CN207725586U - The outer pin hand stage apparatus of boat segmental - Google Patents

The outer pin hand stage apparatus of boat segmental Download PDF

Info

Publication number
CN207725586U
CN207725586U CN201721731792.5U CN201721731792U CN207725586U CN 207725586 U CN207725586 U CN 207725586U CN 201721731792 U CN201721731792 U CN 201721731792U CN 207725586 U CN207725586 U CN 207725586U
Authority
CN
China
Prior art keywords
railing
angle iron
iron frame
thick stick
rail post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721731792.5U
Other languages
Chinese (zh)
Inventor
谢静
王冠
杨开君
孟庆威
欧阳光梓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN XINGANG SHIPBUILDING HEAVY INDUSTRY Co Ltd
Original Assignee
TIANJIN XINGANG SHIPBUILDING HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN XINGANG SHIPBUILDING HEAVY INDUSTRY Co Ltd filed Critical TIANJIN XINGANG SHIPBUILDING HEAVY INDUSTRY Co Ltd
Priority to CN201721731792.5U priority Critical patent/CN207725586U/en
Application granted granted Critical
Publication of CN207725586U publication Critical patent/CN207725586U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a kind of outer pin hand stage apparatus of boat segmental, the angle iron frame upper end of the device is fixed with expanded metal lath, angle iron frame is surrounded by slot, and rail post is inserted into slot, and avris railing thick stick is inserted into rail post upper end, side rail post apical lateral is connected with railing sleeve, railing sleeve interpolation enters railing thick stick, and angle iron frame front end connects two card slots, reinforcing rib is equipped with outside card slot, card slot bottom is set there are two trepanning, and the nut coordinated with bolt is fixed under trepanning.Advantageous effect is construction personnel can be made to carry tool using the device freely to reach segmentation different zones, setting up a row scaffold only needs 2 people to install and dismantle, it is installed at segmentation watertight structure, become connection watertight region and the external platform of normal areas, installation and dismounting are about respectively 30 minutes, it is overall to save 3 hours time, consumables are saved, installation and removal efficiency are improved.

Description

The outer pin hand stage apparatus of boat segmental
Technical field
The utility model is related to pin hand stage apparatus outside a kind of boat segmental.
Background technology
Boat segmental is made with anti-appearance formula on moulding bed mostly, and outer there are on buttress after segmentation tread flaking, construction personnel is still Equipment, tool is used to continue construction operation, segmentation frame height itself has the structure of watertight form, apply in 2 meters away from ground distances Worker person can not be from the upper free shuttling of segmentation.It is put up a ladder at present using surrounding or is barricaded as arranging foot hand formula, but two kinds of forms exist Drawback, surrounding ladder submode, construction personnel is not easy Portable device, tool reaches segmentation each region, and segmentation outer ledge is taken Foot hand formula in a row can solve construction personnel's Portable device, tool and freely construct in the upper free shuttling of segmentation, but expense of taking a lot of work When, sectional making cost is increased, in view of the above-mentioned problems, exploitation and composition of being eager goes out the outer pin hand stage apparatus of boat segmental, just It freely shuttles in construction personnel's Portable device, tool and carries out operation in segmentation each region.
Invention content
For the deficiencies in the prior art, it is flat that the purpose of this utility model is to provide a kind of outer pin hand of boat segmental Table apparatus makes construction personnel's Portable device, tool freely shuttle and carries out operation in segmentation each region, and reaches reduction with profit The effect of attaching/detaching apparatus time.
To achieve the above object, the technical solution adopted in the utility model is to provide a kind of outer pin hand platform of boat segmental Device, wherein:The device includes angle iron frame, and angle iron frame upper end is fixed with expanded metal lath, and angle iron frame is surrounded by slot, Rail post is inserted into slot, and avris railing thick stick is inserted into rail post upper end, and side rail post apical lateral is connected with railing sleeve, column Rod sleeve interpolation enters railing thick stick, and angle iron frame front end connects two card slots, reinforcing rib is equipped with outside card slot, and card slot bottom is equipped with two A trepanning is fixed with the nut coordinated with bolt under trepanning.
The effect of the utility model is small and exquisite using the device volume, can be quick installed at segmented edges, by external flat Table apparatus can make construction personnel carry tool and freely reach segmentation different zones, and original scaffold sets mode will to be segmented side Edge side the whole body sets up a row scaffold, needs 3 people installation, and step is more when completing within about 3 hours, and constructing, and iron wire consumables use Amount is big, and when dismounting needs 3 people, about 1 hour, and existing apparatus only needs 2 people to install and dismounting, is installed in segmentation watertight structure Place becomes connection watertight region and the external platform of normal areas, and installation and dismounting are about respectively 30 minutes, overall to save the time 3 hours, consumables are saved, improve installation and removal efficiency.
Description of the drawings
Fig. 1 is the front view of the outer pin hand stage apparatus of the utility model boat segmental
Fig. 2 is the side view of the outer pin hand stage apparatus of the utility model boat segmental
Fig. 3 is the vertical view of the outer pin hand stage apparatus of the utility model boat segmental;
Fig. 4 is the stereogram of the outer pin hand stage apparatus of the utility model boat segmental;
Fig. 5 is the spring retainer sectional view in the outer pin hand stage apparatus of the utility model boat segmental;
Fig. 6 is the use state diagram of the outer pin hand stage apparatus of the utility model boat segmental.
In figure:
1, angle iron frame 2, expanded metal lath 3, slot 4, rail post 5, avris railing thick stick 6, railing sleeve 7, railing thick stick 8, card slot 9, nut 10, bolt 11, reinforcing rib 12, spring retainer 13, segmentation 14, buttress 15, ladder
Specific implementation mode
The structure of pin hand stage apparatus outside the boat segmental of the utility model is illustrated in conjunction with attached drawing.
As shown in Figs. 1-5, the outer pin hand stage apparatus structure of the boat segmental of the utility model is that the device includes ship The outer pin hand stage apparatus of segmentation, which includes angle iron frame 1, and 1 upper end of angle iron frame is fixed with expanded metal lath 2, angle frame Frame 1 is surrounded by slot 3, and rail post 4 is inserted into slot 3, and avris railing thick stick 5 is inserted into 4 upper end of rail post, and side rail post 4 pushes up End outside is connected with railing sleeve 6, and 6 interpolation of railing sleeve enters railing thick stick 7, and 1 front end of angle iron frame connects two card slots 8, card slot 8 Outside is equipped with reinforcing rib 11, and 8 bottom of card slot is set there are two trepanning, and the nut 9 coordinated with bolt 10 is fixed under trepanning.
The rail post 4, avris railing thick stick 5, be equipped in railing thick stick 7 can Fast Installation and dismounting spring retainer 12。
8 lower end tapping of the card slot is welded with nut 9, is screwed into bolt 10, can fix pin hand platform outside boat segmental At segmental structure edge, card slot 8 is suitable for the segmental structure of different plate thickness.
What the function of the outer pin hand stage apparatus of the segmentation of the utility model was realized in:
As shown in fig. 6, segmentation 13, by 14 2 meters of frame rise ground of buttress, 15 sides that need to climb up a ladder can reach in segmentation 13, such as Shown in Fig. 4, which is inserted into 13 marginal textures of segmentation, bolt 10 is tightened, rail post 4 is inserted into slot 3, utilize Spring retainer 12 built in rail post 4 is stuck in 3 trepanning of slot, then avris railing thick stick 5 is inserted into rail post 4, utilizes avris Spring retainer 12 built in railing thick stick 5 is stuck in 4 trepanning of rail post, and finally railing thick stick 7 is inserted into railing sleeve 6, utilizes column Spring retainer 12 built in bar thick stick 7 is stuck in 6 trepanning of railing sleeve, can will be segmented outer pin hand stage apparatus and is erected at segmentation 13 edges, so that construction personnel's Portable device, tool, which freely shuttle, is being segmented the progress operation of 13 each regions.

Claims (2)

1. a kind of outer pin hand stage apparatus of boat segmental, it is characterized in that:The device includes angle iron frame (1), angle iron frame (1) upper end is fixed with expanded metal lath (2), and angle iron frame (1) is surrounded by slot (3), and rail post (4) is inserted into slot (3), railing Avris railing thick stick (5) is inserted into column (4) upper end, and side rail post (4) apical lateral is connected with railing sleeve (6), railing sleeve (6) Interpolation enters railing thick stick (7), and angle iron frame (1) front end connects two card slots (8), reinforcing rib (11), card slot are equipped with outside card slot (8) (8) bottom sets the nut (9) being fixed under trepanning there are two trepanning with bolt (10) cooperation.
2. the outer pin hand stage apparatus of boat segmental according to claim 1, it is characterized in that:The rail post (4), avris column Be equipped in bar thick stick (5), railing thick stick (7) can Fast Installation and dismounting spring retainer (12).
CN201721731792.5U 2017-12-13 2017-12-13 The outer pin hand stage apparatus of boat segmental Expired - Fee Related CN207725586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721731792.5U CN207725586U (en) 2017-12-13 2017-12-13 The outer pin hand stage apparatus of boat segmental

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721731792.5U CN207725586U (en) 2017-12-13 2017-12-13 The outer pin hand stage apparatus of boat segmental

Publications (1)

Publication Number Publication Date
CN207725586U true CN207725586U (en) 2018-08-14

Family

ID=63097399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721731792.5U Expired - Fee Related CN207725586U (en) 2017-12-13 2017-12-13 The outer pin hand stage apparatus of boat segmental

Country Status (1)

Country Link
CN (1) CN207725586U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence
CN110171550A (en) * 2019-06-13 2019-08-27 江南造船(集团)有限责任公司 Stage apparatus for container hatch cover assembling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence
CN109537919B (en) * 2018-09-29 2021-06-01 沪东中华造船(集团)有限公司 Quick erecting method of segmented tongue-and-groove fence
CN110171550A (en) * 2019-06-13 2019-08-27 江南造船(集团)有限责任公司 Stage apparatus for container hatch cover assembling

Similar Documents

Publication Publication Date Title
CN205935641U (en) Template formwork system of aluminum alloy shear force wall
CN207725586U (en) The outer pin hand stage apparatus of boat segmental
CN104060810A (en) Novel attached electric construction platform and mounting method for same
CN202099933U (en) Precast column and lifting appliance thereof
CN206888904U (en) A kind of cat ladder for bridge pier column construction
CN102787709B (en) The construction method of decorative panel cladding system and the decorative panel cladding system be made up of it
CN206495496U (en) A kind of aluminum alloy mould plate shear wall top bracing means
CN204982858U (en) Prestressing force frame diaphragm wall
CN208983284U (en) A kind of foundation-free bridge lamp lamp stand mounting seat
CN208168161U (en) A kind of fabricated shear wall reinforcing bar posting
CN103362259A (en) Back-flow-type rain cover adopting steel structure
CN205224603U (en) Strengthening construction device for door and window concrete arched lintel
CN204282817U (en) Door-window opening mould plate installs structure
CN205976477U (en) Formula of sinking bathroom hangs mould device
CN205502426U (en) Wood system railing convenient to installation
CN205206162U (en) Cornice structure
CN204370711U (en) A kind of water-proof noise reducing movable plank house
CN205990780U (en) One kind is safe, easy-to-dismount to face frontier defense protection unit
CN109881581B (en) Steel plate wrapped wood handrail
CN205296823U (en) Early form removal bearing leg hand frame
CN212451103U (en) Novel mud scraper
CN212154061U (en) Multifunctional building support assembly
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN220013446U (en) Construction management environmental protection noise reduction device
CN205422160U (en) Stand and penetrating formula enclosure of penetrating formula enclosure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814

Termination date: 20211213