CN104060999A - 一种隧洞塌方处理方法及结构 - Google Patents

一种隧洞塌方处理方法及结构 Download PDF

Info

Publication number
CN104060999A
CN104060999A CN201410074188.4A CN201410074188A CN104060999A CN 104060999 A CN104060999 A CN 104060999A CN 201410074188 A CN201410074188 A CN 201410074188A CN 104060999 A CN104060999 A CN 104060999A
Authority
CN
China
Prior art keywords
tunnel
section
hole
main hole
landslide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410074188.4A
Other languages
English (en)
Inventor
赵星
彭继乐
赵继勇
韩纯杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201410074188.4A priority Critical patent/CN104060999A/zh
Publication of CN104060999A publication Critical patent/CN104060999A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种隧洞塌方处理方法及结构,包括处理隧洞主洞(1)的塌方段(4)的方法,特征是它采用开挖至少一条旁通洞(2)绕开隧洞主洞(1)的塌方段(4)转回隧洞主洞(1),并且在隧洞主洞(1)中从塌方段(4)的后方反向开挖处理塌方段(4)的方法。本发明能够安全便捷地处理隧洞内塌方,能最大限度减少塌方处理对工程工期的影响,相比从塌方段正面处理时反复塌方反复处理,极大降低了塌方处理的风险和投资,有显著的经济效益和社会效益。

Description

一种隧洞塌方处理方法及结构
技术领域
本发明涉及水利水电、交通等行业隧洞工程施工技术领域,尤其是涉及一种隧洞塌方的处理方法及结构。
背景技术
目前我国正在大力发展水利、能源、交通运输等基础产业的建设,水利水电、铁路、城市地下交通等工程包含了大量隧洞施工,受主观、客观等各方面因素的影响,隧洞塌方的情况时有发生,轻者造成大量物资的无谓浪费、人员窝工,重者延误工程工期甚至危及作业人员的生命安全。特别是进行长大隧洞施工过程中,塌方问题更为突出,在受到断层破碎带、软弱围岩、丰富地下水或其他不利因素影响时,塌方的处理非常困难,而且经常会出现反复塌方反复处理的情况,往往会耗费大量人力、物力与时间,既增加了工程投资又延误了工程工期。因此,设计一种便于安全快捷地处理隧洞内塌方的技术手段是十分必要的。
发明内容
本发明的目的在于提供一种能够安全便捷地处理隧洞内塌方的隧洞塌方处理方法及结构,以克服现有技术的不足。
本发明是通过如下技术方案予以实现的:本发明是用于处理隧洞主洞的塌方段,它采用开挖至少一条旁通洞绕开隧洞主洞的塌方段转回隧洞主洞,并且在隧洞主洞中从塌方段的后方反向开挖处理塌方段的方法。旁通洞与隧洞主洞的距离需满足相关规范要求,并且根据实际勘察的地质情况确定。旁通洞的挂口处和出口处的位置为隧洞主洞中塌方段前后一定距离外,且岩层地质情况适宜的位置。
本发明的技术方案的实施具体包括如下步骤:
第一步,首先确定旁通洞挂口位置,然后对挂口处两侧的隧洞主洞进行加强支护;
第二步,开挖旁通洞绕过隧洞主洞的塌方段转回隧洞主洞,并对旁通洞的进口段和出口段进行锁口处理形成加固段;锁口的方式采用加密钢支撑支护或加密锚杆支护,以避免旁通洞开挖对隧洞主洞岩层的扰动产生二次塌方,并有利于旁通洞自身岩层的稳定性,确保旁通洞施工的顺利进行;
第三步,在隧洞主洞中旁通洞的出口处形成两个掌子面,一个是继续向前施工隧洞主洞的新的掌子面,另一个是反向处理塌方段的掌子面;
第四步,从新的掌子面继续向前施工主洞隧洞,并同时反向处理塌方段。从前后两个方向施工塌方段,从而形成两个掌子面,两个掌子面相对推进,可以大大提高塌方段处理的速度。
本发明主要技术要点在于这种处理隧洞塌方的旁通洞结构,该旁通洞的入口设在在隧洞主洞的塌方段的掌子面的前方,离掌子面有一定的距离,确保旁通洞的开挖不至于对塌方段再次扰动,并且它完全绕开塌方段转回隧洞主洞,其两端均与隧洞主洞相接。旁通洞在与隧洞主洞相接处均设有进行锁口处理的加固段。加固段采用加密钢支撑支护或加密锚杆支护结构进行锁口处理。旁通洞的断面形状为城门洞型或马蹄形。鉴于旁通洞将来也可作为排水洞使用,旁通洞也可根据将来隧洞主洞的排水需要附加其它结构,如排水沟等。当然,也可作为临时交通转运通道,或者作为将来隧洞主洞施工的部分材料堆放地,可以根据需要在旁通洞中设置材料堆放架或者堆放台。因此,旁通洞并非在塌方段处理完成后就废弃,而是可以在隧洞主洞施工的整个施工期间能够得到合理的利用,以提高施工的便利性。
与现有技术相比,本发明通过在隧洞旁侧设旁通洞,绕过塌方洞段及其影响带后再转入主洞施工,在旁通洞的施工过程中,能根据旁通洞的地质情况对主洞塌方段及其后方地质情况作出较准确的判断;旁通洞绕过塌方段进入主洞后,隧洞的施工形成了两个工作面,一个是继续向前方施工主洞的掌子面,一个是反向从后往前开挖塌方段的掌子面,塌方段施工不再影响主洞施工工期;旁通洞形成后可作为排水通道,减轻了主洞内的地下水压力,对塌方段的施工非常有利。
从工程施工来看,采用旁通洞进行塌方处理,能最大限度减少塌方处理对工程工期的影响,相比从塌方段正面处理时反复塌方反复处理,极大降低了塌方处理的风险和投资,有显著的经济效益和社会效益。
附图说明
图1是本发明的结构示意图。
附图标记说明:1-隧洞主洞,2-旁通洞,3-加固段,4-塌方段,5-塌方段掌子面。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
如图1,图1展示了本发明的技术方案所处的境况及技术方案的一种实施方式,图中塌方段4位于隧洞主洞1中的某一段,由于塌方段4的存在,隧洞主洞1无法继续向前施工,而只能停止于塌方段4的塌方段掌子面5的前方,等待塌方段4完全处理完成后才能继续向前施工隧洞主洞1。而由于隧洞塌方往往是因为该点的岩层地质情况较差导致,因此若直接从塌方段掌子面5处开始处理塌方段4,将十分困难,因为该处的地质可能是最差的一处,而且存在极大的安全隐患。
因此,本发明采用了这样的一种方法,也就是开挖一条旁通洞2从地质相对较好的旁侧完全绕过塌方段4转回塌方段4的后方回到隧洞主洞1的设计线路上,当然,这个过程需要借助物探等手段获取该处及周边的岩层情况,以设计出最优的旁通洞2的路线。
旁通洞2绕回隧洞主洞1的设计线路上后,形成前后两个新的掌子面,前方的掌子面可以沿隧洞主洞1的设计线路继续向前开挖隧洞主洞1,后方的掌子面反向开挖塌方段4所在的地段,并及时进行塌方段4的加强支护处理,直到处理至原先的塌方段掌子面5的位置,从而完成塌方段4的处理。图1中的箭头所指方向为新的两个掌子面的施工行进方向。
而鉴于旁通洞2与隧洞主洞1的连接段往往对岩层破坏较大,因此有必要对旁通洞2与隧洞主洞1的两个连接段进行锁口加固处理,形成两个加固段3(如图1所示),旁通洞2与隧洞主洞1洞底平顺连接。当然,加固段3的长度和加固方式视具体工程特点及物探地质资料和实际揭露地质情况确定,并符合相关技术规范的要求。
采用本发明的施工方法,通过在隧洞主洞1的塌方段掌子面5前一定距离处挂口打旁通洞2,绕过塌方段4后再进入隧洞主洞1施工,能尽快恢复隧洞主洞1施工,减少塌方处理对工期的影响;施工旁通洞2的过程中大致摸清了隧洞主洞1的塌方段4及后方围岩情况,有利于降低施工风险。
旁通洞2的长度可根据现场实际情况暂定,施工过程中根据实际揭露的情况延长或缩短。旁通洞2与隧洞主洞1的距离不宜太远以节省投资,也不宜太近,以满足安全及相关规范的要求为宜。旁通洞2的断面形状为城门洞形或马蹄形,断面尺寸以满足基本交通需求为宜。
如图1所示,本发明的实施主要按照如下步骤进行:
第一步,首先确定旁通洞2挂口位置,然后对挂口处两侧的隧洞主洞1进行加强支护;
第二步,开挖旁通洞2绕过隧洞主洞1的塌方段4转回隧洞主洞1,并对旁通洞2的进口段和出口段进行锁口处理形成加固段3;
第三步,在隧洞主洞1中旁通洞2的出口处形成两个掌子面,一个是继续向前施工隧洞主洞1的新的掌子面,另一个是反向处理塌方段4的掌子面;
第四步,从新的掌子面继续向前施工主洞隧洞1,并同时反向处理塌方段4。
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。

Claims (7)

1.一种隧洞塌方处理方法,包括处理隧洞主洞(1)的塌方段(4)的方法,其特征在于:它采用开挖至少一条旁通洞(2)绕开隧洞主洞(1)的塌方段(4)转回隧洞主洞(1),并且在隧洞主洞(1)中从塌方段(4)的后方反向开挖处理塌方段(4)的方法。
2.根据权利要求1所述的隧洞塌方处理方法,其特征在于该方法具体包括如下步骤:
第一步,首先确定旁通洞(2)挂口位置,然后对挂口处两侧的隧洞主洞(1)进行加强支护;
第二步,开挖旁通洞(2)绕过隧洞主洞(1)的塌方段(4)转回隧洞主洞(1),并对旁通洞(2)的进口段和出口段进行锁口处理形成加固段(3);
第三步,在隧洞主洞(1)中旁通洞(2)的出口处形成两个掌子面,一个是继续向前施工隧洞主洞(1)的新的掌子面,另一个是反向处理塌方段(4)的掌子面;
第四步,从新的掌子面继续向前施工主洞隧洞(1),并同时反向处理塌方段(4)。
3.根据权利要求2所述的隧洞塌方处理方法,其特征在于:所述锁口的方式采用加密钢支撑支护或加密锚杆支护。
4.一种用于处理隧洞塌方的旁通洞结构,其特征在于:该旁通洞(2)的入口设在在隧洞主洞(1)的塌方段(4)的掌子面(5)的前方,并且它完全绕开塌方段(4)转回隧洞主洞(1),其两端均与隧洞主洞(1)相接。
5.根据权利要求4所述的用于处理隧洞塌方的旁通洞结构,其特征在于:所述旁通洞(2)在与隧洞主洞(1)相接处均设有进行锁口处理的加固段(3)。
6.根据权利要求5所述的用于处理隧洞塌方的旁通洞结构,其特征在于:所述加固段(3)采用加密钢支撑支护或加密锚杆支护结构进行锁口处理。
7.根据权利要求4所述的用于处理隧洞塌方的旁通洞结构,其特征在于:所述旁通洞(2)的断面形状为城门洞型或马蹄形。
CN201410074188.4A 2014-03-03 2014-03-03 一种隧洞塌方处理方法及结构 Pending CN104060999A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410074188.4A CN104060999A (zh) 2014-03-03 2014-03-03 一种隧洞塌方处理方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410074188.4A CN104060999A (zh) 2014-03-03 2014-03-03 一种隧洞塌方处理方法及结构

Publications (1)

Publication Number Publication Date
CN104060999A true CN104060999A (zh) 2014-09-24

Family

ID=51548907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410074188.4A Pending CN104060999A (zh) 2014-03-03 2014-03-03 一种隧洞塌方处理方法及结构

Country Status (1)

Country Link
CN (1) CN104060999A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522963A (zh) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 一种tbm隧洞施工卡机脱困方法
CN106522972A (zh) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 一种tbm刀盘和护盾卡机处理方法
CN109681230A (zh) * 2019-01-22 2019-04-26 中铁第四勘察设计院集团有限公司 一种双层盾构隧道上下层车行联络通道及其设置方法
CN110924958A (zh) * 2019-10-25 2020-03-27 中交第二公路勘察设计研究院有限公司 一种利用服务隧道对主洞关门塌方的处置方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060165489A1 (en) * 2002-11-22 2006-07-27 Dong-Hyun Seo Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
JP4083336B2 (ja) * 1999-03-15 2008-04-30 株式会社奥村組 トンネルの築造方法
JP4564895B2 (ja) * 2005-06-24 2010-10-20 大成建設株式会社 トンネル拡幅方法
CN102359395A (zh) * 2011-08-03 2012-02-22 中铁十二局集团第四工程有限公司 一种隧道断层大规模突水涌泥溃口的封堵方法
CN202467856U (zh) * 2012-01-17 2012-10-03 四川省交通运输厅公路规划勘察设计研究院 具有双向互通结构的超长公路隧道
CN103590836A (zh) * 2013-11-26 2014-02-19 中铁第四勘察设计院集团有限公司 一种浅埋暗挖隧道塌方处理方法
CN203716984U (zh) * 2014-03-03 2014-07-16 中国水电顾问集团贵阳勘测设计研究院有限公司 一种用于处理隧洞塌方的旁通洞结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4083336B2 (ja) * 1999-03-15 2008-04-30 株式会社奥村組 トンネルの築造方法
US20060165489A1 (en) * 2002-11-22 2006-07-27 Dong-Hyun Seo Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
JP4564895B2 (ja) * 2005-06-24 2010-10-20 大成建設株式会社 トンネル拡幅方法
CN102359395A (zh) * 2011-08-03 2012-02-22 中铁十二局集团第四工程有限公司 一种隧道断层大规模突水涌泥溃口的封堵方法
CN202467856U (zh) * 2012-01-17 2012-10-03 四川省交通运输厅公路规划勘察设计研究院 具有双向互通结构的超长公路隧道
CN103590836A (zh) * 2013-11-26 2014-02-19 中铁第四勘察设计院集团有限公司 一种浅埋暗挖隧道塌方处理方法
CN203716984U (zh) * 2014-03-03 2014-07-16 中国水电顾问集团贵阳勘测设计研究院有限公司 一种用于处理隧洞塌方的旁通洞结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕康成: "黑河引水零号隧洞软岩段施工方案优化", 《西安公路交通大学学报》, 30 October 1998 (1998-10-30) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522963A (zh) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 一种tbm隧洞施工卡机脱困方法
CN106522972A (zh) * 2016-11-23 2017-03-22 中铁十八局集团有限公司 一种tbm刀盘和护盾卡机处理方法
CN106522972B (zh) * 2016-11-23 2018-08-31 中铁十八局集团有限公司 一种tbm刀盘和护盾卡机处理方法
CN106522963B (zh) * 2016-11-23 2018-08-31 中铁十八局集团有限公司 一种tbm隧洞施工卡机脱困方法
CN109681230A (zh) * 2019-01-22 2019-04-26 中铁第四勘察设计院集团有限公司 一种双层盾构隧道上下层车行联络通道及其设置方法
CN109681230B (zh) * 2019-01-22 2024-05-03 中铁第四勘察设计院集团有限公司 一种双层盾构隧道上下层车行联络通道及其设置方法
CN110924958A (zh) * 2019-10-25 2020-03-27 中交第二公路勘察设计研究院有限公司 一种利用服务隧道对主洞关门塌方的处置方法
CN110924958B (zh) * 2019-10-25 2021-05-28 中交第二公路勘察设计研究院有限公司 一种利用服务隧道对主洞关门塌方的处置方法

Similar Documents

Publication Publication Date Title
WO2021068691A1 (zh) 一种煤矿强弱强全采全充方法
CN105134216B (zh) 破碎顶板110工法巷旁防塌落结构
CN108442943A (zh) 一种渡线段隧道双侧壁导坑法施工方法
CN104500075B (zh) 绳锯机切割地下障碍物的施工方法
CN104060999A (zh) 一种隧洞塌方处理方法及结构
CN108005660A (zh) 一种高速公路隧道施工方法
CN109209392A (zh) 适用于大断面隧道ⅳ-ⅴ级围岩的全环开挖方法
CN105804748B (zh) 一种露天运输系统下分区开采挂帮矿的方法
CN106121659B (zh) 一种下穿城市主干道上软下硬地层小断面隧道开挖方法
CN102359379A (zh) 环形盾构机及隧道施工方法
CN111997639B (zh) Tbm施工隧道不良地质段卡机脱困及加固改良地质的方法
CN107355226A (zh) Tbm施工隧洞断层破碎带洞段处理结构
CN104632236A (zh) Tbm-epb双模式盾构在复合地层中的施工方法
CN104389612A (zh) 一种隧道局部塌方的治理方法
CN103993885A (zh) 一种暗挖隧道侧向开洞支撑体系构建方法
CN105909256A (zh) 一种采用掌子面预加固留核心土三台阶临时仰拱技术的大跨软弱围岩隧道施工方法
CN203716984U (zh) 一种用于处理隧洞塌方的旁通洞结构
CN109356593A (zh) 一种引水隧洞开挖施工方法
CN104141500A (zh) 一种板结砂砾石地层洞室施工方法
AU2018208634B2 (en) Clean and efficient coal mining method
CN106337687B (zh) 矿山斜溜井便捷式分段支护方法
CN108374674B (zh) 六导洞十二步地下空间开挖支护方法
CN104747197B (zh) 一种土压平衡盾构机土仓泥饼探测装置
Hu et al. Ground freezing application of intake installing construction of an underwater tunnel
CN104612113A (zh) 一种引水隧洞岩溶水处理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140924