CN104034984B - Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission - Google Patents

Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission Download PDF

Info

Publication number
CN104034984B
CN104034984B CN201410280097.6A CN201410280097A CN104034984B CN 104034984 B CN104034984 B CN 104034984B CN 201410280097 A CN201410280097 A CN 201410280097A CN 104034984 B CN104034984 B CN 104034984B
Authority
CN
China
Prior art keywords
short
current
circuit
test
inverter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410280097.6A
Other languages
Chinese (zh)
Other versions
CN104034984A (en
Inventor
马宇
行鹏
宋志顺
陈明涛
葛亮
安友良
靳駪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China XD Electric Co Ltd
Original Assignee
China XD Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China XD Electric Co Ltd filed Critical China XD Electric Co Ltd
Priority to CN201410280097.6A priority Critical patent/CN104034984B/en
Publication of CN104034984A publication Critical patent/CN104034984A/en
Application granted granted Critical
Publication of CN104034984B publication Critical patent/CN104034984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Inverter Devices (AREA)

Abstract

The invention discloses a short-circuit test method for an engineering valve assembly in a running test for flexible direct current transmission. A short-circuit test for a flexible direct-current engineering valve assembly is carried out by virtue of a back-to-back loop test system for flexible direct current transmission; the back-to-back loop test system for flexible direct current transmission is composed of a current converter station A and a current converter station B; the current converter station A is a rectification station, the current converter station B is an inversion station, and a direct-current bus is connected between the two current converter stations; an electronic switch L used for controlling the short-circuit time of the direct-current bus is installed on the direct-current bus; a positive pole and a negative pole are short-circuit by controlling the on-off of the short-circuit electronic switch L; the short-circuit current value between the positive pole and the negative pole, that is, a direct-current side, and the short-circuit current value of a bridge arm current are detected; each peak current and a short-circuit current duration time are measured. According to the short-circuit test method, the problem that the test object MMC valve of the short-circuit current test for flexible direct current transmission is difficult to complete the test due to high voltage class, high current and high capacity is solved.

Description

A kind of short-circuit test method of engineering valve module in flexible DC power transmission operation test
Technical field
The invention belongs to flexible DC power transmission test field, it is related to a kind of short-circuit test side of flexible direct-current transmission field Method, the short-circuit test method of engineering valve module in more particularly, to a kind of flexible DC power transmission operation test.
Background technology
Start to be applied to direct current with high-power high voltage insulated gate bipolar transistor (IGBT) valve technology device can be turned off Transmission of electricity, indicates the birth of third generation HVDC Transmission Technology.This technology is suitable for low capacity transmission of electricity, is also suitable for Large Copacity Transmission of electricity.With the increase of flexible DC power transmission engineering in world wide, China is in progress also very in terms of flexible DC power transmission engineering Hurry up, but flexible DC power transmission (MMC-HVDC) the technology development time based on modularization multi-level converter is short, in Practical Project The feature that middle generally existing voltage is high, electric current is big, capacity is big;So the operation type that MMC valve is carried out before putting into operation certainly will be influenced whether Formula is tested, and is difficult to simulation and actual operating mode identical equivalent full capacity test loop in experimental enviroment at present.
Conventional similar test method is generally individually to adopt synthesis loop, is led to using generating set or capacitor bank Cross the simulation that short circuit current to be realized by peripheral circuit to the test method of test product injection high current, but because flexible DC power transmission is short The features such as electric pressure of road current testing tested test product MMC valve is high, electric current is big, capacity is big has been difficult to return in traditional synthesis To complete on road, to be badly in need of a kind of test method adapting to the test of flexible DC power transmission short circuit current at present.
Content of the invention
The purpose of the present invention is the shortcoming overcoming above-mentioned prior art, provides one kind can meet high voltage, high current, great Rong The short-circuit test method of engineering valve module in the flexible DC power transmission operation test of amount demand.
The present invention seeks to be achieved through the following technical solutions:
A kind of short-circuit test method of engineering valve module in flexible DC power transmission operation test, using the flexible DC power transmission back of the body Backrest loop test system carries out the short circuit current test of soft straight engineering valve module, described flexible DC power transmission back-to-back loop examination Check system is made up of inverter A station and inverter B station, and inverter A stands as converting plant, and inverter B stands as Inverter Station, two changes of current It is connected with high-tension bus-bar after device station difference connection transformer and primary cut-out Q0, connect dc bus between two current conversion stations, directly On stream bus, short-circuit electrical switch L is installed;Test product valve module is included in a converter station of back-to-back loop test system In, adjusted by the switch off time and fictitious load controlling dc-side short-circuit electrical switch L and control by test product valve module Short-circuit current value, realize the short-circuit test of engineering valve module.
Two described converter stations are made up of 24 valve modules altogether, and a valve module is made up of 2 power models, each By in series after 2 diodes of 2 IGBT parallel connected in reverse phase, wherein half valve module is as accompanying examination valve section, another for power model Valve module carries out short circuit current test as tested valve section, and short-circuit test specifically includes following steps:
Step 1, by being passed through deionized water to inverter and heating, make the junction temperature of inverter IGBT reach maximum;
Step 2, startup inverter, and reach 1.1 times of rated values of normal operating current, continuous service 10min, make The operating mode of two converter station IGBT reaches thermal balance;
Step 3, by controlling short-circuit electrical switch L break-make, make positive and negative intereelectrode short-circuit, that is, short-circuit electrical switch L open, Bypass IGCT action in inverter and lasting 100ms;
I.e. DC side and bridge arm current short-circuit current value between step 4, detection positive and negative electrode, measure each peak point current and short Road current duration.
Described back-to-back loop test system, two converter stations are sequentially connected connection transformer, primary cut-out respectively It is connected with high-tension bus-bar after Q0 and high-tension switch cabinet, when short-circuit electrical switch L opens, high-tension switch cabinet trips to complete disjunction shape State.
Traditional DC current transmission valve is carried out all on synthesis loop with the test of flexible direct current transmission converter valve short circuit current, Using generating set or capacitor bank, short circuit current is realized by the test method that peripheral circuit injects high current to test product Simulation;But the spy such as the electric pressure that flexible DC power transmission short circuit current tests tested test product MMC valve is high, electric current is big, capacity is big Point has been difficult to complete on traditional synthesis loop, and the present invention is based on flexible DC power transmission back-to-back loop test system Feature, can be caused with reasons such as the system failure that fully equivalent MMC valve occurs in actual operating mode, DC side earth faults Short trouble, test product valve module is included in a current conversion station of back-to-back three-phase modular multilevel inverter, MMC changes Stream device DC side is adjusted and the short-circuit current value controlling by test product valve module with short-circuit electrical switch L and fictitious load, leads to Cross the short-circuit electrical switch L break-make of control, make positive and negative intereelectrode short-circuit, be DC side and bridge arm current short circuit electricity between detection positive and negative electrode Flow valuve, measures each peak point current and short circuit current persistent period, realizes the short-circuit test of engineering valve module.
Brief description
Fig. 1 is the circuit theory diagrams of the present invention;
Fig. 2 is the short circuit current test waveform figure of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings, illustrate the solution of the present invention:
The present invention carries out the short circuit current of soft straight engineering valve module using flexible DC power transmission back-to-back loop test system Test, as shown in figure 1, described flexible DC power transmission back-to-back loop test system is made up of inverter A station and inverter B station, Inverter A stands as converting plant, and inverter B stands as Inverter Station, and two converter stations connect connection transformer, primary cut-out respectively Be connected with high-tension bus-bar after Q0 and high-tension switch cabinet, between two current conversion stations connect dc bus, dc bus is provided with for Control the electrical switch L of dc bus short circuit duration;Two converter stations are made up of 24 valve modules altogether, and valve module is by 2 Individual power model composition, each power model is by series, test product valve module bag after 2 diodes of 2 IGBT parallel connected in reverse phase It is contained in a converter station of back-to-back loop test system, wherein half valve module tries valve section, second half valve group as accompanying Part carries out short circuit current test as tested valve section.
Back-to-back in loop test system, Q0 is converter valve A and converter valve B primary cut-out;R0 is current-limiting resistor, Surge current when charging in major limitation loop;T01, T02 are transformator;L1-L6 is brachium pontis reactance, is mainly used in restriction and changes Stream, minimizing harmonic wave;L switchs for dc bus side, and short-circuit electrical switch L controls dc-side short-circuit;Also include dc bus side to bear Carry, DC load inductance and resistance are used for adjusting output current size.
Short-circuit test method comprises the following steps:
A, it is passed through deionized water to back-to-back MMC inverter so as to flow reaches service requirement value, heat pure water cooling system Deionized water in system is to 52 DEG C, and keeps constant, makes the junction temperature of inverter IGBT reach maximum;
B, the back-to-back MMC inverter of startup, and reach 1.1 times of rated values of normal operating current, continuous service 10min;The operating mode of MMC inverter IGBT is made to reach thermal balance;
C, adjusted by valve control system and send break-make instruction, make positive and negative intereelectrode short-circuit, that is, short-circuit electrical switch L open, Bypass IGCT action in MMC inverter, high-tension switch cabinet trip to complete disjunction, and continue 100ms,
It is DC side and bridge arm current short-circuit current value between D, detection positive and negative electrode, measure each peak point current and short circuit electricity The stream persistent period.
As shown in Fig. 2 the present invention carries out soft straight engineering using flexible DC power transmission back-to-back loop test system after testing The short circuit current test of valve module, each short circuit peak of short circuit current is no substantially decayed, and is the most light of test method of the present invention Point, is successfully completed using flexible DC power transmission back-to-back loop test system and is applied to flexible DC power transmission engineering Converter Station Valve Assembly short circuit current is tested;Experiment proves that, it is soft that 10kV/12.5MW flexible DC power transmission back-to-back loop test system completes Property DC transmission engineering Converter Station Valve assembly (comprising 56 power models) short circuit current test meet run type approval test The technical specification of project.

Claims (2)

1. in a kind of flexible DC power transmission operation test engineering valve module short-circuit test method it is characterised in that:Using flexibility Direct current transportation back-to-back loop test system carries out the short circuit current test of soft straight engineering valve module, the described flexible DC power transmission back of the body Backrest loop test system is made up of inverter A station and inverter B station, and inverter A stands as converting plant, and inverter B stands as inversion Stand, be connected with high-tension bus-bar after two converter station difference connection transformers and primary cut-out Q0, connect between two current conversion stations Dc bus, dc bus is provided with short-circuit electrical switch L;Test product valve module is included in the one of back-to-back loop test system In individual converter station, adjust and pass through with control by the switch off time and fictitious load controlling dc-side short-circuit electrical switch L The short-circuit current value of test product valve module, realizes the short-circuit test of engineering valve module;
Two described converter stations are made up of 24 valve modules altogether, and a valve module is made up of 2 power models, each power By in series after 2 diodes of 2 IGBT parallel connected in reverse phase, wherein half valve module is as accompanying examination valve section, another valve group for module Part carries out short circuit current test as tested valve section, and short-circuit test specifically includes following steps:
Step 1, by being passed through deionized water to inverter and heating, make the junction temperature of inverter IGBT reach maximum;
Step 2, startup inverter, and reach 1.1 times of rated values of normal operating current, continuous service 10min, make two The operating mode of converter station IGBT reaches thermal balance;
Step 3, by controlling short-circuit electrical switch L break-make, make positive and negative intereelectrode short-circuit, that is, short-circuit electrical switch L open, the change of current Bypass IGCT action in device and lasting 100ms;
It is DC side and bridge arm current short-circuit current value between step 4, detection positive and negative electrode, measure each peak point current and short circuit electricity The stream persistent period.
2. engineering valve module according to claim 1 short-circuit test method it is characterised in that:Described back-to-back loop examination Check system, two converter stations be sequentially connected respectively after connection transformer, primary cut-out Q0 and high-tension switch cabinet with high-tension electricity Line connects, and when short-circuit electrical switch L opens, high-tension switch cabinet trips to complete disjunction state.
CN201410280097.6A 2014-06-20 2014-06-20 Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission Active CN104034984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410280097.6A CN104034984B (en) 2014-06-20 2014-06-20 Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410280097.6A CN104034984B (en) 2014-06-20 2014-06-20 Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission

Publications (2)

Publication Number Publication Date
CN104034984A CN104034984A (en) 2014-09-10
CN104034984B true CN104034984B (en) 2017-02-15

Family

ID=51465826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410280097.6A Active CN104034984B (en) 2014-06-20 2014-06-20 Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission

Country Status (1)

Country Link
CN (1) CN104034984B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107728035A (en) * 2017-10-26 2018-02-23 厦门科华恒盛股份有限公司 The detection method and three phase mains of transistors breakdown in a kind of three phase mains

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104914340B (en) * 2015-06-11 2016-11-09 中国西电电气股份有限公司 Flexible direct current transmission converter valve wholly-controled device overcurrent turn-off function pilot system and method
CN105137212B (en) * 2015-06-11 2016-08-24 中国西电电气股份有限公司 A kind of high-speed power electrical switch realizes the method for short-circuit test between converter valve polar curve
KR101980691B1 (en) * 2015-06-18 2019-05-22 엘에스산전 주식회사 Synthetic test circuit for valve test of hvdc
CN105823945B (en) * 2016-04-13 2018-10-23 国网福建省电力有限公司 A kind of true bipolar flexible direct current passive inverter experimental rig and test method
CN107179498A (en) * 2017-01-25 2017-09-19 全球能源互联网研究院 A kind of inspection circuit and method for flexible DC power transmission MMC valve
CN107884634B (en) * 2017-09-21 2020-01-24 北京机械设备研究所 Self-circulation test method of back-to-back converter
CN111273192B (en) * 2020-03-19 2022-03-29 南京南瑞继保电气有限公司 Fault backup protection method and device for converter of flexible direct current transmission system
CN113376463B (en) * 2021-06-10 2024-04-16 荣信汇科电气股份有限公司 STATCOM minimum starting voltage test device and method
CN114167167B (en) * 2021-11-15 2024-02-09 许继集团有限公司 Short-circuit current test device and test method for modularized multi-level converter

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2841345B2 (en) * 1990-03-05 1998-12-24 マルコン電子株式会社 DC voltage application test circuit for capacitors
JP5872184B2 (en) * 2011-04-21 2016-03-01 株式会社東芝 Lightning resistance test apparatus and test method
CN102323546B (en) * 2011-08-25 2014-05-07 中国电力科学研究院 Back-to-back test method of VSC-HVDC MMC valve stable state operation test
CN103033701B (en) * 2012-11-30 2017-11-07 许继电气股份有限公司 The high-power operating test device of flexible direct current transmission converter valve stable state and test method
CN103051174B (en) * 2012-12-07 2015-01-07 国网智能电网研究院 High position energy-taking power supply device of submodule of MMC valve and realizing method thereof
CN103064016B (en) * 2012-12-11 2015-05-06 国家电网公司 Fault protection method for steady-state operation testing apparatus of modular multilevel converter (MMC) valve
CN103066551B (en) * 2012-12-13 2015-04-01 国网智能电网研究院 Fault protective system for short-circuit current testing apparatus
CN103187722B (en) * 2013-04-09 2015-12-09 国家电网公司 For flexible direct current power transmission system DC side overvoltage protection and guard method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107728035A (en) * 2017-10-26 2018-02-23 厦门科华恒盛股份有限公司 The detection method and three phase mains of transistors breakdown in a kind of three phase mains

Also Published As

Publication number Publication date
CN104034984A (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN104034984B (en) Short-circuit test method for engineering valve assembly in running test for flexible direct current transmission
CN104035027B (en) Method for performing valve assembly running type test by using back-to-back loop test system
Peralta et al. Detailed and averaged models for a 401-level MMC–HVDC system
CN102323546B (en) Back-to-back test method of VSC-HVDC MMC valve stable state operation test
CN201075124Y (en) Transient forward voltage tester for recuperation duration of DC converter valve
CN103063945B (en) Flexible direct current transmission sub-module test device and test method thereof
CN202433456U (en) Test device for IGBT (insulated gate bipolar translator) parallel power unit
WO2012174827A1 (en) Physical real-time dynamic simulation device for flexible direct-current transmission system
CN104914340B (en) Flexible direct current transmission converter valve wholly-controled device overcurrent turn-off function pilot system and method
CN204679566U (en) A kind of high pressure flexible direct current transmitted power unit forceful electric power test loop
CN104714132A (en) Flexible direct current power transmission converter performance testing platform and control method thereof
CN203813384U (en) DC ice melting device based on voltage source type current converter
CN103560541A (en) Fault ride-through control device and method for alternating/direct current mixed microgrid
CN102486515A (en) Fault current composite test method for high-voltage direct current power transmission converter valve
CN105137212B (en) A kind of high-speed power electrical switch realizes the method for short-circuit test between converter valve polar curve
CN110824275A (en) Micro-grid AC/DC bus interface converter demonstration test platform
CN105467308A (en) Flexible DC power transmission engineering voltage source converter valve short circuit current test method
CN112269152A (en) Transformer and converter valve charging test circuit and method
CN102290587A (en) Redox flow cell simulation method and simulator
CN103580054B (en) A kind of converter valve AC system 1s fault tolerance property analytical method
CN103986308A (en) Dynamic voltage-sharing circuit of direct-current capacitor of multilevel converter
CN104866656A (en) Bridge arm equivalent circuit of modular multilevel converter with full-bridge structure
CN201344957Y (en) High-voltage frequency-conversion phase-shifting or rectifier transformer load simulator
CN202102064U (en) Testing apparatus used for testing function of wind turbine generator system low voltage crossing compensating apparatus
Feng et al. Design of high power density sub module in modular multilevel converter for VSC-HVDC project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant