CN104030631A - Cement-based penetration crystallization leak-stopping material and construction method thereof - Google Patents

Cement-based penetration crystallization leak-stopping material and construction method thereof Download PDF

Info

Publication number
CN104030631A
CN104030631A CN201410196081.7A CN201410196081A CN104030631A CN 104030631 A CN104030631 A CN 104030631A CN 201410196081 A CN201410196081 A CN 201410196081A CN 104030631 A CN104030631 A CN 104030631A
Authority
CN
China
Prior art keywords
water
parts
construction
scupper
leak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410196081.7A
Other languages
Chinese (zh)
Inventor
李海燕
樊细杨
樊腾
李政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Xi Yang Waterproofing Work Group Co ltd
Original Assignee
Dalian Xi Yang Waterproofing Work Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Xi Yang Waterproofing Work Group Co ltd filed Critical Dalian Xi Yang Waterproofing Work Group Co ltd
Priority to CN201410196081.7A priority Critical patent/CN104030631A/en
Publication of CN104030631A publication Critical patent/CN104030631A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a cement-based penetration crystallization leak-stopping material and a construction method thereof. The material is characterized by being prepared from the following raw materials in parts by weight: 159 parts of ordinary portland cement P.O 42.5, 53 parts of 80-100 mesh quartz sand, and master batch, wherein the master batch comprises 15 parts of 400 mesh silica fume, 5 parts of 120 mesh quartz sand, 5 parts of light magnesium oxide, 5 parts of calcium hydroxide, 20 parts of calcium carbonate, 1.6 parts of hydroxy propyl cellulose and 1.6 parts of dispersable latex powder PSB150. The construction method comprises: step 1, construction of an antiseepage water surface; step 2, construction of a water-seepage surface; and step 3, construction of a water-leakage port. The material is high in anti-seepage pressure, strong in bonding capability, good in water proofness, resistant to ageing, free of toxicity, odorless and free of pollution, can be constructed in the presence of water, and construction is simple.

Description

Cement-base infiltration crystallization patching materials and constructional method thereof
Technical field
The invention belongs to patching materials and constructional method thereof, particularly a kind of cement-base infiltration crystallization patching materials and constructional method thereof.
Background technology
Cement-base infiltration crystallization patching materials is mainly used in moisture-proof and seepage-proof and the leakage maintaining of various masonries, new-old concrete buildings, and various underground structure, structures, raceway groove, lavatory bathe between and protection against the tide, the impervious and leak stopping of the engineering such as pond.
Domestic same type of material exists resistance to compression at present, folding strength is low, and viscosifying power is low, and heat-resisting, poor water resistance is easily aging, and not environmental protection is harmful to the person, and construction trouble can be with water construction.
Summary of the invention
The object of the invention is to overcome above-mentioned technical deficiency, a kind of resistance to compression, High anti bending strength are provided, viscosifying power is strong, heat-resisting, water tolerance performance is good, is difficult for agingly, and asepsis environment-protecting, can be with cement-base infiltration crystallization patching materials and the constructional method thereof of water construction.
The technical scheme that technical solution problem of the present invention adopts is: a kind of cement-base infiltration crystallization patching materials, is characterized in that: formulated by weight by following raw material: 42.5 159 parts of ordinary Portland cements: 80~100 53 parts of order quartz sands; Masterbatch: masterbatch comprises 15 parts of 400 order silicon ashes; 120 5 parts of order quartz sands, 5 parts of light magnesium oxides, 5 parts, calcium hydroxide, 20 parts, calcium carbonate, 1.6 parts of 1.6 parts of HPMC hydroxypropylcelluloses and PSB150 redispersable latex powders.
Described cement: being ordinary Portland cement, is by mixing material and the levigate hydraulic cementing materials of making of proper amount of gypsum of Portland clinker, 5%-20%, claims again Portland cement.
Described quartz sand: nonmetallic mineral, it is a kind of silicate minerals hard, wear-resisting, stable chemical performance that has, color is oyster white or colourless translucent, hardness 7, is widely used in the industry such as glass, casting, pottery and refractory materials, smelting duriron, flux for metallurgy, metallurgy, building, chemical industry, plastics, rubber, abrasive material.
Described silicon ash: be SILICA FUME or claim cohesion silicon ash, be iron alloy when smelting duriron and industrial silicon, in ore-smelting furnace, produce SiO and Si gas that a large amount of volatility are very strong, after gaseous emission, be oxidized rapidly condensation precipitation with air and form.Be mainly used in mortar, concrete, material industry, novel wall material, finishing material, dinas brick raw material etc.
Described quartz sand: nonmetallic mineral, it is a kind of silicate minerals hard, wear-resisting, stable chemical performance that has, color is oyster white or colourless translucent, hardness 7, is widely used in the industry such as glass, casting, pottery and refractory materials, smelting duriron, flux for metallurgy, metallurgy, building, chemical industry, plastics, rubber, abrasive material.
Described light magnesium oxide: be a kind of odorless, tasteless, the loose unformed powder of nontoxic white lightweight, can be dissolved in diluted acid, water insoluble and alcohol; There is extremely fireproof heat-insulating property, be widely used in the industries such as rubber, rubber plate, rubber item, medicine, food.
Described calcium hydroxide: claim again white lime, slaked lime, the aqueous solution is called clarification liming, chemical formula Ca (OH) 2, be a kind of white powder solid, there is the general character of alkali, be a kind of highly basic, only can be slightly soluble in water, calcium hydroxide is widely used in industry.
Described sodium carbonate: claim again soda or soda ash etc., its sterling is white powder or fine-grannular, soluble in water, is slightly soluble in dehydrated alcohol, is insoluble to propyl alcohol, is widely used in the industry such as medicine, papermaking, metallurgy, glass, weaving, dyestuff.
Described hydroxypropylcellulose: be a kind of white or slightly with particle or the fibering powder of yellow or grey, odorless, tasteless, flammable, there is plasticity; The excipient of useful as drug, in makeup available it make emulsifying agent, fruit glaze agent, clouding agent, thickening material, dispersion agent, stablizer, membrane-forming agent etc.
Described redispersable latex powder: be a kind of water-soluble redispersible powder, using polyvinyl alcohol as protective colloid, there is the features such as high viscosifying power, water resisting property, application property and thermal insulation; Can be used for ceramic tile bond, ceramic tile bond, to snappiness by polymer mortar product of high requirement etc.
The constructional method of cement-base infiltration crystallization patching materials:
Step 1, water-impervious surface construction: basal plane is processed, and basal plane must be fully moistening to saturated without ponding, and require firm, totally and smooth, levelling is not leaked with concrete or water in uneven place;
After basal plane levelling, be coated with successively the first layer, the second layer, the 3rd layer (after being painted with the second layer, without infiltration, not doing the 3rd layer); Proportion scale, powder and water are 1:0.25~0.35; Every layer of consumption is 1.3kg/ ㎡, and thickness is done 2 layers for 1.5mm, does 3 layers for 2.2mm; Batching is that 1:0.25~0.35 stirs within 2 minutes, to become evenly by powder and water, does not contain the puttylike nian of fecula or granule; Apply the first layer, treat that coating sclerosis hand does not stay fingerprint, squirted, can not ponding; Carry out again second layer coating; During material loading, firmly repeatedly scraping back and forth to smear makes coating closely knit and note overlap joint;
Step 2, infiltration surface construction: basal plane is processed, and basal plane must be firm, clean, smooth fully moistening to saturated without ponding, and levelling is not leaked with concrete or water in uneven place; The serious priming hole of should getting that seeps water reduces pressure and percolating water is concentrated and drawn;
Distribution: infiltration surface construction selects rapid-hardening water not leak; By material, by powder and water, be that 1:0.25~0.35 stirs within 2 minutes, to become uniformly not containing fecula granule puttylike nian;
Coated materials: apply and do altogether two to three layers; If basal plane infiltration is serious, first in bottom, play priming hole step-down, then construction from top to bottom; Specific practice: dry basal plane upper the first layered material rapidly with dry cloth, after coating sclerosis, hand does not stay fingerprint, is squirted, and can not have ponding, at upper the second layered material, if part still has infiltration, then adds one deck, until do not leak the construction of band water; Last shutoff priming hole; During material loading, firmly and back and forth smear several times more, make coating closely knit, and note overlap joint; Every layer of materials amount is 1~1.5kg/ ㎡, and total materials amount is 2~3kg/ ㎡;
Step 3, scupper construction: first to processing base level, with chisel or reciprocating drill, scupper has been got to the above degree of depth of 5cm, in bore, mouth is greater than collar extension, is shown in new stubble, and rinses well;
Sequence of construction: seal after first leak stopping:
Distribution: scupper leak stopping selects rapid-hardening water not leak; Leak stopping material is 1:0.25 by powder and water, and kneading becomes material group repeatedly; Sealing compound is 1:0.3~0.35 by powder and water, stirs and within 2 minutes, becomes even puttylike nian;
Coated materials: according to scupper shape, leak stopping material is pinched into the material group that is slightly less than scupper size, be placed into after having pinched hard sense with hand and fill in scupper, with wooden stick extruding, gently pound and make it compacted to surrounding, moment leak-stopping, the sealing compound on trowel for 10cm place around in scupper outside then; Leak stopping order is wanted the following scupper of first leak stopping mouth of a river diameter 5mm, the above scupper of rear leak stopping mouth of a river diameter 5mm.
The invention has the beneficial effects as follows: this invention antiosmotic pressure is high, viscosifying power strong, water-tolerant, anti-aging, nontoxic, tasteless, pollution-free, can be with water construction, easy construction.
Embodiment
Embodiment, a kind of cement-base infiltration crystallization patching materials, is characterized in that: formulated by weight by following raw material: 42.5 159 parts of ordinary Portland cements: 80~100 53 parts of order quartz sands; Masterbatch: masterbatch comprises 15 parts of 400 order silicon ashes; 120 5 parts of order quartz sands, 5 parts of light magnesium oxides, 5 parts, calcium hydroxide, 20 parts, calcium carbonate, 1.6 parts of 1.6 parts of HPMC hydroxypropylcelluloses and PSB150 redispersable latex powders.Before leak stopping, WATER REPELLENT may leakage area first done by the surrounding at the leak stopping mouth of a river, etc. coating, has after certain degree of hardness in leak stopping.
The constructional method of cement-base infiltration crystallization patching materials:
Step 1, water-impervious surface construction: basal plane is processed, and basal plane must be fully moistening to saturated without ponding, and require firm, totally and smooth, levelling is not leaked with concrete or water in uneven place;
After basal plane levelling, be coated with successively the first layer, the second layer, the 3rd layer (after being painted with the second layer, without infiltration, not doing the 3rd layer); Proportion scale, powder and water are 1:0.25~0.35; Every layer of consumption is 1.3kg/ ㎡, and thickness is done 2 layers for 1.5mm, does 3 layers for 2.2mm; Batching is that 1:0.25~0.35 stirs within 2 minutes, to become evenly by powder and water, does not contain the puttylike nian of fecula or granule; Apply the first layer, treat that coating sclerosis hand does not stay fingerprint, squirted, can not ponding; Carry out again second layer coating; During material loading, firmly repeatedly scraping back and forth to smear makes coating closely knit and note overlap joint;
Step 2, infiltration surface construction: basal plane is processed, and basal plane must be firm, clean, smooth fully moistening to saturated without ponding, and levelling is not leaked with concrete or water in uneven place; The serious priming hole of should getting that seeps water reduces pressure and percolating water is concentrated and drawn;
Distribution: infiltration surface construction selects rapid-hardening water not leak; By material, by powder and water, be that 1:0.25~0.35 stirs within 2 minutes, to become uniformly not containing fecula granule puttylike nian;
Coated materials: apply and do altogether two to three layers; If basal plane infiltration is serious, first in bottom, play priming hole step-down, then construction from top to bottom; Specific practice: dry basal plane upper the first layered material rapidly with dry cloth, after coating sclerosis, hand does not stay fingerprint, is squirted, and can not have ponding, at upper the second layered material, if part still has infiltration, then adds one deck, until do not leak the construction of band water; Last shutoff priming hole; During material loading, firmly and back and forth smear several times more, make coating closely knit, and note overlap joint; Every layer of materials amount is 1~1.5kg/ ㎡, and total materials amount is 2~3kg/ ㎡;
Step 3, scupper construction: first to processing base level, with chisel or reciprocating drill, scupper has been got to the above degree of depth of 5cm, in bore, mouth is greater than collar extension, is shown in new stubble, and rinses well;
Sequence of construction: seal after first leak stopping;
Distribution: scupper leak stopping selects rapid-hardening water not leak; Leak stopping material is 1:0.25 by powder and water, and kneading becomes material group repeatedly; Sealing compound is 1:0.3~0.35 by powder and water, stirs and within 2 minutes, becomes even puttylike nian;
Coated materials: according to scupper shape, leak stopping material is pinched into the material group that is slightly less than scupper size, be placed into after having pinched hard sense with hand and fill in scupper, with wooden stick extruding, gently pound and make it compacted to surrounding, moment leak-stopping, the sealing compound on trowel for 10cm place around in scupper outside then; Leak stopping order is wanted the following scupper of first leak stopping mouth of a river diameter 5mm, the above scupper of rear leak stopping mouth of a river diameter 5mm.
Moisture-keeping maintaining after waterproof layer and leak stopping: after coating sclerosis, carry out in time moisture-keeping maintaining, guarantee that coating humidity is in case efflorescence.Maintenance for the first time notes not destroying coating.Maintenance method: water spray, the wet thing of lid, painting curing fluid capable, maintenance 2~3 days.At moist especially place (as the vault of ponding etc.) or after waterproof layer sclerosis, do immediately protective layer in the above or paste bulk can not do moisture-keeping maintaining.
When using this material, note its keeping, should seal and leave cool place, dry place in, the quality guaranteed period is 6 months.Construction is as needed to strengthen wet curing under burning sun in summer; 1~3% the frostproofer that will add powder weight winter when-5 ℃ of following conditions constructions; Construction, prevents that rainwater from washing out waterproof layer in the rain.

Claims (2)

1. cement-base infiltration crystallization patching materials and a constructional method thereof, is characterized in that: material is formulated by weight by following raw material: 42.5 159 parts of ordinary Portland cements: 80~100 53 parts of order quartz sands; Masterbatch: masterbatch comprises 15 parts of 400 order silicon ashes; 120 5 parts of order quartz sands, 5 parts of light magnesium oxides, 5 parts, calcium hydroxide, 20 parts, calcium carbonate, 1.6 parts of 1.6 parts of HPMC hydroxypropylcelluloses and PSB150 redispersable latex powders.
2. the constructional method of cement-base infiltration crystallization patching materials according to claim 1, is characterized in that:
Step 1, water-impervious surface construction: basal plane is processed, and basal plane must be fully moistening to saturated without ponding, and require firm, totally and smooth, levelling is not leaked with concrete or water in uneven place;
After basal plane levelling, be coated with successively the first layer, the second layer, the 3rd layer (after being painted with the second layer, without infiltration, not doing the 3rd layer); Proportion scale, powder and water are 1:0.25~0.35; Every layer of consumption is 1.3kg/ ㎡, and thickness is done 2 layers for 1.5mm, does 3 layers for 2.2mm; Batching is that 1:0.25~0.35 stirs within 2 minutes, to become evenly by powder and water, does not contain the puttylike nian of fecula or granule; Apply the first layer, treat that coating sclerosis hand does not stay fingerprint, squirted, can not ponding; Carry out again second layer coating; During material loading, firmly repeatedly scraping back and forth to smear makes coating closely knit and note overlap joint;
Step 2, infiltration surface construction: basal plane is processed, and basal plane must be firm, clean, smooth fully moistening to saturated without ponding, and levelling is not leaked with concrete or water in uneven place; The serious priming hole of should getting that seeps water reduces pressure and percolating water is concentrated and drawn;
Distribution: infiltration surface construction selects rapid-hardening water not leak; By material, by powder and water, be that 1:0.25~0.35 stirs within 2 minutes, to become uniformly not containing fecula granule puttylike nian;
Coated materials: apply and do altogether two to three layers; If basal plane infiltration is serious, first in bottom, play priming hole step-down, then construction from top to bottom; Specific practice: dry basal plane upper the first layered material rapidly with dry cloth, after coating sclerosis, hand does not stay fingerprint, is squirted, and can not have ponding, at upper the second layered material, if part still has infiltration, then adds one deck, until do not leak the construction of band water; Last shutoff priming hole; During material loading, firmly and back and forth smear several times more, make coating closely knit, and note overlap joint; Every layer of materials amount is 1~1.5kg/ ㎡, and total materials amount is 2~3kg/ ㎡;
Step 3, scupper construction: first to processing base level, with chisel or reciprocating drill, scupper has been got to the above degree of depth of 5cm, in bore, mouth is greater than collar extension, is shown in new stubble, and rinses well;
Sequence of construction: seal after first leak stopping;
Distribution: scupper leak stopping selects rapid-hardening water not leak; Leak stopping material is 1:0.25 by powder and water, and kneading becomes material group repeatedly; Sealing compound is 1:0.3~0.35 by powder and water, stirs and within 2 minutes, becomes even puttylike nian;
Coated materials: according to scupper shape, leak stopping material is pinched into the material group that is slightly less than scupper size, be placed into after having pinched hard sense with hand and fill in scupper, with wooden stick extruding, gently pound and make it compacted to surrounding, moment leak-stopping, the sealing compound on trowel for 10cm place around in scupper outside then; Leak stopping order is wanted the following scupper of first leak stopping mouth of a river diameter 5mm, the above scupper of rear leak stopping mouth of a river diameter 5mm.
CN201410196081.7A 2014-05-12 2014-05-12 Cement-based penetration crystallization leak-stopping material and construction method thereof Pending CN104030631A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410196081.7A CN104030631A (en) 2014-05-12 2014-05-12 Cement-based penetration crystallization leak-stopping material and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410196081.7A CN104030631A (en) 2014-05-12 2014-05-12 Cement-based penetration crystallization leak-stopping material and construction method thereof

Publications (1)

Publication Number Publication Date
CN104030631A true CN104030631A (en) 2014-09-10

Family

ID=51461661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410196081.7A Pending CN104030631A (en) 2014-05-12 2014-05-12 Cement-based penetration crystallization leak-stopping material and construction method thereof

Country Status (1)

Country Link
CN (1) CN104030631A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107056187A (en) * 2017-04-07 2017-08-18 中铁十二局集团有限公司 A kind of underground pollution environment construction concrete
CN107285684A (en) * 2017-07-14 2017-10-24 俞水忠 Water-proofing material for stopping leak
CN108484004A (en) * 2018-02-09 2018-09-04 湖北固天下建筑防水工程有限公司 A kind of HR concretes defect restoration of the ecosystem, which is controlled, oozes plugging material
CN109826325A (en) * 2019-03-01 2019-05-31 浙江至臻建设有限公司 A kind of anti-seepage construction method of architectural engineering
CN115521103A (en) * 2022-09-29 2022-12-27 成都工业学院 Underwater grouting plugging material and preparation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107056187A (en) * 2017-04-07 2017-08-18 中铁十二局集团有限公司 A kind of underground pollution environment construction concrete
CN107285684A (en) * 2017-07-14 2017-10-24 俞水忠 Water-proofing material for stopping leak
CN108484004A (en) * 2018-02-09 2018-09-04 湖北固天下建筑防水工程有限公司 A kind of HR concretes defect restoration of the ecosystem, which is controlled, oozes plugging material
CN109826325A (en) * 2019-03-01 2019-05-31 浙江至臻建设有限公司 A kind of anti-seepage construction method of architectural engineering
CN115521103A (en) * 2022-09-29 2022-12-27 成都工业学院 Underwater grouting plugging material and preparation method thereof

Similar Documents

Publication Publication Date Title
CN106966679B (en) A kind of ternary gelling system facing mortar and its application method
KR101893060B1 (en) Mortar composition for repairing and reinforcing concrete structure, and method of repairing and reinforcing concrete structure using the same
CN103172330B (en) Environment-friendly colorful tile joint mixture and preparation method thereof
CN102898114B (en) Plant root puncture resistance environment-friendly self-healing waterproof adhesive and preparation method of adhesive
MX2014001274A (en) Fire protection mortar.
CN104030631A (en) Cement-based penetration crystallization leak-stopping material and construction method thereof
CN102531490B (en) Ecological low cement-based finishing mortar
KR101777267B1 (en) Adhesive composition for ceramic tile for waterproof and method for laying ceramic tile on concrete structure therewith
CN102701641A (en) Building finish material, composite raw material and dosage proportion
CN102643059B (en) Bonding treating agent for concrete inorganic interface
CN104211341B (en) Interior wall premixing motar and production method thereof
KR101789052B1 (en) A composition of polymer mortar having barley stone and construction materials having the same and eco-friendly concrete repair and supplement method thereof
KR101598073B1 (en) View Stone Panel using Recycling Material
CN110746166A (en) Self-crystallized anti-permeability and moisture-proof mortar and production method thereof
CN102923991B (en) Concrete multifunctional corrosion remover and preparation method thereof
CN105218025A (en) A kind of Polymer Mortar
CN102234185B (en) Water-proof deep penetration sealer and preparation process thereof
CN102531476B (en) Alkali-free cement-based permeable crystallization waterproof material
CN110885226B (en) Colored gypsum plastering mortar and preparation method thereof
CN104030632A (en) Cement-based penetration crystallization type crack self-healing waterproof material
CN109133781B (en) Preparation method of environment-friendly dry powder crack sealer
CN110885220A (en) Polymer cement waterproof coating suitable for low-temperature environment and preparation method thereof
CN107140897A (en) A kind of decorative engineering construction water cement mortar and preparation method thereof
CN106278066A (en) Fast hard impervious gap filler
CN104556925A (en) Gypsum-based seal mortar for through-wall holes and preparation method of gypsum-based seal mortar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140910

WD01 Invention patent application deemed withdrawn after publication