CN104060810B - A kind of novel attached electric operation platform and installation method thereof - Google Patents
A kind of novel attached electric operation platform and installation method thereof Download PDFInfo
- Publication number
- CN104060810B CN104060810B CN201410282973.9A CN201410282973A CN104060810B CN 104060810 B CN104060810 B CN 104060810B CN 201410282973 A CN201410282973 A CN 201410282973A CN 104060810 B CN104060810 B CN 104060810B
- Authority
- CN
- China
- Prior art keywords
- platform
- corner
- driver
- operation platform
- angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention provides a kind of novel attached electric operation platform, and described operation platform includes that linear platform and Corner Link, described Corner Link are used for connecting linear platform, it is possible to achieve turn external corner, turn out cloudy angle and three kinds of corner modes of curve.The invention has the beneficial effects as follows: solve the confinement problems of general attached electric operation platform boundary of works area;Solve broken line, curve construction corner or right angle platform cannot construct, the eccentric torsion problem during using after inside choosing;Solve broken line, the standardization issue of curve operation platform;There is the right angle platform after connection or corner platform synchronous lifting and automatic flat-adjustable function.
Description
Technical field
The invention belongs to the realm of building construction, be specifically related to the construction of a kind of novel attached electric
Platform and construction method thereof, wherein attached electric operation platform belongs to high level or Super High is built
Build alien invasion decorations and large space top and decoration for vertical face construction construction scaffold body
System.And the present invention solves high-rise building irregular contour structure and uses attached electric to execute
The problem of work platform.
Background technology
Along with the profile of modern building fabric is innovated day by day, building structure also becomes increasingly complex,
Use as the attached electric operation platform of structure alien invasion decorations and also receive greatly
Restriction.
Attached electric operation platform (or referred to as electric bridge scaffold) has used abroad
Through comparative maturity, also have begun on market the most at home use, but by this product
The restriction of product structural system, includes that the attached electric used on domestic and international market is executed at present
Work platform is linear pattern, and this product is for domestic various complex contour building structure, office
Sex-limited the biggest.
Conventionally, as adhesion type operation platform can only set up linear single-column or
Twin columns are constructed, and integrated mode is more single, and type selecting has limitation very big, causes on the one hand
Equipment usage quantity sharply increases, and construction cost increases therewith;On the other hand attached electric
The use of operation platform have received significant limitation.
Consider for more than attached electric operation platform all unfavorable situations, have developed and originally execute
Work platform and method system, for high-rise building irregular contour structure.
Summary of the invention
The present invention is directed to deficiency of the prior art, it is provided that a kind of attached electric operation platform
And construction system, product can be made to have the wider array of scope of application, can concrete according to building structure
Form can be to use the different forms such as broken line, curve, corner, preferably outside matching building
Shape, provides job platform and security protection for facade construction.
The present invention provides a kind of novel attached electric operation platform, and described operation platform includes
Linear platform and Corner Link, described Corner Link is used for connecting linear platform, permissible
Realization turns external corner, turn out cloudy angle and three kinds of corner modes of curve;
Further, described Corner Link includes turning right-angle connector and turning oblique angle connector,
Its transfer right-angle connector realizes turning external corner and angle of turning out cloudy, and turns oblique angle connector for realizing song
Line corner;
Further, described linear platform also includes that driver, driver pedestal, triangle are vertical
Post, upper limit column, landing beam, electric cabinet, wherein driver is bolted
On driver pedestal, three corner posts carry out connecing height, often by high-strength bolt with 1.5m for unit
6m arranges wall-attaching equipment together, installs upper limit column, platform at the top of three corner posts
Beam uses platform connecting pin to connect into required design length;
Further, arrange in described landing beam and driver junction levelness position limiting clamp and
Travel switch, for ensureing that the level of landing beam promotes;
Further, scaffold board is laid on described landing beam top, and ladder is connected to driver base
On seat, described landing beam is provided with guard rail, arranges peace in the position of guard rail correspondence ladder
Air cock;
Further, described electric cabinet is fixed on Terrace prevention field and puts, and flexible scaffold tubes is inserted
On described landing beam;
Further, driver pedestal is adjusted being up to the standard by adjustable support leg rocking bar;
Further, described upper limit column includes vertical stopping means and upper limit post
Tooth bar, when wherein driver runs to tip position, travel switch connects with vertical limit element
Electric cabinet signal can be given after touch, automatically cut off general supply;And upper limit column tooth bar is only
There is the half of stem height, preventing driver roof fall if played after stroke switch failure
Effect;
Further, described electric construction platform is double column platforms.
The invention has the beneficial effects as follows:
1) confinement problems of general attached electric operation platform boundary of works area is solved;
2) solve broken line, curve construction corner or right angle platform cannot construct, after inside choosing
Eccentric torsion during use
Problem;
3) broken line, the standardization issue of curve operation platform are solved;
4) there is the right angle platform after connection or corner platform synchronous lifting and automatic flat-adjustable function.
Accompanying drawing illustrates:
Fig. 1 is the attached electric operation platform structural representation of the present invention;
Fig. 2 is the corner mode schematic diagram of the present invention, and (a), for turning external corner, (b) is angle of turning out cloudy,
C () is curve form;
Fig. 3 is installation steps schematic diagram one of the present invention;
Fig. 4 is installation steps schematic diagram two of the present invention;
Fig. 5 is the structural representation of the upper limit column of the present invention;
Fig. 6 is the connection cellular construction schematic diagram of the present invention, and wherein (a) connects single for turning oblique angle
Unit;B () turns right angle and connects unit.
Detailed description of the invention:
The present invention will the present invention is described in detail in conjunction with Figure of description.This attached electric
Operation platform system uses intelligent control technology, outside the structure for complex contour and curve
Decorations, have carried out special design and research and development.Corner or curve plateau consider equipment
Turnover repeatedly use, connector has been carried out standardized designs, corner platform connector with
The connector of standard platform is unanimously and tool considers interchangeability.Not only can realize inner corner trim to connect,
External corner connection can also be carried out, increase flexibility and convenience that operation platform is arranged.
See Fig. 1, for the attached electric operation platform structural representation of the present invention, drive
Device 1 is bolted on driver pedestal 2, and driver pedestal 2 can be by adjustable
Supporting leg rocking bar 12 is adjusted being up to the standard, and three corner posts 3 pass through height with 1.5m for unit
Strength bolt carries out connecing height, and every 6m arranges wall-attaching equipment 9 one, at the top of three corner posts 3
Installing upper limit column 4, prevent driver element from exceeding column 3, landing beam 5 uses platform
Connecting pin 13 connects into design length, and landing beam 5 and driver 1 junction arrange levelness
Position limiting clamp 10, for ensureing that the level of landing beam 5 promotes, pin hand is laid on landing beam 5 top
Plate 6, ladder 14 is connected to driver pedestal 2, and for upper lower platform, landing beam 5 protects
The position of the corresponding ladder 14 in hurdle 15 arranges safety door 7;Electric cabinet 8 is fixed on Terrace prevention
Field is put, and flexible scaffold tubes 11 is inserted on landing beam 5.
This corner platform promotes to be provided with and is provided with water at driver 1 with platform link position
Pingdu position limiting clamp 10 and travel switch, when two drivers operation synchronization discrepancies reach to arrange value,
Open travel switch, to electric cabinet 8 signal, carry out automatic leveling, when plateau levels degree is full
When foot controls to require, operation platform can recover to promote automatically.This system can ensure that broken line
Or the synchronism that curve operation platform promotes, it is to avoid the torsion that platform asynchronous lifting causes
Deformation so that platform construction is more safe and reliable.
Upper limit column 4 is the design of anti-roof fall dual safety.On the one hand, upper limit stands
Vertical limit element 16 (vertical spacing bar strip) installed by post 4, and driver runs to position, top
When putting, travel switch can be cut to electric cabinet 8 signal after contacting with vertical limit element automatically
Disconnected general supply, on the other hand, due to the one of upper limit column tooth bar 17 only stem height
Half, prevent driver roof fall phenomenon if can play after stroke switch failure.
This corner platform system, first should carry out electric construction platform according to structural working drawing
Arrange (as shown below), adjust the load of operation platform with each according to the load in construction
Position stressing conditions also carries out structure model selection.
Corner platform system mainly has and turns external corner device, angle apparatus of turning out cloudy, three kinds of curve device
(seeing Fig. 2), the detailed description of the invention of explanation corner platform as a example by turning external corner:
The direction turned is different with angle, turns out cloudy angle and external corner refers generally to turn 90 degrees angle, curve root
Different according to curvature angles.
1) mark the position of seat in the plane, determine the coordinate of benchmark seat in the plane.
2) first installing the platform base of A platform, regulation adjustable support leg makes platform roller leave
Ground, uses platform regulation bolt to adjust levelness and the perpendicularity of base, uses level
Instrument is surveyed and is positioned.
3), after installing platform base, the first segment contilever platform crossbeam on the left of A is installed, makes
Fix with driver element with three special bearing pins;First segment contilever platform on the right side of A is installed horizontal
Beam, uses two special bearing pins to fix on (two, top), and bilateral symmetry is installed, such as Fig. 3
Shown in.
4) according to above step installation standard platform beam to corner position of platform, under landing beam
Portion arranges support, connects corner platform (i.e. Corner Link), as shown in Figure 6.
5) pedestal of B platform is installed, after adjusting, is symmetrically installed platform beams, uses three
Individual dedicated platform connecting pin 13.
6) then mounting platform annex: ladder 14, guard rail 15 etc..
7) electric cabinet 8, Horizontal limiting folder 10 are installed, and debug.
8) promote platform, first wall-attaching equipment 9 is installed, arrange the less than 6m position
One wall-attaching equipment 9, continues to lift up platform, installs second wall-attaching equipment 9, and this attached wall fills
Put the distance with first wall-attaching equipment 9 and be not more than 6m, utilize construction platform device to install three
Corner post 3, and wall-attaching equipment 9 is installed according to this, later per pass wall-attaching equipment 9 ultimate range is not
More than 6m.
9) when being installed to design height, in top, one joint upper limit column 4 is installed.
Wherein corner platform is a single platform, is used for connecting AB platform, corner platform
As in accompanying drawing 5, (b) turns out cloudy angle and external corner, (a) is for turning different curves;See figure
6 (b), four direction all makes the cast steel joint of band mother-son mouth, actually used in general only use
To both direction, it is simply that for standardized designs, this corner platform is at angle and the external corner of turning out cloudy
Time all can use, it is to avoid design bead angle platform and inner corner trim corner platform;See figure
6 (a), is used to turn curve, needs the angle turned according to specific needs individually designed.
Due to conventional residential housing complex contour, attached electric operation platform is in ordinary residence
The problem that use cost is high becomes the principal element that limit product is promoted, if can be by single column
Operation platform (the longest 9.8m) uses the mode of corner or broken line to connect into double column platform
(the longest can reach 30m), can largely reduce electric construction platform usage quantity,
Thus reduce construction cost.On the other hand two single column operation platforms form a double column
Platform rear stability is more preferable.
Body series platform can increase the integrated mode of operation platform, more can press close to the foreign steamer of building
Profile surface, saves the quantity of erection construction platform, reduces use cost, improves platform overall steady
Qualitative, reduce construction blind area.
Claims (7)
1. an attached electric operation platform, it is characterised in that described operation platform includes straight line
Platform and Corner Link, described Corner Link is used for connecting linear platform, it is possible to achieve turn sun
Angle, turn out cloudy angle and three kinds of corner modes of curve;
Described Corner Link includes turning right-angle connector and turning oblique angle connector, and its transfer right angle is even
Fitting realizes turning external corner and angle of turning out cloudy, and turns oblique angle connector for realizing curvilinear corner;
Described linear platform include driver (1), driver pedestal (2), three corner posts (3),
Upper limit column (4), landing beam (5), electric cabinet (8), wherein driver (1) passes through
Being bolted on driver pedestal (2), three corner posts (3) pass through height with 1.5m for unit
Strength bolt carries out connecing height, and every 6m arranges wall-attaching equipment (9) together, at three corner posts (3)
Upper limit column (4) is installed at top, and landing beam (5) uses platform connecting pin (13) to connect
Become design length.
Electric construction platform the most according to claim 1, it is characterised in that described flat
Platform beam (5) and driver (1) junction arrange levelness position limiting clamp (10) and travel switch,
For ensureing that the level of landing beam (5) promotes.
Electric construction platform the most according to claim 2, it is characterised in that described platform
Scaffold board (6) is laid on beam (5) top, and ladder (14) is connected on driver pedestal (2),
Described landing beam (5) is provided with guard rail (15), the corresponding ladder (14) of guard rail (15)
Position safety door (7) is set.
Electric construction platform the most according to claim 3, it is characterised in that described automatically controlled
Case (8) is fixed on guard rail (15) position, and flexible scaffold tubes (11) is inserted in described landing beam
(5) on.
Electric construction platform the most according to claim 1, it is characterised in that driver base
Seat (2) can be adjusted being up to the standard by adjustable support leg rocking bar (12).
Electric construction platform the most according to claim 5, it is characterised in that described top
Spacing column (4) includes vertical limit element (16) and upper limit column tooth bar (17), its
When middle driver (1) runs to tip position, travel switch connects with vertical limit element (16)
Electric cabinet (8) signal can be given after touch, automatically cut off general supply;And upper limit column tooth bar
(17) only having the half of stem height, preventing driver from emitting if played after stroke switch failure
The effect on top.
Electric construction platform the most according to claim 1, it is characterised in that described electronic
Operation platform is double column platforms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410282973.9A CN104060810B (en) | 2014-06-23 | 2014-06-23 | A kind of novel attached electric operation platform and installation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410282973.9A CN104060810B (en) | 2014-06-23 | 2014-06-23 | A kind of novel attached electric operation platform and installation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104060810A CN104060810A (en) | 2014-09-24 |
CN104060810B true CN104060810B (en) | 2016-09-07 |
Family
ID=51548723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410282973.9A Active CN104060810B (en) | 2014-06-23 | 2014-06-23 | A kind of novel attached electric operation platform and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104060810B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328903B (en) * | 2014-11-06 | 2016-08-17 | 上海建工一建集团有限公司 | Flame retardant type assembled integral hoisting scaffold and assembly and disassembly methods thereof |
CN106276551A (en) * | 2015-06-01 | 2017-01-04 | 江苏京龙工程机械有限公司 | Two-layer twin columns lifting working platform |
CN105040965A (en) * | 2015-07-07 | 2015-11-11 | 北京星河模板脚手架工程有限公司 | Attached type raising and falling overhead working device and construction method |
CN109944430A (en) * | 2019-04-15 | 2019-06-28 | 青岛一建集团有限公司 | A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation |
CN111395185A (en) * | 2020-03-31 | 2020-07-10 | 云南工程建设总承包股份有限公司 | System and method for applying electric bridge type scaffold platform to construction of equal-section high pier |
CN112942797A (en) * | 2021-02-01 | 2021-06-11 | 上海金茂建筑装饰有限公司 | Construction platform installation method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000257255A (en) * | 1999-03-10 | 2000-09-19 | Takenaka Komuten Co Ltd | Self-lifting type suspended scaffolding, and method for replacing suspension wire |
JP2004176403A (en) * | 2002-11-27 | 2004-06-24 | Ando Corp | Lifting/lowering working stage |
CN201506699U (en) * | 2009-09-25 | 2010-06-16 | 北京星河模板脚手架工程有限公司 | Electric lifting bridge rack for construction |
CN201679222U (en) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | Two-masted climbing working platform |
CN203654700U (en) * | 2013-11-20 | 2014-06-18 | 成都嘉泽正达科技有限公司 | Adjustable corner connection assembly for inserted lift scaffold |
-
2014
- 2014-06-23 CN CN201410282973.9A patent/CN104060810B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000257255A (en) * | 1999-03-10 | 2000-09-19 | Takenaka Komuten Co Ltd | Self-lifting type suspended scaffolding, and method for replacing suspension wire |
JP2004176403A (en) * | 2002-11-27 | 2004-06-24 | Ando Corp | Lifting/lowering working stage |
CN201506699U (en) * | 2009-09-25 | 2010-06-16 | 北京星河模板脚手架工程有限公司 | Electric lifting bridge rack for construction |
CN201679222U (en) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | Two-masted climbing working platform |
CN203654700U (en) * | 2013-11-20 | 2014-06-18 | 成都嘉泽正达科技有限公司 | Adjustable corner connection assembly for inserted lift scaffold |
Non-Patent Citations (1)
Title |
---|
附着式电动施工平台的工程应用——长青大厦98米高空顶部采光棚桁架平台设计与施工;姜传库等;《中国建筑金属结构》;20111130(第11期);第46-51页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104060810A (en) | 2014-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104060810B (en) | A kind of novel attached electric operation platform and installation method thereof | |
CN107338887A (en) | Only have the connection method of flat out of plane constraint and upper connecting node at the top of out-hung panel | |
CN102619340A (en) | Mounting method for unitary glass curtain wall | |
CN105781100A (en) | Template component for sidewall of subway station | |
CN201144515Y (en) | Steel structure high altitude construction platform | |
CN104251028A (en) | Combined stone curtain wall | |
CN205804939U (en) | template assembly for subway station side wall | |
CN202081427U (en) | Embedded bolt positioning device for tower crane foundation | |
CN207003748U (en) | A kind of upper connecting node of precast concrete out-hung panel | |
CN202689491U (en) | Lower supporting type overhanging scaffold | |
CN103850374B (en) | Element type curtain wall system | |
CN203905434U (en) | Novel attached type electric construction platform | |
CN207725586U (en) | The outer pin hand stage apparatus of boat segmental | |
CN110359696A (en) | A kind of adjustable attachment type raise scaffold and its tiltedly climb method | |
CN203514368U (en) | Side slope detection work platform | |
CN104947868B (en) | A kind of base of formula railing post on chip of encorbelmenting | |
CN204282788U (en) | Shaping type scaffold can be assembled | |
CN207553313U (en) | A kind of attachment device of steel construction and out-hung panel | |
CN203742039U (en) | Novel component type curtain wall system | |
CN108222339B (en) | High-precision unit system easy to construct | |
CN207863444U (en) | Independent attached wall mounting column | |
CN205712160U (en) | A kind of steel frame basis column foot installs leveling pier nose | |
CN106854950A (en) | A kind of novel protective guardrail | |
CN209323936U (en) | A kind of civil engineering work construction bracket | |
CN203684709U (en) | Adjusting device for assembly inclination angle of truss of steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |