CN104032840B - 附加角钢的预应力装配式框架节点连接结构 - Google Patents

附加角钢的预应力装配式框架节点连接结构 Download PDF

Info

Publication number
CN104032840B
CN104032840B CN201410312635.5A CN201410312635A CN104032840B CN 104032840 B CN104032840 B CN 104032840B CN 201410312635 A CN201410312635 A CN 201410312635A CN 104032840 B CN104032840 B CN 104032840B
Authority
CN
China
Prior art keywords
reinforced concrete
angle steel
column
steel
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410312635.5A
Other languages
English (en)
Other versions
CN104032840A (zh
Inventor
付秀艳
杨志年
尤志国
韩建强
裴亚晖
Original Assignee
PENGDA CONSTRUCTION GROUP
North China University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PENGDA CONSTRUCTION GROUP, North China University of Science and Technology filed Critical PENGDA CONSTRUCTION GROUP
Priority to CN201410312635.5A priority Critical patent/CN104032840B/zh
Publication of CN104032840A publication Critical patent/CN104032840A/zh
Application granted granted Critical
Publication of CN104032840B publication Critical patent/CN104032840B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

一种附加角钢的预应力装配式框架节点连接结构及其施工方法,由预制钢筋混凝土柱、预制钢筋混凝土梁和角钢三大部分组成,钢筋混凝土梁柱和角钢均为工厂预制,将预制钢筋混凝土柱吊装到指定位置,预制柱安装就位后吊装预制钢筋混凝土梁到指定位置,然后在梁柱预留的钢绞线预埋管中穿入钢绞线并在梁柱接缝处用高强灌浆料连接,灌浆料强度达到设计要求后张拉预应力钢绞线至设计预拉力,最后在梁柱节点安装角钢,形成整体的预应力附加角钢连接节点。角钢安装在梁柱节点处,在外力作用下尤其是发生地震时,角钢在转角处发生弯曲变形,同时消耗能量,使装配式框架结构在发生地震时能够实现有效耗能的效果。

Description

附加角钢的预应力装配式框架节点连接结构
技术领域
本发明涉及一种土木工程抗震领域中装配式混凝土框架结构,特别是一种附加角钢的预应力装配式框架结构节点连接结构,是一种新型预制框架结构节点连接与耗能技术。
背景技术
我国是一个地震多发国家,大部分地区处于抗震设防区。在实际工程施工中,装配式框架结构可以降低工程造价,加快施工速度,减少资源消耗,降低环境污染。是我国建筑业发展的方向之一。与现浇钢筋混凝土框架结构相比由于装配式钢筋混凝土框架结构节点没有新的设计方法耗能能力略显不足,尤其是抗震耗能能力较低一直是阻碍其发展的主要因素之一。开发新的装配式框架结构节点连接结构,使装配式框架结构在地震作用下消耗能量,有效地提高建筑物的抗震能力是亟待解决的问题。
发明内容
由于地震发生时建筑结构的节点强度和耗能能力是抗震性能的重要指标,为了降低地震对结构的破坏程度,本发明针对现有技术装配式钢筋混凝土框架结构节点耗能能力差的不足,提供一种附加角钢的预应力装配式框架结构节点连接结构。该结构的节点角钢合理利用角钢弯曲变形来消耗能量,使结构在保证整体性的基础上实现有效耗能的效果。有效地提高装配式框架结构在地震作用下的耗能能力。
实现上述目的采用以下技术方案:
一种附加角钢的预应力装配式框架结构节点连接结构,由预制钢筋混凝土柱、预制钢筋混凝土梁和角钢三大部分组成,预制钢筋混凝土梁由梁纵筋,梁箍筋,梁钢绞线预埋管,梁端角钢预埋管和混凝土构成,预制钢筋混凝土柱由柱纵筋,柱箍筋,柱钢绞线预埋管,柱角钢预埋管和混凝土构成,预制钢筋混凝土梁与预制钢筋混凝土梁柱通过预应力钢绞线有效连接,在预制钢筋混凝土梁与预制钢筋混凝土柱的梁柱接缝处用高强灌浆料灌缝,形成梁柱整体节点;在梁柱整体节点处安装角钢,所述角钢的钢板上设有多个角钢安装孔,通过角钢安装孔用紧固件将角钢与梁柱整体节点固定,形成附加角钢的预应力装配式框架结构节点连接结构。
进一步,所述的预制钢筋混凝土梁内平行设置有多条梁钢绞线预埋管和梁端角钢预埋管。
进一步,所述的预制钢筋混凝土柱内平行设置有多条柱钢绞线预埋管和柱角钢预埋管。
进一步,钢绞线是无粘结预应力钢绞线。
一种附加角钢的预应力装配式框架结构节点连接结构的施工方法,所述方法按照下列步骤进行:
a.制备预制钢筋混凝土梁和预制钢筋混凝土柱以及角钢;
b.吊装预制钢筋混凝土柱到设计安装位置,保证预制钢筋混凝土柱上的预留钢绞线预埋管及柱角钢预埋安装管的方向正确无误;
c.吊装预制钢筋混凝土梁到设计安装位置,预制钢筋混凝土梁和预制钢筋混凝土柱上的钢绞线预埋管要对正;
d.在预制钢筋混凝土梁和预制钢筋混凝土柱内的钢绞线预埋管中安分别装无粘结预应力钢绞线;
e.预制钢筋混凝土梁和预制钢筋混凝土柱的梁柱接缝处用高强灌浆料灌缝,形成梁柱整体节点;
f.待灌浆料达到设计强度后张拉预应力钢绞线对预制钢筋混凝土梁和预制钢筋混凝土柱施加设计的预压力;
g.在预制钢筋混凝土梁和预制钢筋混凝土柱的角钢预埋管分别中穿入角钢固定螺杆,安装角钢并拧紧固定螺母。
采用上述技术方案,与现有技术相比,本发明的角钢安装在预制钢筋混凝土梁和预制钢筋混凝土柱的节点处,在外力作用下尤其是地震发生时,角钢在转角处发生弯曲变形,同时消耗能量,可以有效提高装配式框架结构节点的耗能能力。本发明的梁柱和角钢均由工厂预制,可用于新建的工程结构,也可用于建筑物的加固与改良。具有施工简单、安全可靠、节省造价、经久耐用且易于替换等优点,具有广阔的应用前景。
附图说明
图1为本发明连接结构示意图。
图2为本发明节点角钢正立面示意图。
图3为本发明节点角钢侧立面示意图。
图4为本发明预制钢筋混凝梁顶面示意图。
图5为本发明预制钢筋混凝梁端截面示意图。
图6为本发明预制钢筋混凝梁正截面示意图。
图7为本发明预制钢筋混凝柱正立面示意图。
图8为本发明预制钢筋混凝柱截面示意图。
图中:预制钢筋混凝土柱1,角钢2,预制钢筋混凝土梁3,螺栓4,钢绞线预埋管5,角钢安装预埋管6,安装螺孔7,梁端角钢预埋管8,梁钢绞线预埋管9,梁箍筋10,梁纵筋11,柱角钢预埋管12,柱钢绞线预埋管13,柱箍筋14,柱纵筋15。
具体实施方式法
下面结合附图和实例对本发明做进一步说明。
参见附图1,这种附加角钢的预应力装配式框架结构节点连接结构由预制钢筋混凝土柱1、预制钢筋混凝土梁3和角钢2三大部分组成。具体结构见图1-8。
见图4,图5和图6,预制钢筋混凝土梁3由梁端角钢预埋管8,梁钢绞线预埋管9,梁箍筋10,梁纵筋11和混凝土组成。见图7,图8,预制钢筋混凝土柱1由柱角钢预埋管12,柱角钢预埋管13,柱箍筋14,柱纵筋15和混凝土构成。
见图2,图3,角钢2的钢板上设有多个角钢安装孔即安装螺孔7。
在预制钢筋混凝土梁3与预制钢筋混凝土柱1的梁柱接缝处用高强灌浆料灌缝,预制钢筋混凝土梁3与预制钢筋混凝土柱1用灌浆料连接,形成梁柱整体节点;在梁柱整体节点处安装角钢2,通过安装螺孔7用紧固件螺栓4将角钢2与梁柱整体节点固定,形成附加角钢的预应力装配式框架结构,该结构用于装配式框架结构梁柱节点。
钢绞线预埋管5分为梁钢绞线预埋管9和柱钢绞线预埋管13。角钢安装预埋管6分为梁端角钢预埋管8,柱角钢预埋管12。见图1,图4,图5,在预制钢筋混凝土梁3内平行设置有多条梁钢绞线预埋管9和梁端角钢预埋管8。
在预制钢筋混凝土柱1内平行设置有多条柱钢绞线预埋管13和柱角钢预埋管12。
本发明采用的钢绞线是无粘结预应力钢绞线。钢绞线穿在梁柱各自的钢绞线预埋管内。
本发明的钢绞线预埋管5和角钢安装预埋管6均采用PVC材料或波纹钢管制作,直径为15~30mm。钢绞线为钢质材料制作,直径为15.2mm。
本发明附加角钢的预应力装配式框架结构节点连接结构的施工方法,按照下列步骤进行:
a.在工厂按照设计要求,制备预制钢筋混凝土梁和预制钢筋混凝土柱以及角钢。
b.在框架结够的建筑物上,吊装预制钢筋混凝土柱到设计安装位置,保证预制钢筋混凝柱柱上的预留钢绞线预埋管及预制钢筋混凝柱上的角钢安装预埋管的方向正确无误。
c.吊装预制钢筋混凝土梁到设计安装位置,预制钢筋混凝土梁和预制钢筋混凝土柱上的钢绞线预埋管要对正。
d.在预制钢筋混凝土梁和预制钢筋混凝土柱内的钢绞线预埋管中安分别穿装无粘结预应力钢绞线;
e.预制钢筋混凝土梁和预制钢筋混凝土柱的梁柱接缝处用高强灌浆料灌缝,高强灌浆料将预制钢筋混凝土梁和预制钢筋混凝土柱胶管连接为一体,形成梁柱整体节点。
f.待灌浆料达到设计强度后张拉预应力钢绞线对预制钢筋混凝土梁和预制钢筋混凝土柱施加设计的预压力。
g.在预制钢筋混凝土梁和预制钢筋混凝土柱的角钢预埋管分别中穿入角钢固定螺杆,安装角钢并拧紧固定螺母。
本发明的工作原理:
本发明将角钢安装在梁柱整体节点上,在地震发生时,预应力钢绞线保证梁柱的有效连接,角钢可以在转角处发生弯曲变形消耗能量,以有效的消耗地震能量,保证装配式混凝土框架结构在地震发生时,实现节点的有效连接和有效耗能的效果,保护建筑结构。
上述实施例仅表达了本发明的一种实施方式,但并不能因此而理解为对本发明范围的限制。应当指出,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。

Claims (4)

1.一种附加角钢的预应力装配式框架节点连接结构,由预制钢筋混凝土柱、预制钢筋混凝土梁和角钢三大部分组成,预制钢筋混凝土梁由梁纵筋,梁箍筋,梁钢绞线预埋管,梁端角钢预埋管和混凝土构成,预制钢筋混凝土柱由柱纵筋,柱箍筋,柱钢绞线预埋管,柱角钢预埋管和混凝土构成,其特征在于,预制钢筋混凝土梁与预制钢筋混凝土梁柱通过预应力钢绞线有效连接,在预制钢筋混凝土梁与预制钢筋混凝土柱的梁柱接缝处用高强灌浆料灌缝,形成梁柱整体节点;在梁柱整体节点处安装角钢,所述角钢的钢板上设有多个角钢安装孔,通过角钢安装孔用紧固件将角钢与梁柱整体节点固定,形成附加角钢的预应力装配式框架结构节点连接结构,其施工方法按照下列步骤进行:
a.制备预制钢筋混凝土梁和预制钢筋混凝土柱以及角钢;
b.吊装预制钢筋混凝土柱到设计安装位置,保证预制钢筋混凝土柱上的预留钢绞线预埋管及柱角钢预埋安装管的方向正确无误;
c.吊装预制钢筋混凝土梁到设计安装位置,预制钢筋混凝土梁和预制钢筋混凝土柱上的钢绞线预埋管要对正;
d.在预制钢筋混凝土梁和预制钢筋混凝土柱内的钢绞线预埋管中安分别装无粘结预应力钢绞线;
e.预制钢筋混凝土梁和预制钢筋混凝土柱的梁柱接缝处用高强灌浆料灌缝,形成梁柱整体节点;
f.待灌浆料达到设计强度后张拉预应力钢绞线对预制钢筋混凝土梁和预制钢筋混凝土柱施加设计的预压力;
g.在预制钢筋混凝土梁和预制钢筋混凝土柱的角钢预埋管分别中穿入角钢固定螺杆,安装角钢并拧紧固定螺母。
2.根据权利要求1所述的附加角钢的预应力装配式框架节点连接结构,其特征在于,所述的预制钢筋混凝土梁内平行设置有多条梁钢绞线预埋管和梁端角钢预埋管。
3.根据权利要求1所述的附加角钢的预应力装配式框架节点连接结构,其特征在于,所述的预制钢筋混凝土柱内平行设置有多条柱钢绞线预埋管和柱角钢预埋管。
4.根据权利要求1所述的附加角钢的预应力装配式框架节点连接结构,其特征在于,钢绞线是无粘结预应力钢绞线。
CN201410312635.5A 2014-07-03 2014-07-03 附加角钢的预应力装配式框架节点连接结构 Expired - Fee Related CN104032840B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410312635.5A CN104032840B (zh) 2014-07-03 2014-07-03 附加角钢的预应力装配式框架节点连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410312635.5A CN104032840B (zh) 2014-07-03 2014-07-03 附加角钢的预应力装配式框架节点连接结构

Publications (2)

Publication Number Publication Date
CN104032840A CN104032840A (zh) 2014-09-10
CN104032840B true CN104032840B (zh) 2016-03-23

Family

ID=51463812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410312635.5A Expired - Fee Related CN104032840B (zh) 2014-07-03 2014-07-03 附加角钢的预应力装配式框架节点连接结构

Country Status (1)

Country Link
CN (1) CN104032840B (zh)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6290054B2 (ja) * 2014-09-18 2018-03-07 株式会社東芝 検知システム、センサモジュール及び検知方法
CN105386520A (zh) * 2015-11-16 2016-03-09 重庆市彭洲混凝土有限公司 一种混凝土梁柱节点
CN105804262B (zh) * 2016-03-25 2019-08-02 合肥工业大学 耗能支撑与装配式混凝土框架双重耗能节点及装配方法
CN105804409B (zh) * 2016-05-10 2018-01-26 华北理工大学 预制装配式剪力墙结构装配工作面纵向钢筋定位装置及方法
CN107587605A (zh) * 2016-07-07 2018-01-16 中恒建设集团有限公司 一种全预制预应力装配式结构及其施工方法
CN106368317A (zh) * 2016-09-21 2017-02-01 清华大学 全预制装配式框架、开缝式剪力墙以及框架‑剪力墙结构
CN106759879A (zh) * 2016-12-12 2017-05-31 福州大学 预制预应力混凝土框架自康复耗能节点及其施工方法
CN106968332A (zh) * 2017-03-09 2017-07-21 武汉大学 一种预应力装配式高性能圆钢管混凝土柱‑混凝土梁节点及其施工方法
CN106759948A (zh) * 2017-03-09 2017-05-31 武汉大学 一种预应力装配式高性能钢筋混凝土梁柱节点及其施工方法
CN106836490A (zh) * 2017-03-09 2017-06-13 武汉大学 一种预应力装配式高性能方钢管混凝土柱‑混凝土梁节点及其施工方法
CN106884486B (zh) * 2017-03-20 2023-06-02 清华大学 高层建筑多灾害防御架构
CN107152097B (zh) * 2017-05-12 2022-08-26 东南大学 带悬挑板框架外附预应力装配式耗能框架加固的结构
CN107795012B (zh) * 2017-11-01 2023-05-12 大连理工大学 基于缓粘结预应力技术的主动约束式现浇框架梁柱节点体系
CN108468378B (zh) * 2018-04-13 2020-05-08 武汉科技大学 一种混凝土结构预制装配式节点
CN108978858A (zh) * 2018-08-21 2018-12-11 长安大学 方形钢管混凝土柱与钢筋混凝土梁的连接节点结构及施工方法
CN109469097A (zh) * 2018-10-07 2019-03-15 筑梦高科建筑有限公司 一种预制装配式混凝土构件的钢筋锚固连接结构及连接方法
CN109322387A (zh) * 2018-10-25 2019-02-12 安徽建筑大学 一种装配式混凝土框架梁柱的连接节点
CN109296069A (zh) * 2018-10-25 2019-02-01 安徽建筑大学 一种预制装配钢结构可修复的抗震耗能连接节点
CN109235639A (zh) * 2018-11-15 2019-01-18 福建工程学院 带耗能装置的无粘结预应力装配式节点及施工方法
CN110145023A (zh) * 2019-06-25 2019-08-20 安徽建筑大学 一种预制装配式混凝土矩形梁柱连接节点
CN112854441A (zh) * 2021-01-08 2021-05-28 哈尔滨工业大学 装配式混凝土自复位梁柱转动节点连接结构及拼装方法
CN113585457A (zh) * 2021-09-08 2021-11-02 温州医科大学 一种预制混凝土梁柱连接方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3842484B2 (ja) * 1999-05-19 2006-11-08 積水ハウス株式会社 柱と梁の接合構造及びこれを備えた建築物
CN101029503A (zh) * 2007-04-06 2007-09-05 北京工业大学 预制预应力混凝土结构梁、柱组合节点
KR101042404B1 (ko) * 2010-01-20 2011-06-17 (주)대들보구조안전기술단 철근콘크리트 기둥-보 접합부의 건식 내진 보강 구조 및 공법
CN101831958A (zh) * 2010-04-30 2010-09-15 河北理工大学 钢筋混凝土框架节点
CN101936043A (zh) * 2010-08-11 2011-01-05 东南大学 摩擦耗能型自定心墩柱结构节点连接装置
CN102864944B (zh) * 2012-10-11 2016-12-21 北京筑福国际工程技术有限责任公司 一种角钢支托砌体结构及其加固方法
CN102966185B (zh) * 2012-12-06 2014-07-30 河北联合大学 新型钢管混凝土连接节点及其施工方法
CN103132602A (zh) * 2013-02-27 2013-06-05 同济大学 一种自复位框架梁柱节点
CN203924364U (zh) * 2014-07-03 2014-11-05 河北联合大学 附加角钢的预应力装配式框架结构节点连接结构

Also Published As

Publication number Publication date
CN104032840A (zh) 2014-09-10

Similar Documents

Publication Publication Date Title
CN104032840B (zh) 附加角钢的预应力装配式框架节点连接结构
CN104032839B (zh) 摩擦型阻尼器装配式框架节点的连接结构及其施工方法
CN203924364U (zh) 附加角钢的预应力装配式框架结构节点连接结构
CN203924363U (zh) 摩擦型阻尼器装配式框架节点的连接结构
CN104499568A (zh) 方钢管预制柱-预制叠合梁装配整体式框架及施工方法
CN107237402A (zh) 一种低损伤自复位装配式混凝土双向框架梁柱节点
CN102661010B (zh) 一种组合剪力墙
CN103711329A (zh) 外贴钢骨混凝土框架法加固结构的方法
CN103352583A (zh) 装配式多层砖混结构加固方法
CN103938730A (zh) 无粘结预应力与普通钢筋连接混凝土梁圆钢管混凝土柱组合节点
CN103924676B (zh) 预应力连接混凝土梁圆钢管混凝土柱节点
CN111622348B (zh) 一种预应力自复位混凝土桁架结构及装配方法
CN103924679A (zh) 预应力与普通钢筋连接混凝土梁圆钢管混凝土柱组合节点
CN108412036B (zh) 装配式h型钢柱-独立基础-混凝土圈梁十字形连接节点
CN207714796U (zh) 一种用于钢筋混凝土梁柱节点的抗震加固装置
CN108625491B (zh) 装配式h型钢柱-独立基础-混凝土圈梁l形连接节点
CN203947593U (zh) 一种安全式钢结构节点构件
CN206428805U (zh) 一种装配式钢‑混凝土预制阳台
CN202611010U (zh) 钢板-砌体组合剪力墙
CN103924682A (zh) 无粘结预应力连接混凝土梁圆钢管混凝土柱节点
CN103938732A (zh) 预应力与普通钢筋连接预制混凝土梁方矩形钢管混凝土柱组合节点
CN103924685B (zh) 预应力连接混凝土梁圆钢管混凝土柱节点
CN210264016U (zh) 一种砖混结构墙体的装配式抗震加固结构
CN203008402U (zh) 单层硬山搁檩砌体住宅的钢架护顶结构
CN103938731A (zh) 预应力与普通钢筋连接预制混凝土梁圆钢管混凝土柱组合节点

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 063000 Hebei province Tangshan City Xinhua West Road No. 46

Applicant after: North China Polytechnics

Applicant after: Pengda Construction Group

Address before: 063000 Hebei province Tangshan City Xinhua West Road No. 46

Applicant before: Hebei United University

Applicant before: Pengda Construction Group

CB03 Change of inventor or designer information

Inventor after: Fu Xiuyan

Inventor after: Yang Zhinian

Inventor after: You Zhiguo

Inventor after: Han Jianqiang

Inventor after: Pei Yahui

Inventor before: Han Jianqiang

Inventor before: Liu Ranran

Inventor before: Liao Yong

Inventor before: Fu Xiuyan

Inventor before: Ding Yang

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fu Xiuyan

Inventor after: You Zhiguo

Inventor after: Jin Shengyu

Inventor after: Han Jianqiang

Inventor after: Pei Yahui

Inventor after: Yang Zhinian

Inventor after: Liu Yang

Inventor before: Fu Xiuyan

Inventor before: Yang Zhinian

Inventor before: You Zhiguo

Inventor before: Han Jianqiang

Inventor before: Pei Yahui

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170508

Address after: 063210 Tangshan City Road, Tangshan, Hebei Bay ecological city, Bohai Avenue, No. 21

Patentee after: North China Polytechnics

Address before: 063000 Hebei province Tangshan City Xinhua West Road No. 46

Co-patentee before: Pengda Construction Group

Patentee before: North China Polytechnics

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20190703

CF01 Termination of patent right due to non-payment of annual fee