2003-04-11 Hitachi Ltd Input/output method of document data, its executing device and recording medium with processing program recorded thereon
JP2003114715A (en) * 2001-10-05 2003-04-18 Toshiba Corp Maintenance and inspection management system
JP2004118648A (en) * 2002-09-27 2004-04-15 Toshiba Microelectronics Corp Resource management server, human resource management method and human resource management system
JP2004123347A (en) * 2002-10-04 2004-04-22 Matsushita Electric Ind Co Ltd Container export/import control device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04322955A (en) * 1991-04-22 1992-11-12 Mitsubishi Motors Corp Display method of work indicating slip
JP2001282731A (en) * 2000-03-30 2001-10-12 Seiko Epson Corp Online data input supporting method, and recording medium with online data input support processing program recorded thereon
JP2002117097A (en) * 2000-10-10 2002-04-19 Toyota Motor Corp Method and system for managing construction information
JP2002259500A (en) * 2001-03-06 2002-09-13 Omron Corp Preparation apparatus for instruction document and support system for work
JP2003056277A (en) * 2001-08-20 2003-02-26 Enzan Kobo:Kk System for integrated control of computerized construction of tunnel
JP2003108771A (en) * 2001-09-28 2003-04-11 Hitachi Ltd Input/output method of document data, its executing device and recording medium with processing program recorded thereon
JP2003114715A (en) * 2001-10-05 2003-04-18 Toshiba Corp Maintenance and inspection management system
JP2004118648A (en) * 2002-09-27 2004-04-15 Toshiba Microelectronics Corp Resource management server, human resource management method and human resource management system
JP2004123347A (en) * 2002-10-04 2004-04-22 Matsushita Electric Ind Co Ltd Container export/import control device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008146502A (en) * 2006-12-12 2008-06-26 Systec:Kk Work safety plan management system
JP4850973B1 (en) * 2010-09-14 2012-01-11 ギアヌーヴ株式会社 Construction site labor management system and server
JP2012073811A (en) * 2010-09-29 2012-04-12 Hitachi Ltd Work management system
JP2012230550A (en) * 2011-04-26 2012-11-22 Civilsite Co Ltd Construction management support device and construction management support program
JP2015114706A (en) * 2013-12-09 2015-06-22 三菱重工業株式会社 Risk calculation system and risk calculation method
JP2016118852A (en) * 2014-12-19 2016-06-30 カシオ計算機株式会社 Work management system and program
KR101957982B1 (en) * 2017-10-13 2019-03-14 주식회사 포스코 Security activity smart tool box meeting system using beacon tag
CN112488329A (en) * 2020-11-26 2021-03-12 南通市市政工程设计院有限责任公司 Municipal works supervision information management system

Similar Documents

Publication Publication Date Title
Pötters et al. Effectivity of quality methods used on the shop floor of a serial production–how important is Poka Yoke?
US20120072252A1 (en) Talent management dashboard
JP2006154934A (en) Plant construction work information management system
Vorobyov et al. Economic assessment of the control of human-factor impact on faults of technical facilities in railway-transport technological processes
Toha et al. Paradigm of sustainable process safety management for industrial revolution 4.0: A circular economy and sustainability perspective
Kirwan An overview of a nuclear reprocessing plant Human Factors programme
Klein et al. Implementing an effective conduct of operations and operational discipline program
Santos et al. Using pattern matching for the international benchmarking of production practices
JP6875317B2 (en) Process chart creation system and its creation method
Pray et al. The human element in safe shipping: ABS initiatives
Maalouf et al. Enabling the creation of synergies between Occupational Health and Safety and Productivity
JP2019191911A (en) Guidance plan creation system and guidance plan creation program
Anderson et al. Managing safety in construction.
Hydyrov Governance responsibilities and security and safety management systems: Does corporate governance support security and safety management systems?
JP5548572B2 (en) Work management system.
Cooke et al. Safety case implementation-An Australian regulator's experience
Macek Work safety in production processes located in Poland
Rosado Miranda Implementation of the 5S Methodology in the Spare Parts Warehouse area located in a Medical Device Company
ADIO INFLUENCE OF VISUAL MANAGEMENT PRACTICES ON SAFETY PERFORMANCE ON CONSTRUCTION SITES IN ABUJA
Hrabova Аutomation of risk assessment processes in aviation system
Purwanto et al. Strategy of Performance Development of Indonesia Aerodrome Inspector in 2020
Rizwan et al. Safety Mangement in Oil & Gas Industry-The How's and the Why's
Awasthi et al. Improving the Safety Management System and the Health and Safety of Construction Workers in the Workplace
Dingee The Traits of a High Reliable Organization HRO
Chandegra et al. TOTAL PRODUVCTIVE MAINTENANCE IMPLEMENTATION THROUGH DIFFERENT STRATEGIES: A REVIEW

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070928

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100223

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100423

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100615